WelcomeVeranda Street Bridge Replacement
Public Meeting
East End Community Center195 North Street, Portland, ME
Thursday, August 8, 20196:00 PM
![Page 2: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/2.jpg)
Veranda Street Bridge ReplacementPublic Meeting
• Welcome• Project Schedule• April Workshop Recap• Alignment Design Selection & Enhancements• Discussion/Question and Answer• Close
Agenda:
![Page 3: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/3.jpg)
Project Schedule
![Page 4: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/4.jpg)
April 2019 Public Workshop Findings
• Alignment 2b received the most public support• Decreasing motorist speed is a priority • Increasing bicycle and pedestrian safety is
important• Addition of green space is positive for the
neighborhood• The multiuse path should connect (now or in the
future) to neighboring areas • Opinions varied about parking options on the
street • Opinions varied about center turning lanes
![Page 5: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/5.jpg)
Alignment Selection
NORTH
Alignment Alternative 2b
![Page 6: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/6.jpg)
Veranda Street Beneath Bridge (Looking toward Falmouth)
11’-0” Lane
11’-0” Lane
5’-0” Bike w/2’-0” Buffer
5’-0” Bike w/2’-0” Buffer
10’-0” Multi-Use Path5’-0”Sdwk.
3’-0” 3’-0”
57’-0”
Veranda Street Away From Bridge (Looking toward Falmouth)
11’-0”Lane
11’-0”Lane
Varies 6’-0” to 10’-0”6’-0”Sdwk.
5’-0” Bike2’-0” Buffer
5’-0” Bike2’-0” Buffer
Alignment Selection
![Page 7: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/7.jpg)
• Broadly supported by public workshop attendees
• Provides sufficient capacity in the current year and future
• Reduces vehicle speeds and maximizes green space
• Signalized intersections at both interstate ramps
• Increases safety for all transportation modes
• Provides community green space as well as a buffer to existing homes
• Supports accelerated construction of the new bridge
• Facilitates multi-use pathway connections
Benefits of Selected Alignment
![Page 8: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/8.jpg)
Alignment Enhancements
NORTH
Alignment Alternative 2b
Install radar speed sign south of Martin’s Point Bridge
![Page 9: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/9.jpg)
Alignment Enhancements
NORTH
Alignment Alternative 2b
Rectangular Rapid Flashing Beacons, signage and high-visibility crosswalks
mid-block crossings
![Page 10: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/10.jpg)
Alignment Enhancements
NORTH
Alignment Alternative 2b
Painted bike lane buffers
![Page 11: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/11.jpg)
Alignment Enhancements
Limited on-street parking, two separate parking areas
![Page 12: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/12.jpg)
Alignment Enhancements
Shifting roadway alignment south further improves visibility and sight lines
![Page 13: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/13.jpg)
Alignment Enhancements
Bicycle & Pedestrian Accommodations
![Page 14: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/14.jpg)
Bridge Improvements• Unchanged from concepts previously presented• Includes accelerated construction of a new single span steel girder bridge• Remainder of existing bridge converted to embankment
![Page 15: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/15.jpg)
Bridge Improvements• Unchanged from concepts previously presented• Includes accelerated construction of a new single span steel girder bridge• Remainder of existing bridge converted to embankment
![Page 16: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/16.jpg)
Construction Phasing
Existing Conditions
![Page 17: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/17.jpg)
Construction Phasing
Phase 1 (Approx. May 2020 – August 2020)
• Maintain Veranda Street traffic pattern and pedestrian movement
• Construct foundations, abutments, and falsework
![Page 18: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/18.jpg)
Construction Phasing
Phase 2 (Approx. August 2020 – Nov. 2020)
• Combine Veranda Street NB and SB traffic
• Construct lightweight fill embankment
• Construct upper portion of bridge
![Page 19: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/19.jpg)
Construction Phasing
Phase 3Accelerated Bridge ConstructionClosure Period, Step 1 (April 2021)(Total closure period approx. 56 hours)(Step 1 closure period approx. 22 hours)
• I-295 and Veranda Street closed• Demolish existing bridge
![Page 20: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/20.jpg)
Construction Phasing
Phase 3Accelerated Bridge ConstructionClosure Period, Step 2 (April 2021)(Total closure period approx. 56 hours)(Step 2 closure period approx. 17 hours)
• I-295 and Veranda Street closed• Complete lateral slide and construct
earth embankment
![Page 21: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/21.jpg)
Construction Phasing
Phase 3Accelerated Bridge ConstructionClosure Period, Step 3 (April 2021)(Total closure period approx. 56 hours)(Step 3 closure period approx. 13 hours)
• I-295 and Veranda Street closed• Construct bridge approaches
![Page 22: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/22.jpg)
Construction Phasing
Phase 3Accelerated Bridge ConstructionClosure Period, Step 4 (April 2021)(Total closure period approx. 56 hours)(Step 4 closure period approx. 11 hours)
• I-295 and Veranda Street closed• Place I-295 pavement, install median
barrier and guardrail
![Page 23: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/23.jpg)
Phase 4(Approx. April 2021 – July 2021)
• I-295 and Veranda Street reopened to traffic
• Construct north portion of Veranda Street
Construction Phasing
![Page 24: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/24.jpg)
Construction Phasing
Phase 5(Approx. July 2021 – November 2021)
• I-295 and Veranda Street open• Construct south portion of Veranda
Street and I-295 ramps
![Page 25: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/25.jpg)
Construction Phasing
Completed Project(November 2021)
• Potential green space improvements not shown and will be completed under the direction of the City of Portland
![Page 26: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/26.jpg)
Detours
Interstate Through Traffic Northbound Interstate Traffic Southbound Interstate Traffic
![Page 27: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/27.jpg)
Detours
Southbound Route 1 Traffic Northbound Route 1 Traffic Southbound Route 88 Traffic
![Page 28: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/28.jpg)
Next Steps
![Page 29: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/29.jpg)
Discussion and Questions
![Page 30: Veranda Street Bridge Replacement - Maine.gov](https://reader034.vdocuments.net/reader034/viewer/2022050516/6272523c4eadc807537fa06c/html5/thumbnails/30.jpg)
Thank You!