Download - UNHCR NC Shelter Survey 2000-2010
UUNNHHCCRR NNoorrtthheerrnn CCaauuccaassuuss SShheelltteerr PPrrooggrraammmmeess
SSuurrvveeyy 22000000 -- 22001100
UUNNHHCCRR SSuubb--OOffffiiccee VVllaaddiikkaavvkkaazz
uuppddaattee aass oonn 3300 NNoovveemmbbeerr 22001100
UNHCR IP remarks
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010
individual houses new building: RUS48 standard house "turn-key" - - - - - - 22 54 17 14 15 122 15 122 -individual houses new building (non-standard) "self-help" - - - - - 40 - - - - - 40 - - 40 IP: DRCindividual houses new building: RUS48 standard house "self-help" - - - - - - 20 20 20 19 20 99 20 - 99 IP: DRCtemporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - 11 154 218 238 114 62 - - 43 840 - - 840 IP: DRC
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010
individual houses new building: RUS48 standard house "turn-key" - - - - - - - - - - 5 5 5 5 -individual houses rehabilitation: "roof + 1 dry room" "self-help" 820 3968 1506 1502 750 901 113 52 - - - 9612 - - 9612 IP: PIN+DRCindividual houses new building: 48 m² individual house (non-standard) "self-help" - - - - - - - - 29 30 31 90 30 - 90 IP: DRCtemporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - - 20 889 222 351 317 - 23 116 1938 130 *) - 1938 IP: DRC+VESTA
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010
individual houses new building (different standards & non-standard) "turn-key" 24 36 70 70 40 7 - - - - - 247 - 240 7 IP: DRCindividual houses new building: RUS48 standard house "turn-key" - - - - - - 7 - - - - 7 5 7 -individual houses new building (different standards & non-standard) "self-help" - - - - - 12 - - - - - 12 - - 12 IP: DRCindividual houses new building: RUS60/RUS63 simplified standard house "self-help" - - - - - - - - - 16 15 31 16 **) 31 IP: DRC (UNTFHS)temporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - - - 2 2 22 - - - 7 33 - - 33 IP: DRC
*) 130+37 units -mainly in ChR,
in RI&
in RNOAas well
**) 16 cases - UNHCR IP type of shelterinclusive 369 279 new housesincome - 9612 roof + 1 dry room
generation - 2811 box tentsUNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 08.02.2010
2000 - 2010
recapitulation
2000 - 2010
UNHCR Shelter NC
shelter units implementedin all 3 republics (RI, ChR, RNOA)
2000 - 2010
UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in North Ossetia-Alania (RNOA) RNOA# housing units implemented in North Ossetia-Alania
2000 - 2010
UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in Chechnya (ChR) ChR# housing units implemented in Chechnya
implementation by
area of reconstruction in NCUNHCR Shelter in North Caucasus 2000 - 2010 (update as on 30 November 2010)
RI# housing units implemented in Ingushetia
UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in Ingushetia (RI)by the 3 republics (RI, ChR, RNOA)
detailed breakdown
Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n 31
/01/20
10 (b
ooks
clos
ed)
UNHCR-RI'09 "turn-key" RUS48 Standard Houses Troitskaya, Karabulak, Yandare, Barsuki, Ekazhevo, Gamurzievo, x x x 14 14 62 x 97(2nd complete assessment; 29/10/'09) Altievo, Nazran, Nasyr-Kort, Kantyshevo, Dolakovo
DRC-RI'09 "self-help" RUS48 Standard Houses Karabulak, Plievo, Barsuki, Gamurzievo, (Surkhakhi), (Ali-Yurt), x x x 16 (19) 1) 16 (19) 88 (107) x by DRC 92(7th complete assessment; 19&25/01/'10) Kantyshevo, Dolakovo, Novy Redant, Zyazykov-Yurt,
Sagopshi, MalgobekDRC-NC'09/'10 "box tents" (improved standard) production line in Troitskaya x x x 160 x by DRC 100
elements production (sets) (workshop assessment; 19/01/'10) (160 sets)
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNHCR-RI'10 "turn-key" RUS48 Standard Houses Karabulak, Plievo, Yandare, Ekazhevo, Nasyr-Kort, Nazran, Kantyshevo, x x x 15 15 84 x 28(1st complete assessment; 28/09/'10) Zyazykov-Yurt, Sagopshi, Malgobek
DRC-RI'10 "self-help" RUS48 Standard Houses Karabulak, Plievo, Troitskaya, Sleptsovskaya, Nasyr-Kort, Kantyshevo, x x x 20 20 94 x by DRC 51(2nd complete assessment; 21/10/'10) Dolakovo, Novy Redant, Zyazykov-Yurt, Yuzhny, Malgobek
DRC-RI'10 "box tents" (improved standard) Karabulak, Sleptsovskaya, Nasyr-Kort, Dolakovo, Zyazykov-Yurt, x x x 43 37 174 x by DRC/Vesta 83 2)housing units assembling Sagopshi, Malgobek, Plievo, Altievo, Nazran, Troitskaya 166 of 163+37=200 units:
43 in RI, 116 in ChR, 7 in RNOA UNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) 3 objects inaccessible due to security reasons (in Ali-Yurt & Surkhakhi) 2) as on 30/11/2010
Typeof programme/project of reconstruction approach of beneficiaries
Review 2009Implementation Implementation
Plans 2010
Type Type Number
Type Implementation ImplementationNumber modus
Shelter Programmes/Projects in North Caucasus 2009/2010UNHCR
René Edward Knupfer, Technical Coordinator
Shelter Programmes/Projects in Ingushetia
modusof programme/project of reconstruction approach of beneficiaries
Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
DRC-ChR'09 "self-help" complete rehabilitation of destroyed houses Gudermes, Alkhan-Kala & Stary Achkhoi x x x 11 (12) 1) 11 (12) 58 (67) x by DRC 96(mostly cat. IV) (2nd complete assessment; 11/03/'10)
Urus-Martan x x x 13 13 65 x by DRC 57(2nd complete assessment; 02/12/'09)
Samashki x x x 5 5 27 x by DRC 84(2nd complete assessment; 03/02/'10)
DRC-ChR'09/'10 "box tents" (improved standard) Sernovodsk x x x 34 27 144 x by DRC/Vesta 100 2)housing units assembling (1st assessment - 7 sites; 03/02/'10) (34 of 34 units)
&Grozny, Urus-Martan, Alkhan-Kala, Gekhi, Stary Achkhoi, Novy Sharoi,
Samashki, Yandy, Khambi-Irzi, Zakan-Yurt
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNHCR-ChR'10 "turn-key" RUS48 Standard Houses Grozny (Oktyabrsky & Zavodskoy) x x x 5 5 32 x 65(4th complete assessment; 13/10/'10)
DRC-ChR'10 "self-help" complete rehabilitation of destroyed houses 1st package / 1st part: Grozny urban district x x x 13 13 60 x by DRC 45(mostly cat. IV & V, some objects III, II, I) - Grozny-Oktyabrsky & Grozny-Leninsky
(3rd complete assessment; 13/10/'10)1st package / 2nd part: Grozny rural district x x x 5 5 27 x by DRC 32
- Alkhan-Kala(2nd complete assessment; 14/09/'10)
2nd package / 1st part: Urus-Martan district x x x 8 8 33 x by DRC 21- Alkhan-Yurt & Urus-Martan
(2nd complete assessment; 25/08/'10)2nd package / 2nd part: Urus-Martan district & Achkhoi-Martan district x x x 5 5 26 x by DRC 36
- Gekhi, Khambi-Irzi, Novy Sharoi, Achkhoi-Martan(1st complete assessment; 14/09/'10)
DRC-ChR'09/'10 "box tents" (improved standard) Grozny, Sernovodsk, Shalazhi, Shali, Sovkhoz Rodina, Duba-Yurt, x x x 116 99 417 x by DRC/Vesta 83 3)housing units assembling Katar-Yurt, Stary Atagi, Achkhoi-Martan, Urus-Martan, Chechen-Aul, 166 of 163+37=200 units:
Zakan-Yurt, Samashki, Goyskoye, Alkhazurova, Kalinovskaya, Gekhi, 43 in RI, 116 in ChR, 7 in RNOA Roshi-Chu, Tangi-Chu, Gush-Kort, Yarysh-Mardi, Valerik, Prigorodnoe
Khambi-Irzi, Yandy, Serzhen-Yurt, Ulus-KertUNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) 1 object excluded from programme due to lack of progress (in Stary Achkhoi) 2) as on 31/01/2010, (books closed)
3) as on 30/11/2010
Type Type Number of programme/project of reconstruction approach of beneficiaries
Number
Implementation Implementation
Plans 2010Type Implementation
Shelter Programmes/Projects in North Caucasus 2009/2010René Edward Knupfer, Technical Coordinator
Shelter Programmes/Projects in ChechnyaReview 2009
UNHCR
modus
of programme/project of reconstruction approach of beneficiaries modusType Implementation
Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNTFHS-RNOA'09 "self-help" - 1st package : x x x 7 7 34 x DRC 95United Nations Trust Fund for Human Security (UNTFHS), Khataldon 7 sites
sustainable integration & recovery in North Ossetia-Alania RNOA; (7th complete assessment; 07/09/'10)RUS63 (60), 63m2 (60m2) Standard Houses 2nd package : x x x 9 9 36 x DRC 74
Tsalykovo 1 site, Mairamadag 2 sites, Beslan 4 sites, Vladikavkaz 2 sites(4th complete assessment; 26/08/'10 & 07/09/'10)
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (i
ndivi
duals
)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNTFHS-RNOA'10 "self-help" - Brut, Darg-Kokh, Kardzhin, Zmeyskaya, Krasnogor, Ardon, Nart, x x x 16 16 82 x DRC 12United Nations Trust Fund for Human Security (UNTFHS), Dzuarikau, Alagir, Khataldon, Mairamadag, Vladikavkaz
sustainable integration & recovery in North Ossetia-Alania RNOA; (2nd complete assessment; 26/08/'10 & 07/09/'10)RUS63 (60), 63m2 (60m2) Standard Houses
UNHCR-RNOA'10 "turn-key" …...… (locations not yet defined) x x x ~ 5 ~ 5 nn x ..RUS48 Standard Houses
DRC-RNOA'10 "box tents" (improved standard) Nart, Vladikavkaz, Ardon, Alagir, Dzuzarikau x x x 7 7 40 x DRC 83 1)housing units assembling 166 of 163+37=200 units:
43 in RI, 116 in ChR, 7 in RNOA UNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) as on 30/11/2010
Type Implementation ImplementationNumber of reconstruction approach of beneficiaries modus
Typeof programme/project
Review 2009Implementation ImplementationType Type Number
of beneficiaries
Shelter Programmes/Projects in North Caucasus 2009/2010UNHCR
René Edward Knupfer, Technical Coordinator
Shelter Programmes/Projects in North Ossetia-Alania
approach modus
Plans 2010
of programme/project of reconstruction
type of shelter implementation
Ing
ush
eti
a (
RI)
Ch
ech
nya (
Ch
R)
No
rth
Oss
eti
a-A
lan
ia (
RN
OA
)
tota
l (R
I +
Ch
R +
RN
OA
)
individual houses new building: RUS48 standard "turn key" (TK) 122 5 7 134individual houses new building: RUS48 standard "self help" (SH) 99 99individual houses new building: non standard "self help" (SH) 40 40individual houses new building: RUS60 simplified standard "self help" (SH) 31 31individual houses new building: non standard, 48m² limited "self help" (SH) 90 90individual houses new building: miscellaneous or no standard "turn key" (TK) 247 247individual houses new building: miscellaneous or no standard "self help" (SH) 12 12individual houses rehabilitation: "roof + one dry room" "self help" (SH) 9612 9612temporary shelter "box tents" (BT): prefab hut, set supply "self help" (SH) 840 1938 33 2811
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: RUS48 standard "turn key" (TK) 122 5 7 134
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: RUS48 standard "self help" (SH) 99 99
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: non standard "self help" (SH) 40 40
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: RUS60 simplified standard "self help" (SH) 31 31
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: non standard, 48m² limited "self help" (SH) 90 90
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: miscellaneous or no standard "turn key" (TK) 247 247
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
2000 - 2010 (30/11/'10)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: miscellaneous or no standard "self help" (SH) 12 12
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses rehabilitation: "roof + one dry room" "self help" (SH) 9612 9612
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
temporary shelter "box tents" (BT): prefab hut, set supply "self help" (SH) 840 1938 33 2811
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
2000 - 2010 (30/11/'10)
UUNNHHCCRR NNoorrtthheerrnn CCaauuccaassuuss
RRUUSS 4488 SSttaannddaarrdd HHoouusseess SShheelltteerr PPrrooggrraammmmee 22000066--22001100
RUS 48 UNHCR Northern Caucasus Standard House
RUS 48 UNHCR Northern Caucasus Standard House
Типовой дом 48
RUS 48 UNHCR Northern Caucasus Standard House
optional house extension
RUS48 UNHCR “Turn-Key” Standard House; 10.00 m x 4.80 m = 48 m² optionally extendable (+ 37 m²) from 48 m² (10.00 m x 4.80 m) to 85 m² :
+ [(3.095 + 0.25 + 3.095 + 0.475) x (0.475 + 4.445 + 0.475)] = + (6.915 x 5.395); the result will be a new L-shaped layout
layout extension partially along front façade (next to entrance/corridor/bedroom), corridor extension (l = 2.30, w = 1.10) & new entrance to corridor extension,
result : additional two bedrooms, extension of foundation, façades & roof construction