![Page 1: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/1.jpg)
THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY
![Page 2: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/2.jpg)
JOBSITE SEDIMENT CONTROL TECHNOLOGY
TECHNOLOGY WAS VIRTUALLY NON-TECHNOLOGY WAS VIRTUALLY NON-EXISTENT JUST A FEW DECADES AGOEXISTENT JUST A FEW DECADES AGO
EARLY SOLUTIONS INVOLVED CREATIVE EARLY SOLUTIONS INVOLVED CREATIVE USE OF EXISTING MATERIALSUSE OF EXISTING MATERIALS
NEW JOB SPECIFIC TECHNOLGY IS NOW NEW JOB SPECIFIC TECHNOLGY IS NOW AVAILABLEAVAILABLE
THERE IS MORE TO COME!THERE IS MORE TO COME!
![Page 3: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/3.jpg)
SEDIMENT
SEDIMENT IS MATTERSEDIMENT IS MATTER
DEPOSITED BY SOMEDEPOSITED BY SOME
NATURAL PROCESSNATURAL PROCESS
![Page 4: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/4.jpg)
SEDIMENT PROBLEMS DEPOSITION ONTO DEPOSITION ONTO
ADJACENT ADJACENT PROPERTYPROPERTY
CLOGGING OF CLOGGING OF DRAINAGE DRAINAGE SYSTEMSSYSTEMS
DEPOSITION INTO DEPOSITION INTO WATERWAYSWATERWAYS
TRACKING ONTO TRACKING ONTO ROADWAYSROADWAYS
![Page 5: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/5.jpg)
SEDIMENT CONTROL TEMPORARY TEMPORARY
MEASURES OR MEASURES OR STRUCTURES STRUCTURES DESIGNED TO DESIGNED TO CONTAIN CONTAIN SEDIMENTSEDIMENT
![Page 6: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/6.jpg)
SEDIMENT CONTROL VS. EROSION CONTROL
SEDIMENT CONTROLSEDIMENT CONTROL COSTLYCOSTLY UNATTRACTIVEUNATTRACTIVE TEMPORARY TEMPORARY HIGH HIGH
MAINTENANCEMAINTENANCE SHOULD BE SHOULD BE
ELIMINATED AS ELIMINATED AS SOON AS POSSIBLESOON AS POSSIBLE
EROSION CONTROLEROSION CONTROL COST EFFECTIVECOST EFFECTIVE ATTRACTIVEATTRACTIVE PERMANENTPERMANENT MINIMAL MINIMAL
MAINTENANCEMAINTENANCE SHOULD BE SHOULD BE
IMPLEMENTED AS IMPLEMENTED AS SOON AS POSSIBLESOON AS POSSIBLE
![Page 7: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/7.jpg)
RACHEL CARSON HER BOOK, HER BOOK, SILENTSILENT
SPRING, SPRING, RELEASED RELEASED IN 1962, BROUGHT IN 1962, BROUGHT WIDESPREAD WIDESPREAD ATTENTION TO THE ATTENTION TO THE ENVIRONMENTAL ENVIRONMENTAL MOVEMENTMOVEMENT
EPA WAS FORMED EPA WAS FORMED IN 1970IN 1970
![Page 8: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/8.jpg)
1969 - CUYAHOGA1969 - CUYAHOGARIVER ON FIRE!RIVER ON FIRE!
CLEVELAND, OHIOCLEVELAND, OHIO
![Page 9: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/9.jpg)
THE CLEAN WATER ACT THE DRIVING FORCE THE DRIVING FORCE
BEHIND A RAPIDLY BEHIND A RAPIDLY GROWING INDUSTRYGROWING INDUSTRY
ENFORCED ENFORCED NATIONALLY BY THE NATIONALLY BY THE ENVIRONMENTAL ENVIRONMENTAL PROTECTION PROTECTION AGENCY (EPA)AGENCY (EPA)
![Page 10: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/10.jpg)
NPDESNATIONAL POLLUTANT DISCHARGE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEMELIMINATION SYSTEM
o PHASE I ENACTED IN 1972PHASE I ENACTED IN 1972o ALL PROJECTS OF FIVE ACRES OR ALL PROJECTS OF FIVE ACRES OR
MORE WERE IMPACTEDMORE WERE IMPACTEDo HAS CREATED A STRONG DEMAND FOR HAS CREATED A STRONG DEMAND FOR
COST EFFECTIVE SOLUTIONSCOST EFFECTIVE SOLUTIONS
![Page 11: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/11.jpg)
SEDIMENTSEDIMENT
CONTROLCONTROL
TECHNOLOGYTECHNOLOGY
![Page 12: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/12.jpg)
SEDIMENT CONTROL COSTLY BUT COSTLY BUT
NECESSARYNECESSARY MUST BE MUST BE
INSTALLED INSTALLED PROPERLYPROPERLY
MUST BE MUST BE MAINTAINEDMAINTAINED
MUST BE REMOVED MUST BE REMOVED ON A TIMELY BASISON A TIMELY BASIS
![Page 13: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/13.jpg)
SEDIMENT CONTROL TIPSI.I. MINIMUM AMOUNT OF MINIMUM AMOUNT OF
SOIL SHOULD BE SOIL SHOULD BE EXPOSED AT ANY EXPOSED AT ANY GIVEN TIMEGIVEN TIME
II.II. DISTURBED AREAS DISTURBED AREAS SHOULD ALSO BE SHOULD ALSO BE KEPT TO A MINIMUMKEPT TO A MINIMUM
III.III. PERMANENT PERMANENT EROSION CONTROL EROSION CONTROL MEASURES SHOULD MEASURES SHOULD BE INSTALLED AS BE INSTALLED AS QUICKLY AS QUICKLY AS POSSIBLE!POSSIBLE!
![Page 14: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/14.jpg)
JOBSITE BASICS
MUST PROTECT:MUST PROTECT: ADJACENT PROPERTYADJACENT PROPERTY
NEARBY STREAMS AND WATERWAYSNEARBY STREAMS AND WATERWAYS ROADWAYSROADWAYS
STORM WATER INLETSSTORM WATER INLETS
![Page 15: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/15.jpg)
PROBLEMS
![Page 16: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/16.jpg)
MORE PROBLEMS
![Page 17: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/17.jpg)
SAY IT’S NOT TRUE
![Page 18: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/18.jpg)
PERIMETER PROTECTION SILT FENCE MOST SILT FENCE MOST
COMMONLY USEDCOMMONLY USED SHOULD BE INSTALLED SHOULD BE INSTALLED
ANYWHERE WHERE ANYWHERE WHERE SEDIMENT COULD SEDIMENT COULD LEAVE PROPERTYLEAVE PROPERTY
THE BE EFFECTIVE IT THE BE EFFECTIVE IT MUST BE INSTALLED MUST BE INSTALLED CORRECTLY AND CORRECTLY AND MAINTAINED MAINTAINED PROPERLYPROPERLY
![Page 19: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/19.jpg)
SILT FENCE INSTALLATION MUST BE MUST BE
TRENCHED IN TO TRENCHED IN TO BE EFFECTIVEBE EFFECTIVE
MACHINE MACHINE INSTALLATION INSTALLATION COMBINES COMBINES INCREASED SPEED INCREASED SPEED WITH SLICING WITH SLICING METHODOLOGYMETHODOLOGY
![Page 20: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/20.jpg)
![Page 21: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/21.jpg)
![Page 22: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/22.jpg)
SILT FENCE NOTES
POSTS CAN BE WOOD POSTS CAN BE WOOD OR STEELOR STEEL
POST QUALITY & POST QUALITY & SPACING & FABRIC SPACING & FABRIC QUALITY ARE QUALITY ARE CRITICAL CRITICAL COMPONENTSCOMPONENTS
WIRE BACK SILT WIRE BACK SILT FENCE SOMETIMES FENCE SOMETIMES SPECIFIEDSPECIFIED
FABRIC WITDTHS VARYFABRIC WITDTHS VARY D. O. T. REQUIREMENTS D. O. T. REQUIREMENTS
VARY STATE TO STATEVARY STATE TO STATE THERE IS A LOT OF THERE IS A LOT OF
POOR QUALITY SILT POOR QUALITY SILT FENCE AROUNDFENCE AROUND
![Page 23: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/23.jpg)
THREE KEYS TO SILT FENCE PERFORMANCE
POST QUALITY POST QUALITY AND AND THICKNESSTHICKNESS
FABRIC FABRIC QUALITYQUALITY
POST SPACINGPOST SPACING
![Page 24: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/24.jpg)
OTHER PERIMETER PROTECTION TOOLS
STRAW WATTLESSTRAW WATTLES EXCELSIOR LOGSEXCELSIOR LOGS COMPOST SOCKSCOMPOST SOCKS ROLLED UP ROLLED UP
SEDIMENT SEDIMENT BARRIERSBARRIERS
![Page 25: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/25.jpg)
STRAW WATTLES 8” TO 20” DIAMETER8” TO 20” DIAMETER AVAILABLE WITH AVAILABLE WITH
PHOTODEGRADABLE PHOTODEGRADABLE NETTINGNETTING
EASY TO INSTALLEASY TO INSTALL A VERSATILE A VERSATILE
SEDIMENT CONTROL SEDIMENT CONTROL TOOLTOOL
![Page 26: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/26.jpg)
ASPEN FIBER LOGS
ASPEN WOOD ASPEN WOOD FIBER LOGSFIBER LOGS
EASY EASY INSTALLATIONINSTALLATION
VARIED USESVARIED USES TYPICALLY 8” – 20” TYPICALLY 8” – 20”
IN DIAMETERIN DIAMETER
![Page 27: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/27.jpg)
COMPOST SOCKS GEOSYNTHETIC GEOSYNTHETIC
TUBE FILLED WITH TUBE FILLED WITH COMPOSTED COMPOSTED MATERIALMATERIAL
DESIGNED FOR DESIGNED FOR BOTH SEDIMENT BOTH SEDIMENT COLLECTION AND COLLECTION AND FILTRATION OF RUN FILTRATION OF RUN OFFOFF
![Page 28: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/28.jpg)
COMPOST BERMS
![Page 29: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/29.jpg)
ROLLED UP SEDIMENT BARRIERS
UNROLLED LENGTHWISE IN THE FIELD, UNROLLED LENGTHWISE IN THE FIELD, THEN ROLLED UP WIDTH WISETHEN ROLLED UP WIDTH WISE
NATIVE MATERIAL SUCH AS LEAVES, NATIVE MATERIAL SUCH AS LEAVES, GRASS CLIPPINGS, ETC. CAN BE ROLLED UP GRASS CLIPPINGS, ETC. CAN BE ROLLED UP TO INCREASE DIAMETERTO INCREASE DIAMETER
![Page 30: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/30.jpg)
PERIMETER PROTECTION NOTEBOOK
ALL MUST BE ALL MUST BE MAINTAINEDMAINTAINED
GEOSYNTHETIC GEOSYNTHETIC PRODUCTS MUST PRODUCTS MUST BE REMOVED AND BE REMOVED AND DISPOSED OF DISPOSED OF PROPERLYPROPERLY
STUDY YOUR STUDY YOUR OPTIONS!OPTIONS!
![Page 31: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/31.jpg)
PERIMETER PROTECTION TRENDS
SPECIFICATIONS SPECIFICATIONS ARE BECOMING ARE BECOMING TIGHTER AND MORE TIGHTER AND MORE JOB SPECIFICJOB SPECIFIC
MORE PAY ITEMS MORE PAY ITEMS AND LESS “LUMP AND LESS “LUMP SUM” SUM” SPECIFICATIONSSPECIFICATIONS
![Page 32: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/32.jpg)
CONCENTRATED FLOWS
DRAINAGE SWALESDRAINAGE SWALES
THE IDEA IS TO SLOW THE IDEA IS TO SLOW DOWN FLOWS AND DOWN FLOWS AND COLLECT SEDIMENTCOLLECT SEDIMENT
HAY BALES AND SILT HAY BALES AND SILT FENCE FENCE SHOULD NOTSHOULD NOT BE USED IN DRAINAGE BE USED IN DRAINAGE SWALESSWALES
![Page 33: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/33.jpg)
ILLINOIS DEPARTMENT OF TRANSPORTATION
EFFECTIVE 1-1-07 EFFECTIVE 1-1-07 THE USE OF EITHER THE USE OF EITHER HAY BALES OR SILT HAY BALES OR SILT FENCE IN FENCE IN CONCENTRATED CONCENTRATED FLOW AREAS WAS FLOW AREAS WAS FORBIDDEN ON ALL FORBIDDEN ON ALL I-DOT PROJECTSI-DOT PROJECTS
NO!NO!
BANNED!BANNED!
![Page 34: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/34.jpg)
OUR LUNCH,OUR LUNCH,NOT YOUR NOT YOUR SEDIMENTSEDIMENTCONTROL!CONTROL!
![Page 35: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/35.jpg)
![Page 36: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/36.jpg)
![Page 37: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/37.jpg)
NOT FOR CONCENTRATED FLOWS!NOT FOR CONCENTRATED FLOWS!
![Page 38: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/38.jpg)
HAY BALES!! FOR LACK FOR LACK OF A OF A BETTER BETTER TOOL!TOOL!
![Page 39: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/39.jpg)
TEMPORARY DRAINAGE SWALE PROTECTION
THE TOP PERFORMING PRODUCTS ON THE THE TOP PERFORMING PRODUCTS ON THE MARKET ARE DESIGNED FOR THIS SPECIFIC MARKET ARE DESIGNED FOR THIS SPECIFIC PURPOSEPURPOSE
ACCEPTABLE PRODUCTS INCLUDE STRAW ACCEPTABLE PRODUCTS INCLUDE STRAW WATTLES AND EXCELSIOR LOGSWATTLES AND EXCELSIOR LOGS
![Page 40: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/40.jpg)
DRAINAGE SWALE TEMPORARY PROTECTION BASICS
DESIGNED TO SLOW DOWN FLOW AND DESIGNED TO SLOW DOWN FLOW AND COLLECT SEDIMENTCOLLECT SEDIMENT
STRUCTURES MUST BE MAINTAINEDSTRUCTURES MUST BE MAINTAINED MUST BE DESIGNED TO BE MUST BE DESIGNED TO BE
OVERTOPPEDOVERTOPPED INSTALLATION MUST NOT ALLOW FOR INSTALLATION MUST NOT ALLOW FOR
STRUCTURES TO BE BYPASSEDSTRUCTURES TO BE BYPASSED
![Page 41: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/41.jpg)
DITCH CHECK NOTES
PRESCRIBED SPACING—BOTTOM OF PRESCRIBED SPACING—BOTTOM OF UPHILL STRUCTURE LEVEL WITH TOP OF UPHILL STRUCTURE LEVEL WITH TOP OF DOWNHILL DITCH CHECKDOWNHILL DITCH CHECK
![Page 42: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/42.jpg)
MANUFACTURED DITCH CHECKS
TECHNOLOGY IS NOW TECHNOLOGY IS NOW AVAILABLE TO DEAL WITH AVAILABLE TO DEAL WITH CONCENTRATED FLOWS!CONCENTRATED FLOWS!
![Page 43: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/43.jpg)
MANUFACTURED DITCH CHECK I
• Constructed of UV Constructed of UV stabilized HDPE or stabilized HDPE or Biodegradable plasticBiodegradable plastic
• LightweightLightweight
• ReusableReusable• Length:Length: 1 m (3.3 ft)1 m (3.3 ft)• Height:Height: 230 mm (9 230 mm (9
in)in)• Width:Width: 270 mm (11 270 mm (11
in)in)• Weight:Weight: 1 kg (2 lbs)1 kg (2 lbs)
![Page 44: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/44.jpg)
MANUFACTURED DITCH CHECK II
KEY FEATURESKEY FEATURES
FRONT APRONFRONT APRON BARRIER SECTIONBARRIER SECTION SPLASH APRONSPLASH APRON OVERLAP AT BOTH OVERLAP AT BOTH
ENDSENDS 7-FOOT SECTIONS7-FOOT SECTIONS
![Page 45: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/45.jpg)
WATTLES AND SOCKS
VERSATILE AND VERSATILE AND EASY TO INSTALLEASY TO INSTALL
TYPICALLY 8” TO TYPICALLY 8” TO 20” PROFILE20” PROFILE
SOME ARE SOME ARE TOTALLY TOTALLY BIODEGRADABLEBIODEGRADABLE
![Page 46: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/46.jpg)
ROCK DITCH CHECKS
A TRADITIONAL A TRADITIONAL PRACTICE—WITH PRACTICE—WITH BOTH PROS AND BOTH PROS AND CONSCONS
CAN BE LEFT IN CAN BE LEFT IN PLACE PLACE PERMANENTLYPERMANENTLY
![Page 47: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/47.jpg)
DITCH CHECK SUMMARY CONCENTRATED FLOWS ON ACTIVE CONCENTRATED FLOWS ON ACTIVE
JOBSITES CREATE A UNIQUE JOBSITES CREATE A UNIQUE PROBLEMPROBLEM
THE MOST EFFECTIVE SOLUTIONS…THE MOST EFFECTIVE SOLUTIONS…
……SLOW DOWN FLOW RATESSLOW DOWN FLOW RATES
……OVERTOP BY DESIGNOVERTOP BY DESIGN
……COLLECT SETTLING SEDIMENTCOLLECT SETTLING SEDIMENT
![Page 48: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/48.jpg)
![Page 49: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/49.jpg)
![Page 50: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/50.jpg)
![Page 51: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/51.jpg)
WATERWAY PROTECTION
DEWATERING DEWATERING BAGSBAGS
WATER WATER INFLATED INFLATED DAMSDAMS
TURBIDITY TURBIDITY CURTAINSCURTAINS
![Page 52: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/52.jpg)
DEWATERING BAGS FILTER FABRIC BAG WITH FILTER FABRIC BAG WITH
SIZED INTAKESIZED INTAKE DESIGNED TO FILL WITH DESIGNED TO FILL WITH
SEDIMENT & RELEASE SEDIMENT & RELEASE WATER THROUGH FILTER WATER THROUGH FILTER FABRIC WALLSFABRIC WALLS
SHOULD NOT BE SHOULD NOT BE INSTALLED OVER INSTALLED OVER DISTURBED SOILSDISTURBED SOILS
DISPOSED OF AFTER DISPOSED OF AFTER FILLING WITH SEDIMENTFILLING WITH SEDIMENT
SIZED TO FIT JOB SIZED TO FIT JOB REQUIREMENTSREQUIREMENTS
![Page 53: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/53.jpg)
WATER INFLATED DAMS
ISOLATE AREAS ISOLATE AREAS THAT MUST BE THAT MUST BE DISTURBED ALONG DISTURBED ALONG WATER WAYSWATER WAYS
CUSTOM DESIGNED CUSTOM DESIGNED AND INSTALLED AND INSTALLED ACCORDING TO ACCORDING TO JOBSITE JOBSITE REQUIREMENTSREQUIREMENTS
![Page 54: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/54.jpg)
TURBIDITY CURTAINS
ALTERNATIVE TO ALTERNATIVE TO WATER INFLATED WATER INFLATED DAMSDAMS
INCORPORATE INCORPORATE CABLES AND CABLES AND WEIGHTS TO WEIGHTS TO SECURE CURTAINS SECURE CURTAINS IN PLACEIN PLACE
![Page 55: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/55.jpg)
POLYMERS
SEDIMENT CONTROLSEDIMENT CONTROLTOOL BOXTOOL BOX
FLOC LOGSFLOC LOGS POWDERPOWDER EMULSIONEMULSION
![Page 56: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/56.jpg)
FLOC LOGS
SOIL PARTICLE REMOVALSOIL PARTICLE REMOVAL USE WHERE TURBID FLOWS OCCURUSE WHERE TURBID FLOWS OCCUR SOIL TESTING IS ESSENTIALSOIL TESTING IS ESSENTIAL
![Page 57: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/57.jpg)
POND SKIMMERS Skims just beneath
the surface—avoiding floating debris
Safely removes cleanest water from sediment basin
![Page 58: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/58.jpg)
![Page 59: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/59.jpg)
STABILIZED CONTRUCTION ENTRANCES
PREVENT TRACKING PREVENT TRACKING OF JOBSITE OF JOBSITE SEDIMENT ONTO SEDIMENT ONTO ADJACENT STREETSADJACENT STREETS
SIZED ROCK AND SIZED ROCK AND GEOTEXTILES OR GEOTEXTILES OR CELLULAR CELLULAR CONFINEMENT CONFINEMENT OFTEN USEDOFTEN USED
![Page 60: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/60.jpg)
STABILIZED ENTRANCES NON-WOVEN NON-WOVEN
GEOTEXILES MOST GEOTEXILES MOST OFTEN USED FOR OFTEN USED FOR SEPARATION & SEPARATION & FILTRATIONFILTRATION
CELLAR CELLAR CONFINEMENT GRID CONFINEMENT GRID FOR LOAD SUPPORT FOR LOAD SUPPORT & DISTRIBUTION& DISTRIBUTION
![Page 61: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/61.jpg)
TRACK OUT DEVICE
![Page 62: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/62.jpg)
WHEEL WASH STATIONS
![Page 63: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/63.jpg)
ADJACENT ROADWAY PROTECTION NOTES
FOR PRACTICAL PURPOSES, FOR PRACTICAL PURPOSES, TEMPORARY ENTRANCE CAN OFTEN TEMPORARY ENTRANCE CAN OFTEN BE CONVERTED TO PERMANENT BE CONVERTED TO PERMANENT ENTRANCEENTRANCE
PROJECT SCOPE AND SITE SPECIFICS PROJECT SCOPE AND SITE SPECIFICS WILL VARY WIDELYWILL VARY WIDELY
KNOW YOUR OPTIONS!KNOW YOUR OPTIONS!
![Page 64: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/64.jpg)
INLET PROTECTION
DESIGNED TO DESIGNED TO PREVENT PREVENT SEDIMENT FROM SEDIMENT FROM ENTERING ENTERING DRAINAGE DRAINAGE SYSTEMSSYSTEMS
MUST BE MUST BE MAINTAINED!MAINTAINED!
![Page 65: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/65.jpg)
INLET PROTECTION TYPESEXTERNALEXTERNAL
DESIGNED TO DESIGNED TO INTERCEPT INTERCEPT SEDIMENT BEFORE SEDIMENT BEFORE IT ENTERS THE IT ENTERS THE STORM DRAIN STORM DRAIN STUCTURESTUCTURE
INTERNALINTERNAL
DESIGNED TO DESIGNED TO FILTER STORM FILTER STORM WATER AFTER IT WATER AFTER IT ENTERS THE ENTERS THE STRUCTURESTRUCTURE
![Page 66: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/66.jpg)
INLET PROTECTION TOOLS
WOOD FIBER LOG WOOD FIBER LOG INLET PROTECTIONINLET PROTECTION
MANUFACTURED MANUFACTURED GEOTEXTILE INLET GEOTEXTILE INLET FILTERSFILTERS
![Page 67: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/67.jpg)
INLET PROTECTION TOOLS INLET FILTER—INLET FILTER—
METAL FRAME; METAL FRAME; GEOTEXTILE GEOTEXTILE FILTERFILTER
SILT BAG—SILT BAG—INTERNAL INTERNAL FILTRATION FILTRATION DEVICEDEVICE
![Page 68: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/68.jpg)
EVOLUTION OF EXTERNAL INLET PROTECTION PRODUCTS
I.I. SILT FENCE, HAY BALES, WATTLES, SILT FENCE, HAY BALES, WATTLES, SAND BAGS, ETC.SAND BAGS, ETC.
II.II. MONOFILAMENT GEOTEXTILESMONOFILAMENT GEOTEXTILES
III.III. MONOFILATMENT GEOTEXTILE MONOFILATMENT GEOTEXTILE MANUFACTURED PRODUCTSMANUFACTURED PRODUCTS
IV.IV. THREE DIMENSIONAL THREE DIMENSIONAL MANUFACTURED PRODUCTSMANUFACTURED PRODUCTS
![Page 69: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/69.jpg)
EXTERNAL INLET PROTECTION
![Page 70: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/70.jpg)
INLET PROTECTION BOTTOM LINE
ASK TOUGH ASK TOUGH QUESTIONS!QUESTIONS!
LONGEVITYLONGEVITY DURABILITYDURABILITY FLOWABILITYFLOWABILITY SEDIMENT SEDIMENT
REMOVAL REMOVAL CAPABILITIESCAPABILITIES
![Page 71: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/71.jpg)
OTHER TOOLS
TEMPORARY TEMPORARY DIVERSION DIVERSION CHANNELSCHANNELS
SEDIMENT SEDIMENT TRAPSTRAPS
TEMPORARY TEMPORARY BASINSBASINS
![Page 72: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/72.jpg)
KEY POINTS SEDIMENT CONTROL IS TEMPORARY AND SEDIMENT CONTROL IS TEMPORARY AND
VERY EXPENSIVEVERY EXPENSIVE EROSION CONTROL PROVIDES PERMANENT EROSION CONTROL PROVIDES PERMANENT
SOLUTIONSSOLUTIONS
THEREFORE: MINIMIZE DISTURBANCE IN THEREFORE: MINIMIZE DISTURBANCE IN TERMS OF BOTH TIME AND AREA AND TERMS OF BOTH TIME AND AREA AND
INSTALL PERMANENTINSTALL PERMANENT
EROSION CONTROL AS SOON AS POSSIBLE!EROSION CONTROL AS SOON AS POSSIBLE!
![Page 73: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/73.jpg)
SPECIFICATIONS
SHOULD INCLUDE PAY SHOULD INCLUDE PAY ITEMS—FOR ITEMS—FOR ACCOUNTABILITY SAKE!ACCOUNTABILITY SAKE!
LUMP SUM = NO SUMLUMP SUM = NO SUM
![Page 74: THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY](https://reader036.vdocuments.net/reader036/viewer/2022062409/56649d055503460f949d871f/html5/thumbnails/74.jpg)
REMEMBER!
WHEN WE WHEN WE SEND SEND WATER WE SEND THE WATER WE SEND THE WORKS! -- INCLUDING WORKS! -- INCLUDING
SEDIMENT AND SEDIMENT AND POLLUTANTS!!POLLUTANTS!!