Download - Tri-Rail Final
-
7/30/2019 Tri-Rail Final
1/124
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miam
Brow
Tri-Rail Coastal LinkStation AreaOpportunities
-
7/30/2019 Tri-Rail Final
2/124
Acknowledgements
The South Florda Regonal Transportaton Authorty would lke to acknowledge
the Coastal Ctes or ther work preparng or Tr-Ral Coastal Lnk passenger ral
serce along the Florda East Coast ralway corrdor. We hope that ths book tellsthe story about how your communty wll benet rom the Tr-Ral Coastal Lnk.
South Florda Regonal Transportaton Authorty800 NW 33rd Street
Pompano Beach, FL 33064
www.srta..go
www.tr-ral.com
Report Prepared by
Aprl 2013
i
-
7/30/2019 Tri-Rail Final
3/124
TOD Booklet Purpose
TOD and Tr-Ral 1Sezng the TOD Opportunty 2How Wll the Regon Benet rom Tr-Ral Coastal Lnk? 5
Oerew o TOD 7What s Transt-Orented Deelopment? 7Benets o TOD 7Prncples or Successul TOD 8
TOD Tmelne 10
Creatng TOD: Staton Typologes 13Staton Typologes 14
Proposed Statons 21
Exstng Tr-Ral Statons 79
Contents
ii
-
7/30/2019 Tri-Rail Final
4/124
Bscayne Bouleard, Mam
-
7/30/2019 Tri-Rail Final
5/124
Much work has been done by the communtes along the Florda East Coast ralway
n antcpaton o Tr-Ral Coastal Lnk passenger serce. Many communtes hae
engaged ther ctzens n dscussons about ther son or the staton areas, andhow these staton areas can connect to key destnatons n ther towns. Ths booklet
s ntended to summarze the work that has been prepared to date and prode
normaton about the deelopment potental or each staton area. The book s
dded nto e sectons:
1. TOD and Tr-Ral prodes an oerew o the opportunty to mplement TOD
along the Tr-Ral Coastal Lnk corrdor.
2. Oerew o TOD ntroduces the concept o TOD, ts benets, and prncples or
success.
3. Creatng TOD: Staton Typologes recommends TOD typologes that can be
appled to statons along the corrdor.
4. Proposed Statons prodes specc analyss or the statons along the proposed
Tr-Ral Coastal Lnk corrdor.
5. Exstng Tr-Ral Statons prodes specc analyss or the statons along the
exstng Tr-Ral corrdor.
TOD Booklet Purpose
iv
-
7/30/2019 Tri-Rail Final
6/124
Mzner Park, Boca Raton
-
7/30/2019 Tri-Rail Final
7/124
Rdng Tr-Ral s the preerred mode o transportaton or many throughout South
Florda. Wth the addton o the proposed Tr-Ral Coastal Lnk, ths preerence wll
grow stronger. The Tr-Ral Coastal Lnk s antcpated to ncrease access to transtor thousands o people who le and work along the Southeast Florda Coastlne.
More than a means to get rom pont A to pont B, the Tr-Ral Coastal Lnk captal
nestment connects lablty, moblty, and transt by expandng the regonal
transt network n Southeast Florda. The Tr-Ral Coastal Lnk prodes greater
access to multple destnatons wthn numerous ctes, neghborhoods, and
actty centers between Jupter n Palm Beach County and downtown Mam. it
also connects the exstng Tr-Ral serce n the South Florda Ral Corrdor along
i-95 to the hstorc cty centers along US 1. Currently, only 16 percent o the jobs
wthn the regon are reachable a transt n less than 90 mnutes. Wth the Tr-Ral
Coastal Lnk, downtown areas and neghborhoods wll now be drectly accessbleby regonal passenger ral. improed access makes the area more attracte to
busnesses and mproes the qualty o le or resdents.
Ths report explores the potental o the communtes sered by the Tr-Ral Coastal
Lnk to leerage the transt nestment. They can draw people nto ther communtes
by creatng new, brant lable places around the transt statons. Known as Transt
Orented Deelopment (TOD), ths walkable, mxed-use deelopment pattern can
transorm an auto-dependent place nto one wth alue and character: a place
people want to be.
Section 1
TOD and Tri-Rail
1
-
7/30/2019 Tri-Rail Final
8/124
11th Street - Miami36th Street - Miami
79th Street - Miami
Toney Penna - Jupiter
192nd Street - Aventura
Park Avenue - Lake Park
Government Center - Miami
125th Street - North Miami
Lake Avenue - Lake Worth
13th Street - Riviera Beach
Atlantic Avenue - Delray Beach
Hollywood Boulevard - Hollywood
NE 2nd Street - Boca Raton
SE 4th Street - Hallandale Beach
163rd Street - North Miami Beach
Atlantic Boulevard - Pompano Beach
PGA Boulevard - Palm Beach Gardens
38th Street - Oakland Park Boulevard
26th Street - Wilton Manors
Ft.Lauderdale - HollywoodInternational Airport
Evernia Street - West Palm Beach
Boynton Beach Boulevard -Boynton Beach
Government Center (Broward Blvd) -Fort Lauderdale
45th Street - West Palm Beach
Gregory Road - West Palm Beach
Hillsboro Boulevard - Deereld Beach
Dania Beach - Dania Beach
55th Street - Miami
Mangonia Park
West Palm Beach
Lake Worth
Boynton Beach
Delray Beach
Boca Raton
Deereld Beach
Pompano Beach
Cypress Creek
Ft.Lauderdale
Ft.LauderdaleHollywood
International AirportSheridan Street
Hollywood
Opa Locka
Golden Glades
ah Market
Tri-Rail/MetrorailTransfer
miAirport
RegionalRail
PALM BEACH
BROWARD
MIAMI-
DADE
Sezng the TOD OpportuntyThe 28 proposed staton locatons or the Tr-Ral
Coastal Lnk on the Florda East Coast Ralway ary
sgncantly n character, creatng unque attrbutes and
market potental or TOD. They also present a arety
o deelopment types, ncludng greeneld stes, low-
densty suburban communtes, downtown busness
dstrcts, and hgh-densty urban deelopment. Ths
arety prodes opportunty, as does the permanent
nature o xed-gudeway transt. Fxed-gudeway
transt has sgncantly greater potental oer bus
transt to catalyze deelopment because t s seen as a
permanent nestment n a corrdor.
The Tr-Ral Coastal Lnk Staton Area Market and
Economc Analyss report ndcates that between 2015
and 2025, the staton locatons hae an ncremental
aluebased on deelopment and unt alues
o approxmately $2.66 bllon, whch equates to
approxmately 4,100 addtonal dwellng unts and
8.5 mllon addtonal square eet o commercal
deelopment.
To realze ths regonal benet, howeer, the transt
system must hae the ollowng key attrbutes:
The qualty o the tran experence must be hghenough that people are wllng to leae thecomort o ther automobles.
There must be sgncant tme sangs realzed bytakng the commuter ral tran oer drng.
in less deeloped areas, there must be parkngaalable at the staton stes.
2 Secton 1: TOD and Tr-Ral
-
7/30/2019 Tri-Rail Final
9/124
Wthn the proposed Tr-Ral Coastal Lnk corrdor, the oundaton on whch to
buld TOD already exsts. Boca Raton, Delray Beach, Lake Worth, and Hollywood are
communtes bult on grds o streets ormng the backbone o walkable urbansm.
West Palm Beach, Fort Lauderdale, 54th Street, 36th Street n Mdtown Mam, and
downtown Mam all hae walkable, mxed-use centers wth a arety o housng
choces.
Midtown Miami
increased Desre orWalkable Urban CentersWalkable places hae a hgher alue than
places that are non-walkable. A 2012 Brookngs
insttuton study o walkablty n the Washngton,
DC, regon ound that on a scale o 1 (completely
non-walkable) to 5 (ery walkable), renters would
pay about $300 more or an apartment that scored
a 2 oer a 1 and $1,200 more or an apartment
that scored a 5. Each step on the scale equated to
an 80-percent ncrease n retal sales and a $9-per-
square-oot ncrease n oce space.Washington, DC
3
-
7/30/2019 Tri-Rail Final
10/124
Natonally, the market or TOD s strong. More and more people preer to le n
urban centers that are compact, walkable, and hae a mx o uses and serces
the exact type o place that TOD creates. Currently, the demand ar exceeds the
supply: accordng to a 2011 artcle n The Atlanticmagazne, a thrd o Amercan
households want to le where they can own ewer cars, but less than 10 percent
can nd housng n these locatons.
Market demand s expected to grow as baby boomers age and younger generatons
embrace a more urban lestyle that does not nclude rely on ownng a car.
Accordng to AARP, by 2030, 20 percent o Amercans wll be oer the age o 65, o
whch one n e wll not dre. Between 2001 and 2009, the aerage annual ehclemles traeled or young people decreased by 23 percent (based on a 2012 study
by the US Publc interest Research Group and the Fronter Foundaton). Accordng
to research by the Center or Transt-Orented Deelopment, by 2030, 25 percent o
people n the rental or housng market wll be seekng housng near transt.
West Palm Beach
Hollywood
Cities and
neighborhoods
with the highestland values are
those where
people can
easily interact
and connect
both within
neighborhoods
and todestinations
outside and they
have held their
land value even
in the recession.
~ Are We There Yet? Creating
Complete Communitiesor 21st Century America
(Reconnecting America)
4 Secton 1: TOD and Tr-Ral
-
7/30/2019 Tri-Rail Final
11/124
Economic Benefts:
$580 million in new residential development
$850 million in new commercial development
$18 million in tax revenue rom new development
5,000 new construction jobs
$250 million in labor income $630 million in overall economic output
28,000 new permanent jobs
Transportation Benefts:
$140 million in time savings
$12 million in uel savings
$11 million in vehicle operating savings
Regional Mobility: Signifcantly increase regional mobilitywhere only
16 percent o jobs are reachable via transit in less than 90
minutes
Environmental Benefts:
The service will reduce vehicular emissions by
approximately2,300 tons o CO2
per year
Fiscal Conditions: Cost o public inrastructure and services reduced through
more compact, mixed-use development and the ability to
create a more stable and higher-value regional real estate
market as a result o greater transit proximity or new and
existing properties in station areas
How Wll the Regon Benetrom Tr-Ral Coastal Lnk?
5
-
7/30/2019 Tri-Rail Final
12/124
CtyPlace, West Palm Beach
-
7/30/2019 Tri-Rail Final
13/124
What s Transt-Orented Deelopment?
Transt-Orented Deelopment algns transt nestments wth a communtysson or how t wants to grow. Characterzed by a mx o uses, more-ntense
deelopment, and walkable streets wthn a mle o transt (a typcal 10-mnute
walk), TOD promotes actty around the clock and brngs potental rders closer to
transt acltes.
TOD enables people who le and work there to walk more, use transt more, and
own ewer cars than the rest o the larger communty. People who le n a TOD are
e tmes more lkely to commute by transt than other resdents. Locatons next
to xed-gudeway systems, such as Tr-Ral corrdors, also mantan land alue as
experenced durng the recent recesson.
Benets o TODCommuntes can make sgncant progress toward mprong ther qualty o le by
lnkng transt and land use. TODs ncrease moblty choce and reduce transportaton
costs. By creatng actty nodes lnked by transt, TOD creates more optons or
trael, especally or those who cannot or choose not to use a car. Resdents lng
n transt-rch neghborhoods spend 16 percent less on transportaton than those
lng n auto-dependent neghborhoodsaccordng to a study by the Center
or Transt-Orented Deelopmentsang an aerage o $9,500 per household.
Snce transportaton s the second-largest household expense, the reducton n
transportaton costs efectely ncreases dsposable household ncome.
TOD ncreases health benets and publc saety by makng walkng more
conenent than drng and prodng nrastructure that supports walkng and
bkng. Accordng to recent studes, people who le n neghborhoods wthn
an easy walk o shops and busnesses are 7 percent less lkely to be obese. The
ncreased actty prodes eyes on the street throughout the day and eenng,
thus helpng to ncrease saety or pedestrans, transt users, and others.
Section 2
Overview o TOD
Source: Center or Transit-
Oriented Development
Transit-Rich Neighborhood
Average US Family
Auto-Dependent
Neighborhood
59
49
433225
3219
329
Percentage Expenditure:
Transportation
Housing
Other Expenses
Transt AccessReduces
Transportaton
Costs and increases
Dscretonary income
7
-
7/30/2019 Tri-Rail Final
14/124
Prncples or Successul TOD
Plannng and mplementng successul TOD noles many small decsons that drectly nuence the landuse, crculaton, urban orm, and oerall perormance o a place. Six basic principles defne the essential
characteristics o successul TODs. Whle these prncples should be appled to create a transt-supporte
enronment surroundng each o the staton areas, TOD must be customzed to be compatble wth a
communtys character and aspratons.
1Medum- to hgh-
densty deelopmentDensty s about scale, wth
the goal o creatng a compact
walkable dstrct. TOD has a hgher
net aerage densty than the
communty aerage, wth hghest
denstes located closest to the
transt staton. Hgher denstes
ncrease rdershp by prodng
access to more people, and create
an acte place where people want
to be.
2A mx o land usesConcentratng a mx o land
uses creates an nterestng place
wth a arety o destnatons
allowng people to le, work,
and play n the same place. A
transt-supporte enronment
ncludes a mx o resdental,
commercal, serce, employment,
and publc uses. Employment uses
should be located closer to transt:
people are wllng to walk urther
to get to ther homes.
3Compact, hgh qualtypedestran-orentedenronmentEery transt trp starts and ends
wth a pedestran trp. Calmng
streets by reducng trac speeds,actatng the street wth acte
ground-oor uses, and addng
amentesstoreront wndows,
awnngs, archtectural eatures,
lghtng, and landscapnghelp
create a comortable pedestran
enronment.
8 Secton 2: Oerew o TOD
-
7/30/2019 Tri-Rail Final
15/124
4An acte dened
centerDened centers create an 18-hour place by oferng multple
attractons and reasons or
pedestrans to requent the area
both day and nght. Centers must
hae both a dense mx o uses and
a sense o place and communty
so that people choose to gather
there. A cohese, acte center
can be created by plannng TOD
as a dstrct rather than nddualprojects.
5Lmted, managedparkngAbundant and nexpense
parkng motates people to
dre rather than use transt. By
creatng a more managed parkng
supply and mong parkng rom
surace parkng lots to on-street
parkng and structures, resdents,
shoppers, and employees are
encouraged to use transt and
to walk once they reach ther
destnaton.
6Publc leadershpThe publc sector must lead the
TOD efort beore the prate
sector s wllng to commt tme
and money. Publc leadershp s
needed rom when a staton area
s beng deeloped throughout
the le span o the staton area.
A collaborate and enablng
approachwth the use o new
nnoate tools to complement
and enhance plannng
efortsmakes or successul
mplementaton.
9
-
7/30/2019 Tri-Rail Final
16/124
TOD TmelneTOD s an eolutonary process: deelopment n the rght orm, uncton, and locaton does not occuroernght. Plannng begns well beore transt constructon s underway and serce commences. it can
take years, sometmes decades, or plannng and deelopment to achee hgh-perormng TOD. Generally
speaking, there are fve key phases involved in creating successul TOD.TOD plannng and deelopment
should progress at the same pace as the plannng and deelopment o the transt project. As the certanty o
the transt nestment ncreases, so should the strength o the plannng.
When a regon and ts
communtes decde to pursue
hgh-capacty transt, the TOD
dscusson should also begn. A
publc dscusson ocused on the
queston, How do we want to
grow and how can transt help
us get there? can help denty
mportant places to sere,
opportuntes or redeelopment,
and potental staton locatons.
An oerall TOD corrdor son
and strategy can help dene
the dferent roles each staton
wll play n the corrdor (.e.,employment dstrct, health care
ocus, etc.). Ths coordnated
approach wll help ensure that the
staton area sons complement,
rather than compete, wth each
other so the ull economc
deelopment potental o the
oerall corrdor can be reached.
Wth TOD, one sze does not t
all. TOD plans can specy detals
about desred land uses, densty,
urban orm, and pedestranamentesall elements to
acltate and encourage the use
o transt as well as creaton o
hgh qualty, desrable places.
ideally, TOD plans and assocated
gudelnes are adopted nto
land use polcy and requre
uture deelopment to be
consstent wth TOD prncples. An
mplementaton strategy should
be part o TOD plans and prodea road map on how to make the
plan realty, ncludng roles and
responsbltes o arous partners.
Beore the Plan The TOD Plan1 2
10 Secton 2: Oerew o TOD
-
7/30/2019 Tri-Rail Final
17/124
As transt nrastructure
constructon begns (platorm,
statons, and tracks), addtonal
publc realm staton area
mproements, such as pedestran
crossngs and connectons near
staton platorms, should also be
made. By enhancng walkablty
and supportng uture TOD, these
publc mproements lay the
groundwork or assurng easy
access to transt statons. Although
some mproements may not
be consdered TOD supporte
on the surace, such as suraceparkng, they acltate uture
TOD as the market matures. it s
also durng ths phase that TOD
mplementaton begns n ull
orce, through TOD regulatons
and ncentes, and dented and
prortzed TOD opportunty stes.
Publcimproementsnear the Staton3
As the transt lne matures,
nterest n deelopment along
and near the lne wll lkely
ncrease. Goernment and ts
partners wll need to take the lead
n managng and encouragng
TOD to ensure that deelopment
consstent wth TOD prncples s
bult. Regulatons, ncentes, TOD
plot projects, and the proson
o publc amentes, such as parks
and streetscape mproements,
can promote TOD and hgh qualty
staton places where people want
to le, work, and play.
As TOD dstrcts reach buld-
out, there wll be nstances
where addtonal mxed-use/
resdental nll, redeelopment,parkng structures, pedestran
mproements, and open space
are desred. Although goernment
and non-prot partners wll stll
hae a role n mplementng TOD,
more specalzed TOD deelopers
wll emerge, broadenng the
pattern o TOD throughout the
corrdor.
Partnershpsand improedAmentes
Bult TODDstrcts4 5
11
-
7/30/2019 Tri-Rail Final
18/124
Oertown, Mam
-
7/30/2019 Tri-Rail Final
19/124
13
TODs should be thought o as groupngs o projects wthn to mle (a e- to
ten-mnute walk) o a transt stop, orented nward to the transt stop, wth uses
that complement each other, rather than a sngle buldng. Groupng projects nto
TOD dstrcts or staton areas creates acte places. Wthn the corrdor, the uncton
and sze o each staton area should complement each other. Not all statons wll
be able to sere as a major retal destnaton, or example, wthout dlutng retal at
all the statons.
Staton typologes are one way to thnk about the type o deelopment approprate
at each staton gen the larger corrdor context. The ollowng typologes suggest
a dferent scale and mx o uses, resultng n a dferent uncton and orm or each
staton area along the corrdor. Fe staton typologes are dented n the Florda
Department o Transportaton (FDOT) South Florda East Coast Corrdor (SFECC)
Phase 3 Staton Renement Report:
Cty Center
Town Center
Neghborhood Center
Employment Center
Park-and-Rde
The ollowng pages prode a descrpton o the typologes based on TOD best
practces.
Section 3
Creating TOD:Station Typologies
-
7/30/2019 Tri-Rail Final
20/124
11th Street - Miami36th Street - Miami
79th Street - Miami
Toney Penna - Jupiter
192nd Street - Aventura
Park Avenue - Lake Park
Government Center - Miami
125th Street - North Miami
Lake Avenue - Lake Worth
13th Street - Riviera Beach
Atlantic Avenue - Delray Beach
Hollywood Boulevard - Hollywood
NE 2nd Street - Boca Raton
SE 4th Street - Hallandale Beach
163rd Street - North Miami Beach
Atlantic Boulevard - Pompano Beach
PGA Boulevard - Palm Beach Gardens
38th Street - Oakland Park Boulevard
26th Street - Wilton Manors
Ft.Lauderdale - HollywoodInternational Airport
Evernia Street - West Palm Beach
Boynton Beach Boulevard -Boynton Beach
Government Center (Broward Blvd) -Fort Lauderdale
45th Street - West Palm Beach
Gregory Road - West Palm Beach
Hillsboro Boulevard - Deereld Beach
Dania Beach - Dania Beach
55th Street - Miami
PALM BEACH
BROWARD
MIAMI-
DADE
RegionalRail
Mangonia Park
West Palm Beach
Lake Worth
Boynton Beach
Delray Beach
Boca Raton
Deereld Beach
Pompano Beach
Cypress Creek
Ft.Lauderdale
Ft.LauderdaleHollywood
International AirportSheridan Street
Hollywood
Opa Locka
Golden Glades
ah Market
Tri-Rail/Metrorail
Transfer
amiAirport
Staton Typologes
City Center
Town Center
Neighborhood Center
Employment Center
Park-and-Ride
14 Secton 3: Creatng TOD: Staton Typologes
-
7/30/2019 Tri-Rail Final
21/124
City Center
Key Characterstcs
High density: Dstnctely desgned hgh-densty buldngs near statons sereas dentyng eatures and contrbute to the qualty o the cty skylne.
A mix o uses: A horzontal and ertcal mx o uses that nclude oce orresdental aboe retal spaces wth contnuous aades that algn to the buld-to-lne.
Compact, high-quality, pedestrian-oriented environment: Hghly acteand clear pedestran paths are dened by street amentes and transparency obuldng rontages.
Active defned center: Taller buldngs extend aboe the street wall (.e.,buldngs that rame the pedestran zone), but do not mpede the comortablepedestran scale t denes.
Limited, managed parking: Structured parkng should be ntegrated ntodeelopment. Parkng rato maxmums should be based on proxmty tostaton.
Urban parks and open space: Programmed enronments wth pedestranamentes encourage communty nteracton and gatherng places or largegroups.
Cty centers
hae the hghestdensty and
greatest mx o
uses, ncludng
mult-amly
housng wth
ground-oor
retal or oce
uses. Regonaldestnatons
are located n
downtowns,
along wth local-
and communty-
serng retal.
15
-
7/30/2019 Tri-Rail Final
22/124
Town Center
Key Characterstcs
Moderate-high density: Scale o densty should t nto exstng communtyand nclude destnaton retal wth housng.
A mix o uses: Mostly resdental wth local-supportng commercal andemployment uses. Archtecture should reect exstng enronment.
Compact, high-quality, pedestrian-oriented environment: Amentes suchas lghtng, sgnage, and street trees rame the pedestran zone and separateehcular trac.
Active defned center: Calm streets by usng a arety o pang and make thestreets smaller to create a place or people not domnated by ehcles.
Limited, managed parking: On-street parkng should be proded. Somestructured parkng should be ntegrated nto the deelopment, whle suraceparkng should occur behnd the deelopment.
Urban parks and open space: Programmed spaces or acte and passe uses,such as town plazas or neghborhood parks, should be a prorty.
Town centers
hae a mxo mostly
resdental land
uses, wth local-
supportng
commercal and
employment
uses. The leel
o densty sscaled to t n
wth the exstng
communty.
16 Secton 3: Creatng TOD: Staton Typologes
-
7/30/2019 Tri-Rail Final
23/124
Neighborhood Center
Key Characterstcs
Low density: Neghborhoods ofer sngle-amly attached or detached housngstock, wth some mult-amly housng unts.
A mix o uses: Prmarly resdental wth perodc small-scale local retal uses.
Compact, high quality, pedestrian-oriented environment: Lghtng, pang,and secondary access rom man road ofer saer places or pedestrans.
Active defned center: Communty centers, schools, and recreaton aclteshelp to stmulate a pro-acte neghborhood.
Managed parking: Angled or parallel on-street parkng can help mtgateoerow rom parkng n the neghborhood and create clear paths to and romretal and resdental deelopment.
Urban parks and open space: Larger-scale publc space can ofer a aretyo uses (such as recreaton elds, communty gardens, pcnc amentes, etc.)wthn a centralzed locaton.
Neghborhood
centers haehgher denstes
wthn the
closest 600 eet
o the transt
staton, scalng
down to low-
densty suburban
deelopmentnearer to the
adjacent, non-
TOD land uses.
Resdental and
neghborhood
retal land uses
are smlar tothose located
outsde the
staton area.
17
-
7/30/2019 Tri-Rail Final
24/124
Employment Center
Key Characterstcs
Moderate to high density: varous scale o densty that s scaled to t nto thesurroundng area but also denes the area accordng to the type o busness orserces ofered.
Mix o uses: Prmary use typcally conssts o commercal oce, medcal,goernment, or retal wth lttle or no resdental use.
Compact, high-quality, pedestrian-oriented environment: Acte and clearpedestran paths are dened by street amentes and transparency o buldng
rontages. Defned center: Restaurant or retal uses are mxed wth an employment area
that ofers dnng, retal, and hosptalty serces.
Managed parking: Structured parkng should be ntegrated nto deelopment.Parkng rato maxmums should be based on proxmty to staton.
Open spaces: Programmed, landscaped, and streetscaped enronments wthpedestran amentes encourage communty nteracton and gatherng.
Employment
centers haea greater
concentraton
o employment
uses as
compared to
other land uses
adjacent to a
staton area. Theleel o densty s
hgher than the
type o land uses
outsde o the
TOD.
18 Secton 3: Creatng TOD: Staton Typologes
-
7/30/2019 Tri-Rail Final
25/124
Park-and-Ride
Key Characterstcs
Open space or vacant: Undeeloped parcels o land nclude open space aswell as parcels that reman acant or underutlzed.
Medium quality, pedestrian-oriented environment: Acte and clear accessthat s dened by landscapng and street amentes.
Managed parking: Surace lot parkng accessble rom an adjacent roadwayand connectng arteral network. Clear connecton to staton stop andsurroundng deelopment.
Open spaces: Landscaped and streetscaped enronment.
Park-and-rdes
desgnate areasor parkng
to sere the
passenger ral
serce wthn
close proxmty
to the staton
stop. These
areas seek topresere land use
or uture TOD
deelopment.
19
-
7/30/2019 Tri-Rail Final
26/124
CtyPlace, West Palm Beach
-
7/30/2019 Tri-Rail Final
27/124
The ollowng pages summarzes the proposed 28 staton areas n the Tr-Ral Coast-
al Lnk corrdor. A land use typology was appled based on a son or each sta-
ton area as dented by stakeholders durng publc plannng eforts. The sonsdescrbe uture areas o change, access and connectty mproements, and the
uture urban orm o the staton area. The uture economc mpact o the proposed
staton s also shown. The staton area today s descrbed as well.
The proposed Tr-Ral Coastal Lnk statons hae dferent orms, unctons, and
characterstcs wthn ther respecte communtes and the larger regon. The ty-
pologes and staton area summares reflect these dferences. in addton, the sta-
ton areas are n aryng stages o readness to become successul TODs. Some are
more suburban n character, whle others are more urban. Others sere to support
major regonal destnatons and are as ully deeloped as they wll eer be.
As the Tr-Ral Coastal Lnk project moes rom plannng to desgn to constructon
and nally to operaton, the creaton o transt-supporte communtes wll also
progress as descrbed n the TOD Tmelne (page 10). Takng the next step to moe
the TOD staton area sons rom plannng to mplementaton can be enhanced by
deelopng a cohese, regonal strategy to support local actons.
Section 4
Proposed Stations
21
-
7/30/2019 Tri-Rail Final
28/124
Station Area Today
Toney Penna JUPiTERSouth o Toney Penna Dre and Dxe Hghway
Strengths and Opportuntes
Sgncant resdental deelopmentwthn walkng or bkng dstanceo the staton area could supportbusnesses at the staton.
Jupter Medcal Center (thetowns largest employer) has nllopportuntes on ts property.
Strong redeelopment potental,based on low-alue exstng landuses, and large tracts o acant landexst adjacent to and wthn mleo the staton, especally along ToneyPenna Dre.
The 2011 update o the Jupter
Comprehense Plan supports TODalong Toney Penna Dre.
Weaknesses and Barrers
Exstng deelopment (lghtndustral, warehouse, strpcommercal, and low-denstyresdental) s not transt supporte.
Access rom east o the staton sconstraned by Hghway A1A due to
ts sze, ehcle speeds, and lack opedestran amentes.
Lmted redeelopment potentaleast o the staton, as the area sbult out wth a stable sngle-amlyresdental communty.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
29/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
Centered on Jupter Medcal Center, the Toney Penna Staton area wllenhance Jupters current reputaton as a great place to le, work, andplay by prodng addtonal opportuntes or housng and employmentdersty and ncreasng regonal connectty.
Pedestran-rendly commercal and resdental deelopment and the JupterMedcal Center wll brng transt rders and generate actty around the staton.
The ntensty o buldngs wll be greatest closest to the staton wth 34 storesand taper to 2- to 3-story buldngs to blend nto the surroundng bult context.
New employment opportuntes wll support the medcal center as well asother proessonal oces.
A structured park-and-rde aclty or commuters arrng by car to ths end-o-lne staton wll be easly accessble rom the regonal connector o i-95.
On eenngs and weekends, the parkng aclty wll support small-scalecommercal uses n the staton, makng t a truly brant place to le and work.
Future Vision taken rom Jupiter Transit-Oriented Development Charrette Report, prepared by
Treasure Coast Regional Planning Council, 2008.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
3,360
650
2,370
460
$65,000,000
204,000
$13,900,000
$575,000
$237,000
23
-
7/30/2019 Tri-Rail Final
30/124
Station Area Today
PGA BoulevardPALM BEACH GARDENSintersecton o PGA Bouleard and Hghway A1A
Strengths and Opportuntes
Large undeeloped parcels westo staton sutable or regonalcorporate headquarters orlarge-scale employment center.
Gardens Mall s a 10-mnute walkrom the staton.
Major employment at theBomedcal Center s a regonaldestnaton.
Exstng commercal/ocedeelopment s n close proxmty tothe staton.
Weaknesses and Barrers Pedestran access to seeral
deelopment stes s lmted byhghways and dranage canals.
Exstng deelopment s autoorented and not pedestran rendly.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
31/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
As a regonal park-and-rde, the PGA Bouleard Staton wll mproe accessand sblty or both exstng and proposed regonal destnatons, and wllsupport new pedestran connectons wthn the staton area.
A park-and-rde at the PGA Bouleard Staton wll brng people to Palm BeachGardens and help retalze entertanment and commercal destnatons aroundthe transt staton, such as the Downtown at the Gardens deelopment.
vacant area northwest o the staton wll present a strong opportunty or large-scale mxed-use deelopment.
The PGA Bouleard Staton wll prode ncreased access to employment, retal,and mxed-use actty centers that are wthn walkng dstance.
Wth easy access to and rom i-95, the park-and-rde at ths staton wll ncreasepassenger actty or ths locaton.
Future Vision taken rom Palm Beach Gardens Transit-Oriented Development Charrette: The
Citizens Master Plan, prepared by Treasure Coast Regional Planning Council, 2009.
Park-and-Ride
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
5,750
2,380
1,000
$0
732,000
$57,800,000
$332,000
$52,000
25
-
7/30/2019 Tri-Rail Final
32/124
Station Area Today
Park Avenue LAKE PARKOld Dxe Hghway and Park Aenue
Strengths and Opportuntes
Approxmately 100 acres o acantndustral land west o the statonpresered as a conseraton area.
Derse mx o resdentaldeelopment wthn walkngdstance o the staton.
Good pedestran access to exstng
deelopment east and south romthe proposed staton.
Muncpal oces located nearthe staton sere as a regonaldestnaton.
Deelopment ntates n place tosupport TOD.
Redeelopment opportunty on5.8-acre parcel o acant land owned
by the Town o Lake Park.
Weaknesses and Barrers
industral zonng lmts opportuntyor transt-orented nll orredeelopment to the west o thestaton.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
33/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The Park Aenue Staton wll be the ocal pont o new mxed-usedeelopment n the downtown and wll benet rom Lake Parks exstngtranst-supporte hstorc street layout.
Catalyst deelopment at Park Aenue and Tenth Street wll prode a crtcalmass o mxed-use deelopment surroundng a publc Town Green plaza.
The new Town Green wll become a publc gatherng place and sere as the
heart o the downtown.
A parkng structure near the statonwth ground-oor retal and resdentalusescan sere commuters and the downtown area.
Addtonal redeelopment along Park Aenue wll nclude mxed-use, mult-story buldngs placed at or near the rontng sdewalks.
A nature center just west o the staton wll nclude trals and an obseratonplatorm.
Future Vision taken rom Community Redevelopments Agency Plan or Lake Park, 2010.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,730
310
2,930
$0
94,000
$7,500,000
$100,000
$18,000
27
-
7/30/2019 Tri-Rail Final
34/124
Station Area Today
13th Street RiviERA BEACHintersecton o 13th Street and Old Dxe Hghway
Strengths and Opportuntes
Near the Port o Palm Beach and theCtys ndustral core.
vacant 7.47-acre parcel located westo the proposed staton.
Future land use desgnated asdowntown mxed use.
Rera Beach CRA Ctzens MasterPlan (2008) calls or mxed use, greenand open space, a pedestran plaza,and trac calmng to support thetranst staton.
Weaknesses and Barrers Smaller parcels/property owners. Lmted TOD opportuntes due to
ndustral orentaton.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
35/124
Station Area Tomorrow
Future vson
The 13th Street Staton wll be the gateway to the Port o Palm Beach, thenew FPL Power Plant, and a new mxed-use waterront.
The proposed Tr-Ral Coastal Lnk staton wll sere as a gateway toneghborhood destnatons along 13th Street and regonal destnatons such asBcentennal Park and the Rera Beach Muncpal Marna.
Redeelopment along 13th Street wll create new energy wth conc landmark
buldngssuch as the remodeled Boys and Grls Club and the MartmeAcademyand neghborhood retal destnatons.
Mxed-use deelopment around the staton wll nclude resdental,employment, and retal uses.
Small green spaces and a plaza wll prode open space or the staton area.
The Port o Palm Beach ste redeelopment wll create a better transton romthe man street uses.
Future Vision rom Riviera Beach Community Redevelopment Area Citizens Master Plan,Charrette Report prepared by Treasure Coast Regional Planning Council, 2008, and the South
Florida East Coast Corridor Transit Study: Station Area Planning Workbook, 2012.
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Neighborhood Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,865
240
3,650
$0
69,000
$5,200,000
$72,000
$12,000
29
-
7/30/2019 Tri-Rail Final
36/124
Station Area Today
45th Street WEST PALM BEACH45th Street between Greenwood and Pnewood Aenues
Strengths and Opportuntes
St. Marys Medcal Center, a regonalhosptal aclty, s located northwesto the staton area.
The staton ste s approxmately onemle southwest o the Port o PalmBeach.
St. Marys Medcal Center owns amajorty o the acant land aroundthe staton that wll lkely be used toexpand ths regonal destnaton.
Weaknesses and Barrers Few large, acant parcels exst n the
staton area or deelopment whlethe majorty o land use s sngle-amly resdental.
Except or St. Marys MedcalCenter, the staton area does notprode strong redeelopment ordeelopment opportuntes.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
37/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
I
Future vson
Wth a staton at ts ront door, St. Marys Medcal Center wll be the prmarydraw o the 45th Street Staton n West Palm Beach.
Future deelopment at St. Marys Medcal Center wll be consstent wth theexstng deelopment at the medcal center.
Patents and employees o the hosptal wll be able to rde the Tr-Ral CoastalLnk to the ront door o St. Marys Medcal Center.
Future Vision taken rom Station Area Market and Economic Analysis, April 2013.
Employment Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
3,050
4,960
$0
$5,200,000
$0
$0
31
-
7/30/2019 Tri-Rail Final
38/124
Station Area Today
proposed station community retail residential industrial vacant
Strengths and Opportuntes
vbrant downtown settng thatsupports TOD, resdental, hotel,oce, and mxed uses.
Proxmate to CtyPlace (mxed-useactty center), Kras Center or thePerormng Arts, the Palm BeachCounty Conenton Center, and
Clemats Street.
Deelopment plans, whch aresupporte o transt, are n place orexstng acant parcels n the statonarea.
Good pedestran access n centraldowntown locaton.
Crculator system prodes staton
area and downtown access.
Weaknesses and Barrers
Oce acancy rates are hgh.
Evernia StreetWEST PALM BEACHEerna Street and Quadrlle Bouleard
-
7/30/2019 Tri-Rail Final
39/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
Future vson
Redeelopment around the staton area wll create a town center andenhance the entrance to downtown, whch s a place that s already abrant, mxed-use communty wth cultural nsttutons, conerenceacltes, and a redeeloped waterront.
A busness dstrct west o the staton wll prode an urban core and anchorbetween the two man retal centers o CtyPlace and Clemats Street.
Ths staton ste wll also nclude the co-locaton o a staton or All AboardFlorda passenger ral serce.
A lnear park along the FEC ralway wll prode a green spne through most odowntown.
Future Vision taken rom West Palm Beach Transit-Oriented Development Charrette Reportprepared by Treasure Coast Regional Planning Council, 2005.
23,700
1,690
10,310
80
$15,500,000
447,000
$33,500,000
$630,000
$107,000
33
-
7/30/2019 Tri-Rail Final
40/124
Station Area Today
Gregory Road WEST PALM BEACHGeorga Aenue and Gregory Road
Strengths and Opportuntes
Large acant parcel southeast o theproposed staton locaton prodesopportunty or deelopmentactty.
Staton would prode access toexstng retal and commercaldeelopment.
Weaknesses and Barrers
Canal to the south and dranage
use o adjacent acant parcelprode barrer to deelopment andredeelopment.
Poor pedestran access to the staton
rom neghborng deelopment. Lmted TOD opportuntes due to
industral land uses along GeorgaAenue.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
41/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The busnesses and redeelopment around the park-and-rde at GregoryAenue wll prode opportuntes or commuters to run errands on therway to or rom work.
Strong pedestran lnkages and sgns rom the park-and-rde to the transt andnearby shops wll help draw people rom the park-and-rde structure.
The staton wll sere as a communty ocal pont and encourage denscaton
o the surroundng land uses.
Park-and-Ride
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
3,060
1,780
8,795
170
$24,000,000
32,000
$2,200,000
$212,000
$90,000
35
-
7/30/2019 Tri-Rail Final
42/124
Station Area Today
Lake Avenue LAKE WORTHFEC Ralway and Lake Aenue
Strengths and Opportuntes
Two-acre redeelopmentopportunty ste or mxed usesoutheast o the staton.
Resdental redeelopmentopportuntes on three to our stesoer 1 acre.
Staton prodes access to ccand cultural uses, downtownretal, restaurants, busnesses, andresdences.
Weaknesses and Barrers Staton area domnated by small
parcels wth multple owners,requrng aggregaton o land.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
43/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
Mxed-use and arts-orented redeelopment wll be encouraged andaccommodated wthn the exstng abrc n ths town center.
As a landmark n the downtown, the FEC staton wll become a sgnature ccbuldng, anchorng Lucerne Aenue n the downtown and reectng thehstorc structures throughout downtown.
A Lot Dstrct on both sdes o the FEC ralway wll redeelop the exstng
ndustral buldngs nto mxed-use buldngs wth a ocus on the arts. Future land uses wll nclude art space, studos, retal, resdental, and lght-
ndustral shops n lot buldngs that wll hae raw and adaptable space yet beattracte on the exteror.
The character o the hstorc neghborhoods east o the staton wll bepresered and enhanced wth elements to make Lucerne Aenue morepedestran rendly.
Future Vision taken rom The Lake Worth Transit-Oriented Development Charrette: TheCitizens Master Plan, 2008. Citizens Master Plan, 2008.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
3,060
230
8,790
150
$13,500,000
70,000
$4,400,000
$184,000
$59,000
37
-
7/30/2019 Tri-Rail Final
44/124
Station Area Today
Boynton Beach Blvd BOYNTON BEACHFEC Ralway between Boynton Beach Bouleard and Ocean Aenue
Strengths and Opportuntes
Exstng derse mx o land uses,moderate to hgh acancy rates,and multple redeelopmentopportuntes makes the staton areaa good opportunty or uture TOD.
vacant land surrounds the stewthn mle, ncludng 6.5 acres o
acant commercal land south o thestaton area.
The staton can draw on the synergyrom exstng deelopment and thectys proposed Cultural Corrdoron Ocean Aenue, whch s wthnwalkng dstance.
Weaknesses and Barrers
vacant parcels are small wthmultple owners, requrngconsoldaton or deelopment.
inland waterway east o the statonconstrans access to the staton.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
45/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
A town center at the Boynton Beach Bouleard Staton wll create adowntown core and buld momentum or other redeelopment alongFederal Hghway and Ocean Aenue.
A hgh-densty employment-node characterstc o a central busness dstrctwll be ensoned between Boynton Beach Bouleard and Ocean Aenue.
The area wll nclude a brant mx o retal, oce, and resdental uses where
resdents o all ages can gather and nteract.
The staton and parkng garage wll sere as a gateway at the center o the TODdstrcta key actor n the oerall marketablty o the staton area.
A network o connected streets and pedestran paths wll support ntegratedpedestran actty throughout the staton area.
Future Vision taken rom Boynton Beach CRAs Downtown Vision and Master Plan, February
2008.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
7,210
990
5,270
600
$83,900,000
305,000
$19,800,000
$1,242,000
$5055,000
39
-
7/30/2019 Tri-Rail Final
46/124
Station Area Today
Atlantic Avenue DELRAY BEACHEast Atlantc Aenue between NE 2nd and NE 3rd Aenues
Strengths and Opportuntes
Eght acres o acant land wthn mle o the staton prodesopportunty or TOD.
Major destnatons n the statonarea nclude parks and culturalcenters, muncpal oces, anentertanment dstrct, and a tenns
eent center.
Busnesses are thrng AlongAtlantc Aenue, ndcatng thestrength o the area.
CRA Master Plan proposalncorporates deelopment ntatescompatble wth TOD, such astrac calmng and mxed-use
deelopment.
Weaknesses and Barrers
The proposed staton area couldspur more deelopment locatedsouth o Atlantc Aenue.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
47/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
Buldng upon decades o careul redeelopment, the Atlantc AenueStaton wll urther enhance the lablty, ncluseness, and sense o untyn the Delray Beach town center by enhancng regonal connectty.
Atlantc Aenue wll be enhanced wth landmark gateways anchorngdowntown wth the staton on the west end and an enhanced veterans Park atthe east end.
inestments n prate land and publc nrastructure wll urther supportpockets o mxed-use man street redeelopment and wll enhance pedestranconnectty wth a green network.
Future redeelopment wll presere the ctys hertage and llage-lke characterthrough consstent archtectural and urban desgn qualtes.
The pedestran scale o Atlantc Aenue west o the staton wll contnue east othe staton to create a man street enronment, wth resdental unts aboeground-oor retal.
Future Vision taken rom Downtown Delray Beach Master Plan, 2002, and the South FloridaEast Coast Corridor Transit Study: Station Area Planning Workbook, 2012.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
5,660
920
6,270
40
$10,100,000
285,000
$19,100,000
$350,000
$73,000
41
-
7/30/2019 Tri-Rail Final
48/124
Station Area Today
Strengths and Opportuntes
Proposed staton area ncludesdeelopment o a pedestranpromenade along part o PalmettoPark Road to create a sense o place.
The cty muncpal complex s a keydestnaton n the staton area.
Good mx o uses and opportuntes
or growth on acant parcels nearthe staton.
Staton prodes access to MznerPark mxed-use deelopmentresdental, retal, and entertanment.
Redeelopment opportunteson 4 acres at the ntersecton oPalmetto Park Road and MznerBouleard.
Weaknesses and Barrers
Redeelopment stes are small andwll requre aggregaton or large-scale deelopment to occur.
NE 2nd Street BOCA RATONNE 2nd Street and Dxe Hghway
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
49/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The town center at the NE 2nd Street Staton wll buld upon the success oMzner Park to become a communty place: a destnaton where people canconnect wth other communty members throughout the day and eenng.
A network o pedestran-scaled streets and open space connects downtownand the staton area.
Sanborn Square Quarter wll become ts own place wth derse land uses and a
mx o old, new, small, and large buldngs ocused around an urban plaza.
At the staton and west o Dxe Hghway, the Cty Hall Quarter wll prodea strong sual center or the downtown wth ts multple publc buldngs,mxed-use buldngs, and lbrary.
Redeelopment along East Palmetto Park Road wll create a lely character(day and eenng) wth new resdental condomnums, oces, and restaurants,and wll draw passengers rom the FEC ralway nto the downtown to theintracoastal Waterway, beach, and Sler Palm Park.
Future Vision taken rom Downtown Boca Raton Master Plan Update, 2007.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
8,010
550
5,760
200
$43,800,000
169,000
$14,700,000
$464,000
$162,000
43
-
7/30/2019 Tri-Rail Final
50/124
Station Area Today
Hillsboro Boulevard DEERFiELD BEACHHllsboro Bouleard and Dxe Hghway
Strengths and Opportuntes
The area has good roadway accessto the north, east, and west o theste.
vacant propertes, wth preousapproals, exst or townhousedeelopment to the south andsoutheast o the staton whle mult-
amly stes are aalable to the westo the staton.
Potental commercalredeelopment opportuntes exsteast o the proposed staton locatonalong Hllsboro Bouleard.
Weaknesses and Barrers
Poor pedestran access to the ste.
No master plannng eforts n themmedate area.
Deelopment potental at themmedate locaton o the staton slmted.
No expectatons or majordeelopment changes.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
51/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The Hllsboro Bouleard Staton wll act as a gateway to Cty Hall andDeereld Beach.
A retalzed Dxe Hghway corrdor weaes the old and the new to createcommunty contnuty, and rebulds and repars the abrc o the neghborhood.
The Dxe Hghway corrdor wll be transormed to accommodate bothautomobles and pedestrans, and wll respect a neghborhood wth a
coordnated archtectural style, pedestran-rendly enronment, on-streetparkng, a coordnated landscape theme, coordnated street urnshngs, andlghtng.
The buldngs rontng the corrdor wll contnue the archtectural style othe communty wth Florda vernacular/Carbbean and Florda vernacular/Medterranean archtecture.
Future Vision taken rom City o Deerfeld Beach Vision Plan, 2000, and the South Florida EastCoast Corridor Transit Study: Station Area Planning Workbook, 2012.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,560
4,500
80
$3,000,000
$0
$16,000
$44,000
45
-
7/30/2019 Tri-Rail Final
52/124
Station Area Today
Atlantic Boulevard POMPANO BEACHNE 1st Street and FEC Ralway
Strengths and Opportuntes
Located next to the hstorcdowntown Pompano Beach and n aCommunty Redeelopment Area.
Located n close proxmty to boththe Cty Muncpal complex andBroward County Transt (BCT ) transthub.
vacant and underutlzed parcelsprode retal redeelopmentpotental north o the ste.
Cty-owned parcels south o thestaton prode opportuntes orresdental redeelopment.
Staton could sere as a mult-modaltranst hub, ncorporatng commuterral serce.
Cty polcy dentes commuter ral
as a drer or uture oce demandand resdental deelopment nearthe staton.
Weaknesses and Barrers
Exstng retal acancy rates mplythat the market does not exst orlarge-scale redeelopment.
Pedestran connectty to thestaton s poor.
Small parcel szes and the needto aggregate propertes createchallenges or redeelopment.
Ten-acre ste behnd the BCT transthub wll lkely redeelop as retal.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
53/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
A mxed-use, walkable town center at the Atlantc Bouleard Staton wllbe a catalyst or addtonal nll and redeelopment n and around hstorcdowntown Pompano Beach.
Three key destnatons near the staton areaOld Pompano, The Cc Campus,and the MLK/Hammondlle areaswll be connected by a sae, walkable, andpedestran-rendly enronment n order to enhance the brancy o the area
wth ncreased opportuntes or socal nteracton and busness deelopment. A transt core near the staton wll ocus compact, dense mxed-use
deelopment along major streets to create a brant and unque enronmentwhle mantanng the hstorc and cultural core o Old Pompano.
At the ntersecton o the FEC ralway and Atlantc Bouleard, an enhanced CcCampus area wth a proposed Broward County Publc Lbrary and nearby retal,oce, and addtonal cultural uses wll create actty n the area throughoutthe day.
Future Vision taken rom ULI Technical Assistance Panel or the city o Pompano Beach NWRA,2011.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,320
210
6,550
40
$1,900,000
63,000
$3,900,000
$60,000
$50,000
47
-
7/30/2019 Tri-Rail Final
54/124
Station Area Today
38th Street OAKLAND PARKAdjacent to Oakland Park Cty Hall along NE 12th Aenue
Strengths and Opportuntes
Sgncant acant/underutlzedparcels near staton ste and west oDxe Hghway prode opportuntesto spur deelopment around thestaton area, ncludng:
Three acres drectly west o thestaton.
Sxteen-plus acre parcel wthplanned large-scale mxed-usedeelopment near staton.
inll opportuntes along DxeHghway south o 38th Street.
Thrteen acres o low-densty/potentally underutlzeddeelopment north o the staton.
There s an exstng CommuntyRedeelopment Area (CRA) Plan,
and mplementaton eforts arewell underway.
Weaknesses and Barrers
Warehouse uses along the east sdeo Dxe Hghway create barrer orthe resdental uses east o DxeHghway to access the staton.
There s poor pedestranconnectty between the exstngresdental neghborhoods andproposed staton.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
55/124
Station Area Tomorrow
Future vson
The Cty o Oakland Park wll proactely mplement ts CRA plan to createa new, walkable downtown or cty resdents, employees, and storscentered on the proposed staton.
12th Aenue redeelopment wll create a place people want to be wth mult-story buldngs, ample room or pedestrans to moe around, and colonnadescontanng shops, oces, and apartments that wll ront the street.
11th Aenue wll be enhanced as a man street wth publc mproements andnew desgn standards.
38th Street and Dxe Hghway wll be redeeloped nto a landmark mxed-useproject that draws people of the tran and nto the communty.
A new cty parkncludng an amphtheater, multuse portco, and parkngwll prode a cc landmark n the staton area.
New pocket parks n the downtown wll prode a seres o places or people togather and chldren to play.
Future Vision taken rom City o Oakland Park Citizens Master Plan prepared by TreasureCoast Regional Planning Council, 1999, and the South Florida East Coast Corridor Transit
Study: Station Area Planning Workbook, 2012.
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
3,900
830
7,350
1,370
$43,200,000
240,000
$17,600,000
$366,000
$1,155,000
49
-
7/30/2019 Tri-Rail Final
56/124
Station Area Today
24th Street WiLTON MANORSFEC Ralway Between NE 26th Street and NE 24th Street
Strengths and Opportuntes
The Transt Orented Corrdor landuse desgnaton allows the necessarymx o land use, densty, and desgnto promote transt usage and createa sense o place that s currentlylackng along the corrdor.
Wlton Manors s consdered a erywalkable cty accordng towalkscore.com.
The area has a hgh occupancy ratewth brant deelopment actty.
Weaknesses and Barrers industral deelopment on the west
sde o the staton area. Waterways to the north and south
restrct access rom these areas tothe staton.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
57/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The staton area wll acltate the deelopment o mxed uses wthn a saeand conenent walkable enronment that seeks to meet the needs oresdental and workng populaton o Wlton Manors.
Hgher-densty mxed-use deelopment wll occur around the staton area tonclude Wlton Dre.
Future Vision taken rom the Citys Comprehensive Plan and the South Florida East CoastCorridor Transit Study: Station Area Planning Workbook, 2012.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,760
6,040
230
$8,300,000
$0
$52,000
$160,000
51
-
7/30/2019 Tri-Rail Final
58/124
Station Area Today
Government Center/Broward Boulevard FORT LAUDERDALENW 2nd Street and Broward Bouleard
Strengths and Opportuntes
Exstng development (muncpalbuldngs, hgh-rse ofces, andmult-amly condomnums) supporttranst.
Located adjacent to the BrowardCounty Transt man termnal.
Located n close proxmty to the
planned Fort Lauderdale WaveStreetcar route, whch wll openaccess to the entre downtown.
Good potental pedestranconnectvty and access.
Over 20 acres o vacant land n thestaton areamany wth transtsupportve development plans nplacewll catalyze developmentaround the staton.
Current plannng actvty or theour-block area to create a mxed-use
downtown moblty hub, ncludngthe Broward County Transt termnal,uture streetcar mantenance aclty,and a co-located All Aboard Flordaand Florda East Coast Ralwaycommuter ral staton.
Weaknesses and Barrers
New Rver may constran access tothe south.
Broward Bouleard (seen lanes)presents a pedestran saety ssue.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
59/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The staton wll sere Broward Countys hghest densty area wth drectpedestran lnkages to bus transt, All Aboard Florda, and Wae Streetcarserce.
The new transt staton wll create a landmark urban gateway and generatencreased pedestran trac and economc talty to the heart o downtown.
The Broward Bouleard corrdor wll be a connected seres o dstrcts and
neghborhoods.
East o the staton (along Broward Bouleard), a mxed-use center wll hae thegreatest concentraton and dersty o commercal and cc uses, wth hgher-densty housng n the downtown cty center.
West o the staton (along Broward Bouleard), denstes wll be lower, wth aarety o housng and neghborhood-scale oce and serce uses.
Future Vision taken rom City o Fort Lauderdale. Images rom Fort Lauderdale Master Plan
Update: Design Guidelines, 2007, Broward Boulevard Gateway Improvement Project, 2012, andthe South Florida East Coast Corridor Transit Study: Station Area Planning Workbook, 2012.
City Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
16,780
5,340
7,450
330
$87,800,000
1,515,000
$124,200,000
$874,000
$554,000
53
-
7/30/2019 Tri-Rail Final
60/124
Station Area Today
Fort Lauderdale-HollywoodInternational AirportPermeter Road and Fort LauderdaleHollywood internatonal Arport
Strengths and Opportuntes
Staton prodes new transportatonopton or the Fort Lauderdale -Hollywood internatonal Arportand potental connectons to PortEerglades.
vacant parcels south o thearport prode strong commercaldeelopment potental.
Weaknesses and Barrers
TOD deelopment, or otherdeelopment not related to thearport, s ery lmted.
Poor pedestran access.
Deelopment around the statonconstraned by heght/land userestrctons near the arport, andexstng and planned expanson oarport acltes and nrastructure.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
61/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The expanded Fort LauderdaleHollywood internatonal Arport wllbecome the preerred gateway to South Florda or nternatonal anddomestc traelers.
The Fort LauderdaleHollywood internatonal Arport expanson wll osternternatonal trac growth, enhance oerall passenger experence, andmproe serce.
Wth a projected economc mpact o $10.6 bllon annually, the expandedarport wll be an economc deelopment drer or the regon.
When the expanson s complete, oer 134,600 total jobs n the regon wll haedrect or ndrect tes to the regon.
Future Vision taken rom the Building or the Future Ft. LauderdaleHollywood International
Airport presentation. Images rom the Fort Lauderdale-Hollywood International Airport,Master Plan UpdatePhase 1, 2006.
Park-and-Ride
Jobs
people employed(badged employees)
total payroll
Passengers Per Day
Annual Economcimpact
12,500
$3.5 Bllon
65,000
$10.6 Bllon
55
-
7/30/2019 Tri-Rail Final
62/124
Station Area Today
Dania Beach Boulevard DANiA BEACHDana Beach Bouleard and NW 4th Aenue
Strengths and Opportuntes
vacant parcels wthn the statonarea prode nll opportuntes.
The Cty o Dana Beach hasmade a sgncant nestment nwater and sewer nrastructure toaccommodate uture deelopment.
The Cty s actely promotngeconomc deelopment andredeelopment o the urban corento a hub or lng, employment,and entertanment.
Good pedestran access tosurroundng land usesretal,
resdental, and commercal.
Weaknesses and Barrers
Underutlzed and acant parcels aresmall and wdely dspersed aroundthe staton area.
industral area near the proposedstaton ste s not conduceto mxed-use or resdentaldeelopment.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
63/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The Dana Beach Bouleard Staton wll be a gateway that leads people tots brant cty center.
The heart o Dana Beachs cty center wll be a pedestran-rendly area wth amx o resdental, commercal, and oce uses.
East o the staton, mxed-use deelopment wll transton n ntensty andorm as t moes away rom the staton toward the adjacent resdental
neghborhoods. A new entryway rom Federal Hghway wll prode connectty and access
to the downtown rom the transt staton, creatng a sense o arral andsoldyng the ctys sense o place.
Future Vision taken rom City o Dania Beach, Community Redevelopment AgencyRedevelopment Plan, 2009. Map taken rom the South Florida East Coast Corridor Transit
Study: Station Area Planning Workbook, 2012.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,660
240
6,170
$0
75,000
$4,700,000
$52.000
$17,000
57
-
7/30/2019 Tri-Rail Final
64/124
Station Area Today
Hollywood BoulevardHOLLYWOODHollywood Bouleard and Dxe Hghway
Strengths and Opportuntes
Exstng pattern o deelopments already transt orented andery walkable wth sdewalks andpedestran crossngs.
Exstng land usesncludngresdental, retal, entertanment, andcommercal usessupport transt.
Good pedestran access tosurroundng land uses.
Aalable capacty o exstngdeelopment can absorb uturegrowth.
Located n a CommuntyRedeelopment Area.
Weaknesses and Barrers
Few remanng small, acant parcelslmt nll and make redeelopmentdcult.
vacancy occurs n exstngdeelopment throughoutdowntown.
Much exstng deelopment s olderand low densty on small parcels.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
65/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
Downtown Hollywoods unque character and hstorc dentty wll drawpeople to get of the tran at the Hollywood Bouleard Staton.
The Dxe Hghway and Hollywood Bouleard ntersecton wll sere as aormal gateway to Downtown and the Hstorc Busness Dstrct n Hollywood,creatng a strong pedestran connecton rom the transt staton to the rest oDowntown.
West o Dxe Hghway, a hgh-ntensty mxed-use corrdor wll be deeloped tosere the transt staton and the nearby resdences.
East o Dxe Hghway (along Hollywood Bouleard toward Young Crcle), thehstorc buldngs wll be renoated to renorce ts unque hstorc dentty. Newnll deelopment wll enhance the pedestran experence, encouragng peopleto lnger and explore the busnesses n Downtown Hollywood, whch, n turn,wll strengthen Hollywoods poston as a regonal entertanment destnaton.
Future Vision taken rom the Downtown Hollywood Master Plan. Images rom the Downtown
Hollywood Master Plan and City o Hollywood CRA Workshop, 2010, and the South Florida EastCoast Corridor Transit Study: Station Area Planning Workbook, 2012.
Town Center
I I
r ll l r i n
i i n l
SETBACK SETBACK
I I
ProposedHollywoodBoulevardSection
i i n l
ET K ET K
I I
r ll l r i n
ir h r r
ProposedDixieHighway Se
ETBACK
I IE I T I T RETAIL CORE DIST I T
ProposedDixieHighway Section
ET K
I IE I T I T RETAIL CORE DISTRICT
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
5,230
610
10,860
530
$53,300,000
175,000
$19,100,000
$910,000
$412,000
59
-
7/30/2019 Tri-Rail Final
66/124
Station Area Today
SE 4th Street HALLANDALE BEACH4th Street and Dxe Hghway
Strengths and Opportuntes
Plans to co-locate the lbrary andBroward College campus, whchwould draw students rom aroundthe regon.
East-west connectons prodeaccess to employment centers,whle mult-modal optons ofer
connectons to major employersoutsde the cty, ncludngconnectons to Memoral Hosptal,
Aentura Hosptal, Aentura Mall,and Tr-Ral.
The Ctys Bluesten Park ConceptualMaster Plan and Town Centerconcept prode a means orestablshng transt-orented desgnto encourage a mx o uses, whch
wll spur redeelopment o the area.
Weaknesses and Barrers
Sngle-amly resdental uses aroundthe staton may stall redeelopmentopportuntes wthn the proposedtown center.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
67/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The new commuter ral staton wll anchor a transt-orented mxed-use town center, whch wll nclude Bluesten Park, Hallandale MuncpalComplex, Broward Lbrary/Broward College Regonal Educaton Center, and
The vllage at Gulstream Park.
Bluesten Park wll be a central amenty as an urban park wth acte and passeuses, a 400-seat amphtheater, and walkng trals or addtonal pedestran
connectons that wll sere as a communty gatherng place or specal eents,ncludng a armers market, communty eents, and concerts.
The vllage at Gulstream Park s plannng new deelopment just east oFederal Hghway that wll connect to the new cty park, ncludng two hotels,a restaurant, and a 2,500-seat theater. These plans wll encompass recreatonalacttes that ocus on amly-rendly entertanment, whch wll drawattendance both regonally and statewde.
Future Vision taken rom City o Hallandale Beach Citywide Master Plan and ImplementationStrategy, 2009, the Bluesten Corridor Concept Plan, 2012, and the South Florida East Coast
Corridor Transit Study: Station Area Planning Workbook, 2012.
Town Center
I
i
Ge
r r
i l
Im f h L k r in cc im r m n i ili .i
Ge
r r
il i l ll l l .
i . T T ill il i
i i i i T ,
i l k . .
. . 1 i l . T
i i l l , ill
|
T hr im n i n l m l i f T n n t r.
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
2,960
6,790
110
$5,100,000
$0
$56,000
$74,000
61
-
7/30/2019 Tri-Rail Final
68/124
Station Area Today
192nd Street AvENTURADxe Hghway/Bscayne Bouleard (US 1) and Aentura Bouleard
Strengths and Opportuntes
Exstng major retal and ocedrectly east o the staton couldsere as anchor or new resdentaluses n the staton area.
Staton area ncludes large acantparcels (approxmately 25 acres) orTOD.
Redeelopment potental ncludeshgh-densty resdental wthpopulaton supportng retal orserces.
The county-sponsored Ojusredeelopment plan and tsmplemented zonng s n place west
o the ralroad tracks.
Weaknesses and Barrers
Poor pedestran access andconnectty to the proposed statonrom the surroundng land uses.
vacant land west o the staton s nunncorporated Mam-Dade Countyand wll requre nter-jursdctonal
coordnaton and pedestranconnectty mproements.
US 1 creates a barrer or pedestranconnectty between thestaton, Aentura Mall, and otherdeelopment wthout sgncantpedestran mproements.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
69/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The 192nd Street Staton wll connect the Aentura Mallone o theregons largest retal destnatonswth the town center southwest o thestaton and located physcally and strategcally wthn the Dxe Hghwaycommercal corrdor.
The exstng llage-lke qualtes wll eole nto an authentc town, wth amxed-use man street along Dxe Hghway and a sae pedestran enronment.
The character o the new town center (southwest o the staton) wll preserethe communtys hertage, enhance ts lablty, and create a sense o unty.
Attracte publc plazas, neghborhood pocket parks, and pedestran-rendlystreets throughout the town center wll create gatherng places.
A regonal park-and-rde (located at ies Dary Road) wll support commutersaccessng the transt staton as well as stors to the town center.
Future Vision taken rom the Ojus Urban Area District Master Plan and Regulations, Municipal
Code o Miami-Dade County.
Park-and-Ride
Example of building heights transition from mixed-use to single-family
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
14,470
1,180
3,730
360
$26,300,000
340,000
$37,800,000
$110,000
$293,000
63
-
7/30/2019 Tri-Rail Final
70/124
Station Area Today
163rd Street NORTH MiAMi BEACH165th Street and Bscayne Bouleard (US 1)
Strengths and Opportuntes
Exstng resdental deelopment scompatble or commuter ral users.
Commercal propertes westand east o the staton proderedeelopment opportuntes.
inll opportuntes exst west andsouth o the staton ste or small-
scale redeelopment. Located n the North Mam Beach
Communty Redeelopment Area.
Local neghborhood resdentsprode market or serce retalalong NE 163rd Street.
Strong east-west and north-southaccess.
Sgncant deelopment capactynearby on many underdeeloped
and underutlzed parcels.
Weaknesses and Barrers
The physcal sze o NE 163rd Streetand US 1 creates a physcal barrer topedestran access and connectty.
Physcal deelopment constrantseast o the FEC ralway nclude the
canal, US 1, and exstng park land.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
71/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The 163rd Street Staton wll connect Mam-Dade Countys largestnorthern roadway corrdor to the broader regon, supportng theredeelopment o North Mam Beach and contnung the transormatonbetween US 1 and the Mall At 163rd Street nto a walkable, mxed-usedestnaton.
The FEC staton wll anchor the east end o Hanord Bouleard and the targeted
downtown corrdor along wth local busnesses such as Laurenzos Market.
Destnatons, ncludng the Cc and Mall Dstrcts, wll lead people rom theFEC staton nto downtown North Mam Beach.
Publc-gatherng and cc spaces wll be located throughout the area, wthgateways serng as denters or the town center.
Ths staton wll dene North Mam Beach as the Crossroads o South Flordaand wll grow as a regonal destnaton or shoppng, dnng, and workng.
Future Vision taken rom North Miami Beach Charrette: A Citizens Master Plan, 1999, and theSouth Florida East Coast Corridor Transit Study: Station Area Planning Workbook, 2012.
Town Center
Jobs
people employed (2018)**
new jobs***
Housingtotal residents (2018)**
new housing units*
value of new housing*
New Commercialnew development (sq. ft.)*
value of new development*
New Revenuead valorem
non ad valorem
* Estimated for 2015-2025
with station
** FDOT SERPM Model (6.5.2)
*** Tri-Rail Coastal Service
Station Area Market and
Economic Analysis, April
2013
1/2-Mle Staton Area
5,180
3,090
5,000
80
$5,400,000
896,000
$95,000,000
$959,000
$178,000
65
-
7/30/2019 Tri-Rail Final
72/124
Station Area Today
125th Street NORTH MiAMiNE 125th Street and FEC Ralway
Strengths and Opportuntes
Redeelopment opportuntes eastand north o the staton area.
Johnson & Wales Unersty has aplanned expanson.
Underutlzed ndustral buldngsouth o the staton could be usedor redeelopment.
Transt passengers lkely to orgnatehere, makng t a prme locaton or apark-and-rde aclty.
Located n a CommuntyRedeelopment Area.
Weaknesses and Barrers
Area s prmarly low-denstyresdental.
Florda Power and LghtTransmsson Faclty s close to thestaton area.
Pedestran connectty s poor.
proposed station community retail residential industrial vacant
-
7/30/2019 Tri-Rail Final
73/124
Station Area Tomorrow
Tri-Rail Coastal Link
Getting Southeast Florida To Work
Miami-D
Browar
Pal
Bea
Future vson
The qualty o le or resdents wll be enhanced wth transt access tothe mxed-use actty centers n the 125th Street Staton area. Anchoredby Johnson & Wales Unersty, the 125th Street Staton wll connect theregon to North Mams commercal spne at 125th Street.