  • An

    Introduction

    to

    10 MW SOLAR PV PLANT 10 MW SOLAR PV PLANT

    AT NTPC UNCHAHAR

    by

    Amit K GautamSr. Manager

    (O&M - Solar Plant Commissioning)

  • SYNOPSIS OF THE PRESENTATION

    Introduction

    What is SPV Technology

    SPV Technology Fundamentals

    Single Line Diagram

    Combination of Solar Cells, Strings, Inverters &

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    Combination of Solar Cells, Strings, Inverters & Inverter Transformer

    The HT Switchboard

    Switchyards (33kV & 220kV)

    Auxiliary Power Scheme

    SCADA & Weather Monitoring System

    Module Washing System

    Fire Fighting System2

    10 MW Solar PV Plant, NTPC Unchahar

  • INTRODUCTION

    Solar power is the

    conversion of sunlight into

    electricity, either directly

    or indirectly.

    It's a quiet, clean &

    renewable source of

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    renewable source of

    energy

    Photovoltaic (PV) modules

    have no moving or

    wearing parts.

    Require less maintenance3

    10 MW Solar PV Plant, NTPC Unchahar

  • SOLAR POWER GENERATION TECHNOLOGIES

    Solar Photo Voltaic (direct):

    PV panels use the

    photovoltaic effect to turn

    the suns energy directly into

    electricity.

    Solar Thermal (indirect):

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC

    Solar PVSolar PV

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    Solar Thermal (indirect):

    Solar thermal panels use the

    suns energy to heat water

    that can be used to generate

    electricity.

    Here, we are using Solar PV technology. 4

    10 MW Solar PV Plant, NTPC Unchahar

  • WHAT IS SPV TECHNOLOGY?

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    A PV panel is made up of a semiconducting material, usually silicon-based sandwiched between two electrical contacts.

    The junction of dissimilar materials (n and p type silicon) creates a voltage.

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    5

  • TYPES OF SOLAR PV TECHNOLOGIES

    Silicon Crystalline Technology

    1. Mono Crystalline PV Cells

    2. Multi Crystalline PV Cells

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    Thin Film Technology

    1. Amorphous Silicon PV Cells

    2. Poly Crystalline PV Cells

    ( Non-Silicon based)

    10 MW Solar PV Plant, NTPC Unchahar

    6Thin Film Thin Film

    Solar CellSolar Cell

  • SILICON CRYSTALLINE TECHNOLOGYTuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    Made using saw-cut

    from single cylindrical

    crystal of Si

    Caste from ingot of

    melted and re-

    crystallized silicon

    Mono Crystalline PV Mono Crystalline PV

    Cells Cells

    Multi Crystalline PV Multi Crystalline PV

    CellsCells

    Currently makes up 86% of PV market

    Very stable with module efficiencies 10-16%

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    7

    crystal of Si

    Operating efficiency

    up to 16%

    crystallized silicon

    Cell efficiency ~12%

    Accounts for 90% of

    crystalline Si market

  • SOLAR CELL FUNDAMENTALS

    Solar Cell Characteristics

    Short circuit current

    (Isc):

    Maximum current

    produced by solar cell

    when its terminals are

    shorted.

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    shorted.

    Open circuit voltage

    (Voc):

    Maximum voltage

    that can be obtained

    from a solar cell when

    its terminals are left

    open. 8

    10 MW Solar PV Plant, NTPC Unchahar

  • Fill Factor (FF):

    It is defined as the

    square-ness of the I-V

    curve

    It is related to the

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    SOLAR CELL FUNDAMENTALS

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    It is related to the

    resistive losses in the

    solar cell.

    In ideal condition its

    value is 100%.

    For a good solar cell it

    is > 80%. 9

    10 MW Solar PV Plant, NTPC Unchahar

    FF = Pm / (Voc x Isc )

  • MAXIMUM POWER POINT TRACKING

    (MPPT)

    MPPT orMaximum Power Point Tracking is

    an algorithm that included in electric power

    converter system used for extracting maximum

    available power from PV module under certain

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    conditions.

    The voltage at which PV module can produce

    maximum power is called maximum power point

    (or peak power voltage).

    Maximum power varies with solar radiation,

    ambient temperature and solar cell temperature. 10

    10 MW Solar PV Plant, NTPC Unchahar

  • HOW MPPT WORKS?

    The major principle of MPPT is to extract

    the maximum available power from PV

    module by making them operate at the

    most efficient voltage (maximum power

    point).

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    point).

    MPPT system is to sample the output of

    the cells and apply the proper resistance

    (load) to obtain maximum power for any

    given environmental conditions. 11

    10 MW Solar PV Plant, NTPC Unchahar

  • MAXIMUM POWER POINT TRACKINGTuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    12

    10 MW Solar PV Plant, NTPC Unchahar

  • SOLAR CELL CHARACTERISTICS

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    Efficiency ():

    Solar cell efficiency is

    the ratio of the electrical

    output of a solar cell to

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    13

    output of a solar cell to

    the incident energy in

    the form of sunlight.

    Efficiency up-to 14-16%

    are normally achieved

    by crystalline Si cells.

    is the efficiency

    Voc is the open-circuit voltage

    Isc is the short-circuit current

    FF is the fill factor

  • LOSSES IN SOLAR CELLS

    1. Unavoidable losses:

    Loss of low energy photons (23%)

    Loss due to excess energy of photons (33%)

    Voltage loss (0.65 0.72)

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    Fill factor loss

    2. Avoidable losses:

    Reflection losses

    Incomplete absorption losses

    Recombination losses14

    10 MW Solar PV Plant, NTPC Unchahar

  • EFFECTS OF TEMPERATURE

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    As the PV cell

    temperature

    increases above

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    15

    increases above

    25C, the module

    Vmp decreases by

    approximately

    0.5% per C

  • EFFECTS OF LOW INSOLATIONTuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    Insolation is the solar

    radiation that reaches

    the earth's surface. It is

    measured by the amount

    of solar energy received

    per cm2 / min.

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    16

    per cm2 / min.

    As insolation decreases

    amperage decreases

    while voltage remains

    roughly constant

  • EFFECT OF SOLAR ORIENTATIONTuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    17

    10 MW Solar PV Plant, NTPC Unchahar

  • SOLAR TRACKING

    To receive maximum intensity of sunrays the

    solar panel surface should be perpendicular

    to sunrays.

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    Max performance is achieved when panels

    are perpendicular to the suns rays.

    Panels should be tracking the sun all the

    time, during day and during different

    seasons. 18

    10 MW Solar PV Plant, NTPC Unchahar

  • SOLAR TRACKING

    Automatic solar tracking makes the system

    very costly.

    If the SPV panel is not tracking the sun then

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    it should be inclined to an angle equal to the

    latitude of the location.

    (28.81 for Unchahar)

    Solar tracking allows to collect 30% extra

    energy with the same SPV panel. 19

    10 MW Solar PV Plant, NTPC Unchahar

  • BYPASS DIODE

    Whenever any cell is under shed then it

    will become reverse biased.

    This reverse bias can be strong depending

    upon the shadowing.

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    The strong reverse bias may force the

    shaded cell to break down.

    The extra power generated by the non

    shaded cells will be dissipated in the

    shaded cell.

    This creates hot spots in the module. 20

    10 MW Solar PV Plant, NTPC Unchahar

  • BYPASS DIODE

    A bypass diode is used to pass the excess current.

    Ideally this should be connected to each cell in

    parallel with opposite polarity.

    Normally one bypass diode is used for every 12-20

    cells (20 in case of Unchahar).

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    21

    10 MW Solar PV Plant, NTPC Unchahar

  • SINGLE LINE DIAGRAM OF SOLAR PLANT AT NTPC UNCHAHAR Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    Solar

    Panels Inverter-A(630 kVA)

    Inverter

    Transformer(1.6 MVA)

    800-550 V DC

    800-550 V DC

    350 V AC

    350 V AC

    33 kV

    O

    u

    t

    d

    o

    o

    r

    V

    C

    B

    33kV U/G Cable

    (Total 16

    Nos.)

    (Total 08

    Nos.)

    (

    T

    o

    t

    a

    l

    0

    8

    N

    o

    s

    .

    )

    (Total 08

    Incomers)

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    22

    10 MW Solar PV Plant, NTPC Unchahar

    ACDB

    Inverter-B(630 kVA)

    33kV HT

    Panel

    Incomers

    O

    u

    t

    g

    o

    i

    n

    g

    -

    1

    O

    u

    t

    g

    o

    i

    n

    g

    -

    2

    2

    0

    0

    k

    V

    A

    A

    u

    x

    .

    T

    r

    a

    n

    s

    .

    33kV Switchyard

    (Solar Plant)

    T

    r

    a

    n

    s

    m

    i

    s

    s

    i

    o

    n

    L

    i

    n

    e

    (

    0

    .

    8

    k

    m

    O

    /

    H

    &

    3

    .

    7

    5

    k

    m

    U

    /

    G33/220 kv Switchyard

    (Bay-5)

    12.5 MVA

    Transformer

    (33/230 kV)

    3

    3

    k

    V

    B

    r

    e

    a

    k

    e

    r

    2

    2

    0

    k

    V

    B

    r

    e

    a

    k

    e

    r

    Isolator

    Bus

    Isolators

    B

    u

    s

    -

    1

    B

    u

    s

    -

    2

    T

    B

    C

    33 kV

    415 V

    Incomers)

    L

    i

    n

    e

    I

    s

    o

    l

    a

    t

    o

    r

    Note: For more details refer NTPC Drawing No. 5708-004-PVE-P-034

  • COMBINING SOLAR CELLS

    Solar cells can be electrically connected in

    series (voltage add) or in parallel (current

    add) to give any desired voltage and

    current (or power).

    Photovoltaic cells are typically sold in

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    Photovoltaic cells are typically sold in

    modules (or panels) of 12, 24, 36, 48, 60

    volts with power outputs of 50 to 200+

    watts.

    These are then combined into arrays to

    give the desired power or watts. 23

    10 MW Solar PV Plant, NTPC Unchahar

  • COMBINING SOLAR CELLS (AT UNCHAHAR) Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC

    MODULE PARMETER

    (60 cells in series)

    Open Circuit Voltage (VOC) = 60 0.6 = 36 V

    Short Circuit Current (ISC) = 8.5 A

    Peak Power (Pmax) = 240 Wp

    Voltage at peak power point (Vmax) = 29 V

    Current at peak power point (Imax) = 8.28 A

    STRING PARMETER

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    24

    / STRING

    (24 modules in series)

    Open Circuit Voltage (VOC)

    = 24 36 = 864 VOC

    Short Circuit Current (ISC) = 8.5 A

    Peak Power (Pmax) = 5762.88 Wp

    Voltage at peak power point (Vmax) = 696 V

    Current at peak power point (Imax) = 8.28 A

    At Unchahar

    Total No. of Modules = 42,240

    Total No. of Strings = 1,760

  • COMBINING STRINGS

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    22 Strings in parallel

    S

    t

    r

    i

    n

    g

    -

    0

    1

    S

    t

    r

    i

    n

    g

    -

    0

    2

    S

    t

    r

    i

    n

    g

    -

    2

    2

    SMU PARMETER

    (22 strings in parallel)

    Voc = 864 V

    Vmax= 696 V

    ISC = 8.5 22 A=187 Amp

    Imax = 8.28 22 A =182.16 Amp

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    25

    SMU

    -1

    SMU

    -3

    SMU

    -5

    SMU

    -2

    SMU

    -4

    Inverter

    INVERTER PARMETER

    (05 SMU in parallel)

    Voc = 864 V

    Vmax = 696 Volts

    ISC = 187 5 A=935 Amp

    Imax = 182.16 5 A =910.8 Amp

  • COMBINING INVERTERS

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    Two inverters are giving output to one transformer.

    The transformer contains two primary(LT)& one

    Two inverters are giving output to one transformer.

    The transformer contains two primary(LT)& one

    Inverter-A Inverter-B

    350 V AC350 V AC

    (A presentation by Amit K Gautam)

    10 MW Solar PV Plant, NTPC Unchahar

    26

    primary(LT)& one secondary(HT) winding.

    The transformer out put is fed to HT panel as shown in the diagram

    primary(LT)& one secondary(HT) winding.

    The transformer out put is fed to HT panel as shown in the diagram

    5

    33kV HT Panel

    33 kV

    33 kV

    Outdoor VCB

    33 kV

    Indoor VCB

  • THE HT SWITCH-BOARD

    All the 8 incomers are feeding power to the HT panel.

    One outgoing feeder is for power evacuation/back-charging.

    The other outgoing feeder is for auxiliary supplies.

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    I

    n

    c

    o

    m

    e

    r

    -

    1

    (

    P

    a

    n

    e

    l

    -

    2

    )

    I

    n

    c

    o

    m

    e

    r

    -

    2

    (

    P

    a

    n

    e

    l

    -

    3

    )

    I

    n

    c

    o

    m

    e

    r

    -

    3

    (

    P

    a

    n

    e

    l

    -

    4

    )

    I

    n

    c

    o

    m

    e

    r

    -

    4

    (

    P

    a

    n

    e

    l

    -

    5

    )

    I

    n

    c

    o

    m

    e

    r

    -

    5

    (

    P

    a

    n

    e

    l

    -

    7

    )

    I

    n

    c

    o

    m

    e

    r

    -

    6

    (

    P

    a

    n

    e

    l

    -

    8

    )

    I

    n

    c

    o

    m

    e

    r

    -

    7

    (

    P

    a

    n

    e

    l

    -

    9

    )

    I

    n

    c

    o

    m

    e

    r

    -

    8

    (

    P

    a

    n

    e

    l

    -

    1

    0

    )

    I

    n

    c

    o

    m

    e

    r

    -

    9

    (

    S

    P

    A

    R

    E

    )

    P

    a

    n

    e

    l

    -

    1

    2

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    27

    10 MW Solar PV Plant, NTPC Unchahar

    33 kV HT Panel

    Outgoing Feeder

    to

    33kV Switchyard(Solar Plant)

    Panel No. 6

    33kV

    Feeder

    To 200 kVA

    Auxiliary

    Transformer(33kV/415V)

    Panel No. 7

    B

    U

    S

    P

    T

    (

    P

    a

    n

    e

    l

    -

    1

    )

    M

    e

    t

    e

    r

    i

    n

    g

    P

    r

    o

    t

    e

    c

    t

    i

    o

    n

  • 33 KV SWITCHYARD (AT SOLAR PLANT)Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    F

    R

    O

    M

    3

    3

    K

    V

    S

    W

    I

    T

    C

    H

    G

    E

    A

    R

    T

    O

    2

    2

    0

    K

    V

    N

    T

    P

    C

    ,

    U

    N

    C

    H

    A

    H

    A

    R

    ,

    S

    W

    I

    T

    C

    H

    Y

    A

    R

    D

    ISOLATORM

    E

    T

    E

    R

    I

    N

    G

    P

    T

    M

    E

    T

    E

    R

    I

    N

    G

    P

    T

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    28

    10 MW Solar PV Plant, NTPC Unchahar

    F

    R

    O

    M

    3

    3

    K

    V

    S

    W

    I

    T

    C

    H

    G

    E

    A

    R

    N

    T

    P

    C

    ,

    U

    N

    C

    H

    A

    H

    A

    R

    ,

    S

    W

    I

    T

    C

    H

    Y

    A

    R

    D

    E

    A

    R

    T

    H

    S

    W

    I

    T

    C

    H

    E

    A

    R

    T

    H

    S

    W

    I

    T

    C

    H

    M

    E

    T

    E

    R

    I

    N

    G

    P

    T

    M

    E

    T

    E

    R

    I

    N

    G

    C

    T

    M

    E

    T

    E

    R

    I

    N

    G

    C

    T

    L

    I

    G

    H

    T

    N

    I

    N

    G

    A

    R

    R

    E

    S

    T

    E

    R

    M

    E

    T

    E

    R

    I

    N

    G

    P

    T

  • 33/220 KV SWITCHYARD (AT UNCHAHAR) : BAY-5 Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    1

    2

    .

    5

    M

    V

    A

    P

    o

    w

    e

    r

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    (

    3

    3

    /

    2

    3

    0

    k

    V

    )

    E

    a

    r

    t

    h

    S

    w

    i

    t

    c

    h

    e

    s

    T

    B

    C

    L

    i

    g

    h

    t

    n

    i

    n

    g

    A

    r

    r

    e

    s

    t

    e

    r

    33 kV Line

    from

    Solar Plant

    Line Isolator Po

    t

    e

    n

    t

    i

    a

    l

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    C

    u

    r

    r

    e

    n

    t

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    3

    3

    k

    V

    O

    u

    t

    d

    o

    o

    r

    V

    a

    c

    u

    u

    m

    C

    i

    r

    c

    u

    i

    t

    B

    r

    e

    a

    k

    e

    r

    C

    u

    r

    r

    e

    n

    t

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    L

    i

    g

    h

    t

    n

    i

    n

    g

    A

    r

    r

    e

    s

    t

    e

    r

    Y33 kV

    (ONAN

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    29

    10 MW Solar PV Plant, NTPC Unchahar

    1

    2

    .

    5

    M

    V

    A

    P

    o

    w

    e

    r

    T

    r

    a

    n

    s

    f

    o

    r

    m

    e

    r

    (

    3

    3

    /

    2

    3

    0

    k

    V

    )

    220 kV

    Breaker

    E

    a

    r

    t

    h

    S

    w

    i

    t

    c

    h

    e

    s

    Bus

    Isolators

    B

    u

    s

    -

    1

    B

    u

    s

    -

    2

    T

    B

    C

    LineIsolator

    220 kV

    Lightning

    Arrester

    (ONAN

    Dyn11)

    220 kV

    TBC Breaker

    Bus

    Isolators

  • AUXILIARY POWER SCHEME Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    From 33 kV Main HT Panel

    Y

    SPARE

    Electronic Interlock

    200 kVA

    Auxiliary Transformer

    33/0.415kV

    Dyn11 MCCB, TPN400A, 25kA

    MCCB, TPN

    400A, 25kA ACDB

    E

    x

    t

    e

    r

    n

    a

    l

    i

    l

    l

    u

    m

    i

    n

    a

    t

    i

    o

    n

    2

    D

    B

    4

    D

    B

    6

    D

    B

    8

    D

    B

    3

    D

    B

    5

    D

    B

    7

    D

    B

    W

    a

    t

    e

    r

    P

    u

    m

    p

    s

    L

    o

    c

    a

    l

    S

    t

    a

    r

    t

    e

    r

    F

    i

    e

    l

    d

    I

    n

    s

    t

    r

    u

    m

    e

    n

    t

    D

    B

    C

    M

    C

    S

    R

    o

    o

    m

    D

    B

    (

    L

    i

    g

    h

    t

    s

    ,

    A

    C

    U

    n

    i

    t

    s

    f

    o

    r

    S

    C

    A

    D

    A

    R

    o

    o

    m

    ,

    A

    l

    l

    s

    o

    c

    k

    e

    t

    s

    ,

    A

    u

    x

    i

    l

    i

    a

    r

    y

    p

    o

    w

    e

    r

    f

    o

    r

    M

    a

    i

    n

    H

    T

    p

    a

    n

    e

    l

    )

    1

    D

    B

    (

    L

    i

    g

    h

    t

    s

    ,

    V

    e

    n

    t

    .

    E

    x

    h

    a

    u

    s

    t

    ,

    A

    u

    x

    .

    f

    o

    r

    V

    C

    B

    S

    e

    c

    u

    r

    i

    t

    y

    R

    o

    o

    m

    D

    B

    (

    L

    i

    g

    h

    t

    s

    ,

    A

    u

    x

    .

    S

    o

    c

    k

    e

    t

    s

    ,

    V

    e

    n

    t

    .

    E

    x

    h

    a

    u

    s

    t

    )

    P

    o

    w

    e

    r

    S

    o

    c

    k

    e

    t

    O

    f

    f

    i

    c

    e

    A

    r

    e

    a

    (

    T

    o

    C

    o

    m

    p

    u

    t

    e

    r

    s

    )

    S

    P

    A

    R

    E

    (

    6

    f

    e

    e

    d

    e

    r

    s

    )

    B

    a

    t

    t

    e

    r

    y

    C

    h

    a

    r

    g

    e

    r

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    3

    2

    A

    M

    C

    C

    B

    3

    2

    A

    M

    C

    C

    B

    3

    2

    A

    M

    C

    C

    B

    1

    6

    A

    M

    C

    C

    B

    1

    6

    A

    M

    C

    C

    B

    1

    6

    A

    M

    C

    C

    B

    6

    3

    A

    M

    C

    C

    B

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    30

    10 MW Solar PV Plant, NTPC Unchahar

    Emergency lights

    in CMCS,

    SCADA

    & Inverter Rooms

    E

    m

    e

    r

    g

    e

    n

    c

    y

    I

    n

    v

    e

    r

    t

    e

    r

    2

    1

    5

    k

    V

    A

    (

    C

    M

    C

    S

    )

    150 AH Battery

    (60 Min Backup)

    230V, 50Hz,1Ph.

    AC Supply

    E

    x

    t

    e

    r

    n

    a

    l

    i

    l

    l

    u

    m

    i

    n

    a

    t

    i

    o

    n

    I

    R

    -

    2

    D

    B

    I

    R

    -

    4

    D

    B

    I

    R

    -

    6

    D

    B

    I

    R

    -

    8

    D

    B

    I

    R

    -

    3

    D

    B

    I

    R

    -

    5

    D

    B

    I

    R

    -

    7

    D

    B

    Lights, Vent. Exhaust,

    Aux. for VCB

    W

    a

    t

    e

    r

    P

    u

    m

    p

    s

    L

    o

    c

    a

    l

    S

    t

    a

    r

    t

    e

    r

    Bore Well Pumps

    (3 feeders)

    F

    i

    e

    l

    d

    I

    n

    s

    t

    r

    u

    m

    e

    n

    t

    D

    B

    C

    M

    C

    S

    R

    o

    o

    m

    D

    B

    (

    L

    i

    g

    h

    t

    s

    ,

    A

    C

    U

    n

    i

    t

    s

    f

    o

    r

    S

    C

    A

    D

    A

    R

    o

    o

    m

    ,

    A

    l

    l

    s

    o

    c

    k

    e

    t

    s

    ,

    A

    u

    x

    i

    l

    i

    a

    r

    y

    p

    o

    w

    e

    r

    f

    o

    r

    M

    a

    i

    n

    H

    T

    p

    a

    n

    e

    l

    )

    I

    R

    -

    1

    D

    B

    (

    L

    i

    g

    h

    t

    s

    ,

    V

    e

    n

    t

    .

    E

    x

    h

    a

    u

    s

    t

    ,

    A

    u

    x

    .

    f

    o

    r

    V

    C

    B

    S

    e

    c

    u

    r

    i

    t

    y

    R

    o

    o

    m

    D

    B

    (

    L

    i

    g

    h

    t

    s

    ,

    A

    u

    x

    .

    S

    o

    c

    k

    e

    t

    s

    ,

    V

    e

    n

    t

    .

    E

    x

    h

    a

    u

    s

    t

    )

    P

    o

    w

    e

    r

    S

    o

    c

    k

    e

    t

    O

    f

    f

    i

    c

    e

    A

    r

    e

    a

    (

    T

    o

    C

    o

    m

    p

    u

    t

    e

    r

    s

    )

    S

    P

    A

    R

    E

    (

    6

    f

    e

    e

    d

    e

    r

    s

    )

    DCDB

    To all VCBs

    220 V DC

    Note: For more detail please refer drawing no. 5708-004-PVE-P-077-03

    3

    2

    A

    M

    C

    C

    B

    2

    2

    0

    V

    D

    C

    ,

    2

    0

    0

    A

    H

  • SCADA System Architecture

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)Tuesday, June 17, 2014 10 MW Solar PV Plant, NTPC Unchahar 31

  • MODULE WASHING SYSTEM

    There are 1760 structures/strings in site, it is

    planned to clean every PV module thrice a

    month.

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    All PV modules shall be cleaned in 10 days

    (10% per day) and from the 11th day again

    the first structure will be cleaned.

    Like this, the cleaning process will be going

    on through out the month. 32

    10 MW Solar PV Plant, NTPC Unchahar

  • MODULE WASHING SYSTEM (CONTD.)

    There are three bore-wells in the Solar Plant

    Tuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    Water Balance : Borewell-1, Tank Capacity 3000 litres

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    33

    10 MW Solar PV Plant, NTPC Unchahar

  • Module Washing System (contd.)Water Balance : Borewell-2, Tank Capacity 4000 litres

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)34

    Water Balance : Borewell-2, Tank Capacity 4000 litres

  • MODULEWASHING SYSTEMTuesday, June 17, 2014

    10 MW Solar PV Plant, NTPC Unchahar

    (A presentation by Amit K Gautam)(A presentation by Amit K Gautam)

    35

    10 MW Solar PV Plant, NTPC Unchahar

  • Fire Fighting SystemCMCS & Inverter Room-1

    Inverter

    Transformer

    -1

    Aux.

    Trans.

    SCADA

    Room

    OVCB

    -1

    Ladies

    Toilet

    Gents

    Toilet

    Pantry

    Inverter

    Room-1

    (A presentation by Amit K Gautam)36

    *Drawing not to scale

    Sand filled fire buckets

    Smoke detectors

    Fire extinguisher (DCP) 10 kg

    Fire extinguisher (CO2) 9 kg

    Fire extinguisher (Foam) 9 kg

    Fire extinguisher (hand portable,

    pressurized ) 9 kg

    Legends

    33kV Switchyard (Solar Plant)

    Room-1 Store Room Battery Room

  • THANK YOU