Franklin Square Hospital Patient Tower Nicole R. Lucas – Structural Option Dr. Hanagan – Faculty Advisor April 13, 2009 B.A.E. / M.A.E.

Upload: others

Post on 07-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

F rank l i n Squa re Hosp i t a l Pa t i en t Towe r

N i c o l e R . Lu c a s – S t r u c t u r a l O p t i o n

D r . H a n a g a n – F a c u l t y A d v i s o rA p r i l 1 3 , 2 0 0 9B . A . E . / M . A . E .

Page 2: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Connection Details (M.A.E.) 

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Ou t l i ne o f P resen t a t i on

Background of Building 

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Background

Introduction

Criteria/Goals 

Introduction to Thesis 

Vibration Study

New Design

Conclusions

Architectural Breadth

Design Summary

Cost /Schedule Breadth 

Page 3: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Loca t i on

Background B a l t i m o r e , M D

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Page 4: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Bu i l d ing S t a t i s t i cs

Background

3 5 6 , 0 0 0 S q u a r e F e e t

7 S t o r i e s

C o n s t r u c t i o n N o v e m b e r 2 0 0 7 - J u n e 2 0 1 0

C o s t - $ 1 1 9 M i l l i o n

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Page 5: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Func t i ons

Background

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

E m e r g e n c y E x p a n s i o nI C UP a t i e n t R o o m sP e n t h o u s e

Page 6: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Func t i ons

Background P a t i e n t R o o m s

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Te a m S t a t i o n sO f f i c e s

Page 7: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

E x i s t i ng Cond i t i ons

Background F o u n d a t i o n S y s t e m

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

D r i l l e d   p i e r s / c a i s s o n s

4 ’   d i a m e t e r

‐ 2 ’ ‐ 0 ” ‐ 4 2 ’ ‐ 0 ”   ( 3 , 0 0 0 p s i )

G r a d e   b e a m s :   ( 2 4 ” x 2 4 ” )

5 ”   S O G   ( 3 , 0 0 0   p s i )

E x i s t i n g   r e t a i n i n g   w a l l   p l a n   N o r t h  

1 2 ”   f o u n d a t i o n  w a l l   a r o u n d   p e r i m e t e r

255’‐0”

261’‐7”

Plan North

Page 8: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

E x i s t i ng Cond i t i ons

Background F l o o r S y s t e m

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Tw o ‐w a y   f l a t   p l a t e   s l a b

5 , 0 0 0   p s i

T y p i c a l   b a y   3 0 ’   x   3 0 ’

3 0 ’   x   1 5 ’   b a y s   a r o u n d   e g r e s s

P e r i m e t e r   b e a m s   ( 5 , 0 0 0   p s i )

T y p i c a l   2 1 ”   x   2 1 ”   c o l u m n s

7 , 0 0 0   p s i   ( g r o u n d ‐ t h i r d )

5 , 0 0 0   p s i   ( f o u r t h ‐ p e n t h o u s e )

S t u d   r a i l sPlan North

30’‐0”

30’‐0” 30’‐0” 15’‐0”

Page 9: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

E x i s t i ng Cond i t i ons

Background

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

L a t e r a l S y s t e m

C o n c r e t e  m om e n t   f r a m e s

Page 10: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

E x i s t i ng Cond i t i ons

Background R o o f S y s t e m

Introduction

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

W 1 2   a n d  W 1 4   b e a m s   s p a n n i n g   1 5 ’ ‐ 0 ” ,   2 0 ’ ‐ 0 ”   a n d  3 0 ’ ‐ 0 ”

B e a m s   s p a c e d   a t   5 ’ ‐ 0 ”

W 1 6 ,  W 1 8 ,   a n d  W 2 1   g i r d e r s   s p a n n i n g   3 0 ’

R o o f   D e c k   1 . 5 ”   d e e p ,  w i d e   r i b ,   2 0   g a g e  g a l v a n i z e d  m e t a l   d e c k

Page 11: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Reasons fo r Redes ign

M u l t i p l e S t e e l t o C o n c r e t e C o n n e c t i o n s

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Background

Introduction

Page 12: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Reasons fo r Redes ign

L a t e r a l L o a d s I n c l u d i n g R e d u c i n g W e i g h t

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Background

Introduction

Direction N-S E-W

V (kips) = 339 418

1.6 *V (kips) = 542 669

Total Weight of Building (kips) = 46,529

V (kips) = 865

W i n d C h a p t e r 6 A S C E 7 - 0 5

S e i s m i c C h a p t e r s 1 1 a n d 1 2 A S C E 7 - 0 5

Page 13: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Reasons fo r Redes ign

F o u n d a t i o n S y s t e m

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Criteria/Goals

Connection Design

Design Summary

Background

Introduction 1 2 3 C a i s s o n s

1 2 3 T o n s o f S t e e l

2 , 4 0 4 C Y o f C o n c r e t e

Page 14: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Steel Design

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

C r i t e r i a /Goa l s

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Introduction

Connection Design

Design Summary

Background

Criteria / Goals

Reduce the seismic loads so the difference between seismic and wind loads aren’t so large

Decrease impact on foundation

Provide an efficient system to resist loading utilizing typical member sizes

Eliminates concrete to steel connections in existing design

Preserve the flexibly in floor plan according to the architect’s requests

Façade compliments existing building

Maintain or reduce costs of structural system

Maintain or reduce time in structural schedule

Page 15: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Se i smic Des ign Resea rch

C a n u s e R v a l u e u p t o 8

T h e h i g h e r t h e R v a l u e t h e m o r e d e t a i l e d

D e s i g n P h i l o s o p h y : C o n c e n t r a t e d a m a g e a t p o i n t s t h a t w i l l n o t a f f e c t g r a v i t y l o a d c a r r y i n g c a p a c i t y

M e m b e r s a n d c o n n e c t i o n s t o r e m a i n e l a s t i c

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Introduction

Connection Design

Design Summary

Background

Steel Design

Page 16: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Momen t F r ame O r i en t a t i on

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Introduction

Connection Design

Design Summary

Background

Steel Design

R A M A s s u m p t i o n s- C o l u m n s a r e p i n n e d a t f o u n d a t i o n- G r a v i t y m e m b e r s a r e s i m p l y s u p p o r t e d- L a t e r a l m e m b e r s a r e f i x e d - f i x e d - C o n n e c t i o n t o e x i s t i n g b u i l d i n g n o t i n c l u d e d

Page 17: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Momen t F r ame O r i en t a t i on

R e d – L a t e r a l

B l u e – G r a v i t y

Architectural Study

Cost/Schedule

Conclusion

Vibration Study

Introduction

Connection Design

Design Summary

Background

Steel Design

Eliminated Steel to Concrete Connections!

Page 18: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

V i b r a t i on S tudyI C U – S e c o n d F l o o r

A I S C D e s i g n G u i d e 1 1C h a p t e r 4 D e s i g n f o r W a l k i n g E x c i t a t i o n

W 1 4 x 2 2 ( a / g = 0 . 8 5 ) t o W 1 4 x 6 8 ( a / g = 0 . 4 5 )

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Connection Design

Design Summary

Background

Vibration Study

Page 19: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

V i b r a t i on S tudy

C h a p t e r 6 D e s i g n f o r S e n s i t i v e E q u i p m e n t

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Connection Design

Design Summary

Background

Vibration Study

F n = 4 . 4 6 H z

Page 20: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

V i b r a t i on S tudy

C h a p t e r 6 D e s i g n f o r S e n s i t i v e E q u i p m e n t

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Connection Design

Design Summary

Background

Vibration Study

Page 21: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Connec t i on Des ign (M.A .E )

T y p i c a l M o m e n t C o n n e c t i o n

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Design Summary

Background

Connection Design

S h e a r G i r d e r / C o l u m n F l a n g e C o n n e c t i o n

Page 22: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Connec t i on Des ign (M.A .E )

S h e a r G i r d e r / C o l u m n W e b C o n n e c t i o n

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Design Summary

Background

Connection Design

S h e a r B e a m / G i r d e r C o n n e c t i o n

Page 23: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

La t e r a l Loads

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Design Summary

W i n d

Total Weight of Building (kips) = 42384

V (kips) = 702

Direction N-S E-W

V (kips) 391 481

1.6*V (kips) 626 770

S e i s m i c

Reduced Seismic Loads!

Page 24: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Founda t i on

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Design Summary

T y p i c a l 1 5 ’ x 1 5 ’ x 3 6 ” S p r e a d F o o t i n g s

( 3 0 ) # 6 E a c h W a y

B a s e P l a t e s 2 0 . 5 ” x 1 4 . 5 ”

Reduced Impact on Foundations!

Page 25: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Des ign Summary

Architectural Study

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Design Summary

D e c k : 3 ¼ ” l i g h t w e i g h t c o n c r e t e 2 ” d e e p b y 1 8 g a g e g a l v a n i z e d c o n c r e t e m e t a l d e c k

G r a v i t y C o l u m n s : W 1 4 s h a p e s

L a t e r a l B e a m s : W 1 6 a n d W 2 4 s h a p e s

G r a v i t y C o l u m n s : W 1 2 s h a p e s

G r a v i t y B e a m s : W 1 0 x 1 2 , W 1 4 s h a p e s

Utilized Typical Member Sizes!

Page 26: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

A rch i t ec tu r a l S tudy

Design Summary

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Architectural Study O r i g i n a l D e s i g n v s . N e w D e s i g n

Floor Plan

Preserved Flexibility in Floor Plan!

Page 27: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

F açade S tudy

Design Summary

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Architectural Study

Page 28: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

F açade S tudy

Design Summary

Cost/Schedule

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Architectural Study

O r i g i n a l D e s i g n ( To p ) v s . N e w D e s i g n ( B o t t o m )Façade Still Compliments Existing Building!

Page 29: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Cos t Ana l ys i s

Design Summary

Architectural Study

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Cost/Schedule

SteelBeams $3,724,769

Column $1,282,158

Moment Connections

$95,200

Steel Deck / Slab

$992,087

Fireproofing $814,625

Foundation $79,552

ConcreteBeams $658,417

Column $248,627

Slabs $2,668,157

Structural Steel $60,306

Fireproofing $10,005

Foundation $556,148

C o n c r e t e$ 1 1 . 9 5 / s q f o o t

S t e e l$ 1 9 . 9 3 / s q f o o t

3.89

6.49

$0

$1

$2

$3

$4

$5

$6

$7

Cost

in M

illio

ns

Concrete Steel

Increase in Cost : (

Page 30: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Schedu le Ana l ys i s

Design Summary

Architectural Study

Conclusion

Steel Design

Introduction

Vibration Study

Connection Design

Background

Cost/Schedule

210

156

0

50

100

150

200

250

Dura

tion

in D

ays

Concrete

Steel

Steel

Lead Time 40 days 40 days

Columns ( 2 Stories)

2 days 1 day

Beams (First Story)

8 days

9 daysBeams

(Second Story)8 days

Deck (First Story)

7 days

9 daysDeck

(Second Story)7 days

Moment Connection

18 days 1 day

Spray Fireproofing

23 days 23 days

Concrete

Foundation / SOG 30 days 30 days

Formwork 12 days

24 days

Stand up Columnsand pour

5 days

Reinforcing for Beams

3 days

Reinforcing for Top Bars

2 days

Reinforcing for Bottom Bars

2 days

Concrete Slab Pour 3 days

Curing of Concrete 7 days

Stripping of Formwork and

Reshoring10 days

4.05

6.49

$0

$1

$2

$3

$4

$5

$6

$7

Cost

in M

illio

ns

Concrete Steel

S a v i n g o f $ 2 2 4 , 6 0 0 P l u s R e v e n u e

C o n c r e t e S t r u c t u r e – 2 1 0 d a y s

S t e e l S t r u c t u r e – 1 5 6 d a y s

Reduced Time in Schedule!

Page 31: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

C r i t e r i a /Goa l s

Design Summary

Architectural Study

Cost/Schedule

Steel Design

Introduction

Vibration Study

Connection Design

Background

Conclusion

Reduce the seismic loads so the difference between seismic and wind loads aren’t so large

Decrease impact on foundation resulting in eliminated the current caisson system

Provide an efficient system to resist loading utilizing typical member sizes

Preserve the flexibly in floor plan according to the architect’s requests

Façade compliments existing building

Eliminates complicated concrete to steel connections in existing design

Maintain or reduce costs of structural system

Maintain or reduce time in structural schedule

?

Steel is Viable Option!

Page 32: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

Criteria/Goals

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

Acknowledgemen ts

Design Summary

Architectural Study

Cost/Schedule

Steel Design

Introduction

Vibration Study

Connection Design

Background

Conclusion

Rathgeber / Goss Associates:  Justin Domire and Mike Goss

Lillibridge:  Roger Becker and Joe Weiner 

Franklin Square Hospital Center: Dennnis Kephart 

Wilmot / Sanz: Juan C. Alvarez and Vir Arya 

Leach Wallace: Fred Marr 

Bovis Lend Lease: Alan Bender and Kiersten Zabinski

The Entire Pennsylvania State University Architectural Engineering Department and Staff.  Dr. Hanagan, Professor Parfitt, Professor Holland 

Each of the Mentors on all of the Discussion Boards

The Penn State University Architectural Engineering Class of 2009

My family and friends for their support and love

Page 33: Dr. Hanagan – Faculty AdvisorCriteria/Goals. Architectural Study. Cost/Schedule. Conclusion. Vibration Study. Introduction. Connection Design. Design Summary. Background. Criteria

N i c o l e L u c a s F r a n k l i n S q u a r e H o s p i t a l P a t i e n t T o w e r S t r u c t u r a l O p t i o n

F r ank l i n Squa re Hosp i t a l Pa t i en t Towe r