SERVICES OF BUILD ENVIRONMENT PROJECT
MBA(CPM) –SECTION A GROUP 2PROJECT GROUP 1
ABIN BABU ,PUNEET SURI ,POORVA RATHORE,
Page 1
POORVA RATHORE,MOHIT MISHRA,DEVESHVARMA
SERVICES IN PLOT DEVELOPMENT
![Page 2: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/2.jpg)
CONTENTS
•INTRODUCTION & AUTHORITIES•APPROVAL & BYELAWS•AVAILABLE SERVICES & DETAILING•WATERBALANCE DIAGRAM•ALTERNATIVES & SUGGESIONS
Page 2
•ALTERNATIVES & SUGGESIONS
![Page 3: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/3.jpg)
INTRODUCTION
Page 3
![Page 4: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/4.jpg)
INTRODUCTION & AUTHORITIES RESPONSIBLE• Labourers cooperative housing
committee,Majhola
• Under the Uttar Pradesh Awas Vikas Parishad
Page 4
• Under the Uttar Pradesh Awas Vikas Parishad
![Page 5: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/5.jpg)
SITE LOCATION
Page 5
![Page 6: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/6.jpg)
• Based on housing for all to include EWS and LIG housing at Majhola,Moradabad.
• Total Area of the Project is 446.84 Acres.
• Project phase 1 under construction and being considered for the project work.
Page 6
• Phase 1 - 3.76 Acres
![Page 7: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/7.jpg)
LANDUSE DETAILS
SL NO PARTICULARS AREA IN HA %OFTOTAL
1 Residential 0.8187 53.75
2 Nursery school .0605 3.97
Page 7
2 Nursery school .0605 3.97
3 Shops .0680 4.47
4 green/ park .2287 15.01
5 Roads /path .3473 22.83
TOTAL 1.5232/3.76 Acres 100
![Page 8: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/8.jpg)
FACILITIES PROVIDED• Park - .2287 HA
• Nursery school - .0605 HA
• Convenient shops – .0680 HA
• Residential - .8187 HA
• Roads /Path- .3473 HA
Page 8
• Roads /Path- .3473 HA
• Sizes of Roads provided
9 m wide
7.5 m wide
12 m wide
![Page 9: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/9.jpg)
PLOT DIVISIONPlot size (m*m) Type Number of plots
5 m * 12m Residential 39
8 m * 16m Residential 13
9 m * 20m Residential 9
Page 9
10 m *15 m Residential 6
3.57 m * 8.4m EWS 10
4.76 m * 3.4m LIG 10
![Page 10: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/10.jpg)
APPROVAL & BYELAWS
Page 10
![Page 11: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/11.jpg)
BYELAWS ,DESIGN CODES CONSIDERED
• SP 7;NATIONAL BUILDING CODE 2005
• UP BYE LAWS
• BYE LAWS FOR AWAAS VIKAS YOJANA IS NOT UPDATED TILL NOW ON THE WEBSITE.
• HOWEVER, LOCAL MORADABAD BYE LAWS HAVE BEEN CONSIDERED IN
Page 11
• HOWEVER, LOCAL MORADABAD BYE LAWS HAVE BEEN CONSIDERED IN THE PROJECT AS WELL.
• UTTAR PRADESH JAL NIGAM BYE LAWS.
![Page 12: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/12.jpg)
AVAILABLE SERVICES & DETAILING
Page 12
![Page 13: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/13.jpg)
• Design criteria followed for
– Roads
– Water supply
– Drain
Page 13
– Drain
– sewage
![Page 14: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/14.jpg)
MAJHOLA YOJANA ROAD CROSS SECTION PLAN
CROSS SECTION OF ROAD
Page 14
![Page 15: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/15.jpg)
WATER SUPPLY & DRAIN Based on UP Jal nigam design
criteria.
Individual Scale -155 lpcd
75% of water would be drained through sewers.
Min 1 m head to be kept in all branch lines as based on UP jal nigamRules.
Terminal pressure of 0.60m where two lines meet.
Page 15
sewers.
Pipe diameter and head loss calulations based on modified Hazen Williams formula.
Value of C for PVC pipes has been taken as 145.
meet.
Peak factor of 3.00 has been taken as contributing population in the area not more than 50000.
![Page 16: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/16.jpg)
Modified hazen williams formula
S=frictional slope ,HL/Lthe equation can be modified into
Page 16
the equation can be modified into
![Page 17: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/17.jpg)
Distance in m Sectional
population
Total population Discharge per
day
Dia of pipe Type of pipe Loss of
head per
1000 in m
Loss * cr
15 30 30 14.1 100 Pvc
27 30 30 14.10 100 Pvc
25 50 50 23.5 100 Pvc
86 190 250 117.5 100 Pvc 0.38 0.033
27 25 325 152.75 100 Pvc 0.61 0.016
40.50 50 50 23.50 100 Pvc
Page 17
40.50 50 50 23.50 100 Pvc
47 50 100 47 100 Pvc
41 40 100 47 100 Pvc
38 60 160 75.2 100 Pvc 0.15 0.006
52 90 575 270.25 100 Pvc 1.77 0.092
![Page 18: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/18.jpg)
WATERBALANCE DIAGRAM
Page 18
![Page 19: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/19.jpg)
SL NO TYPE TYPE OF
USE
NO OF DU
‘S
POPULATION DENSITY EXPECTE
D
POPULAT
ION
WATER
REQUIRE
MENT
TOTAL
CONSPT
N
%FLOW
TO
SEWER
FLOW TO
SEWER
1 5*12 RES 39 2/DU 78 155 LPCD 12090 90 10881
2 8*16 RES 13 3/DU 39 155 LPCD 6045 90 5440
3 9*20 RES 9 4/DU 36 155 LPCD 5580 90 5022
4 10*15 RES 6 4.5/DU 27 155 LPCD 4185 90 3766
5 3.57*8.4 EWS 10 3/DU 30 155 LPCD 4650 90 4185
6 4.76*3.4 LIG 10 2/DU 20 155 LPCD 3100 90 2795
Page 19
7 NURSERY EDU 605M2 @4SQM/P 152 45 LPCD 6840 90 6156
8 SHOPS MER 680M2 @2SQM/P 226.67 30 LPCD 6800.1 90 6126
SUBTOTAL A 49290 44370
9 GARDEN
@25KL/A
CRE/DAY
0.565AC
RE
25KL/ACRE/DAY 14125L 0 0
SUBTOTAL B 14125 0
10 ADDITION
AL
WATER
USAGE
10000 100 10000
SUBTOTAL C 10000 0
![Page 20: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/20.jpg)
• Grand total =a +b+c =73415 lpd
• Flow to stp =54361 lpd
• Water demand for domestic purposes=59 290 lpd
• Stp influent load =54361 lpd
• Recovery % = 13590.25 lpd
• Use of recycled water = 14125 lpd
Page 20
• Use of recycled water = 14125 lpd
• Discharge to public sewer (75%)= 40770 lpd
• Excess water required=535 lpd
![Page 21: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/21.jpg)
AWAAS VIKAS YOGANA DEVELOPMENT
59290 + 535 LPD
54361 LPD
14125 LPD
Page 21
STP
40770 LPD
![Page 22: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/22.jpg)
ALTERNATIVES & SUGGESIONS
Page 22
![Page 23: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/23.jpg)
• CHANGES IS STP MODEL
• REQUIREMENT OF FIRE SAFETY MEASURES
• BITUMEN ROADS
Page 23
![Page 24: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/24.jpg)
AWAAS VIKAS YOGANA DEVELOPMENT
45165 LPD
40648.5 LPD
30010 LPD
SUGGESTED MODEL
Page 24
STP(90%)
6573 LPD
![Page 25: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/25.jpg)
vpark
Plot type 1
2 nursery
6
Page 25
v
Type 3 Type 4 & 5 shop
![Page 26: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/26.jpg)
Page 26
![Page 27: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/27.jpg)
Page 27
![Page 28: water balance diagram for a project](https://reader033.vdocuments.net/reader033/viewer/2022042515/5871b7791a28ab55058b4bbd/html5/thumbnails/28.jpg)
Page 28