Transcript
Page 1: Topsides installation options for semi-submersible floating production systems

Topsides installation optionsfor semi-submersible floating production systems

Niels HaakmanGeneral Manager, TAISUN divisionYantai Raffles Offshore Ltd

Page 2: Topsides installation options for semi-submersible floating production systems

Among Floating Production Units the (deep draft) semisub is increasingly popular

Source: Offshore Engineer – May 2009

Page 3: Topsides installation options for semi-submersible floating production systems

For these, you have to make the important decision of topsides installation

Source: Offshore Engineer – May 2009

Page 4: Topsides installation options for semi-submersible floating production systems

You have to address this early in your project

Page 5: Topsides installation options for semi-submersible floating production systems

You have to address this early in your project

Page 6: Topsides installation options for semi-submersible floating production systems

float over

heavy liftskidding

taisun

Page 7: Topsides installation options for semi-submersible floating production systems

Hull deeply submerged

Topsides loaded on barge or self

floating

Mating by (de)ballasting

Float over

Page 8: Topsides installation options for semi-submersible floating production systems

Proven since the 1980s

No modifications required on

topsides

Topsides can be fully completed

Float over

Page 9: Topsides installation options for semi-submersible floating production systems

Damage stability requires many compartments

Restricted access, especially offshore

Complex, risky operation

Float over

Page 10: Topsides installation options for semi-submersible floating production systems

Hull kept at design draft

Topsides lifted from barge,

usually in pieces

Limited to about 12,000 tonsHeavy lift

Page 11: Topsides installation options for semi-submersible floating production systems

Less risky than float over

Very capable external partners

No modifications to the hull requiredHeavy lift

Page 12: Topsides installation options for semi-submersible floating production systems

Installation window narrow and expensive

Offshore hook up is expensive, cumbersome

Heavy lift

Page 13: Topsides installation options for semi-submersible floating production systems

Installation window narrow and expensive

Offshore hook up is expensive, cumbersome

Massive engineering

effort requiredHeavy lift

Page 14: Topsides installation options for semi-submersible floating production systems

Topsides built or jacked to height

skidding

Page 15: Topsides installation options for semi-submersible floating production systems

Topsides built or jacked to height

Hull skidded under topsides

skidding

Page 16: Topsides installation options for semi-submersible floating production systems

Hull skidded under topsides

Topsides built or jacked to height

skiddingTopsides skidded

on top of hull

Page 17: Topsides installation options for semi-submersible floating production systems

Topsides can be fully completed

Integration can take place at the

yard

Full access for all staff skidding

Page 18: Topsides installation options for semi-submersible floating production systems

Requires special structure

Jacking very high, especially for

deep draft semi’s

Massive engineering

effort required skidding

Page 19: Topsides installation options for semi-submersible floating production systems

Lift plates installed on deck

TAISUN

Page 20: Topsides installation options for semi-submersible floating production systems

Lift plates installed on deck

TAISUN

Page 21: Topsides installation options for semi-submersible floating production systems

Lift plates installed on deck

Topsides lifted from barge in one

module

TAISUN

Page 22: Topsides installation options for semi-submersible floating production systems

Lift plates installed on deck

Topsides lifted from barge in one

module

Hull towed into position

TAISUN

Page 23: Topsides installation options for semi-submersible floating production systems

Full access for all staff

TAISUN

Page 24: Topsides installation options for semi-submersible floating production systems

Full access for all staff

Lifting is not a design criterion

TAISUN

Page 25: Topsides installation options for semi-submersible floating production systems

Full access for all staff

Lifting is not a design criterion

Full integration can take place at

yard

TAISUN

Page 26: Topsides installation options for semi-submersible floating production systems

Lift plates require free space on

deck

Maximum lifting height of 80

meters

Draft limited to dock depth

TAISUN

Page 27: Topsides installation options for semi-submersible floating production systems

Mating cost

Completed topsides

Yard integration

Engineering impact

Page 28: Topsides installation options for semi-submersible floating production systems

Are you planning your new floating production system?