RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.011
VICINITY MAP
LOCATION MAP
-
FM
FM
FM
FM
FM
FM
FM
FM
SCALE IN FEET
0 500 1000
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.012
EXISTING CONDITIONS
SITE PLAN
SEWER
FORCE
MAIN
ATS 3
BOUNDARY
MARINE
PARK
SEAPLANE
FLOAT
LIGHTERING
FLOAT
CBJ DOCKS
CBJ
PARKING
GARAGE
EGAN DR
.
MA
RIN
E W
AY
SOUTH
FRANKLIN
ST
MINERS
COVE
SEAWALK
SOUTH
FRANKLIN
DOCK
MINERS
COVE
CHAN
NEL
GASTIN
EAU
INTERMEDIATE
VESSEL
FLOAT
TRAM PLAZA
CRUISE SHIP TERMINAL
STAGING AREA
TAKU
SMOKERIES/
FISHERIES
TAKU
FISHERIES
DOCK
FISHERMEN'S
MEMORIAL
PORT
CUSTOMS
BLDG
MERCHANTS
WHARF
ALA
SKA S
TEAM
SHIP
DO
CK
CRUIS
E S
HIP
TERM
INAL
MLLW = 0
MHW = 15.4
HTL = 20.8
-
1000'
1000'
SCALE IN FEET
0 500 1000
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.013
PROPOSED
SITE PLAN
PROPOSED
NORTH BERTH
BOUNDARY,
SEE SHEET 4
PROPOSED
SOUTH BERTH
BOUNDARY,
SEE SHEET 5
PROPOSED RETAINING WALL,
MOORAGE FLOAT AND
TAKU SMOKERIES IMPROVEMENTS,
SEE SHEETS 6 & 7.
CHAN
NEL
GASTIN
EAU
MLLW = 0
MHW = 15.4
HTL = 20.8
MLLW = 0
MHW = 15.4
HTL = 20.8
MLLW = 0
MHW = 15.4
HTL = 20.8
-
1000'
SCALE IN FEET
0 200 400
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.014
MARINE
PARK
EXISTING
SEAPLANE
FLOAT
CBJ
PARKING
GARGAGE
MERCHANTS
WHARF
MAT
CH
LINE
SHEE
T 4
SHEE
T 5
EXISTING
CBJ DOCK
EGAN DR.
MA
RIN
E W
AY
SO
UTH
FR
AN
KLIN
ST
EXISTING
LIGHTERING
FLOAT
NORTH BERTH
PROPOSED SITE PLAN
MLLW = 0
MHW = 15.4
HTL = 20.8
MLLW = 0
MHW = 15.4
HTL = 20.8
STRUCTURE SUMMARY (NORTH BERTH)
STRUCTURE SIZE PILE # PILE DIA.
APPROACH DOCK 6,200 SF 24 24"
VEHICLE TRANSFER BRIDGE 20' x 148' 5 24'
BRIDGE LANDING 30' x 65' 0 0
CONCRETE FLOATING DOCK 50' x 400' 14 48"
MOORING & BREASTING
DOLPHINS6 EA 38 48"
NEW
APPROACH
DOCK
w/ SECURITY
GATE
NEW VEHICLE
TRANSFER
BRIDGE
NEW BRIDGE
LANDING
NEW CONCRETE
FLOATING DOCK
NEW MOORING
& BREASTING
DOLPHINS,
SEE SHEET 10
C
D
DC
E
E
B
B
-
1000'
SCALE IN FEET
0 200 400
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.015
SOUTH BERTH
PROPOSED SITE PLAN
TAKU
SMOKERIES/
FISHERIES
BLDG
EXISTING
CBJ DOCK
MAT
CH
LINE
SHEE
T 4
SHEE
T 5
SEE
SHEETS
6 & 7
INTERMEDIATE
VESSEL
FLOAT
SOUTH
FRANKLIN
ST
CRUISE SHIP
TERMINAL
STAGING
AREA
MINERS
COVE
SEAWALK
MLLW = 0
MHW = 15.4
HTL = 20.8
STRUCTURE SUMMARY (SOUTH BERTH)
STRUCTURE SIZE PILE # PILE DIA.
APPROACH DOCK 7,800 SF 26 24"
VEHICLE TRANSFER BRIDGE 20' x 148' 5 24"
BRIDGE LANDING 30' x 65' 0 0
CONCRETE FLOATING DOCK 50' x 300' 14 48"
MOORING AND BREASTING
DOLPHINS7 EA 47 48"
NAVIGATIONAL BOOM 410 LF 5 48"
NEW
APPROACH
DOCK W/
SECURITY
GATE
NEW VEHICLE
TRANSFER BRIDGE
NEW BRIDGE
LANDING
NEW CONCRETE
FLOATING DOCK
NEW MOORING &
BREASTING DOLPHINS,
SEE SHEET 9
C
D
D
C
E
E
B
B
J
J
NEW
NAVIGATIONAL
BOOM,
SEE SHEET 15
-
SCALE IN FEET
0 100 200
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAUDOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01 6
TRANSFER BRIDGE
PROPOSED DEMOLITION PLAN
TRAM
PLAZA
BLDG
TO REMAIN
EXISTING
CBJ DOCK
SOUTH
FRAN
KLIN ST
CRUISE SHIP
TERMINAL
STAGING AREA
TAKU SMOKERIES/
FISHERIES BLDG
FISHERMEN'S
MEMORIAL
EXISTING
INTERMEDIATE
VESSEL
FLOAT
MINERS
COVE
SEAWALK
MLLW = 0
MHW = 15.4
HTL = 20.8
MLLW = 0
MHW = 15.4
HTL = 20.8
REMOVE DOLPHINS
& CATWALKS, TYP.
TAKU FISHERIES
DOCK TO BE
RECONFIGURED
DEMO PORTION OF
SOUTH FERRY DOCK
PORT CUSTOMS BLDG
TO REMAIN
REMOVE
TRANSFER BRIDGE
EXISTING DOCK
TO REMAIN
DEMOLITION SUMMARY
STRUCTURE SIZE NO. OF PILES PILE Ø
TRANSFER BRIDGE 2,600 SF 12 (STEEL)12" (8)
24" (4)
SOUTH FERRY DOCK 7,250 SF 120 (TIMBER) 12"
DOLPHINS & ASSOC. CATWALKS 6 EA @ 300LF 22 VARIES
-
1
SCALE IN FEET
0 100 200
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAUDOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01 7
TRANSFER BRIDGE
PROPOSED SITE PLAN
TRAM
PLAZA
BLDG
EXISTING
CBJ DOCK
SOUTH
FRAN
KLIN ST
CRUISE SHIP
TERMINAL
STAGING AREA
TAKU SMOKERIES/
FISHERIES BLDG
TAKU
FISHERIES
DOCK
FISHERMEN'S
MEMORIAL
EXISTING
INTERMEDIATE
VESSEL
FLOAT
PORT
CUSTOMS
BLDG
MINERS
COVE
SEAWALK
SOUTH
FERRY
DOCK
MLLW = 0
MHW = 15.4
HTL = 20.8
MLLW = 0
MHW = 15.4
HTL = 20.8
STRUCTURE SUMMARY (RETAINING WALL AND TAKU
SMOKERIES DOCK)
STRUCTURE SIZE # OF PILES PILE ø
CONCRETE RETAINING WALL
AND FILL
75 LF X
1'-3" WIDE9 24"
NEW DOCK ADDITION 11,000 SF 2, 34 16", 12.75"
CONCRETE MOORAGE
FLOAT16' X 200' 6 20"
GANGWAY8' X 120' 0 0
NEW WORK DECK ADDITION 1,200 SF 15, 1 16", 24"
NEW GANGWAY
NEW CONCRETE
MOORAGE FLOAT
NEW WORK DECK
ADDITION
NEW DOCK ADDITION,
APPROX. 11,000 SF
NEW CONCRETE
RETAINING WALL
AND FILL
SUMMARY OF FILL QUANTITIES
MATERIAL
TOTAL
PROJECT
QTY
QTY BELOW
HTL
QTY
SEAWARD
MHW
FILL 700 CY 200 CY 400 CY
BASE COURSE 20 CY 20 CY 20 CY
RIP RAP 50 CY 50 CY 50 CY
EXCAVATION 100 CY 0 CY 0 CY
H
H
G
G
A
A
F
F
NEW
MOORING
PILE
-
EXISTING DOCK
TO REMAINTOP OF DOCK
ELEV. +25' ±
16'
GANGWAY
MHW
ELEV. +15.4'
HTL
ELEV. +20.8
MLLW
ELEV. +0.0'
16' x 250' CONCRETE FLOAT
TOP OF PILE
ELEV. +30' ±
APPROX.
BEDROCK
APPROX.
GROUND LINE
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.018
SECTIONS
SECTION A-A
-
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.019
SECTIONS
SECTION B-B
SECTION C-C
MLLW
ELEV. +0.0'
FLOATING
DOCK
140'
TRANSFER
BRIDGE
NEW
PIER
MHW
ELEV. +15.4'
HTL
ELEV. +20.8'
STEEL PIPE
PILE, TYP.
STEEL PILE
CAP
TOP OF PIER
ELEV. +27'±
EXISTING DOCK
TO REMAIN
24'
TIMBER
DECK
MHW
ELEV. +15.4'
APPROX.
BEDROCK
APPROX.
GROUNDLINE
BULLRAIL
HTL
ELEV. +20.8'
MLLW
ELEV. +0.0'
TOP OF DECK
ELEV. +27' ±
-
24'-0"
30'-0"
STEEL DECK
BRIDGE LANDING
PEDESTRIAN
GUARDRAIL
STEEL VEHICLE
TRANSFER BRIDGE
FOAM FILLED
MARINE FENDER
REMOVABLE
COMBINATION
VEHICULAR AND
PEDESTRIAN BARRIER
50'
FLOATING
CONCRETE
DOCK
FREEBOARD
8'-0"
CATWALK
TOP OF PILE
ELEV. +24'±
APPROX.
BEDROCK
STEEL PIPE
PILE, TYP.
APPROX.
GROUNDLINE
QUICK RELEASE MOORING
HOOK NOT SHOWN
DOLPHIN CAP
STEEL PIPE
FENDER PILE, TYP.
DROP ON FENDER
FRAME
FOAM FILLED
MARINE FENDER
MHHW
ELEV. +15.4'
MLLW
ELEV. +0.0'
TOP OF DECK
ELEV. +30'±
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.0110
SECTIONS
SECTION D-D
SECTION E-E
-
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
SECTIONS
SECTION F-F
STEEL PIPE
PILE, TYP.
STEEL PILE
CAP
TOP OF DOCK
ELEV. +27'±
EXISTING DOCK
TO REMAIN
VARIES
0' TO 100'±
TIMBER
DECK
BULLRAIL
MHW
ELEV. +15.4'
HTL
ELEV. +20.8'
MLLW
ELEV. +0.0'
TOP OF DECK
ELEV. +27' ±
APPROX.
BEDROCK
APPROX.
GROUNDLINE
STEEL PIPE
FENDER, TYP.
11
-
5
1
1.5
1
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.0112
SECTION AT TIMBER WALL
NTS
SECTION G-G
RETAINING WALL
FOUNDATION PLAN
+18.0' MLLW
+16.0' MLLW
SHOT ROCK
BACKFILL
SHOT ROCK
BACKFILL
EXISTING TIMBER PILE
EXISTING TIMBER WALL
CONCRETE
RETAINING WALL
CONCRETE
DECK
TIMBER
DECK
EXISTING
GROUND
24" GALVANIZED
STEEL PILE PIPE
RIP RAP
EXISTING CONCRETE
RETAINING WALL
STEEL PILES, TYP.
CONCRETE RETAINING
WALL
END OF CONCRETE
RETAINING WALL
26'-2"
38'-2"
9'-4"
1'-3"
-
TO
P O
F D
EC
K
EL
EV
. +
27
' ±
ML
LW
EL
EV
. +
0.0
'
HT
L
EL
EV
. +
20
.8'
EX
IST
ING
WA
LL
MH
W
EL
EV
. +
15
.4'
EX
IST
ING
GR
OU
ND
CO
NC
RE
TE
DE
CK
TIM
BE
R
GL
U-L
AM
ST
RIN
GE
R
ST
EE
L
VE
RT
ICA
L
PIL
E,
TY
PS
TE
EL
BA
TT
ER
PIL
E,
TY
P
ST
EE
L
PIL
E
CA
P
TIM
BE
R
DE
CK
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.0113
PORT CUSTOMS
DOCK SECTION
SE
CT
ION
H-H
-
TO
P O
F D
EC
K
EL
EV
. +
27
' ±
ML
LW
EL
EV
. +
0.0
'
HT
L
EL
EV
. +
20
.8'
EX
IST
ING
WA
LL
MH
W
EL
EV
. +
15
.4'
EX
IST
ING
GR
OU
ND
CO
NC
RE
TE
DE
CK
TIM
BE
R
GL
U-L
AM
ST
RIN
GE
R
ST
EE
L
VE
RT
ICA
L
PIL
E,
TY
PS
TE
EL
BA
TT
ER
PIL
E,
TY
P
ST
EE
L
PIL
E
CA
P
TIM
BE
R
DE
CK
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.0113
PORT CUSTOMS
DOCK SECTION
SE
CT
ION
H-H
-
STEEL PIPE
PILE, TYP.
GROUNDLINE
BEDROCK
PILE TIP
AS REQ'D
DRILLED AND
GROUTED PIPE
PIN PILE
DRILLED AND
GROUTED ROD
DRILLED SOCKET
SIMILAR IN
SIZE TO PILE
STEEL PIPE PILE TIPS FOR THIS PROJECT
WILL BE INSTALLED PER ONE OF THE
METHODS DEPICTED ON THIS SHEET. ACTUAL
METHOD TO BE DETERMINED AS SUBSURFACE
CONDITIONS BECOME KNOWN. ALL PILES
DRIVEN TO IMPACT HAMMER REFUSAL
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.01
NOTE:
DRIVEN PILE
PIN PILE
ROCK ANCHOR
PILE SOCKET
14
PILE DETAILS
-
CBJ DOWNTOWN
CRUISE SHIP DOCKS
RECONFIGURATION
PROPOSED MODIFICATIONS
PURPOSE:
JANUARY 2013
TO IMPROVE ACCESS, SECURITY, BERTHING
CAPACITY AND SAFETY AT THE CBJ DOWNTOWN
CRUISE SHIP DOCKS.
MLLW = 0.0 FT
HTL = 20.8'
MHW = 15.4'
MLLW = 0.0'
GASTINEAU CHANNEL
JUNEAU
DOWNTOWN CRUISE SHIP DOCKS
CITY AND BOROUGH OF JUNEAU
DATUM:
APPLICATION BY:
IN:
AT:
NEAR:
DATE:
APPLICANT ADDRESS:
SHEET OF 15
CITY AND BOROUGH OF JUNEAU
DOCKS & HARBOR DEPT.
155 S. SEWARD STREET
JUNEAU, AK 99801
PND#: 102050.0115
NTS
PIPE NAVIGATION BOOM
SECTION J-J
PILE HOOP
48"ø
PIPE
STABILIZER
STRUT
BUMPER
48"ø
PIPE
NAVIGATION
BOOM
48"ø
MOORING PILE