    Part of EEA

    Balance use andresource

    protection

    Fosterpartnerships

    Promote sound

    coastal

    management

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    3/22

    General technical

    assistanceMHP regulatory

    guidance

    Review MHPsubmittals (onbehalf of EEA

    Secretary)Assistance through

    RC

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    4/22

    Ch. 91

    ImplementationProtection and

    promotion of

    public use oftidelandsMHP regulatory

    guidanceCh. 91 permit

    authority

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    5/22

    2,000 year old

    principlePublic has

    fundamental rights

    to air, sea, shoreState as trustee of

    the publics rights

    has responsibilityto protect theseinterests

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    6/22

    Primary tool to

    implementprotection of publicuse of tidelands

    Coastal and inlandwaterwaysAny activity that

    takes place withinjurisdiction requiresauthorization

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    7/22

    Where is Chapter 91

    Jurisdiction? Flowed Tidelands Any project in, on, over, or

    under tidal waters seaward ofmean high water (MHW)

    Extends 3 miles seaward

    (state jurisdiction) Filled Tidelands (lands that

    were formerly flowedtidelands) In a DPA, all filled tidelands

    (to Historic High Water(HHW) Outside a DPA, to first public

    way or 250 from MHW(whichever more landward)

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    8/22

    There are 11 DPAs inMassachusetts

    Gloucester, Beverly, Lynn, Salem

    Mystic River, Chelsea Creek,East Boston, South Boston,

    Weymouth Fore River

    New Bedford-Fairhaven, FallRiver

    Based on physical andoperationalfeatures needed to support waterdependent industry

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    9/22

    Waterway and associatedwaterfront developed toaccommodate commercialnavigation or otherutilization of the water;

    Landside spacewith

    physical and use characterthat supports siting ofindustrialfacilities/operations

    Appropriate land-based

    transportation routes andutilities for industrial use

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    10/22

    DPA Policy: protect limited developed

    shoreline resources for industrial uses thatcannot be sited elsewhereBasis:

    Industrial uses need appropriate physical attributes

    Coastal areas with these essential developedattributes are limited

    Unlikely that new developed shoreline can becreated

    Once converted from industrial character, notlikely to revert back Non-industrial uses can be sited in other locations

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    11/22

    Approximately1.7% of

    Massachusetts

    coastline is DPA

    Remainder of

    coast does not

    have the essential

    physical attributes

    to support WDI

    uses

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    12/22

    Approximately

    3.7% ofGloucester

    coastline is DPA

    Remainder ofcoast does not

    have the essential

    physical

    attributes tosupport WDI uses

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    13/22

    State does not require harborplans

    Harbor Plans guide the growthand development of harbors

    Community can do harborplanning with no stateinvolvement

    Community develops vision forharbor

    Identifies key issues

    Develops goals and objectives forharbor and action items to

    address these Action items are implementedlocally

    Actions/projects on the waterfrontmust comply with local zoningand existing state regulations

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    14/22

    Voluntary Community can modify

    some Ch. 91 rules to fitgoals for the harbor

    Changes must beconsistent with state

    tidelands policy MHP reviewed and

    approved by Secretaryof EEA

    Approved MHP guidesDEP Chapter 91licensing decisions

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    15/22

    Part of the MHPCommunity specifies

    allowable SupportingDPA uses

    Can request flexibilityMust

    preserve/enhance

    capacity of the DPA toaccommodate WDIuses

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    16/22

    Water Dependent Industrial(WDI)

    Accessory to WDISupporting DPA Uses

    Temporary Uses

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    17/22

    Industrial in nature and waterdependent

    Examples: Marine terminals/facilities for

    waterborne commerce

    Passenger vessel facilities

    Manufacturing facilities relying on

    goods arriving via water Commercial fishing/processing facilities

    Facilities for construction/maintenanceof vessels or other marine structures(boatyard, storage, dry docks, etc)

    Hydroelectric power facilities

    Industrial facilities dependent onwithdrawal or discharge of largevolumes of water

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    18/22

    Uses associated

    with WDI usesCannot exist on

    their own

    Examples: Roadways

    Parking

    Administration offices

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    19/22

    Commercial or industrial

    uses Provide direct economic or

    operational support to WDIuse

    Differ from accessoryusecan exist without WDIuse

    Certain uses prohibited byregulation (hotel/motel,rec boating, officebuildings, etc.

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    20/22

    Allowed for maximum of 10 years

    Intended to fill vacant spaces/facilitiesExamples:

    Parking

    Warehousing

    Trucking

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13

    21/22

    CZM responsible for

    DPA boundaryreview

    Can be requested

    by: City or town

    Port authority/Regional

    planning agency

    DPA Property owner

    Ten citizens

    3 Key DPA Attributes

  • 7/30/2019 DPA_MHP_Kathryn Glenn Power Points June 1 13