Page 1: Dried Indian Creek Greenway & Stream Restoration

Prepared for: City of Covington Newton County Tunnell - Spangler - WalshBy: Dylan Bailey

Date: May 2011

DR IED INDIAN CREEK GREENWAY & STREAM RESTORATION

Page 2: Dried Indian Creek Greenway & Stream Restoration
Page 3: Dried Indian Creek Greenway & Stream Restoration

01 Project Overview .......................................................................... 502 Photorgraphic Inventory ................................................................ 1303 Precedent Projects ......................................................................... 1904 Inventory & Analysis ....................................................................... 2105 Greenway Trail Plans ...................................................................... 2906 Stream Restoration .......................................................................... 5107 Reference Materials ........................................................................ 5908 Conclusion & Disclaimer ................................................................ 61 09 Acknowledgements ....................................................................... 63

Page 4: Dried Indian Creek Greenway & Stream Restoration
Page 5: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

7

NEED AND PURPOSE STATEMENT

Newton County and the City of Covington, county seat, are involved in a number of progressive projects associated with their ‘2050 Build-Out Plan’ – a plan aimed to create a sustainable future for the county and their resources.

The County is involved in the Atlanta Regional Commission (ARC) and became a member of the Livable Communities Initiative (LCI) in 2005. My project falls under the Covington US 278 Corridor LCI Study Area. The LCI program is intended to promote greater livability, mobility and development alternatives in existing corridors, employment centers, and town centers. The rationale behind the program is that directing development towards areas with existing infrastructure will benefit the region and minimize sprawling land use patterns. Minimizing sprawl, in turn, will potentially reduce the amount of vehicle miles traveled and the air pollution associated with those miles. Finally, the LCI program is using the successful 1996 Olympics model to promote the concept that investment in public infrastructure will spur private investment. Thus, the LCI program is a vehicle whereby the ARC can attempt to direct mixed-use and mixed-income development towards existing infrastructure by providing study and implementation dollars.

The UGA Metropolitan Design Studio of 2007 completed the Pace Street Corridor Study which Tunnell-Spangler-Walsh (TSW) in Atlanta, GA expanded on in their Pace Street Corridor Scoping Report. The city has received funding for further study and development. As part of the initial project, the studio and TSW indicated that a potential greenway could tie into the redeveloped Pace Street where it crosses Dried Indian Creek. To receive further funding, the ARC requires more detailed plans for how and where the Greenway will connect.

DESCRIPTION OF PROPOSED PROJECT

My senior project for the Dried Indian Creek Greenway and Stream Restoration consists of two parts. The main focus will be on the length of Dried Indian Creek between US Hwy. 278 to the north; and, Washington St. to the South as the greenway trail within the 25’ buffer along the creek. The intent of the greenway is to create a recreational and educational opportunity while increasing pedestrian connectivity. Without an aesthetically pleasing creek, which inherently will be more ecologically sound, the greenway will fail to be popular. The second part will be a series of suggestions for remediation of stream conditions, primarily, north of Hwy. 278, adjacent to the Kroger shopping center. Due to the urban nature of the stream, a total restoration is not likely to be conducted in all parts of the stream basin. Stabilization to prevent further erosion will be instituted in areas deemed appropriate.

01 PROJECT OVERVIEW

Page 6: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

8

PROJECT LOCATION MAPS

National Map

State Map

County Map

Covington, GA

Page 7: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

9

EXISTING CONCEPTUAL MASTER PLAN FOR NEWTON PLAZA SHOPPING CENTER DISTRICT

Page 8: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

10

TSW MASTER PLAN OF PACE ST. REDEVELOPMENT

Page 9: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

11

EXISTING

PROPOSED

TYPICAL SECTION BY TSW: 05 - Dried Indian Creek

Page 10: Dried Indian Creek Greenway & Stream Restoration
Page 11: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

13

02 PHOTOGRAPHIC INVENTORY

Section 1 Reference Map 1. Box culvert under Washington Street. Tire in foreground.

2. Box culvert under Clark Street. 3. View from Clark Street fac-ing north towards Bethlehem church and Trailblazer Park.

4. Trailblazer Park: Basketball pa-vilion left, picnic pavilion center, play structure right.

5. Pedestrian bridge between Bethlehem Church and Trailblaz-er Park over Dried Indian Creek.

6. Heavy bank erosion and un-checked parking lot flume into Dried Indian Creek.

1

2

3

4

5

Page 12: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

14

1. Floodplain of creek

2. Residence/business along the creek.

3. Bank erosion and Bethlehem Church parking lot in the back-ground.

4. Pedestrian bridge from Corely Street in need of repair.

5. Path leading from pedestrian bridge to Emory Street.

6. Box culvert under Stone Moun-tain Street.

Section 2 Reference Map

1

23

4 5

6

Page 13: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

15

1. Steep banks and encroach-ing buildings along Emory Street.

2. Bridge over Dried Indian Creek on Emory Street/Hwy. 81.

3. Existing Hydrologic Education area adjacent to Covington City Hall.

4. Interpretive signage about the wetlands work.

5. Fish in one of the wetland ar-eas!

6. View of the abandoned train trestle over Dried Indian Creek from the wetland area.

Section 3 Reference Map

1

2

3

4

5

Page 14: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

16

3. Stormwater runoff from the shopping center parking lot is di-rected into the adjacent creek.

1. View of Dried Indian Creek and deteriorating retaining wall along Pace Street shopping mall

2. View of existing conditions on Pace Street.

4. Box culvert under Pace Street.

5. Dried Indian Creek conflu-ence area adjacent to Pace Street and the Antiques store.

6. Box culvert under Pace Street and confluence area.

7. Severe bank erosion on the box culvert.

Section 4 Reference Map

1

2

3

4

5

6

7

89

10

Page 15: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

17

8. Unchecked flume from An-tiques store parking lot.

9. Excessive trash in Dried Indian Creek tributary adjacent to An-tiques store parking lot.

10. Tributary to Dried Indian Creek adjacent to Antiques store parking lot.

11. Shopping cart in creek ad-jacent to Ford dealership near Hwy. 278.

Section 5 Reference Map

1. Dried Indian Creek near Elm Street.

2. Dried Indian Creek and flood-plain looking towards Fiquett El-ementary School.

1

2

Page 16: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

18

Kroger Shopping Center Reference Map 1. Unchecked storm drain outfall

2. Trash on stream bank 3. Channelized stream 4. Bagged soil and mulch on the stream bank rim and trash

5. Shopping cart in stream 6. Stream bank from erosion col-lapsed drainage outfall

12

3

4

5

6

Page 17: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

19

ANIMAS RIVER TRAIL - DURANGO, CO

Animas River Trail has approximately 7 miles of hard-surface trail running through town along the Animas River with 2.5 additional miles planned for the future. It travels through twelve city parks and across five bridges. Construction of the trail system has spanned several decades starting in the 1970s. Extension of the trail northward past city limits has been in planning for nearly a decade but several public meetings to move the process forward have been held since 2008.

03 PRECEDENT PROJECTS

Art pieces provide visual interest and allow the public to participate in a unique way.

Map of Durango, CO and the Animas River Trail & Greenway.

Trail underpasses integrated into vehicular bridge construction with access to street level.

View of the greenway trail and cyclists.

Page 18: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

20

ROCKY BRANCH RESTORATION - NC STATE UNIVERSITY, DURHAM, NC

Rocky Branch is an urban creek that runs more than a mile through the heart of NC State University campus. The stream was narrow, deep, suffering from severe erosion and is an unsafe eyesore on campus. A three-phase stream restoration, greenway, and 6000’ trail plan is underway with the first two phases already completed. The restoration strives to stabilize the creek; improve water quality, aquatic and wildlife habitat; and integrate the creek into the campus environment.

Master Plan for all three phases

Eroding stream banks prior to restoration.

Bottomless arch culvert for road. Greenway trail travels on the right.

Stream restoration - creation of floodplain zone.

Post stream restoration - creation of wetlands and floodplain.

Page 19: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

21

04 INVENTORY & ANALYSISSITE WALK INVENTORY NOTES MAP

I conducted a site-walk during my inventory and analysis phase of the project with a handheld GPS Trimble unit which I had preloaded GIS maps of my project site. I walked along Dried Indian Creek and made notes on the unit that are georeferenced to that exact location. I made note of areas of high erosion, outfall pipes, and even identified and marked several desirable trees to save. This allowed me to better designate areas that require restoration and route the greenway trail to not impact the desirable trees.

ADJACENT LAND USE MAP

Knowing what land uses buffer the project site allows us to form a better understanding of who will most likely be using the greenway trail and what groups (businesses or residents) may or may not be affected.

HYDROLOGY IMPACT MAP

Studying the hydrology impact map was important for several reasons. The entirety of the trail ended up falling in the flooplain which dictated the path material being a hard material like concrete or asphalt vs. compacted soil. The map also shows impervious surfaces such as parking lots and buildings and the storm drain system with the outfall pipes into Dried Indian Creek. This is integral to understanding where it is coming from and how much water is being discharged into the creek when attempting a stream restoration.

SLOPE PERCENT MAP

The slope percent map was used to determine where steep slopes would prohibit the placement of a concrete walk. In areas of steep slopes, a boardwalk will replace the concrete walk.

SOILS MAP

Studying the soils map allowed an understanding of existing soils. Unfortunately, most of the soils are listed as Urban which will create poor growing conditions.

SURVEY OF EXISTING PROPERTY OWNERS

...to determine their opinions of the proposed greenway plan. The survey was conducted using the following methodology.

A questionnaire was developed to determine property owner opinion. Students in the 2011 UGA Metropolitan Design Studio were asked to contact property owners via telephone to survey opinions and inform them of an informational meeting at the Center for Community Preservation and Planning on March 26, 2011. Letters were also mailed to each property owner as a follow up.

Property owners who attended the informational meeting were asked to participate in a visual preference survey to determine acceptable styles of site furnishings along the trail. In addition, they were presented a conceptual plan and asked to provide feedback.

Page 20: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

22

Page 21: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

23

Page 22: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

24

Page 23: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

25

Page 24: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

26

Page 25: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

27

Page 26: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

28

Page 27: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

29

04 GREENWAY PLANSFor the ease of displaying the master plan in this book, it is broken up into five sections:

SECTION 1

The proposed greenway trail begins on the South end of the project area at Washington St. on the West side of the creek. Between Washington St. and Clark St., the greenway will be located in a residential area. After crossing Clark St. at a crosswalk, the trail will be accessible to the existing Trailblazer Park. Here, the trail will cross Dried Indian Creek to the East side of the creek at the existing footbridge adjacent to Bethlehem church. It will continue for a short distance away from the creek along the Bethlehem Church parking lot.

SECTION 2

The trail will meet back up with the stream past the parking lot and continue north along the east side of the creek. There is an existing footbridge connecting from the cul-du-sac on Corely St. to commercial buildings and on Emory St. The footbridge is in great disrepair and I propose that it be repaired to increase connectivity to both the greenway trail and downtown Covington. The trail then crosses at Stone Mountain St. with a crosswalk and switches back to the West side due to steep slopes and encroaching buildings on the East.

SECTION 3

The trail continues on the West/North side of the creek to where I have proposed that the trail continue under the bridge at Emory St. on a boardwalk. After passing under the bridge, the boardwalk will cross perpendicular to the stream and to continue on the East/South side of the creek where it will it go through an already established interpretive wetland area adjacent to Covington City Hall. The Greenway will tie into an existing boardwalk over the wetland that contains signage to educate the public on various hydrologic processes and the importance of keeping our water resources healthy. After crossing under the train tracks, the trail crosses the stream once again to the North side.

SECTION 4

The trail continues along the creek on the North side. This stretch is all boardwalk. Because buildings encroach on the buffer, the trail needs to move further down the stream bank which is very steep. Once reaching Pace St., a set of ADA compliant ramps takes the user up to street level. Here, they can choose to connect to either downtown Covington or Hwy. 278 on the new sidewalks, or they can cross Pace Street and continue following the greenway. A boardwalk again takes the user across the confluence area of Dried Indian Creek and a small tributary in front of the Antique store. The boardwalk crosses the confluence to meet up with a short section of trail adjacent to the Ford dealership ending at the trailhead at Hwy. 278. A small secondary trail breaks from the boardwalk and crosses East along the antique store parking lot. A previous Master Plan of downtown Covington calls for the entire 100 year floodplain to be turned into greenspace. I do not see this as a realistic immediate goal, and recommended a reduction in the size of the two parking lots in the floodplain to increase the buffer along the creek.

SECTION 5

This section consists of a smaller secondary trail serving to connect EL Fiquett Elementary School and the greenway.

Page 28: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

30

Page 29: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

31

Page 30: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

32

Page 31: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

33

Page 32: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

34

Page 33: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

35

Page 34: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

36

Page 35: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

37

Page 36: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

38

Page 37: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

39

Page 38: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

40

Page 39: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

41

Page 40: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

42

Page 41: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

43

Page 42: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

44

GRADING PLAN

Page 43: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

45

Page 44: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

46

Page 45: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

47

Page 46: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

48

2" x 6" Railing

2" x 4" Posts

6" x 6" Posts

2" x 6" Beams

4" x 6" Decking

8'

10'

2'

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR

OD

UC

ED B

Y A

N A

UTO

DES

K E

DU

CA

TIO

NA

L PR

OD

UC

TPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

BOARDWALK CONSTRUCTION DETAIL PLAN VIEW

Page 47: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

49

2" x 12" Railing

2" x 6" Support Railing

2" x 8" Intermediate Railing

4" x 6" Decking

2" x 4" Post

2" x 12" Joist

6" x 6" Post

14" x 16" Concrete Footer

4" x 14" Crushed StoneLeveling Pad

7/8"Hex Bolt

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR

OD

UC

ED B

Y AN

AU

TOD

ESK ED

UC

ATIO

NA

L PRO

DU

CT

BOARDWALK CONSTRUCTION DETAIL

Page 48: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

50

4"

6"

Concrete, Broom Finish4" Trowel Edge

#57 Stone

Compacted Subgrade

10'

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPR

OD

UC

ED B

Y AN

AU

TOD

ESK ED

UC

ATIO

NA

L PRO

DU

CT

SIDEWALK CONSTRUCTION DETAIL

Page 49: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

51

NECESSITY OF STREAM RESTORATION

The section of Dried Indian Creek North of Hwy. 278 along the Kroger parking lot has been narrowed, straightened, highly eroded, and presently receives an abundance of trash and storm water runoff from the adjacent parking lots and buildings.

Stream restoration is a complex process that requires a broad knowledge base. Having a design team that is diverse in fields of engineering, biology, ecology, hydraulics, and geomorphology will ensure that all aspects of restoration are met with the proper expertise. It should be understood that many stream restoration projects cannot always be returned to their condition prior to disturbance. Because a complete restoration is generally not feasible, the objective is to create a partial recovery of the stream to a natural and healthy state.

Restoration of a stream not only involves reestablishing and improving the stream channel but also stabilizing the banks and flood areas. This encompasses restoring the riparian buffer and the plants located within the stream corridor. This aspect is very important in the health of the stream as the plants adjacent to the stream provide erosion control and food and nutrients to aquatic organisms.

Prior to restoration of a stream, the current health must be measured. There are several ways of determining the health of a stream. The most common practices measure health both chemically and biologically. Once the health of the stream is determined, the proper restoration techniques may be used. Biological testing of a stream consists of identifying and counting the macroinvertibrates; insects, crayfish, and snails. The more diverse the collection of macroinvertibrates is, the healthier the stream. Because of their relatively small range within the environment, they are good indicators of the amount of pollution present in a given area.

Biological testing is effective in determining if a stream is healthy by the number and diversity of species, but it cannot show the specific problem causing the stream to be less healthy. To attain a more accurate measure, testing of the water chemistry also needs to be completed. There are several tests that can be run: temperature, pH, dissolved oxygen, water clarity, nitrogen, phosphorus, chlorine, dissolved solids, and fecal coliform levels. An important note when testing chemical quality is to test for several months to get a good look at the overall chemistry of the stream.

06 STREAM RESTORATION

Testing and Monitoring Stream Conditions

Page 50: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

52

DESIGN PROCESS

1. Define Objectives

-Capacity requirements, fish habitats, aesthetics, erosion protection

2. Define Existing Conditions

3. Identify Constraints

-Topography, encroachment of buildings, land ownership, soil conditions that affect side

slope stability

4. Define Expected Natural Channel Parameters

-Slope, width, depth, roughness and sinuosity

5. Identify Inconsistencies

6. Define Critical Design Parameters

-Meander sequence, channel slope and sinuosity, availability for floodplain to

accommodate sinuosity under future conditions, alternative sinuosities that can be

accommodated given the floodplain and slope constraints, appropriate channel width-

to-depth ratio given the available sinuosity and gradient, sediment size that the channel

can be expected to transport

7. Analyze Channel Dynamics

-Determine if the existing channel is in equilibrium with existing flows and sediment regime

8. Identify Trade-offs

9. Develop Final Design Parameters and Construction Documents

STREAM RESTORATION IMPLEMENTATION

Stream Corridor Manipulation

Deflectors are structures used to alter the flow of a stream. Deflectors can change the dynamics of stream flow depending on design. Using the double deflector design can help deepen and recreate the meander pattern of the stream. Deepening the channel will also increase flow rate.

Pool Formation

Stacked rock in the shape of a V pointing upstream called a cross vane. Creates level change and excavates a pool inside the V called a plunge pool.

Page 51: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

53

Geotextile Fabric

Plantings orLive Stakes

Bank Slope 4:1

Existing Eroding or Steep Bank

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY

AN

AU

TOD

ESK

ED

UC

ATI

ON

AL

PRO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRO

DU

CED

BY A

N A

UTO

DESK

EDU

CA

TION

AL PR

OD

UC

T

LIVE STAKE INSTALLATION WITH SLOPE MODIFICATION

Cross Vane in action after installation Natural Deflector found in a healthy stream

Page 52: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

54

Page 53: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

55

Page 54: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

56

PLANTING PLAN INTENT

The planting plan for this project involves random placement of various species of riparian plants. Mimicking the natural fauna of stream banks, plants will be placed randomly by species but ordered by height. Shorter plants, such as grasses, ferns and river canes will be planted directly on the stream banks. Progressing away from the stream, the plant heights will increase in size, moving from shrubs to small trees to finally large shade trees. Spacing of plants will be close as the goal of the planting design is to recreate a forest environment. Plants must compete with each other in order to survive. This type of reforestation planting insures that the healthiest plants survive. It is slightly more expensive during the initial stages because plants are being installed that will eventually die. In the long term however, the reforested area will be much healthier resulting in less replanting in the future.

SUGGESTED PLANT MATERIALS

Trees

Acer negundo, Boxelder

Betula nigra, River Birch

Salix nigra, Black Willow

Shrubs

Calycanthus florida, Sweetshrub

Itea virginica, Sweetspire

Leucothoe axillaris, Doghobble

Viburnum nudum, Winterthur Viburnum

Xanthorhiza simplicissima, Yellowroot

Perennials

Arundinaria gigantea, Rivercane

Asclepias incarnata, Swamp Milkweed

Chelone glabra, Turtlehead

Eupatorium fistulosum, Joe-Pye-Weed

Juncus effusus, Soft Rush

Lobelia cardinalis, Cardinal Flower

Physostegia virginiana, Obedient Plant

Tiarella spp., Foam Flower

River Birch

Soft Rush

Sweetspire

Joe-Pye-Weed

Sweetshrub

Foam Flower

Turtlehead

Page 55: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

57

BOARDWALK CONCEPTUAL SECTION-ELEVATION

Page 56: Dried Indian Creek Greenway & Stream Restoration

CITY OF COVINGTON

58

Page 57: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

59

06 REFERENCE MATERIALSDesigning Greenways

NC State Stream Restoration Institute

Stream Corridor Restoration: Principles, Processes, & Practices

Landscape Architectural Graphic Standards

Landscape Architectural Graphic Standards: Student Edition

Covington Final LCI Report

Pace Street Corridor Study

DHM Design

Durango Colorado Official Website

Page 58: Dried Indian Creek Greenway & Stream Restoration
Page 59: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

61

07 CONCLUSION & DISCLAIMERConclusion

The Dried Indian Creek Greenway & Stream Restoration achieves the goal of meeting and improving on existing plans connected to Pace Street Redevelopment for which the City of Covington has already received funding for from the LCI. The greenway trail remains within the 25’ stream buffer for nearly the entirety of the length except in areas where property owner’s objected to the trail running through their property. Involving the community was integral because without their support, there would likely be many issues with the implementation. A significant restoration of the stream ecosystem is necessary to stabilize banks and reduce erosion, improve water quality for flora and fauna habitat, and increase the aesthetic quality of the stream which will inherently increase the desire to use the trail by pedestrians. This project is a great opportunity for the City of Covington to increase pedestrian connectivity, improve wildlife habitat and water quality through an urban area, and help educate the public by linking the trail to the existing constructed wetlands adjacent to Covington City Hall, and potential additional signage along the trail, of the importance of preservation and the hydrologic cycle.

Disclaimer Notice

The design service for the City of Covington, GA completed by Dylan Bailey represents student course work with the School of Environmental Design at the University of Georgia during the Spring semester of 2011. The intent of the project is to allow the student to demonstrate an understanding of comprehensive landscape architectural design. It can provide the client with development ideas, but should be used only in determining if feasibility of future development and for publicity purposes to gain support for the professional design and implementation of the proposed project. It must be clearly understood that the student who carried out the project out to meet specific academic objectives and it should not be regarded as a substitute for the work of a licensed practicing landscape architect. Its is not a project which can be necessarily implemented without correction and/or refinement.

The school of Environment and Design, the faculty in the School of Environment and Design and the student completing the project assume no responsibility for the accuracy, feasibility, completeness, or relative merit of the project. In all cases, full credit to the student, faculty and the school must be given whenever the work is displayed. Where the report or drawings fail to meet minimum standards, the school reserves the right to prohibit reproduction for circulations.

Page 60: Dried Indian Creek Greenway & Stream Restoration
Page 61: Dried Indian Creek Greenway & Stream Restoration

DRIED INDIAN CREEK GREENWAY & STREAM RESTORATION

63

08 ACKNOWLEDGEMENTSI would like to thank the following people and organizations, both recent associations and long term relationships, for their help on this project, my schooling, and general path through life:

Donnie Longnecker, ProfessorRandy Vinson, Director of Planning and Zoning, City of CovintonRyan Jenkins, Tunnell-Spangler-WalshKay B Lee, The Center for Community Preservation & PlanningAdam Kirk, The Center for Community Preservation & PlanningShamica Williams, The Center for Community Preservation & Planning2010 UGA Metropolitan Design StudioAnn Christensen, Principal, DHM Design, Durango, COKatie Nelson, Associate, DHM Design, Durango, CO

Both of my parents for always supporting my endeavors and guiding me to where I am in life now – I wouldn’t want to be anywhere else.

Rachel Sotsky for continually pushing me to be and do my best, being there for me, and being by best friend.

My professors, classmates, and friends for the past four years – Its been fun!

Page 62: Dried Indian Creek Greenway & Stream Restoration