dr proposal 3012977 agenda id 3651

Upload: tfooq

Post on 05-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    1/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    OWNER: .MARK HUBER7069 NE 161ST STKENMORE, WA 98028

    918 M.L.K. Jr Way SouthSDR Design Guidance

    Application

    ARCHITECT: NOVION GROUP INC.7806 Lake City Way NE

    Seattle, WA [email protected] (206.361.6133)

    PROJECT:918 M.L.K. JR WAY SSEATTLE, WA 98144

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    2/24

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    3/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    4/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    Zoning Map

    SUBJECT PROPERTY

    918 M.L.K. JR WAY S4

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    5/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    Vicinity

    Amenities

    918 M.L.K. JR WAY S

    BUS SERVICE

    SOLAR ACCESS

    BICYCLE LANE

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    6/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    B

    918 M.L.K. JR WAY S

    A

    D

    6

    C

    B

    VICINITY

    A

    C

    SUBJECT PROPERTY

    D

    E

    E

    F

    F

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    7/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S

    G

    VICINITY

    G

    SUBJECT PROPERTY

    H

    H

    I

    I

    J

    J

    K

    K

    L

    L

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    8/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S

    M

    8

    VICINITY

    M

    SUBJECT PROPERTY

    N

    N

    O

    O

    P

    P

    Q

    Q

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    9/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    MLK JR WAY SOUTH LOOKING EAST

    918 M.L.K. JR WAY S

    SUBJECT PROPERTY

    MLK JR WAY SOUTH EAST FRONTAGE

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    10/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S10

    MLK JR WAY SOUTH EAST FRONTAGE

    MLK JR WAY SOUTH LOOKING EAST

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    11/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    MLK JR WAY SOUTH LOOKING WEST

    918 M.L.K. JR WAY S

    MLK JR WAY SOUTH WEST FRONTAGE

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    12/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    MLK JR WAY SOUTH LOOKING WEST

    918 M.L.K. JR WAY S12

    ACROSS FROM SUBJECT PROPERTY

    MLK JR WAY SOUTH WEST FRONTAGE

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    13/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S

    Site Survey

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    14/24

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    15/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    Design Option A -

    918 M.L.K. JR WAY S

    Concept: A- - PREFERRED OPTION

    Pros: All units are individually defined by modulation and elevation. Each unit has private groundfloor amenity area and above ground . Ground floor amenity areas are elevated above sidewalks for a sense of privacy and security. Good solar exposure to most units.

    Cons:

    Departures:

    ZONING LR2

    LOT AREA 6,300SF

    HOUSING TYPE TOWNHOUSE

    SMC23.41.004: THRESHOLDS FOR DESIGN REVIEW

    SMC23.41.018: 8. SDR REVIEW REQUIRED FOR TONHOUSESSDR PROCESS

    SMC23.45.504: PERMITTED &PROHIBITED USES TOWNHOUSE ALLOWED

    SMC23.45.510: FLOOR AREA RATIO COMPLY WITH SMC23.45.510C

    ALLOWED: 1.2X6300=7560 SF.

    PROPOSED: 7355SF

    SMC23.45.510C: HIGHER FAR REQUIREMENTS BUILT GREEN LEVEL4

    PARKING AT REAR OF LOT.

    SMC23.45.512: DENSITY LIMITS WITH SMC 23.45.510C UNLIMITED

    SMC23.45.514: STRUCTURE HEIGHT LIMIT: 30 FROM AVG. GRADE.

    5 ADDITIONAL FOR ROOF WITH CONDITIONS.

    SMC23.45.518: SETBACKS & SEPARATIONS

    REQUIRED: FRONT: 7 AVG, 5 MIN

    SIDES: 5 MIN.

    REAR: 7 AVG, 5 MIN.

    SMC23.45.522: AMENITY AREA

    REQUIRED: 25% OF LOT AREA=1,575SF

    PROPOSED: 1,785 SF

    SMC23.45.524: LANDSCAPE STANDARDS.

    SMC23.45.526 LEED, BUILT GREEN DEVELOPMENT STANDARDS

    SMC23.45.527: STRUCTURE WIDTH & DEPTH STANDARDS.

    ALLOW: MAX WIDTH 90DEPTH 65% OF LOT DEPTH= 82-0

    PROPOSED: DEPTH 82

    SMC23.45.529: DESIGN STANDARDS.

    SMC23.45.534: LIGHT & GLARE.

    SMC23.54.015 PARKING REQUIRED: 1 STALL PER UNIT-REDUCED

    20% PER FREQUENT TRANSIT=4 STALLS REQUIRED

    PROPOSED: 4 STALLS

    SMC23.54.040 SOLID WASTE AND RECYCLABLE MATERIAL

    REQUIRED: 84SF SHARED

    PROPOSED: 100SF

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    16/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    Design Option B

    918 M.L.K. JR WAY S16

    Concept: . B

    Pros: Similar to concept A with Unit B placed farther from right of way.Cons: Reduction of modulation. Reduction of openness for center units.Departures:

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    17/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    Design Option C -

    918 M.L.K. JR WAY S

    Concept: C-

    Pros:Cons: Modulation is reduced. Sense of openness is reduced. Central units loose exterior

    opening walls. Unit widths are reduced.Departures:

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    18/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S18

    Proposed Site Plan-preferred option

    Zoning Code SummaryZONING LR2

    LOT AREA 6,300SF

    HOUSING TYPE TOWNHOUSE

    SMC23.41.004: THRESHOLDS FOR DESIGN REVIEW

    SMC23.41.018: 8. SDR REVIEW REQUIRED FOR TONHOUSES

    SDR PROCESS

    SMC23.45.504: PERMITTED &PROHIBITED USES TOWNHOUSE ALLOWED

    SMC23.45.510: FLOOR AREA RATIO COMPLY WITH SMC23.45.510C

    ALLOWED: 1.2X6300=7560 SF.

    PROPOSED: 7355SF

    SMC23.45.510C: HIGHER FAR REQUIREMENTS BUILT GREEN LEVEL4

    PARKING AT REAR OF LOT.

    SMC23.45.512: DENSITY LIMITS WITH SMC 23.45.510C UNLIMITED

    SMC23.45.514: STRUCTURE HEIGHT LIMIT: 30 FROM AVG. GRADE.

    5 ADDITIONAL FOR ROOF WITH CONDITIONS.

    SMC23.45.518: SETBACKS & SEPARATIONS

    REQUIRED: FRONT: 7 AVG, 5 MIN

    SIDES: 5 MIN.

    REAR: 7 AVG, 5 MIN.

    SMC23.45.522: AMENITY AREAREQUIRED: 25% OF LOT AREA=1,575SF

    PROPOSED: 1,785 SF

    SMC23.45.524: LANDSCAPE STANDARDS.

    SMC23.45.526 LEED, BUILT GREEN DEVELOPMENT STANDARDS

    SMC23.45.527: STRUCTURE WIDTH & DEPTH STANDARDS.

    ALLOW: MAX WIDTH 90

    DEPTH 65% OF LOT DEPTH= 82-0

    PROPOSED: DEPTH 82

    SMC23.45.529: DESIGN STANDARDS.

    SMC23.45.534: LIGHT & GLARE.

    SMC23.54.015 PARKING REQUIRED: 1 STALL PER UNIT-REDUCED

    20% PER FREQUENT TRANSIT=4 STALLS REQUIRED

    PROPOSED: 4 STALLS

    SMC23.54.040 SOLID WASTE AND RECYCLABLE MATERIAL

    REQUIRED: 84SF SHARED

    PROPOSED: 100SF

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    19/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    20/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S20

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    21/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    22/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    22

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    23/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

  • 7/31/2019 Dr Proposal 3012977 Agenda Id 3651

    24/24

    OWNER-MARK HUBER PROJECT architect-Novion Group Inc

    918 M.L.K. JR WAY S