Third & Fourth StreetTraffic Calming Study
Community Workshop #1August 6, 2014
![Page 2: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/2.jpg)
Overview of Workshop & Summary of Previous Community Input
![Page 3: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/3.jpg)
6:00 to 6:30 Open House
6:30 to 6:45 Welcome and Project Background
6:45 to 7:30 Presentation of Alternatives (Fehr & Peers)
7:30 to 8:00 Sticky Dot Exercise & Closing Remarks
![Page 4: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/4.jpg)
• Understand the Goals & Scope of Work for the Traffic Calming Study
• Present the Results of the Existing Conditions & Alternatives Analysis
• Address Ideas and Concerns Raised During December Workshop & Follow Up Survey
• Provide Feedback on the Alternatives Developed
![Page 5: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/5.jpg)
Policy: Maximize the existing arterial and collector street system to accommodate commuter traffic while reducing traffic intrusion into residential neighborhoods (adopted by the City Council on August 5, 2004)
![Page 6: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/6.jpg)
1992 – Utilities on Third and Fourth Streets were placed underground.
1995 – Pomona Avenue near Glorietta Place was redesigned.
2002 – Caltrans overlayed Third and Fourth Streets with rubberized asphalt.
-- Semi-diverters prohibiting left turns onto A, B and C Avenues from Third Street were installed. (Removed in January 2005)
-- Travel lanes were narrowed to 11 feet in width and on-street parking was added on the south side of Third Street and the north side of Fourth Street.
2005 – 25 MPH speed limit was established on all segments of Third and Fourth Streets.
2007 – Navy opened the Third Street Gate.
2011 – Bulbouts were installed on Third Street at F and H Avenues and on Fourth Street at B Avenue.
![Page 7: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/7.jpg)
May 2014
City awards contract
February 2014
City issues Request for Proposals
November 2013 through January 2014
Two public surveys and a workshop to gather resident input
September 2013
City Council approves the study and funding
April 2013Coronado Transportation Commission proposes the study
![Page 8: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/8.jpg)
Initial Survey
November 2013
• 301 respondents
• Provided insight into the
concerns of residents
regarding the issues with
the traffic on Third and
Fourth Streets
• Provided input on
potential support for
specific traffic calming
measures.
Workshop
December 9, 2013
• 100 attendees briefed
on key issues:
• Navy initiatives to reduce
traffic volume
• Existing speed limits and
traffic speeds on Third
and Fourth Streets
• Traffic enforcement
activities and resources
• City’s traffic circulation
plan and goals
• Completed and planned
improvements to Third
and Fourth Streets
• Discussion of survey
results
Follow-up Survey
After the Workshop
• 123 respondents
• Provided their opinions
regarding specific traffic
calming measures.
![Page 9: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/9.jpg)
Initial Survey Results: Percentage of Respondents Who Feel it is “Important” to Solve This Issue
Slide 1 of 2
90.3%
87.1%
87.1%
87.1%
83.9%
83.9%
53.5%
76.7%
67.4%
34.9%
79.1%
69.8%
65.9%
70.5%
79.5%
65.9%
61.4%
81.8%
71.7%
89.1%
60.9%
47.8%
82.6%
63.0%
Difficulty crossing or turning onto 4th Street
Speed of traffic on 4th Street
Speed of traffic on 3rd Street
Difficulty crossing or turning onto 3rd Street
PM rush hour traffic congestion on 4th Street
Failure of traffic to yield to pedestrians crossing 3rd Street
Bridge Side
NASNI Side
3rd Street
4th Street
20% 40% 60% 80%
![Page 10: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/10.jpg)
Initial Survey Results: Percentage of Respondents Who Feel it is “Important” to Solve This Issue
Slide 2 of 2
80.6%
71.0%
71.0%
67.7%
61.3%
61.3%
83.7%
67.4%
34.9%
48.8%
53.5%
44.2%
81.8%
50.0%
54.5%
75.0%
70.5%
54.5%
78.3%
69.6%
58.7%
47.8%
47.8%
80.4%
Failure of traffic to yield to pedestrians crossing 4th Street
Cars blocking the intersections and alleys on 4th Street
Cars blocking the intersections and alleys on 3rd Street
AM rush hour traffic congestion on 3rd Street
Noise created by traffic on 3rd Street
Noise created by traffic on 4th Street
Bridge Side
NASNI Side
3rd Street
4th Street
20% 40% 60% 80%
![Page 11: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/11.jpg)
• Failure of traffic to yield to pedestrians
• Difficulty crossing or turning onto Third and Fourth Streets from side streets
• Noise created by the traffic
• Cars blocking the intersections and alleys on Third and Fourth Streets
![Page 12: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/12.jpg)
• Adding traffic signals• Creating parkways along Third and Fourth Streets• Installing additional bulbouts• Reducing the width of the travel lanes• Increasing the length of red curbs• Raising the height of the pavement at crosswalks or
intersections• Marking intersections “Keep Clear”• Installing pedestrian activated warning lights• Installing speed bumps
![Page 13: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/13.jpg)
Existing
Conditions
Evaluate Travel
Time
Field
Observations
Review Survey
Results
Identify
Alternatives
Identify
Potential Tools
Develop Three
Alternatives
Technical
Analysis of
Alternatives
Community
InputMeeting #1
Community
SurveyMeeting #2
Revisions &
Reporting
Identify
Recommended
Alternatives
Technical
Analysis of
Preferred
Alternative
Present to
Transportation
Commission &
City Council
![Page 14: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/14.jpg)
Traffic Calming: Reduce the actual speed of the traffic on Third and Fourth Streets to 25 mph
Mobility: Achieve a segment Level of Service (LOS) on Third and Fourth Streets of “C” during non-peak periods and “D” during the peak traffic hour while not increasing the volume of traffic or further delaying the traffic diverted onto adjacent streets during the AM and PM peak rush hours
Resident Concerns: Respond to the additional concerns with the traffic on Third and Fourth Streets and the concerns raised regarding specific measures
![Page 15: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/15.jpg)
Traffic Data
Travel Time
Pedestrian & Bicycle Connectivity
![Page 16: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/16.jpg)
![Page 17: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/17.jpg)
![Page 18: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/18.jpg)
![Page 19: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/19.jpg)
Operating Condition:
AcceptableMarginalFailing
![Page 20: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/20.jpg)
![Page 21: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/21.jpg)
Marked CrosswalkSchool CrosswalkKey Pedestrian CorridorsBicycle Paths/Routes
![Page 22: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/22.jpg)
Traffic calming tools aim to reduce speeds and cut through traffic using physical measures to change driver behavior
![Page 23: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/23.jpg)
Purpose: Improve North-South Access Across the Corridor
![Page 24: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/24.jpg)
Narrow the roadway by extending curb beyond parked vehicles either at intersections or midblock
![Page 25: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/25.jpg)
Purpose: Maintain 25 mph travel speed during free-flow conditions. Most effective when combined with other tools.
![Page 26: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/26.jpg)
Purpose: Reduce capacity to reduce speeds during non-peak conditions
![Page 27: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/27.jpg)
Purpose: Reduce capacity to reduce speeds during non-peak conditions
![Page 28: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/28.jpg)
Tools aimed at improving the walking and bicycling environment along the corridor
![Page 29: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/29.jpg)
Purpose: Improve the driver awareness of marked crosswalks at intersections
![Page 30: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/30.jpg)
Purpose: Provide for minimum 8-9’ paved surface that pedestrians and bicycles can share
![Page 31: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/31.jpg)
Purpose: Provide shade and aesthetic improvements
![Page 32: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/32.jpg)
Purpose: Provide clear zone at intersections to improve visibility of pedestrians and bicyclist waiting to cross the street
Keep
Clear
![Page 33: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/33.jpg)
Roundabouts
Chicanes
Angled Parking
Hawk Signals
![Page 34: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/34.jpg)
Four elements included in all alternatives that provide safety, access and operational benefits to the corridor
![Page 35: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/35.jpg)
Traffic Signals at Alameda
Traffic Signals at B
![Page 36: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/36.jpg)
Keep Clear at 4th
& D
Keep Clear at 3rd
& C
![Page 37: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/37.jpg)
Intersection modifications at Glorietta Place
![Page 38: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/38.jpg)
Traffic Signal Alternative
![Page 39: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/39.jpg)
Traffic Signals at◦ Alameda Boulevard **
◦ F Avenue
◦ H Avenue
◦ B Avenue **
◦ Glorietta Boulevard (no left access)
(** = Common to All Alternatives)
![Page 40: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/40.jpg)
Intersection Reconfiguration at Palm Avenue to Reduce Pedestrian Crossing Distance
![Page 41: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/41.jpg)
Operating Condition:
Acceptable
Marginal
Failing
Improved
over Existing
Increase in
travel time
Decrease in
travel time
x
x
![Page 42: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/42.jpg)
Mode of
Travel
Benefit Assessed West of
Orange
East of
Orange
Automobile Improve Ability to Cross Third & Fourth Street?
Increase in Delay or Travel Time on Third/Fourth?
Reduces Off-Peak Traffic Speeds?
Pedestrian Increases Number of Controlled Crosswalks?
Improves Walking Environment by Widening
Sidewalks?
Improved Visibility of Pedestrians to Drivers?
Bicycle Increases Number of Controlled Crossing
Locations?
Provides Dedicated or Combined Off-Street
Bicycling Facility?
Significant Improvement
Moderate Improvement
About the Same
![Page 43: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/43.jpg)
Traffic Signals Timed for 25 mph Travel Speed
Existing SpeedEstimated SpeedTraffic SignalVertical Deflection
34
(25)
![Page 44: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/44.jpg)
Traffic Calming Alternative
![Page 45: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/45.jpg)
WEST of ORANGE
Lane Reduction: Alameda Boulevard to D Avenue
Intersection Reconfiguration at Palm Avenue
High Visibility Raised Crosswalks
![Page 46: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/46.jpg)
![Page 47: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/47.jpg)
EAST of ORANGE
![Page 48: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/48.jpg)
Operating Condition:
Acceptable
Marginal
Failing
Improved
over Existing
Increase in
travel time
Decrease in
travel time
x
x
![Page 49: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/49.jpg)
Mode of
Travel
Benefit Assessed West of
Orange
East of
Orange
Automobile Improve Ability to Cross Third & Fourth Street?
Increase in Delay or Travel Time on Third/Fourth?
Reduces Off-Peak Traffic Speeds?
Pedestrian Increases Number of Controlled Crosswalks?
Improves Walking Environment by Widening
Sidewalks?
Improved Visibility of Pedestrians to Drivers?
Bicycle Increases Number of Controlled Crossing
Locations?
Provides Dedicated or Combined Off-Street
Bicycling Facility?
Significant Improvement
Moderate Improvement
About the Same
![Page 50: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/50.jpg)
Speed Tables/ Raised Crosswalks Designed for 20-25 mph Travel Speed
Existing SpeedEstimated SpeedTraffic SignalVertical Deflection
34
(25)
![Page 51: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/51.jpg)
Pedestrian & Bicycle Focus Alternative
![Page 52: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/52.jpg)
WEST of ORANGE
Wider Sidewalks by Removing Parking
New Traffic Signals at:◦ Palm Avenue
◦ Third Street & F Avenue
Raised Crosswalks along F Avenue at Fourth Street & Palm Avenue
![Page 53: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/53.jpg)
![Page 54: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/54.jpg)
EAST of ORANGE
Bulb Outs at C Street & A Street
Traffic Signal at Glorietta Boulevard (no left turn access)
![Page 55: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/55.jpg)
Operating Condition:
Acceptable
Marginal
Failing
Improved
over Existing
Increase in
travel time
Decrease in
travel time
x
x
![Page 56: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/56.jpg)
Mode of
Travel
Benefit Assessed West of
Orange
East of
Orange
Automobile Improve Ability to Cross Third & Fourth Street?
Increase in Delay or Travel Time on Third/Fourth?
Reduces Off-Peak Traffic Speeds?
Pedestrian Increases Number of Controlled Crosswalks?
Improves Walking Environment by Widening
Sidewalks?
Improved Visibility of Pedestrians to Drivers?
Bicycle Increases Number of Controlled Crossing
Locations?
Provides Dedicated or Combined Off-Street
Bicycling Facility?
Significant Improvement
Moderate Improvement
About the Same
![Page 57: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/57.jpg)
Traffic Signals & Raised Crosswalks Designed to Maintain 25 mph Speed
Existing SpeedEstimated SpeedTraffic SignalVertical Deflection
34
(25)
![Page 58: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/58.jpg)
Review Concepts & Share Likes/Dislikes
Comment Cards
Community On-Line Survey
Follow Up Workshop with Preferred Alternative
Meetings with Caltrans
Cost Estimates
Reports & Presentations to Transportation Commission and City Council
![Page 59: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/59.jpg)
6 green dots
3 red dots
Green: I like this element of the plan
Red: l do not like this element of the plan
![Page 60: Third & Fourth Street Traffic Calming Study](https://reader034.vdocuments.net/reader034/viewer/2022051412/627e02b4c15fc02cf81613f3/html5/thumbnails/60.jpg)
For Additional Information:
Dave Johnson, Project Manager
Dawn Wilson, Project Manager