drawings deliverables & submittal

15
SD: Shop Drawing & DD: Design Drawing F & K IBRAHIM AL SHUWAYER & PARTNERS LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - B DRAWING TITTLE DRAWING NO Type Division REV # CONTRACTOR - FKS COMPANY - JO REF. OF JO 3 Kirby Structural Design Drawings 13 1 Drawing Index DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 14 2 Achor Bolt Plan DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 30 MP784-5-6/135 26/Oct/10 5 15 3 Achor Bolt Details & Reaction DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 16 4 Achor Bolt Details & Reaction DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 17 5 Roof Framing Plan & Details DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 18 6 Typical Cross Section DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 19 7 Typical Cross Section DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 20 8 Sidewall Framing Elevations DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Wall Framing Elevation GL - D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 21 9 Wall Framing Elevations (1 of 2) DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Partition Side Wall GL -D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 22 10 Wall Framing Elevations (2 of 2) DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 23 11 End Wall Framing Elevations FKS - 786 - ST - E - 06 DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 24 12 End Wall Framing Elevations DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 25 13 Mezzanine Layout Plan & Details FKS - 786 - ST - E - 08 DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 26 14 Crane Beam Layout Plan & Details DD Structural A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 8 SUB-STRUCTURAL 86 1 FKS-786-ST-001 DD Civil A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 C 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 87 2 Anchor Bolt Plan FKS-786-ST-001 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 88 3 Foundation Typical Details - 1 FKS-786-ST-002 DD Civil A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 C 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 89 4 Foundation Typical Details - 2 FKS-786-ST-003 DD Civil A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 B 8/Dec/10 MP784-5-6/186 22/Dec/10 14 C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 90 5 Foundation Typical Details - 3 FKS-786-ST-004 DD Civil A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 91 6 Foundation Typical Details - 4 FKS-786-ST-005 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 8.1 Structural Design Drawings 92 1 Jib Crane Proposal DD Civil A 7/Nov/10 MP784-5-6/154 23/Nov/10 16 93 2 Column Axis, GR Beam, Foundation Layout FKS-786-ST-001 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 94 3 Foundation Typical Details - 3 FKS-786-ST-004 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 98 12 JIB Crane Anchor Bolt Details Sketch Civil A 20/Feb/11 4205 102 15 JO-HC098-SK-001 Sketch Electrical A 29/Aug/10 4380 B 10/Oct/10 4338 NEW WORKSHOP FACILITIES AT ADMIN. CAMP MP#785, MP#786, MP Total Dwg Sl # DATE OF SUBMISSION DATE OF ACTION FKS - 786 - ST - A - 00 FKS - 786 - ST - A - 01 FKS - 786 - ST - A - 02 FKS - 786 - ST - A - 03 FKS - 786 - ST - E - 01 FKS - 786 - ST - E - 02 FKS - 786 - ST - E - 03 FKS - 786 - ST - E - 04 FKS - 786 - ST - E - 05 FKS - 786 - ST - E - 05 FKS - 786 - ST - E - 07 FKS - 786 - ST - E - 09 Column Axix Ground Beam and Footings Layout Foundation Layout Plan showing Existing Under Ground Cables

Upload: nemalipalli007

Post on 24-Nov-2014

113 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Drawings Deliverables & Submittal

SD: Shop Drawing & DD: Design Drawing

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - B

Sl # DRAWING TITTLE DRAWING NO Type Division REV #

CONTRACTOR - FKS COMPANY - JO

REF. OF JO STATUS

3 Kirby Structural Design Drawings

13 1 Drawing Index FKS - 786 - ST - A - 00 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Reviewed As NotedB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

14 2 Achor Bolt Plan FKS - 786 - ST - A - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 30 MP784-5-6/135 26/Oct/10 5 Reviewed As Noted

15 3 Achor Bolt Details & Reaction FKS - 786 - ST - A - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

16 4 Achor Bolt Details & Reaction FKS - 786 - ST - A - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

17 5 Roof Framing Plan & Details FKS - 786 - ST - E - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

18 6 Typical Cross Section FKS - 786 - ST - E - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

19 7 Typical Cross Section FKS - 786 - ST - E - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

20 8Sidewall Framing Elevations

FKS - 786 - ST - E - 04 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

Wall Framing Elevation GL - D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

21 9Wall Framing Elevations (1 of 2)

FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

Partition Side Wall GL -D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

22 10 Wall Framing Elevations (2 of 2) FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit

B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

23 11 End Wall Framing Elevations FKS - 786 - ST - E - 06 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

24 12 End Wall Framing Elevations FKS - 786 - ST - E - 07 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

25 13 Mezzanine Layout Plan & Details FKS - 786 - ST - E - 08 DD Structural

A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit

B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

26 14 Crane Beam Layout Plan & Details FKS - 786 - ST - E - 09 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

8 SUB-STRUCTURAL

86 1 FKS-786-ST-001 DD Civil

A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & Resubmit

B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As Noted

C 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed87 2 Anchor Bolt Plan FKS-786-ST-001 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed

88 3 Foundation Typical Details - 1 FKS-786-ST-002 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted

89 4 Foundation Typical Details - 2 FKS-786-ST-003 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted

90 5 Foundation Typical Details - 3 FKS-786-ST-004 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted

91 6 Foundation Typical Details - 4 FKS-786-ST-005 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed

8.1 Structural Design Drawings92 1 Jib Crane Proposal DD Civil A 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit93 2 Column Axis, GR Beam, Foundation Layout FKS-786-ST-001 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit94 3 Foundation Typical Details - 3 FKS-786-ST-004 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit

98 12 JIB Crane Anchor Bolt Details Sketch Civil A 20/Feb/11 4430 For Review & Approval

102 15 JO-HC098-SK-001 Sketch ElectricalA 29/Aug/10 4605 For Review & Approval

B 10/Oct/10 4563 For Review & Approval

NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

Total Dwg DATE OF

SUBMISSION DATE OF ACTION

Column Axix Ground Beam and Footings Layout

Foundation Layout Plan showing Existing Under Ground Cables

Page 2: Drawings Deliverables & Submittal

04/08/2023 Page 2 of 2

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - A

SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO

REF. NO. REF. OF JO STATUS

A FKS-785

1 DRAWING INDEX FKS-785-DI-001A T/46 25.07.2010 MP784-5-6/071 12.08.2010 Revise & ResubmitB T/64 25-08-2010

A.1 ARCHITECTURALA.1.1 EXISTING GROUND FLOOR PLAN WITH EXTENSION FKS-785-BA-001 B T/111 11.10.2010

MP784-5-6/124 17.10.2010 REVIEWEDA.1.2 EXISTING ROOF PLAN WITH EXTENSION FKS-785-BA-002 B T/111 11.10.2010A.1.3 SECTION - A AND SECTION - B FKS-785-BA-003 B T/111 11.10.2010A.1.4 ELEVATION - 1 AND ELEVATION - 2 FKS-785-BA-004 B T/111 11.10.2010

A.2 STRUCTURALA.2.1 STRUCTURAL GENERAL NOTE FKS-785-ST-001 B T/114 12.10.2010 MP784-5-6/124 14.10.2010 REVIEWED

FOOTING, GROUND BEAM LAYOUT AND DETAILS FKS-785-ST-002 B T/114 12.10.2010 MP784-5-6/124 14.10.2010 REVIEWEDANCHOR BOLT PLAN & DETAILS FKS-785-ST-003 B T/114 12.10.2010 MP784-5-6/124 14.10.2010 REVIEWED

Kirby Structural Design Drawings

1 Drawing Index FKS - 785 - ST - A - 00 A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Reviewed As Noted

B T/070 31-08-2010

2 Anchor Bolt Details & Reactions FKS - 785 - ST - A - 01A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & ResubmitB T/070 31-08-2010

3 Anchor Bolt Details & Reactions FKS - 785 - ST - A - 02A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit

B T/070 31-08-2010

4 Roof Framing Plan FKS - 785 - ST - E - 01A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit

B T/070 31-08-2010

5 Typical Cross Section FKS - 785 - ST - E - 02A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit

B T/070 31-08-2010

6 Crane Beam Layout Plan & Details FKS - 785 - ST - E - 03A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & Resubmit

B T/070 31-08-2010

7 End Wall Framing Elevations FKS - 785 - ST - E - 04 A T/041 15-07-2010 MP784-5-6/059 05.08.2010 Revise & ResubmitB T/070 31-08-2010

PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

DATE OF SUBMISSION

DATE OF ACTION

J0-785: EXTENSION OF EXISTING ELECTRICAL MAINTENANCE WORKSHOP

B20
Nizam: SHOULD CHANGE THE DATE (FOOTER) BEFORE PRINTING
Page 3: Drawings Deliverables & Submittal

04/08/2023 Page 3 of 2

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - A

SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO

REF. NO. REF. OF JO STATUS

PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

DATE OF SUBMISSION

DATE OF ACTION

A.3 ELECTRICAL A.3.1 LIGHTING LAYOUT FKS-785-EE-001 A T/46 25.07.2010

MP784-5-6/071 21.08.2010 Reviewed As Noted

A.3.2 POWER LAYOUT FKS-785-EE-002 A T/46 25.07.2010A.3.3 EARTHING SYSTEM LAYOUT FKS-785-EE-003 A T/46 25.07.2010A.3.4 MAIN LIGHTING PANEL FKS-785-EE-004 A T/46 25.07.2010A.3.5 MAIN SWITCH BOARD AND EXHAUST FAN PANEL FKS-785-EE-005 A T/46 25.07.2010A.3.6 WORKSHOP LOAD FORMS FKS-785-EE-006 A T/46 25.07.2010

D OPTIONAL WORKS: OPTION 1 FKS-785-BA-005

D.1FKS-785-BA-006

D.2FKS-785-BA-007

D.3FKS-785-BA-008

D.4FKS-785-BA-009

ELECTRICAL MAINT. WORKSHOP, GROUND FLOOR - PROPOSED FIRE ALARM SYSTEM

ELECTRICAL MAINT. WORKSHOP, MEZZ FLOOR - PROPOSED FIRE ALARM SYSTEM

COMMUNICATION BUILDING - PROPOSED FIRE ALARM SYSTEM

ISNTRUMENT WORKSHOP - PROPOSED FIRE ALARM SYSTEM

Page 4: Drawings Deliverables & Submittal

SD: Shop Drawing & DD: Design Drawing

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - B

Sl # DRAWING TITTLE DRAWING NO Type Division REV #

CONTRACTOR - FKS COMPANY - JO

REF. OF JO STATUS

1 1 Drawing Index FKS-786-DI-001 SD ElectricalA 25/Jul/10 MP784-5-6/072 12/Aug/10 18 Revise & ResubmitB 25/Aug/10 13 For Information & Record

1 GENERAL 0

2 1 Finished Level of Shop area & Wash area FKS-786-GG-001 SD Electrical A 25/Jul/10 MP784-5-6/072 12/Aug/10 18 Reviewed As Noted

2 ARCHITECTURAL 0

3 1 Gound Floor Plan FKS-786-BA-001 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 193 For Review & Approval

4 2 Mezzanine Floor Plan FKS-786-BA-002 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 193 For Review & Approval

5 3 Roof Plan FKS-786-BA-003 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval

6 4 Section - A & B FKS-786-BA-004 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval

7 5 Section - C & D FKS-786-BA-005 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval

8 6 Elevation - E & F FKS-786-BA-006 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & ResubmitB 3/Feb/11 For Review & Approval

9 7Window Finishing Schedules

FKS-786-BA-007 DD ArchtA 6/Jul/10 MP784-5-6/052 25/Jul/10 19 Revise & Resubmit

Door/Window Schedules & Details B 3/Feb/11 4447 For Review & Approval10 8 Finishing Schedules FKS-786-BA-008 DD Archt A 3/Feb/11 4447 For Review & Approval11 9 Toilet Detrails 1 & 2 FKS-786-BA-009 DD Archt A 3/Feb/11 4447 For Review & Approval12 10 Staircase Details FKS-786-BA-010 DD Archt A 3/Feb/11 4447 For Review & Approval

3 Kirby Structural Design Drawings

13 1 Drawing Index FKS - 786 - ST - A - 00 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Reviewed As NotedB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

14 2 Achor Bolt Plan FKS - 786 - ST - A - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 30 MP784-5-6/135 26/Oct/10 5 Reviewed As Noted

15 3 Achor Bolt Details & Reaction FKS - 786 - ST - A - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

16 4 Achor Bolt Details & Reaction FKS - 786 - ST - A - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

17 5 Roof Framing Plan & Details FKS - 786 - ST - E - 01 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

18 6 Typical Cross Section FKS - 786 - ST - E - 02 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

19 7 Typical Cross Section FKS - 786 - ST - E - 03 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

20 8Sidewall Framing Elevations

FKS - 786 - ST - E - 04 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

Wall Framing Elevation GL - D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

21 9Wall Framing Elevations (1 of 2)

FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

Partition Side Wall GL -D C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

22 10 Wall Framing Elevations (2 of 2) FKS - 786 - ST - E - 05 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit

B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

23 11 End Wall Framing Elevations FKS - 786 - ST - E - 06 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 34 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

24 12 End Wall Framing Elevations FKS - 786 - ST - E - 07 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

25 13 Mezzanine Layout Plan & Details FKS - 786 - ST - E - 08 DD Structural

A 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & Resubmit

B 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As Noted

C 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

26 14 Crane Beam Layout Plan & Details FKS - 786 - ST - E - 09 DD StructuralA 15/Jul/10 MP784-5-6/058 4/Aug/10 20 Revise & ResubmitB 7/Sep/10 MP784-5-6/094 21/Sep/10 14 Reviewed As NotedC 21/Oct/10 MP784-5-6/135 26/Oct/10 5 Reviewed

8 SUB-STRUCTURAL

86 1 FKS-786-ST-001 DD Civil

A 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & Resubmit

B 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As Noted

C 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed87 2 Anchor Bolt Plan FKS-786-ST-001 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed

88 3 Foundation Typical Details - 1 FKS-786-ST-002 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 1 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted

89 4 Foundation Typical Details - 2 FKS-786-ST-003 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted

90 5 Foundation Typical Details - 3 FKS-786-ST-004 DD CivilA 3/Nov/10 MP784-5-6/156 24/Nov/10 21 Revise & ResubmitB 8/Dec/10 14 MP784-5-6/186 22/Dec/10 14 Reviewed As NotedC 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed As Noted

91 6 Foundation Typical Details - 4 FKS-786-ST-005 DD Civil C 23/Dec/10 MP784-5-6/201 5/Jan/11 13 Reviewed

8.1 Structural Design Drawings92 1 Jib Crane Proposal DD Civil A 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit93 2 Column Axis, GR Beam, Foundation Layout FKS-786-ST-001 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit94 3 Foundation Typical Details - 3 FKS-786-ST-004 DD Civil B 7/Nov/10 MP784-5-6/154 23/Nov/10 16 Revise & Resubmit

98 12 JIB Crane Anchor Bolt Details Sketch Civil A 20/Feb/11 4430 For Review & Approval

102 15 JO-HC098-SK-001 Sketch ElectricalA 29/Aug/10 4605 For Review & Approval

B 10/Oct/10 4563 For Review & Approval

NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

Total Dwg DATE OF

SUBMISSION DATE OF ACTION

Column Axix Ground Beam and Footings Layout

Foundation Layout Plan showing Existing Under Ground Cables

Page 5: Drawings Deliverables & Submittal

04/08/2023 5 of 8

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - C

SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO

REF. NO. REF. OF JO STATUS

C JO-784: NEW A/C WORKSHOP FKS-784

Kirby Structural Design Drawings

1

Achor Bolt Plan FKS-784-ST-A-00 A T/040 15-07-2010 MP784-5-6/058 04/08/2010 REVISE & RESUBMIT

Achor Bolt Plan FKS-784-ST-A-00 B T/098 26-Oct-2010 MP784-5-6/122 17.10.2010 Revise & Resubmit

2 Drawing Index FKS-784-ST-A-01 B

3 Achor Bolt Details FKS-784-ST-A-02 B

4 Anchor Bolt Reactions FKS-784-ST-A-03 B

5 Roof Framing Plan FKS-784-ST-E-01 B

6 Cross Section GL-2 to GL-5 FKS-784-ST-E-02 B

7 Cross Section GL-6 FKS-784-ST-E-03 B

8 Cross Section GL-7 FKS-784-ST-E-04 B

9 End Wall Framing Elevation GL-7 FKS-784-ST-E-05 B

10 End Wall Framing Elevation GL-1 FKS-784-ST-E-06 B

11 Side Wall Framing Elevations FKS-784-ST-E-07 B

12 Mizzanine Layout Plan & Details FKS-784-ST-E-08 B

13 Crane Beam Layout Plan & Details FKS-784-ST-E-09 B

PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

DATE OF SUBMISSION

DATE OF ACTION

Page 6: Drawings Deliverables & Submittal

04/08/2023 6 of 8

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - C

SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO

REF. NO. REF. OF JO STATUS

PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

DATE OF SUBMISSION

DATE OF ACTION

14 Stair - 1 FKS-784-ST-E-10 B

15 Stair - 2 FKS-784-ST-E-11 B

16 Partition Wall Framing Elevation FKS-784-ST-E-12 B

C.4 SANITARY SEWER AND DRAINAGEC.4.1 EXTERNAL SANITARY SEWER LAYOUT PLAN FKS-784-SS-001C.4.2 TOILET, PANTRY DRAINAGE LAYOUT FKS-784-SS-002

C.5 WATER SUPPLYC.5.1 EXTERNAL WAER SUPPLY LAYOUT - GROUND FLOOR FKS-784-WS-001C.5.2 TOILET, PANTRY WATER SUPPLY LAYOUT FKS-784-WS-002

C.6 ELECTRICALC.6.1 LIGHTING LAYOUT - GROUND FLOOR FKS-784-EE-001 A

T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted

C.6.2 LIGHTING LAYOUT - MEZZ FLOOR FKS-784-EE-002 AC.6.3 POWER LAYOUT - GROUND LAYOUT FKS-784-EE-003 AC.6.4 POWER LAYOUT - MEZZ LAYOUT FKS-784-EE-004 A

C.6.5 EARTHING SYSTEM - GROUND LAYOUT FKS-784-EE-005 A

C.6.6 MAIN LIGHTING PANEL SINGLE LINE DIAGRAM FKS-784-EE-006 AC.6.7 SINGLE LINE DIAGRAM MSB FKS-784-EE-007 AC.6.8 LOAD SCHEDULE - MSB, MLP & DB - 1 FKS-784-EE-008 A

C.6.9 LOAD SCHEDULE - DB-2, MPP AND EXHAUST FAN PANEL FKS-784-EE-009 A

C.6.10 POWER CABLE ROUTE LAYOUT FKS-784-EE-010AB T/84 16.09.2010 MP784-5-6/095 21/9/2010 REVIEWED AS NOTED

C.7 TELEPHONE SYSTEMC.7.1 TELEPHONE LAYOUT - GROUND FLOOR FKS-784-TT-001 A

T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted

C.7.2 TELEPHONE LAYOUT - MEZZ FLOOR FKS-784-TT-002 AC.7.3 TELEPHONE RISER DIAGRAM FKS-784-TT-003 A

Page 7: Drawings Deliverables & Submittal

04/08/2023 7 of 8

F & K IBRAHIM AL SHUWAYER & PARTNERS

LIST OF DRAWING DELIVERABLES & SUBMITTAL REGISTER Building - C

SI NO DRAWING TITTLE DRAWING NO REV NOCONTRACTOR - FKS COMPANY - JO

REF. NO. REF. OF JO STATUS

PROJECT: NEW WORKSHOP FACILITIES AT ADMIN. CAMP CONTRACT # JO/HC098/MP09 MP#785, MP#786, MP#784

DATE OF SUBMISSION

DATE OF ACTION

C.7.4FKS-784-TT-004 A

T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted

C.7.5 CABLE ROUTER LAYOUT FOR DATA AND TELEPHONE CABLEFKS-784-TT-005 A

C.8 DATA SYSTEM

C.8.1 COMPUTER NETWORK LAYOUT - GROUND FLOOR PLAN FKS-784-CU-001 AT/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As Noted

C.8.2 COMPUTER NETWORK LAYOUT - MEZZ FLOOR PLAN FKS-784-CU-002 A

C.9 FIRE ALARM CONTROL SYSTEMC.9.1 FIRE ALARM SYSTEM - GROUND FLOOR FKS-784-FA-001 A

T/48 25.07.2010 MP784-5-6/073 12.08.2010 Reviewed As NotedC.9.2 FIRE ALARM SYSTEM - MEZZ FLOOR FKS-784-FA-002 AC.9.3 SCHEMATIC DIAGRAM FIRE ALARM SYSTEM FKS-784-FA-003 A

C.10 FIRE FIGHTING SYSTEMC.10.1 EMERGENCY EGRESS - GROUND FLOOR FKS-784-FF-001C.10.2 EMERGENCY EGRESS - MEZZ FLOOR FKS-784-FF-002

C.11 HVAC SYSTEMC.11.1 HVAC DUCT LAYOUT - GROUND FLOOR FKS-784-AC-001C.11.2 HVAC DUCT LAYOUT - MEZZ FLOOR FKS-784-AC-002C.11.3 HVAC DUCT TYPICAL DETAILS FKS-784-AC-003C.11.4 SCHEMATIC DIAGRAMS - CONTROL SCHEMES FKS-784-AC-004

SCHEMATIC DIAGRAM OF TELEPHONE & FIBER OPTIC CABLE

Page 8: Drawings Deliverables & Submittal

NEW INSTRUMENT WORKSHOP ### ###

Commencement Of Project ### ###

Kirby Structural Design Drawings ### ###Achor Bolt Plan ### ###Revision A ### 8/4/2010Revision B 9/7/2010 ###Revision C ### ###Achor Bolt Details & Reaction ### ###Revision A ### 8/4/2010Revision B 9/7/2010 ###Revision C ### ###Achor Bolt Details & Reaction ### ###Revision A ### 8/4/2010Revision B 9/7/2010 ###Revision C ### ###

KIRBY SUB-STRUCTURAL CIVIL DRAWINGS ### ###Column Axix Ground Beam and Footings Layout ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Anchor Bolt Plan ### ###Foundation Typical Details - 1 ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Foundation Typical Details - 2 ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Foundation Typical Details - 3 ### ###Revision A ### ###Revision B ### ###Revision C ### 1/5/2011Foundation Typical Details - 4 ### ###

Structural Design Drawings ### ###Jib Crane Proposal ### ###Column Axis, GR Beam, Foundation Layout ### ###Foundation Typical Details - 3 ### ###