000 111000000 222000000 333000000 444000000 555000000 111000000000mmm
38.50
39.0
39.5
0
36.5
0
37.0
37.5
0
38.0
40.0
46.0
47.0
45.4
7
47.0
46.5
0
46.0
34.5
0
33.0
33.5
0
34.0
150Ø
34.50
225Ø
225Ø
150Ø
150Ø
225Ø
37.5
0
150Ø 225Ø
38.0
225Ø
225Ø 38.0
150Ø
38.50 38.50
39.0 39.0
39.5039.50
40.0
40.0 40.50
41.0 40.50 41.50
41.50
42.0
42.0
38.0
38.5
0
38.5
0
38.5
0
150Ø
225Ø
225Ø
ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE
ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES
THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY
DIMENSIONS WORK TO FIGURED DIMS ONLY
THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS
WRITTEN PERMISSION FROM AFL LTD.
SO18
KEY
red line boundary
ACCESS & LEVELS
vehicle access
points
Sta! access
Shared route SO17
G0.7
MG
G0.6
car / caravan
route
Services access
HGV / Coach
route
+44.7 proposed levels
130.0 existing levels
LAND USES
HGV parking
+44.7 +44.7
+45.7
+42.7
car parking (including
integrated landscaping)
coach parking (including
integrated landscaping)
caravan parking (including
integrated landscaping)
Building (Amenity Building
and FFS) - < 12.5m
Building (drive through
co!ee shop) < 6.5m
46.5
0
12mH G2.2
+41
Covered hard-standing
(HGV FFS) < 8m
Service area +40
+40 Sta! parking
VEGETATION & INFRASTRUCTURE
+40 +38 Existing tree lines
G2.0 10mH
+37
Concealment mounds
made up of level changes
and supplementary
planting
Surface water attenuation
+39
P07 22.08.19 TS Access removed from A168 roundabout
P06 20.08.19 TS Lagoon access off A168 added
P05 06.08.18 TS Outline issue - red line amended
P04 24.07.18 TS Outline issue - red line amended
P03 24.07.18 TS Outline issue - Leeming Lane route updated +36 +37 P02 14.08.17 TS Issued for outline planning - amended red line
P01 21.07.17 TS Issued for outline planning MH
G
MH rev date/intls description UTL
SO8
G
+39 G
project
Vale of York MSA G
+36 location
G
A1(M) North Yorkshire MH
G
RS
BT
client RS
G
UTL - SEIZED/ BURIED
MH
SO9 G
G
G
RS G UTL - SEIZED/
BURIED MH
G PT
MH SP CB
UTL SP CB SO10 G BT
MH G
G MH
UTL
UTL - SEIZED/ G BURIED LP
UTL - SEIZED MH LP IC G UTL - SEIZED CB SP
G SO11 SP SP SP
MH CB SP
SP SP SP SP SPSP
LP G
SP MH G MH
UTL SP SEIZED
SP SP
TB G SP RS MKR SP
G
G MH
UTL
MH
SP LP BURIED
SP SP G SP
SP
G G
SP SP
SP SP SP SP SP MH
SP UTL SEIZED LP MH MH RS
G MKR UTL
BOL G
AFL Architects G
RS SP
G
1st Floor LP SP MH
MKR
BOL St Georges House
LP SP
G 56 Peter Street MH
Manchester UK LP
SP G M2 3NQ G
G G t: +44(0)161 236 6263 LP
MH f: +44(0)161 236 6484 UTL SEIZED
G w: www.afl-architects.com SP e: [email protected]
London office
LP t: +44 (0)20 7831 8877
key plan 41.0
SP
G
LP
N
SP
G
MH
drawing title
PARAMETERS PLAN
dwg purpose
PLANNING
0 100 200 300 400 500 1000m scale 1:1500
@ sheet size A1
drawn TS
rev date
checked TS
July 2017
162007 job number
AFL-00-00-DR-A-00120 drawing number
P07 revision