Sl # DRAWING TITTLE DRAWING NO Type Division REV #
CONTRACTOR - FKS COMPANY - JO
REF. OF JO STATUS
3 Kirby Structural Design Drawings
13 1 Drawing Index FKS - 786 - ST - A - 00 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Reviewed As NotedB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
14 2 Achor Bolt Plan FKS - 786 - ST - A - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 30 MP784-5-6/135 26/Oct/10 5 Reviewed As Noted
15 3 Achor Bolt Details & Reaction FKS - 786 - ST - A - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
16 4 Achor Bolt Details & Reaction FKS - 786 - ST - A - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
17 5 Roof Framing Plan & Details FKS - 786 - ST - E - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
18 6 Typical Cross Section FKS - 786 - ST - E - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
19 7 Typical Cross Section FKS - 786 - ST - E - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
20 8Sidewall Framing Elevations
FKS - 786 - ST - E - 04 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
Wall Framing Elevation GL - D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
21 9Wall Framing Elevations (1 of 2)
FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
Partition Side Wall GL -D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
22 10 Wall Framing Elevations (2 of 2) FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit
B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
23 11 End Wall Framing Elevations FKS - 786 - ST - E - 06 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
24 12 End Wall Framing Elevations FKS - 786 - ST - E - 07 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
25 13 Mezzanine Layout Plan & Details FKS - 786 - ST - E - 08 DD Structural
A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit
B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
26 14 Crane Beam Layout Plan & Details FKS - 786 - ST - E - 09 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
8 SUB-STRUCTURAL
86 1 FKS-786-ST-001 DD Civil
A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & Resubmit
B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As Noted
C 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed87 2 Anchor Bolt Plan FKS-786-ST-001 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed
88 3 Foundation Typical Details - 1 FKS-786-ST-002 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted
89 4 Foundation Typical Details - 2 FKS-786-ST-003 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted
90 5 Foundation Typical Details - 3 FKS-786-ST-004 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted
91 6 Foundation Typical Details - 4 FKS-786-ST-005 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed
8.1 Structural Design Drawings92 1 Jib Crane Proposal DD Civil A 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit93 2 Column Axis, GR Beam, Foundation Layout FKS-786-ST-001 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit94 3 Foundation Typical Details - 3 FKS-786-ST-004 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit
98 12 JIB Crane Anchor Bolt Details Sketch Civil A 20/Feb/11 4430 For Review & Approval
102 15 JO-HC098-SK-001 Sketch ElectricalA 29/Aug/10 4605 For Review & Approval
B 10/Oct/10 4563 For Review & Approval
NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
Total Dwg DATE OF
SUBMISSION DATE OF ACTION
Column Axix Ground Beam and Footings Layout
Foundation Layout Plan showing Existing Under Ground Cables
04/08/2023 Page 2 of 2
F & K IBRAHIM AL SHUWAYER & PARTNERS
LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - A
SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO
REF. NO. REF. OF JO STATUS
A FKS-785
1 DRAWING INDEX FKS-785-DI-001A T/46 25.07.2010 MP784-5-6/071 12.08.2010 Revise & ResubmitB T/64 25-08-2010
A.1 ARCHITECTURALA.1.1 EXISTING GROUND FLOOR PLAN WITH EXTENSION FKS-785-BA-001 B T/111 11.10.2010
MP784-5-6/124 17.10.2010 REVIEWEDA.1.2 EXISTING ROOF PLAN WITH EXTENSION FKS-785-BA-002 B T/111 11.10.2010A.1.3 SECTION - A AND SECTION - B FKS-785-BA-003 B T/111 11.10.2010A.1.4 ELEVATION - 1 AND ELEVATION - 2 FKS-785-BA-004 B T/111 11.10.2010
A.2 STRUCTURALA.2.1 STRUCTURAL GENERAL NOTE FKS-785-ST-001 B T/114 12.10.2010 MP784-5-6/124 14.10.2010 REVIEWED
FOOTING, GROUND BEAM LAYOUT AND DETAILS FKS-785-ST-002 B T/114 12.10.2010 MP784-5-6/124 14.10.2010 REVIEWEDANCHOR BOLT PLAN & DETAILS FKS-785-ST-003 B T/114 12.10.2010 MP784-5-6/124 14.10.2010 REVIEWED
Kirby Structural Design Drawings
1 Drawing Index FKS - 785 - ST - A - 00 A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Reviewed As Noted
B T/070 31-08-2010
2 Anchor Bolt Details & Reactions FKS - 785 - ST - A - 01A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & ResubmitB T/070 31-08-2010
3 Anchor Bolt Details & Reactions FKS - 785 - ST - A - 02A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit
B T/070 31-08-2010
4 Roof Framing Plan FKS - 785 - ST - E - 01A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit
B T/070 31-08-2010
5 Typical Cross Section FKS - 785 - ST - E - 02A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit
B T/070 31-08-2010
6 Crane Beam Layout Plan & Details FKS - 785 - ST - E - 03A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit
B T/070 31-08-2010
7 End Wall Framing Elevations FKS - 785 - ST - E - 04 A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & ResubmitB T/070 31-08-2010
PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
DATE OF SUBMISSION
DATE OF ACTION
J0-785: EXTENSION OF EXISTING ELECTRICAL MAINTENANCE WORKSHOP
04/08/2023 Page 3 of 2
F & K IBRAHIM AL SHUWAYER & PARTNERS
LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - A
SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO
REF. NO. REF. OF JO STATUS
PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
DATE OF SUBMISSION
DATE OF ACTION
A.3 ELECTRICAL A.3.1 LIGHTING LAYOUT FKS-785-EE-001 A T/46 25.07.2010
MP784-5-6/071 21.08.2010 Reviewed As Noted
A.3.2 POWER LAYOUT FKS-785-EE-002 A T/46 25.07.2010A.3.3 EARTHING SYSTEM LAYOUT FKS-785-EE-003 A T/46 25.07.2010A.3.4 MAIN LIGHTING PANEL FKS-785-EE-004 A T/46 25.07.2010A.3.5 MAIN SWITCH BOARD AND EXHAUST FAN PANEL FKS-785-EE-005 A T/46 25.07.2010A.3.6 WORKSHOP LOAD FORMS FKS-785-EE-006 A T/46 25.07.2010
D OPTIONAL WORKS: OPTION 1 FKS-785-BA-005
D.1FKS-785-BA-006
D.2FKS-785-BA-007
D.3FKS-785-BA-008
D.4FKS-785-BA-009
ELECTRICAL MAINT. WORKSHOP, GROUND FLOOR - PROPOSED FIRE ALARM SYSTEM
ELECTRICAL MAINT. WORKSHOP, MEZZ FLOOR - PROPOSED FIRE ALARM SYSTEM
COMMUNICATION BUILDING - PROPOSED FIRE ALARM SYSTEM
ISNTRUMENT WORKSHOP - PROPOSED FIRE ALARM SYSTEM
SD: Shop Drawing & DD: Design Drawing
F & K IBRAHIM AL SHUWAYER & PARTNERS
LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - B
Sl # DRAWING TITTLE DRAWING NO Type Division REV #
CONTRACTOR - FKS COMPANY - JO
REF. OF JO STATUS
1 1 Drawing Index FKS-786-DI-001 SD ElectricalA 25/Jul/10 MP784-5-6/072 12/Aug/10 18 Revise & ResubmitB 25/Aug/10 13 For Information & Record
1 GENERAL 0
2 1 Finished Level of Shop area & Wash area FKS-786-GG-001 SD Electrical A 25/Jul/10 MP784-5-6/072 12/Aug/10 18 Reviewed As Noted
2 ARCHITECTURAL 0
3 1 Gound Floor Plan FKS-786-BA-001 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 193 For Review & Approval
4 2 Mezzanine Floor Plan FKS-786-BA-002 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 193 For Review & Approval
5 3 Roof Plan FKS-786-BA-003 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval
6 4 Section - A & B FKS-786-BA-004 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval
7 5 Section - C & D FKS-786-BA-005 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval
8 6 Elevation - E & F FKS-786-BA-006 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval
9 7Window Finishing Schedules
FKS-786-BA-007 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & Resubmit
Door/Window Schedules & Details B 3/Feb/11 4447 For Review & Approval10 8 Finishing Schedules FKS-786-BA-008 DD Archt A 3/Feb/11 4447 For Review & Approval11 9 Toilet Detrails 1 & 2 FKS-786-BA-009 DD Archt A 3/Feb/11 4447 For Review & Approval12 10 Staircase Details FKS-786-BA-010 DD Archt A 3/Feb/11 4447 For Review & Approval
3 Kirby Structural Design Drawings
13 1 Drawing Index FKS - 786 - ST - A - 00 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Reviewed As NotedB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
14 2 Achor Bolt Plan FKS - 786 - ST - A - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 30 MP784-5-6/135 26/Oct/10 5 Reviewed As Noted
15 3 Achor Bolt Details & Reaction FKS - 786 - ST - A - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
16 4 Achor Bolt Details & Reaction FKS - 786 - ST - A - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
17 5 Roof Framing Plan & Details FKS - 786 - ST - E - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
18 6 Typical Cross Section FKS - 786 - ST - E - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
19 7 Typical Cross Section FKS - 786 - ST - E - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
20 8Sidewall Framing Elevations
FKS - 786 - ST - E - 04 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
Wall Framing Elevation GL - D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
21 9Wall Framing Elevations (1 of 2)
FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
Partition Side Wall GL -D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
22 10 Wall Framing Elevations (2 of 2) FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit
B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
23 11 End Wall Framing Elevations FKS - 786 - ST - E - 06 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
24 12 End Wall Framing Elevations FKS - 786 - ST - E - 07 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
25 13 Mezzanine Layout Plan & Details FKS - 786 - ST - E - 08 DD Structural
A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit
B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted
C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
26 14 Crane Beam Layout Plan & Details FKS - 786 - ST - E - 09 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed
8 SUB-STRUCTURAL
86 1 FKS-786-ST-001 DD Civil
A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & Resubmit
B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As Noted
C 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed87 2 Anchor Bolt Plan FKS-786-ST-001 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed
88 3 Foundation Typical Details - 1 FKS-786-ST-002 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted
89 4 Foundation Typical Details - 2 FKS-786-ST-003 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted
90 5 Foundation Typical Details - 3 FKS-786-ST-004 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted
91 6 Foundation Typical Details - 4 FKS-786-ST-005 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed
8.1 Structural Design Drawings92 1 Jib Crane Proposal DD Civil A 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit93 2 Column Axis, GR Beam, Foundation Layout FKS-786-ST-001 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit94 3 Foundation Typical Details - 3 FKS-786-ST-004 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit
98 12 JIB Crane Anchor Bolt Details Sketch Civil A 20/Feb/11 4430 For Review & Approval
102 15 JO-HC098-SK-001 Sketch ElectricalA 29/Aug/10 4605 For Review & Approval
B 10/Oct/10 4563 For Review & Approval
NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
Total Dwg DATE OF
SUBMISSION DATE OF ACTION
Column Axix Ground Beam and Footings Layout
Foundation Layout Plan showing Existing Under Ground Cables
04/08/2023 5 of 8
F & K IBRAHIM AL SHUWAYER & PARTNERS
LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - C
SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO
REF. NO. REF. OF JO STATUS
C JO-784: NEW A/C WORKSHOP FKS-784
Kirby Structural Design Drawings
1
Achor Bolt Plan FKS-784-ST-A-00 A T/040 15-07-2010 MP784-5-6/058 04/08/2010 REVISE & RESUBMIT
Achor Bolt Plan FKS-784-ST-A-00 B T/098 26-Oct-2010 MP784-5-6/122 17.10.2010 Revise & Resubmit
2 Drawing Index FKS-784-ST-A-01 B
3 Achor Bolt Details FKS-784-ST-A-02 B
4 Anchor Bolt Reactions FKS-784-ST-A-03 B
5 Roof Framing Plan FKS-784-ST-E-01 B
6 Cross Section GL-2 to GL-5 FKS-784-ST-E-02 B
7 Cross Section GL-6 FKS-784-ST-E-03 B
8 Cross Section GL-7 FKS-784-ST-E-04 B
9 End Wall Framing Elevation GL-7 FKS-784-ST-E-05 B
10 End Wall Framing Elevation GL-1 FKS-784-ST-E-06 B
11 Side Wall Framing Elevations FKS-784-ST-E-07 B
12 Mizzanine Layout Plan & Details FKS-784-ST-E-08 B
13 Crane Beam Layout Plan & Details FKS-784-ST-E-09 B
PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
DATE OF SUBMISSION
DATE OF ACTION
04/08/2023 6 of 8
F & K IBRAHIM AL SHUWAYER & PARTNERS
LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - C
SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO
REF. NO. REF. OF JO STATUS
PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
DATE OF SUBMISSION
DATE OF ACTION
14 Stair - 1 FKS-784-ST-E-10 B
15 Stair - 2 FKS-784-ST-E-11 B
16 Partition Wall Framing Elevation FKS-784-ST-E-12 B
C.4 SANITARY SEWER AND DRAINAGEC.4.1 EXTERNAL SANITARY SEWER LAYOUT PLAN FKS-784-SS-001C.4.2 TOILET, PANTRY DRAINAGE LAYOUT FKS-784-SS-002
C.5 WATER SUPPLYC.5.1 EXTERNAL WAER SUPPLY LAYOUT - GROUND FLOOR FKS-784-WS-001C.5.2 TOILET, PANTRY WATER SUPPLY LAYOUT FKS-784-WS-002
C.6 ELECTRICALC.6.1 LIGHTING LAYOUT - GROUND FLOOR FKS-784-EE-001 A
T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted
C.6.2 LIGHTING LAYOUT - MEZZ FLOOR FKS-784-EE-002 AC.6.3 POWER LAYOUT - GROUND LAYOUT FKS-784-EE-003 AC.6.4 POWER LAYOUT - MEZZ LAYOUT FKS-784-EE-004 A
C.6.5 EARTHING SYSTEM - GROUND LAYOUT FKS-784-EE-005 A
C.6.6 MAIN LIGHTING PANEL SINGLE LINE DIAGRAM FKS-784-EE-006 AC.6.7 SINGLE LINE DIAGRAM MSB FKS-784-EE-007 AC.6.8 LOAD SCHEDULE - MSB, MLP & DB - 1 FKS-784-EE-008 A
C.6.9 LOAD SCHEDULE - DB-2, MPP AND EXHAUST FAN PANEL FKS-784-EE-009 A
C.6.10 POWER CABLE ROUTE LAYOUT FKS-784-EE-010AB T/84 16.09.2010 MP784-5-6/095 21/9/2010 REVIEWED AS NOTED
C.7 TELEPHONE SYSTEMC.7.1 TELEPHONE LAYOUT - GROUND FLOOR FKS-784-TT-001 A
T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted
C.7.2 TELEPHONE LAYOUT - MEZZ FLOOR FKS-784-TT-002 AC.7.3 TELEPHONE RISER DIAGRAM FKS-784-TT-003 A
04/08/2023 7 of 8
F & K IBRAHIM AL SHUWAYER & PARTNERS
LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - C
SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO
REF. NO. REF. OF JO STATUS
PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784
DATE OF SUBMISSION
DATE OF ACTION
C.7.4FKS-784-TT-004 A
T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted
C.7.5 CABLE ROUTER LAYOUT FOR DATA AND TELEPHONE CABLEFKS-784-TT-005 A
C.8 DATA SYSTEM
C.8.1 COMPUTER NETWORK LAYOUT - GROUND FLOOR PLAN FKS-784-CU-001 AT/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted
C.8.2 COMPUTER NETWORK LAYOUT - MEZZ FLOOR PLAN FKS-784-CU-002 A
C.9 FIRE ALARM CONTROL SYSTEMC.9.1 FIRE ALARM SYSTEM - GROUND FLOOR FKS-784-FA-001 A
T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As NotedC.9.2 FIRE ALARM SYSTEM - MEZZ FLOOR FKS-784-FA-002 AC.9.3 SCHEMATIC DIAGRAM FIRE ALARM SYSTEM FKS-784-FA-003 A
C.10 FIRE FIGHTING SYSTEMC.10.1 EMERGENCY EGRESS - GROUND FLOOR FKS-784-FF-001C.10.2 EMERGENCY EGRESS - MEZZ FLOOR FKS-784-FF-002
C.11 HVAC SYSTEMC.11.1 HVAC DUCT LAYOUT - GROUND FLOOR FKS-784-AC-001C.11.2 HVAC DUCT LAYOUT - MEZZ FLOOR FKS-784-AC-002C.11.3 HVAC DUCT TYPICAL DETAILS FKS-784-AC-003C.11.4 SCHEMATIC DIAGRAMS - CONTROL SCHEMES FKS-784-AC-004
SCHEMATIC DIAGRAM OF TELEPHONE & FIBER OPTIC CABLE
NEW INSTRUMENT WORKSHOP ### ###
Commencement Of Project ### ###
Kirby Structural Design Drawings ### ###Achor Bolt Plan ### ###Revision A ### 8/4/2010Revision B 9/7/2010 ###Revision C ### ###Achor Bolt Details & Reaction ### ###Revision A ### 8/4/2010Revision B 9/7/2010 ###Revision C ### ###Achor Bolt Details & Reaction ### ###Revision A ### 8/4/2010Revision B 9/7/2010 ###Revision C ### ###
KIRBY SUB-STRUCTURAL CIVIL DRAWINGS ### ###Column Axix Ground Beam and Footings Layout ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Anchor Bolt Plan ### ###Foundation Typical Details - 1 ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Foundation Typical Details - 2 ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Foundation Typical Details - 3 ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Foundation Typical Details - 4 ### ###
Structural Design Drawings ### ###Jib Crane Proposal ### ###Column Axis, GR Beam, Foundation Layout ### ###Foundation Typical Details - 3 ### ###