Introduction
Historical Significance of Waterborne TransportationSafe and Efficient (95% of US trade through ports)Evolution of Ships (larger, wider, faster vessels)Evolution of Shipping (containerization)
COLLINS ENGINEERS, INC.
Navigation ChannelsFew rivers or harbors are naturally deep.Channel improvements for ships to enter/leave ports efficiently, quickly and safely.Designing, building, and maintaining channels compared to constructing underwater highways.First US projects in 1789, with congressional approval for lighthouse construction.
COLLINS ENGINEERS, INC.
Dredging = Underwater Excavation
COLLINS ENGINEERS, INC.
Early Forms of DredgingSpades & Buckets (Nile, Tigris, Euphrates)Agitation Dredging (Indus)Scraper Dredging (1435)Bag & Spoon (Netherlands)Revolving Chain “Mud Mill” (1500’s)
COLLINS ENGINEERS, INC.
Dredging ProjectsShort-Term Objective
Construct or maintain channels
Long-Term ObjectiveManagement and operation of disposal areas
COLLINS ENGINEERS, INC.
Project Design ConsiderationsLocation and quantitiesSediment properties and characteristicsEvaluate disposal alternativesIdentify social, environmental, and institutional factors
COLLINS ENGINEERS, INC.
Selection of Dredge Plant Equipment
Material CharacteristicsQuantitiesDredging DepthDistance to Disposal AreaContamination of SedimentsMethod of Disposal
COLLINS ENGINEERS, INC.
Types of Dredges
MechanicalBucketDipper
HydraulicSidecastHopperDustpanCutterhead
COLLINS ENGINEERS, INC.
Bucket DredgesAdvantages
Hard/Compact MaterialsPrecise control of excavation
LimitationsDifficult to retain finesLow production ratesRequires scow barges
COLLINS ENGINEERS, INC.
Dipper DredgesSame Advantages and Limitations as for Bucket Dredges
COLLINS ENGINEERS, INC.
Sidecaster DredgesAdvantages
Self-propelledRapid Response
LimitationsOpen water disposal onlySome material may return to the channel prism
COLLINS ENGINEERS, INC.
Dustpan Dredges
AdvantagesSelf-propelledHigh production ratesRapid deployment
LimitationsLoose materials onlyNo open water1000 ft pumping distance
COLLINS ENGINEERS, INC.
Hopper DredgesAdvantages
Work in open waterSelf-propelled vesselNo obstruction of trafficEconomical over long distances
LimitationsDeep draftNot continuousNo contaminated sedimentsNot effective around structures
COLLINS ENGINEERS, INC.
Cutterhead Pipeline Dredges
AdvantagesMost material typesContinuous operation
LimitationsNo open waterNot self-propelledPipeline is a navigation hazard
COLLINS ENGINEERS, INC.
Cutterhead Dredge Operations
COLLINS ENGINEERS, INC.
Pipeline Transport of Solids
COLLINS ENGINEERS, INC.
Disposal AlternativesOpen-water DisposalConfined Disposal Habitat Development
COLLINS ENGINEERS, INC.
Dewatering & Densification
COLLINS ENGINEERS, INC.
Long Term Dredge Material Management Plans
50-year typical project lifeDredged material characteristicsIdentification of placement sitesImplementation Plan (Party Responsibilities)Geotechnical ReportCost EstimatesHistoric/Archaeological ConcernsAgency Cooperation/CoordinationReal Estate and Local
COLLINS ENGINEERS, INC.
Environmental Challenges:Public Perception IS REALITY!
PastTerminology (spoil, sludge, disposal)Previous History
PresentPollution is a resource that is out of placeBeneficial Uses
COLLINS ENGINEERS, INC.
1969 – National Environmental Policy Act (NEPA)Environmental Impact AssessmentsBalance environmental/economic/social needs
1976 – Clean Water ActState & Federal Permitting
Marine Protection Research and Sanctuaries ActOcean placement of material
Endangered Species Act
Environmental Challenges:Legislation
COLLINS ENGINEERS, INC.
Time DelaysPermit FeesTesting for Contaminated Sediments Seasonal Restrictions
Environmental Challenges:Permit Requirements
COLLINS ENGINEERS, INC.
Beneficial Uses of Dredge Material :Pollution is merely a misplaced resource!
Habitat developmentWetlandsBird IslandsOyster Grounds
Beach nourishmentConstruction
Ports & HarborsHighways & Airports
AgricultureSolid Waste ManagementParks and recreation
MiamiBeach
COLLINS ENGINEERS, INC.
What is Involved with Dredging Projects?
EngineeringSurveys & DesignTidal HydraulicsPhysical Sediment Analysis
EnvironmentalLegal ComplianceAssess Needs and ImpactsChemical Analysis of Sediments
COLLINS ENGINEERS, INC.
Real EstateRights of EntryReleases from Liability
Local OrdinancesLand Use PlansZoningPublic Policy Issues
Economics (Who pays?)
What is Involved with Dredging Projects?
COLLINS ENGINEERS, INC.
Typical Dredging Contracts
Solicitation, Offer, and AwardContract ClausesSpecial Requirements/Restrictions
PermitsSchedules & ProgressShoaling/Additional Work
Plans & Specifications
COLLINS ENGINEERS, INC.
Dredging Contracts - SpecificationsGeneral RequirementsSpecial Requirements
PermitsSchedule & ProgressShoaling & Additional WorkFinal Examination & Acceptance
MeetingsQuality ControlEnvironmental Protection
COLLINS ENGINEERS, INC.
Site WorkDefinition of Payment ItemsCharacter of MaterialsPlacement of Dredge Material
Site Investigation – Material CharacteristicsLocal Regulations
Dredging Contracts - Specifications
COLLINS ENGINEERS, INC.
Measurement & PaymentPlace measure at dredge siteBin measure (Hopper Dredges)Place measure at placement site (very difficult!)Plant Rental/Lump SumPre- and Post-Dredging Hydrographic Surveys
COLLINS ENGINEERS, INC.
Dredging Contracts - Drawings“Specifications Govern” ClausePlan & Section Views of ChannelPlan & Section Views of Placement Site