TAHOE LAKE ELEMENTARY SCHOOL 2021 MODULAR PROJECT DSA #02-118553 ADDENDUM #2 MARCH 18, 2021 DSA02-118553 You are hereby directed to include the following items in the Plans and Specifications dated 3/01/2021, referred to as the Bid Documents for the above referenced project. This Addendum supersedes and supplements all portions of the Bid Documents with which it conflicts. DRAWING CLARIFICATIONS: 1. Sheet A1.0: Vegetation Clearing per NTFPD Standards: Remove note regarding clearing the area behind the Modulars to NTFPD Standards. The TTUSD will perform this work themselves. 2. Sheet A1.0: Fire Dept Connection Sign: Clarification regarding New Fire Department Connection Sign: Provide Aluminum sign 18” high x 24” wide similar to sign shown in Detail 1b, A1.1. Sign to be installed on the south face of the building facing the parking lot and read “Fire Department Connections” with an arrow pointing up the Fire Lane. 3. Sheet A1.1: Door Hardware: Note that the District has installed new door hardware that meets the requirements of being lockable from the inside. Note on sheet is informational only. 4. Sheet A1.3: Swing Set Clarification: Add a note pointing to the swing set at the south area of the playground: “Swing set to remain”. The District purchased and installed the swing set in the summer of 2020. General contractor can either remove and reinstall or work around it in place. 5. Sheet A1.3: Apparatus Equipment Removal: Add following to Sheet Note #2: The District would like to keep the Chinning bar, overhead bars and parallel bars for reinstallation. Remove these three items carefully to avoid damage, remove concrete footings, and store on-site in approved location.

Upload: others

Post on 26-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

TAHOE LAKE ELEMENTARY SCHOOL

2021 MODULAR PROJECT DSA #02-118553 ADDENDUM #2

MARCH 18, 2021

DSA02-118553

You are hereby directed to include the following items in the Plans and Specifications dated 3/01/2021, referred to as the Bid Documents for the above referenced project. This Addendum supersedes and supplements all portions of the Bid Documents with which it conflicts.

DRAWING CLARIFICATIONS:

1. Sheet A1.0: Vegetation Clearing per NTFPD Standards: Remove note regarding clearing the area behind the Modulars to NTFPD Standards. The TTUSD will perform this work themselves.

2. Sheet A1.0: Fire Dept Connection Sign: Clarification regarding New Fire Department Connection Sign: Provide Aluminum sign 18” high x 24” wide similar to sign shown in Detail 1b, A1.1. Sign to be installed on the south face of the building facing the parking lot and read “Fire Department Connections” with an arrow pointing up the Fire Lane. 3. Sheet A1.1: Door Hardware: Note that the District has installed new door hardware that meets the requirements of being lockable from the inside. Note on sheet is informational only. 4. Sheet A1.3: Swing Set Clarification: Add a note pointing to the swing set at the south area of the playground: “Swing set to remain”. The District purchased and installed the swing set in the summer of 2020. General contractor can either remove and reinstall or work around it in place.

5. Sheet A1.3: Apparatus Equipment Removal: Add following to Sheet Note #2: The District would like to keep the Chinning bar, overhead bars and parallel bars for reinstallation. Remove these three items carefully to avoid damage, remove concrete footings, and store on-site in approved location.

TAHOE LAKE ELEMENTARY SCHOOL 2021 MODULAR PROJECT

DSA #02-118553 ADDENDUM #2

MARCH 18, 2021 Page 2 OF 6

DSA02-118553

6. Sheet A1.3: Construction Fencing Add a note pointing to the Playground area that reads: “Provide Construction Fencing and BMP’s around Playground per Drawing C5 as part of Bid Alternate #1. 7. Sheet A1.3: Handrails on Ramp Ramp to have a handrail on each side of ramp. It’s difficult to see, but it is shown on both sides in plan. In detail 10, note that the design does not include 6” curb on ramp. 8. Sheet A1.4: Finishes Plan: Add sheet A1.4 to the drawings set. This sheet calls for various finishes and improvements to the three modular classrooms, including but not necessarily limited to new flooring, interior paint, ceiling tiles, replacement of 6 interior tack able wall panels, exterior coat hook systems, light fixture lamping, roof coating, and gutters.

9. Sheet A1.4: Finishes Plan: Revise note 1, Enlarged Modular Classroom Plan to read:

1. District will remove all carpet, VCT, and base prior to the start of construction.

10. Sheet A1.4: Finishes Plan: Revise note 1, Reflected Ceiling plan to read:

a. District will remove all ceiling tiles prior to the start of construction. Provide new ceiling tiles per Finishes Legend and Specifications, ACT-1.

11. Sheet C1 Demolition and Erosion Plan: Add the sawcut symbol to include the concrete footings required along the centerline of each modular. See C2 and SF-1 for additional information.

12. Sheet A1, Meehleis Modular Building Drawings: Note that the sink has been removed out of classroom P4 and a new countertop

TAHOE LAKE ELEMENTARY SCHOOL 2021 MODULAR PROJECT

DSA #02-118553 ADDENDUM #2

MARCH 18, 2021 Page 3 OF 6

DSA02-118553

has been installed. Modify countertop to accommodate sink. Provide and Install new sink:

A. Elkay 25”x17x6.5 ADA stainless-steel drop-in sink Model number CDKAD2517652, LK35 drain kit, LK1141A Bubbler, and LK 1500CR ADA faucet, along with associated drain piping, water service piping, and LavGuard protection.

13. Sheet A1: Meehleis Modular Building Drawings: Remove and dispose existing small tank water heaters installed in the knee space of each classroom. Install new 6-gallon water heaters in cabinet beside each sink in each classroom. Remove shelf and bore holes and grommet thru cabinet wall for connections. Water Heaters shall be:

AO Smith 6 gallon under counter water heater, model number EJC-6, with standard plug.

14. Sheet A5: Meehleis Modular Building Drawings: Disregard sheet A5 in the MMBI drawing set. This sheet showed building layouts in the original 1997 project. 15. Sheet P-1 Meehleis Modular Building Drawings: Add a note “Extend condensate drains to discharge into 12”x12” block out in paving above infiltration trench.

16. Sheet M2.2: Add the following Regarding Bid Alternate #2:

BID ALTERNATE #2 includes providing the concrete pads, condensing units, refrigerant liquid and suction line sets, electrical connections, cooling coils, condensate drains, etc. Electrical work shown on the electrical drawings to remain in base bid with the exception of final feeders from the subpanel to condensing units are to be included in the alternate.

TAHOE LAKE ELEMENTARY SCHOOL 2021 MODULAR PROJECT

DSA #02-118553 ADDENDUM #2

MARCH 18, 2021 Page 4 OF 6

DSA02-118553

17. Scope Clarifications: Modular Classrooms to be re-installed in conformance with the original Meehleis Modular Buildings, Inc, drawings, including but not limited to the following:

A. On Sheet SF-1, the Geotechnical Engineer has reviewed the project site and found the soil conditions are acceptable to not require the concrete footings at the corners of the Modulars, as described in the sheet note in Detail 10. Each classroom to get new foundations along the centerline as shown.

B. Provide Plywood Draft barriers below buildings at the water riser. Install new insulation and heat tape at new water risers as shown on P-1.

C. Provide new pressure treated foundation boards at all foundations per Sheet SF-1.

D. Provide new plywood skirting at all exposed wood foundation systems. TTUSD to paint once installed.

E. TTUSD will be painting the exterior of the Modular Classrooms while staged at Rideout, and will paint skirts, soffits, trims, and general touch-up once installation is complete at Tahoe Lake Elementary School.

TAHOE LAKE ELEMENTARY SCHOOL 2021 MODULAR PROJECT

DSA #02-118553 ADDENDUM #2

MARCH 18, 2021 Page 5 OF 6

DSA02-118553

18. Electrical Clarifications: District would like all Data Cabling (including telecommunications workstation outlets, wireless access points, security cameras and IP based clock speakers) to be replaced with new Cat-6/6A Cables throughout. Quantity and color of cables and jacks to be color coded per District standard as noted below. Revise Sheet notes 5/E1.0, F/E1.1, etc., to indicate all new Data Cabling.

District’s Cabling Color Standards:

a. Blue for workstation data, 2 Cat-6 drops each. b. Yellow for Wireless Access Points (WAP), 2 Cat-6A drops

each c. Grey for security and surveillance cameras, 1 Cat-6 each d. Green for speakers and clocks, 1 Cat-6 each e. White for analog phones, 1 Cat-6 each (none currently in

scope) f. Purple for building automation systems, , 1 Cat-6

each (none currently in scope)

PROJECT MANUAL AND GENERAL CLARIFICATIONS:

19. Insurance Clarification: Add the following to section General Conditions Section 13.1.7.4 "Claims Made coverage is only acceptable for Professional Liability Coverage. All other liability coverages must be on an occurrence basis. (See 13.1.1.3)"

20. Pre-Qualification Clarification: If the sum of the base bid and all alternates does not exceed ($1M), General Contractors and first-tier electrical, mechanical, and plumbing subcontractors are not required to be prequalified.

TAHOE LAKE ELEMENTARY SCHOOL 2021 MODULAR PROJECT

DSA #02-118553 ADDENDUM #2

MARCH 18, 2021 Page 6 OF 6

DSA02-118553

21. Pre-Bid meeting Agenda. See attached Agenda from the Pre-Bid Meeting held on 3.10.2021. 22. Lay Down Areas and Staging: See attached diagram of Lay Down Area diagrams at each site as approved by the District. The classrooms at Rideout School will be available for disassembly starting on June 7, 2021. They may be staged at the Rideout site in the laydown area as shown for duration of the contract. Staged classrooms shall be fenced. Contractor responsible for temporary protection of Modulars while staged.

ATTACHMENTS:

A. Pre-Bid Agenda dated 3.10.2021. B. Lay Down Diagram – Tahoe Lake Elementary School C. Lay Down Diagram – Rideout School D. Drawing A1.4 Finishes Plan

END OF ADDENDUM #2

AAggeennddaa TThhrreeee MMoodduullaarr CCllaassssrroooommss ffoorr TTaahhooee LLaakkee

EElleemmeennttaarryy

PPrree--BBiidd mmeeeettiinngg WWeeddnneessddaayy MMaarrcchh 1100,, 22002211 aatt 33::0000 PPMM

375 Grove St. Tahoe City CA with visit to Rideout Campus

A. Introductions

1. Rob Koster: TTUSD, Project Manager i) [email protected] ii) Office: 530-582-2542 Cell: 530-308-6489

2. Ward Young Architects i) Ron Larkins

3. DSA Inspector: TBD

B. Bid Schedule:

1. Drawings are available via email. Contact Rose Green at [email protected] or (530) 582-2540 i) Printing can be done at The Office Boss 12177 Business Park Dr # 2, Truckee, CA

96161 (530) 587-1620 for the cost of the prints. 2. Bidders must register with Rose to be put on the list to receive addenda. 3. Final questions are due to Rob Koster by Noon on Wednesday March 24th, 2021. 4. Final addendum will be issued by COB on Friday March 26th, 2021. 5. Bids are due on Wednesday March 31st, by 2:00 PM at the District Office – Gymnasium

11603 Donner Pass Road, Truckee, CA 96161. The building is not visible from Donner Pass Road – it is behind the fire house.

6. The official bid clock will be located in the gymnasium. 7. General contractors and MEP subcontractors must be Prequalified to bid on the project. 8. Roofing subcontractors must be Garland approved installers. 9. The contract will be brought to TTUSD Board meeting on April 7th, 2021. 10. A notice of award will be sent out on Thursday, April 8th, 2021.

C. Construction Schedule:

1. Insurance, bonds, and executed contract due within 5 days of notice of award. 2. Construction begins on or about June 25th, 2021 at TLE, work may start at RO on June

14. If no more snow days work may start earlier at TLE. 3. Substantial completion is expected by August 20th 4. Liquidated damages apply starting August 21, 2021 at $1,000 per day.

D. Scope

The Selective demolition and construction necessary for the relocation of 3 modular classrooms from the Rideout campus to the Tahoe Lake Elementary (TLE) campus; an alternate to remove and replace the playground at TLE and an alternate add cooling to the 3 portable classrooms. Generally, these categories of work involve site work, building relocation and installation, connection of utilities, new finishes, re-roofing, and removing and replacing the modular furnaces. The Project will involve barricading of work areas.

E. Alternates

1. Alternate #1 Playground Contractor shall provide all labor, material and equipment and barricading required to remove the existing play apparatus, wood and concrete retaining walls and curb ramps, and playground surfacing. Reconstruction in includes grading and drainage, concrete ramps and handrails, and procurement and installation of all playground equipment. Bid alternate includes the Play Craft Timber Border system and Fibar playground surfacing.

2. Alternate #2 Contractor shall provide all labor, material and equipment required to install condensing units at the 3 modular classrooms. Includes providing the concrete pads, condensing units, refrigerant liquid and suction line sets, electrical connection, cooling coils, condensate drains, etc. Electrical work, shown on the electrical drawings to remain in the base bid with the exception of the final feeders from the subpanel to the condensing units.

F. Substitutions 1. If you do wish to make a substitution, this must be submitted by March 19, 2021.

G. Public Contract Code & TTUSD Requirements 1. This project is subject to all the requirements of the PCC and prevailing wage. Know the

code and there will be no exceptions. 2. Class B license is required. 3. All procedures for submittals, shop drawings, substitutions, RFI’s, payment requests,

etc, must be in accordance with the project manual. 4. Occupied campus:

i) While this project is scheduled to will occur during summer break, our campuses are public, and the community will still use the fields and playgrounds. Staff will also be on site occasionally. Please be considerate of these activities and people.

ii) No smoking, tobacco products or alcohol at all. iii) Be safe at all times. Students are curious. iv) At a minimum, long pants and short sleeve shirts required – no profanities, tobacco

or alcohol advertisements allowed. v) Deliveries only between 7:00 am and 5:00 pm – this is a residential neighborhood

and we want to be a good neighbor. vi) Do not block access for staff or emergency providers at any time.

5. Finger Printing certification is required. 6. Secure all materials, equipment and trailers at all times. 7. Schedule all shutdowns with TTUSD: Rob Koster at least 7 days in advance. 8. Contractor to provide their own trailer, storage, restroom, and phone. No indoor restroom

use will be allowed. This job does not require a trailer unless the contractor wants to install one for convenience. A classroom can be made available for the contractor’s office.

H. Hazardous materials removal 1. None anticipated. The District has performed HazMat investigations a report is pending.

2. However, specification section 00 73 56 details what to do if you suspect hazardous materials. We want to protect your workers, the school staff and community. Please stop immediately and follow the procedures.

I. Other 1. Debarred, suspended or contractors in process of debarment are not permitted to bid on

this project. 2. The project manual contains Special Conditions – please review and ask questions if

you have any. 3. Bids must include:

(a) Completed bid form – signed (b) Site visit certification form. (c) List of subcontractors form filled out completely (d) Non collusion affidavit (e) Bid bond for 10% of the value of the bid is required (f) Iran Contracting form if bid exceeds $1M

4. All other documents and certifications are not required until contract execution. 5. PLM bonds must be accompanied by a certificate from the Placer County Clerk’s office

which verifies the surety has authority to act as surety upon bonds in CA. 6. Normal district maintenance will be on going. Please work with them if they need access. 7. Provide fencing for laydown areas – protect your equipment and materials. 8. Dumpster must be fenced at the end of each day. Do not put food or food trash in the

open dumpsters. This will attract bears and other wildlife to the campus. 9. Temp Facilities, Electrical Power (110) is available from outlets on site. Water is

available from hose bibs on site. If a need is greater than what is in place, the contractor is responsible to provide it.

10. TTUSD will pay for all special inspections. 11. Contractor to provide porta johns, no use of internal restrooms is permitted. 12. Access and staging- contractor shall us existing access roads and driveways. The

laydown area must be limited to the area around the scope of work.

J. DSA Requirements: 1. This is a DSA project, a DSA inspector will be assigned to this project. The DSA

Sacramento Field Engineer will make period visits.

K. Walk scope areas including the loading zones (ALL) 1. Contractor responsible to protect all finishes not being disturbed including driveways,

sidewalks and, landscaping 2. Contractor responsible for keeping non construction areas clean and for clean-up of

these and the construction area daily. L. Questions?

DSAD E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECT

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT

APP: INC:REVIEWED FOR

SS FLS ACS

DATE:

✔ ✔ ✔

02-118553

03/03/2021

rkoster
PolyLine
rkoster
PolyLine
rkoster
Polygon
rkoster
Typewritten Text
contractors work and laydown area fence as needed.
rkoster
Polygon
rkoster
Typewritten Text
contractors work and laydown area for bid Alt #1 fence as needed.

DSAD E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECTDSADIVISION OF THE STATE ARCHITECT

IDENTIFICATION STAMP DIV. OF THE STATE ARCHITECT

APP: INC:REVIEWED FOR

SS FLS ACS

DATE:

✔ ✔ ✔

02-118553

03/03/2021

rkoster
PolyLine
rkoster
Line
rkoster
Line
rkoster
PolyLine
rkoster
Polygon
rkoster
Polygon
rkoster
Line
rkoster
Typewritten Text
contractors work and laydown area fence as needed.
rkoster
Typewritten Text
contractor to close this area as needed for safe removal of portables
rkoster
Typewritten Text
Fire lane keep clear
rkoster
PolyLine

A CB

7

9

8

P-1, ALL WALLS

HSS COLUMNS PER MODULAR DRAWINGS, TYP

24" x 30" FLOOR ACCESS PANEL W/ REDUCER STRIPS

DN

5 RISERS @ 5.8"4 TREADS @ 11"

4' - 0"

VCT-1 CI

VCT-1CI

P-2

TYPICAL MODULAR CLASSROOM

1 2

8' -

0"

3

RB-1, TYPICAL

5

30"x48" CLEAR SPACE

P2

4

5' - 0"

61

81

71

1

2

3

TYP

TYP

3

(E) LOW SLOPE ROOF 1/4":12"

1

2

SHEET NO.

SHEET TITLE

DATE

DRAWN

SCALE

PROJECT NO.

CHECKED

REVISIONS

These drawings are instruments of service and are property of Ward-Young Architects, A California Corporation. All designs and other information on these drawings are for use on the specified project and shall not be used otherwise without the written permission of Ward -Young Architects.

3 MODULAR CLASSROOMS FOR TAHOE LAKE ELEMENTARY

SCHOOL

1/4" = 1'-0"

A1.4

CV RL

CLASSROOM FINISHESPLAN

19022.00

03/01/2021

00 04 08 FEET02

ENLARGED MODULAR CLASSROOM, TYP. OF 3 (P6 IS MIRRORED)

SCOPE OF INTERIOR FINISHES

DISTRICT WILL REMOVE ALL CARPET, VCT, AND BASE PRIOR TO THE START OF CONSTRUCTION.

NEW FLOORING TO FINISH FLOOR BREAKS AS SHOWN

REPAINT ALL WALLS AND INTERIOR PAINTED FINISHES

NEW RUBBER BASE AND TRANSITIONS

PROVIDE "SAFEHOOK" BACKPACK HOOKS @ 6.4" O.C SPACINGP4 & P6 = 14' LF = 26 HOOKS @ ACH P5= 18 LF = 32 HOOKS

REMOVE (E) UNDERCOUNTER 6 GALLON WATER HEATERS AND REPLACE W/ NEW LOCATED IN ADJACENT CABINETS. NEW UNITS: A0 SMITH EJC-6. TYP. EA. CLASSROOM

PROVIDE (6) 4' x 8' x 1/2" VINYL WRAPPED INTERIOR WALL SURFACE PANELS FOR REPAIR/REPLACEMENT OF DAMAGED (E) PANELS. ASSUME 6 REPAIRS TOTAL. PANELS TO MATCH EXISTING SURFACE TEXTURE - SEE SP-1FOR ORIGINAL SPEC AND REQUIREMENTS.

MODULAR CLASSROOM P4 HAS HAD IT'S SINK REMOVED. INSTALL NEW SINK PER ORIGINAL DRAWINGS AND SPECS. SEE ADDENDUM #2 FOR ADDITIONAL INFORMATION.

2

3

4

5

00 04 08 FEET02

REFLECTED CEILING PLANDISTRICT WILL REMOVE ALL CEILING TILES PRIOR TO THE START OF CONSTRUCTION. PROVIDE NEW CEILING TILES PER FINISH LEGEND AND SPECIFICATIONS, ACT-1.

IN MODULARS P4 & P5, REPLACE EXISTING LIGHT FIXTURES WITH LITHONIA 2BLT4R 2x4 RETROFIT KITS.

WUI COMPLIANT SOFFIT & VENT PER 1/A1.2

1

2

3

00 04 08 FEET02

ROOF PLAN

REPAIR ROOF AT MODULAR LINE PER ROOFING MANUFACTURER'S RECOMMENDATIONS.

RECOAT ENTIRE ROOF PER ROOF-RECOAT SPECIFICATION SECTION 07500.

PROVIDE NEW 18 ga GUTTER AND 24 ga DOWNSPOUT PER ORIGINAL MODULAR DRAWINGS. PROVIDE DOWNSPOUT WITH LATERAL AT BASE TO DRIP INTO DROP INLET. PROVIDE SELF REGULATING ICE MELT CABLE THROUGHOUT GUTTERS AND DOWNSPOUT. EXTEND CABLES DOWN INTO DROP INLET TO FLOW LINE.

1

2

3

HEAT CABLE : SUMMIT ICE MELT SYSTEM, S1 SELF REGULATING CABLE

WALL FINISH

P1 PAINTMFR: DUNN EDWARDSNUMBER: SPMA40FINISH: LOW SHEENCOLOR: TBD

P2 PAINTMFR : DUNN EDWARDSNUMBER : SPMA50FINISH : SEMI-GLOSSCOLOR : TBD

CEILING

ACT-1 - CEILING TILEMFR : ARMSTRONGSTYLE : CORTEGA #747COLOR : WHITESIZE : 2'x4'

WALL BASE

RB1RUBBER WALL BASEMFR: JOHNSONITESTYLE: 6" COVED BASECOLOR: CHARCOAL 20

FLOORING

C1 CARPETMFR: TANDUS STYLE: POWERBOND CENTIVA ALL STARCOLOR: SKYSCRAPERSIZE: ROLL

VCT-1 VINYL COMPOSITE TILEMFR: ARMSTONGSTYLE : PREMIUM EXCELONCOLOR: 5C803 PEARLSIZE: 12x12

FINISH LEGEND

TYP.TYP.

1

6

7

8

1

1

1

1 ADDENDUM #2, 3/17/2021

1

1