draw your way to an estimate - builders' show
TRANSCRIPT
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 1
DrawDraw Your Way to an EstimateYour Way to an EstimateGetting Started with CAD-Assisted
Estimating, Take-Off and BIM
Presented by: Joe Stoddard and John Jones
IBS 2009 – Las Vegas Convention Center North Hall 2 52-254
How long would this take you ?How long would this take you ?and with and with How many mistakes?How many mistakes?
2
What we’ll cover:What we’ll cover:� What is “BIM” ? � What is CAD-assisted estimating ? � Changes Required in Your Approach/Workflow� Potential Pitfalls� Examples of CAD Products – Pro vs. DIY� Your Questions
3
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 2
� Relational Database(s) Represent the Building (the Model )� Standards-Based (buildingSMART Alliance)
� Estimating and Bill-of-Materials
� Lean Construction
� Energy Usage
� Human Ergonomics
� “Collision Detection”
� Green/Sustainability
� Urban Planning
� Entire Lifecycle
http://www.BIMeducation.com
4
Example : Coast Guard ProjectExample : Coast Guard Project“BIG BIM” “BIG BIM”
5
COAST GUARD COAST GUARD ––“little bim”“little bim”
6
BUILDINGS and FLOORS
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 3
Why?Why?� You need to do estimates, and you’re already using CAD !� Profit from the entire project lifecycle – not just construction� Lean and Green
�Fewer Steps (process improvement)�Fewer Resources�Sustainable
� ACCURACY�Production builders - < 1% material variance.
� Resolve Staffing Issues� Conserve Effort (draw once, use many)� Consistent with GenY, tech-oriented buyers
7
Reasons NOT TOReasons NOT TO
� I bought the CAD, big quote due tomorrow morning...
8
How it Works How it Works -- Input / OutputInput / Output� INPUT! The Drawing Represents the Database
�CAD system replaces a digitizer or other onscreen take-off technology
� OUTPUT = Reporting:� Crawl: Item counts, Onscreen Prompts , Schedules� Walk: Calculations extrapolate other materials/labor/oper ations
� Window hardware...outlet boxes.....labor to install… heat loss� Run: Integration with other applications
� Add item to drawing… reference external data � Price information in separate database
� Results are reported directly by the CAD application� Data exported to, or integrated with, estimating external database or
other BIM applications.
9
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 4
Example:Example:Direct Direct CountsCounts
10
Example: Boolean Logic 1 Example: Boolean Logic 1 � IF “lavatory
counter” THEN “include faucet”
� IF “Interior Door” THEN “include trim”
� IF “Exterior Wall” THEN “perform heat loss calc”
11
Example: Boolean Logic 2 Example: Boolean Logic 2
12
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 5
Advanced Assembly Advanced Assembly FormulasFormulas… the sky is the limit… the sky is the limit� “4D”, “5D” etc. � Complete line-item Bill of Materials� Cut Lists � Heat Loss Calculations� Labor Calculations� Time to build (Scheduling) �� Overall Impact
13
Reporting: Reporting: � Export to spreadsheet or Estimating App.
� Ability to create custom Reports�Cut Lists�Room Schedules�Trade Contractor� Load Lists�Purchase Orders�Warranty Requests
14
Easy Collaboration Ideas…Easy Collaboration Ideas…so many ways… so little time…so many ways… so little time…
� Good Old E-mail… � Google Spreadsheet /Documents� SharePoint™ and Office 2007� Photo-Image Sharing Sites
15
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 6
take it away John…take it away John…
16
Toolkit : CADToolkit : CAD--Assisted EstimatingAssisted Estimating(Little bim) (Little bim) � A CAD application with Take-off support
� Basic: � Accurate reporting of areas and lengths � Ability to report basic “counts” (Number of Sinks, etc.)
� Advanced: � Ability to create/customize parametric items � Ability to reference items via part numbers or SKUs� Ability to create and modify assemblies and take-off formulas � Comma/Tab Delimited Export � Direct Integration with estimating applications
� Knowledge of Excel or other Spreadsheet� or an estimating application with text import capability support
17
Basic CBasic C--AE Products AE Products THIS IS BY NO MEANS A COMPLETE LIST !
� SKETCHUP PRO (www.sketchup.com) � Cadsoft/IMSI “TurboSketch” and HGTV Design ($90)
� Basic areas, lengths, and counts � Only DIY product we found that is usable for C-AE
� AutoCAD LT /Visio/ other basic 2D products- can do basic counts of components/blocks
� Chief Architect, SoftPlan LT, DataCAD� Good counts, good export, not very configurable
� ArchT, DataCAD, VectorWorks, REVIT, ArchiCAD � Require programming, configurations, add-ins
see February 2007 JLC article www.jlconline.com
18
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 7
Advanced CAdvanced C--AE ProductsAE Products� Cadsoft Envisioneer (www.cadsoft.com $1000+/-
� Advanced C-AE, single database approach
� SoftPlan Pro/ SoftList (www.softplan.com $2900+/-)
�Very good self-contained reporting engine
� BuildersCAD w/Framing � SolidBuilder
�Manufacturing-ready framing /cutlist packages
19
Related TechnologyRelated Technology� Xactimate Sketch (www.xactimate.com) � CAD estimator (www.cadestimator.com)
� Bring Your Own CAD (or photos)
� OnCenter (www.oncenter.com) � On-screen takeoff
� Vertigraph (www.vertigraph.com/)� BidScreen XL
None of the above are really “CAD-assisted Estimating - Are visual take-off . They are “BIM-related”
20
Changes to workflowChanges to workflow� Design: More collaborative-� budget constraints can be
addressed as they happen� Sales: Estimating becomes more closely related to
sales …. Faster turnaround
� Drafting: Estimator has larger role in driving drafting processes
� Purchasing: Requires fewer review points since items were approved earlier in process
21
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 8
Changes Changes to to Drafting WorkflowDrafting Workflow
� CAD Model must accurately represent what was sold � Think “Model” not “Drawings”
� Objects and assemblies, not lines
� Provide Access to Model � Centralized (network or Internet)
� Appropriate CAD software and/or viewers
22
Delay the “Fork in the Road” Delay the “Fork in the Road” � Old way:
� 3D model, if any, is for presentation only. �No attention to objects – careful line management�Working drawing clean-up begins immediately.
� C-AE Way:� 3D model must contain model information at all times. �Split for “Working drawings” comes at very end of
process if at all . Example: “Exploding” cabinets to hide some lines also removes them from the take-off
�Use Layers, building options, etc. instead for visibility
23
Changes to Workflow Changes to Workflow –– Estimating Estimating � Estimating must drive all drafting decisions: (not design decisions)
� Drafting procedures and Standards � How items are defined in software
� Formulas, assemblies, extrapolated items� What is added to the drawings, and how they are added
� Estimating must oversee drawing quality 3Cs� Clarity... Consistency...Completeness
� Estimating must understand...� take-off portion of the CAD software� import/export capability and formats
� Estimating responsible for closed-loop feedback from field� Estimating responsible for overseeing corrections to the model
� Estimators will need seats of CAD software or related viewers.
24
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 9
Drawing as the Drawing as the DatabaseDatabase
� What is in the drawing?
25
26
Crawl-Walk-Run
Crawl Crawl �Estimating dept. starts to “own” process
� Develop QC for what is on drawings
�Pick Low-hanging fruit from any CAD program� Basic item counts as available, lengths, areas
�Use basic onscreen visual Cues�Take advantage of “Ticklers” � Include basic quantities on drawings�Generate simple item counts
(# of a particular symbol)
27
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 10
Crawl: Crawl: Item countsItem counts
28
Crawl:Crawl:Onscreen Information and Onscreen Information and “Ticklers”“Ticklers”
29
WalkWalk � Basic fixture/millwork ‘schedules’ on drawings� Generate simple reports/export files
� Start to verify against known quantities
� Develop closed-loop reporting and revision mechanism
� Re-purpose estimating time saved
30
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 11
…Walk …Walk another schedule example…another schedule example…
31
RunRun�Model defines take-offs, presentation materials, and
working drawings�Collaborative via Internet�Define Parametric objects, by part #/SKU�Complex assembly formulas, extrapolated materials
and labor organized by cost code �Reports formatted for loads, cut-lists, allowance items,
other complex custom reports� Integration with Excel, estimating software�Cost Data kept in external database (ODBC, etc.) �Review closed-loop feedback and continual
improvement of drawings/model on a regular basis
32
Run: Run:
33
BUILDING MODELAgreement of Sale
As-Sold Estimates
Purchase Orders
Cut-lists
Trade Contractor specs and instruction
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 12
take it away John…take it away John…
34
General Drawing GuidelinesGeneral Drawing Guidelines� Version Control is Critical
�Naming Conventions� ex. 120606-Jones-A1-JLS.spd� Consider NIBS National CAD Standards (www.nibs.org)
National Institute of Building Sciences
� Use requirements checklists�Consistent sales/selections sheets, specs, etc.
� Place Objects where they exist in real world�Ex. – Basement stair object goes on foundation
drawing, not first floor plan.
� Avoid Object Duplication between floors
35
Tips/Tricks Tips/Tricks � Provide schedules/counts/SF directly on
drawings whenever possible � Some products allow you to place
fields/variables/placeholders� Take advantage of 2-way schedules when
possible � Take advantage of shortcuts when appropriate:
� “Notes” with assigned cost to represent an allowance
� Keep cost data external to CAD if possible
36
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 13
DIY vs. Pro 2D/3D Products DIY vs. Pro 2D/3D Products
� DIY:� Configuration at
highest object level only.
� Can accurately report only SF.
� Item TOs etc. are fixed by the software developer
� Still useful for basic areas, etc.
37
DIY vs. Pro 2D/3D DIY vs. Pro 2D/3D Products Products � PRO
� Configuration at every level of detail.
� Compete accounting definitions
� Per-piece and consolidated take-offs
� Flexible reporting options
38
DON’T FORGET: DON’T FORGET: � Evaluation Forms -
Please help to keep us “on the air” ! � Business Card and/or Contact Info for Goodies
� Access to SharePoint™ Site with more resources, tips, tricks , product reviews, and more
� Free copy of Connected.Contractor
� Joe - “Cheap Tricks”: Wed. 1/22 1:15“Cheap Tricks”: Wed. 1/22 1:15--2:45 PM2:45 PMSimple Technology Solutions to Big Business Problems:Rm. # 258-260 North Hall
� John – SoftPlan Booth SoftPlan Booth #C4367 #C4367
39
DRAW YOUR WAY TO AN ESTIMATE: IBS 2009 LAS VEGAS NV.
Copyright 2009 by Mountain Consulting Group, LLC . All rights reservedhttp:// www.mountainconsulting.com 14
Thanks for Coming !Thanks for Coming !� Contact information !
John JonesSoftPlan Systems, Inc. 8118 Isabella Lane Brentwood, TN 37027 Toll-Free: 800-248-0164 [email protected]://www.softplan.com
40
Joe Stoddard, AIBDMountain Consulting Group, LLC: 13 Rolling Acres Lane Lawrenceville, PA 16929Toll-Free: [email protected]://www.mountainconsulting.com