hvac drawings/m-11 hvac... · fl]sm51e flaÜ5[e mct eree;eed by íl. tlhe ail' {hrs 4, hie all...
TRANSCRIPT
![Page 1: HVAC Drawings/M-11 HVAC... · Fl]sM51e FlaÜ5[e mct erEe;eed by íl. Tlhe ail' {hrs 4, hie all General Ccncltcnsn Ccnctfie„ enø gnu] and Air specfficetons shall] Any sjg Eth-rout](https://reader035.vdocuments.net/reader035/viewer/2022070704/5e88e3cb81f78563321eeab5/html5/thumbnails/1.jpg)
M-11
HVACSPECIFICATIONS
ARCHITECT:
MEP ENGINEERS:
1
THE ARCHITECT SHALL RETAIN ALL COMMON LAW STATUTORY & OTHER RESERVED
RIGHTS. THESE DRAWINGS & RELATED DOCUMENTS SHALL NOT BE DUPLICATED,
DISCLOSEDOR OTHERWISE WITHOUT WRITTEN CONSENT.
PROJECT:
no.
distribution date
TERIYAKI MADNESS
OAK BROOK SQUARE
793 E. BUTTERFIELD ROAD
LOMBARD, IL 60148
TMAD-1_LOMBD
12.03.18
TKO
DD
project no:
date:
drawn by:
chk'd by
dwg no:
revision
no.
date
12.27.18
CLIENT:
PROJECT:
no.
distribution date
project no:
date:
drawn by:
chk'd by
dwg no:
revision
no.
date
Issue for Client / Landlord Approval
2
12.27.18Issue for Permit
1
12.28.18Client red lines