Office of Geotechnical Engineering Design of Drilled Shafts for Landslide Stabilization Alexander B.C. Dettloff, P.E. April 19, 2011

Upload: aamir-tauqeer

Post on 27-Dec-2015

118 views

Category:

Documents


11 download

DESCRIPTION

Method and technique description

TRANSCRIPT

Page 1: drilled shaft slope stabilization

Office of Geotechnical Engineering

Design of Drilled Shafts for Landslide Stabilization

Alexander B.C. Dettloff, P.E.April 19, 2011

Page 2: drilled shaft slope stabilization

Trapped Barges in Belleville Dam Flood Gates

Page 3: drilled shaft slope stabilization

Belleville Lock and Dam Upper Pool, January through February, 2005

Normal Pool

Page 4: drilled shaft slope stabilization

Riverboats in Belpre, OH

Page 5: drilled shaft slope stabilization

Old Lock No. 20

Page 6: drilled shaft slope stabilization

ATH-124-02.62

Page 7: drilled shaft slope stabilization

ATH-124-01.92

Page 8: drilled shaft slope stabilization

MEG-124-43.60

Page 9: drilled shaft slope stabilization

ATH-144-03.25

Page 10: drilled shaft slope stabilization
Page 11: drilled shaft slope stabilization
Page 12: drilled shaft slope stabilization

Primary Exploratory Boring Cross Section

Page 13: drilled shaft slope stabilization

Example Exploratory Borings in Profile View

Page 14: drilled shaft slope stabilization
Page 15: drilled shaft slope stabilization

Example Soil and Bedrock Subsurface Profile

Page 16: drilled shaft slope stabilization

Example Groundwater Surface

Page 17: drilled shaft slope stabilization

Estimated Shear Failure Surface

Page 18: drilled shaft slope stabilization
Page 19: drilled shaft slope stabilization

Dr. Robert Y. Liang

University of Akron

• Numerical Study of Soil Arching Mechanism in Drilled Shafts for Slope Stabilization (April 2002)

• Stability Analysis of Drilled Shafts Reinforced Slope(April 2002)

• Drilled Shaft Foundations for Noise Barrier Walls and Slope Stabilization (December 2002)

• Design Methodology for Drilled Shafts to Stabilize a Slope (June 2007)

• Field Instrumentation, Monitoring of Drilled Shafts for Landslide Stabilization and Development of Pertinent Design Method (November 2010)

Page 20: drilled shaft slope stabilization

Soil Arching Between Spaced Drilled Shafts “Liang Method”

Page 21: drilled shaft slope stabilization
Page 22: drilled shaft slope stabilization

Geometric Model with Vertical Slices

Page 23: drilled shaft slope stabilization
Page 24: drilled shaft slope stabilization
Page 25: drilled shaft slope stabilization
Page 26: drilled shaft slope stabilization

Plot of Factor of Safety versus Drilled Shaft Location

Page 27: drilled shaft slope stabilization

Plot of Drilled Shaft Load versus Drilled Shaft Location

Page 28: drilled shaft slope stabilization
Page 29: drilled shaft slope stabilization
Page 30: drilled shaft slope stabilization
Page 31: drilled shaft slope stabilization
Page 32: drilled shaft slope stabilization
Page 33: drilled shaft slope stabilization
Page 34: drilled shaft slope stabilization
Page 35: drilled shaft slope stabilization
Page 36: drilled shaft slope stabilization
Page 37: drilled shaft slope stabilization
Page 38: drilled shaft slope stabilization
Page 39: drilled shaft slope stabilization
Page 40: drilled shaft slope stabilization
Page 41: drilled shaft slope stabilization

Traffic Live Load Surcharge

If horizontal distance to traffic loading, a ≤ ½dτ

also apply a traffic live load surcharge (LS)

to the drilled shafts equal to

2 feet of soil

With minimum total unit weight

γs = 125 pcf

(see AASHTO Section 3.11.6.4)

Page 42: drilled shaft slope stabilization
Page 43: drilled shaft slope stabilization

p-multiplierReduction in soil resistance (p)for closely-spaced shafts in soildue to stress field overlap.ForD = Drilled Shaft DiameterS = Drilled Shaft Spacing,

p-multiplier (βa) = 0.64(S/D)0.34

After Reese, Isenhower, and Wang, “Analysis and Design of Shallow and Deep Foundations” (2006)

The p-multiplier does not apply in bedrock, where limited stress fields for bedrock resistance do not overlap.

Overlapping Stress Fields in Soil

Stress Fields in Bedrock

Page 44: drilled shaft slope stabilization

Full Depth Crack Partial Depth Crack Dropped Ground

Page 45: drilled shaft slope stabilization

Artificial Lowered Ground Surface

Where:

βdh = angle of downhill slope from horizontal

dτ = depth to the shear surface at drilled shaftlocation

for βdh < 45° lower ground surface by

dτ TAN βdh

for βdh ≥ 45° lower ground surface by

Page 46: drilled shaft slope stabilization
Page 47: drilled shaft slope stabilization

Regraded Ground Surface

For the case in which a retaining wall will be used, and the ground surface downhill of the wall is to be regraded to a stable slope (according to stability analysis of the slope below the wall); for LPILE analysis, set the ground surface equal to the location of the proposed regraded ground surface at the base of the wall.

The soil mass downhill of the wall must have a minimum Factor of Safety (FS) = 1.30 against global stability failure.

Page 48: drilled shaft slope stabilization

Load Transfer Reduction

UA Slope 2.1 provides Factor of Safety (FS) for existing shear surface, accounting for load transfer to drilled shafts. This assumes the downhill soil mass stays in place.

For LPILE analysis, assume reduced passive resistance above shear surface, by modifying p-multiplier.

Reduced p-multiplier = (1-1/FS) x βa

= βa – (βa /FS)

Page 49: drilled shaft slope stabilization
Page 50: drilled shaft slope stabilization
Page 51: drilled shaft slope stabilization
Page 52: drilled shaft slope stabilization
Page 53: drilled shaft slope stabilization
Page 54: drilled shaft slope stabilization
Page 55: drilled shaft slope stabilization
Page 56: drilled shaft slope stabilization
Page 57: drilled shaft slope stabilization
Page 58: drilled shaft slope stabilization
Page 59: drilled shaft slope stabilization
Page 60: drilled shaft slope stabilization
Page 61: drilled shaft slope stabilization
Page 62: drilled shaft slope stabilization
Page 63: drilled shaft slope stabilization
Page 64: drilled shaft slope stabilization

Geotechnical Resistance

A check of the resistance of the Geo-materials to overturning of the pile, per FHWA GEOTECHNICAL ENGINEERING CIRCULAR

NO. 10, PUBLICATION FHWA-NHI-10-016, DRILLED SHAFTS: CONSTRUCTION PROCEDURES

AND LRFD DESIGN METHODS (GEC 10).

Resistance factor φ=0.67 is applied to Strength Limit Factored Load in inverse. In other words, multiply the Strength Limit Factored Load by 1.5 times.

Page 65: drilled shaft slope stabilization

Geotechnical Resistance

At increased loading of 1.5 x Strength Limit Factored Load, the drilled shaft may fail structurally. However, Geotechnical Resistance is not a check of the structural capacity of the drilled shaft, but of the Geo-materials to resist movement of the pile. Therefore, for Geotechnical Resistance, analyze a stiffer, stronger pile.

For a re-bar reinforced concrete drilled shaft, follow the procedure for Geotechnical Strength Limit State analysis as described inFHWA GEC 10, Chapter 12, Section 12.3.3.3.1.

For a steel beam section reinforced drilled shaft, maintain Modulus of Elasticity (E) = 29,000 ksi, but increase Moment of Inertia of the steel section (IX) by ratio between Strength Limit State Factored Load and Service Limit State Unfactored Load, divided by the resistance factor φ=0.67 (multiply IX by from approximately 2.2 to 2.6 times).

Page 66: drilled shaft slope stabilization

Geotechnical Resistance

Therefore, for a steel beam section reinforced drilled shaft:

I’x = Ix xStrength Limit State Factored Load

x1

Service Limit State Unfactored Load 0.67

This should keep the stiffness / bending behavior of the drilled shaft under Geotechnical Strength Limit State factored loading proportional to the behavior of the drilled shaft under Service Limit State unfactored loading, discounting the effect of the soil reaction or passive resistance.

Page 67: drilled shaft slope stabilization
Page 68: drilled shaft slope stabilization

Geotechnical Resistance

Check the deflection of the drilled shaft under Geotechnical Strength Limit State factored loading.

If the drilled shaft deflects more than 10% of the nominal drilled shaft diameter (D/10) this is considered failure of Geotechnical Resistance against overturning.

In this case, deeper embedment of the drilled shaft, a larger diameter drilled shaft, or stiffer reinforcement of the drilled shaft may be required.

Page 69: drilled shaft slope stabilization
Page 70: drilled shaft slope stabilization
Page 71: drilled shaft slope stabilization

Shear and Moment Design of Drilled Shaft

Per FHWA Policy Memorandum Related to Structures, dated June 28, 2000, Load and Resistance Factor Design (LRFD) Specifications are required for all new culverts, retaining walls, and other standard structures on which States initiate preliminary engineering after October 1, 2010.

If designing a conventional re-bar reinforced concrete shaft, utilize the FHWA LRFD design procedures for laterally loaded drilled shafts, per FHWA GEC 10, Chapter 12 and Chapter 16.

If designing drilled shafts reinforced with steel beam sections, Check the flexure resistance and shear resistance of the steel beam section according to AASHTO LRFD Bridge Design Specifications, Section 6.10.8 and Section 6.10.9.

Page 72: drilled shaft slope stabilization
Page 73: drilled shaft slope stabilization
Page 74: drilled shaft slope stabilization
Page 75: drilled shaft slope stabilization
Page 76: drilled shaft slope stabilization
Page 77: drilled shaft slope stabilization
Page 78: drilled shaft slope stabilization
Page 79: drilled shaft slope stabilization

A Retaining Wall may benecessary if any of the

following is true:

• Insufficient Overall (Global) Stability

• Insufficient Downhill Stability

• Over-steepened Lower Slope

• Potential Erosion of Toe

• Limited Right of Way

Page 80: drilled shaft slope stabilization
Page 81: drilled shaft slope stabilization
Page 82: drilled shaft slope stabilization

Typical Types ofDrilled Shaft Retaining Walls

Include:

• Soldier Pile and Lagging Wall (most common)

• Tangent Pile Wall

• Plug Pile Wall

• Secant Pile Wall

Page 83: drilled shaft slope stabilization

Soldier Pile and Lagging Wall

• Backfill with structural concrete to bottom of lagging

• Corrosion protection of steel in lagged zone

• Excavate to Install Lagging Panels

• Reinforced Precast Concrete or Timber Panels

• Backfill behind wall with free-draining aggregate

• Regrade slope in front of wall

Page 84: drilled shaft slope stabilization

Soldier Pile and Lagging Wall; Soldier Piles

Page 85: drilled shaft slope stabilization

Soldier Pile and Lagging Wall; Precast Lagging Panels

Page 86: drilled shaft slope stabilization

Soldier Pile and Lagging Wall; Granular Backfill

Page 87: drilled shaft slope stabilization

Tangent Pile Wall

• Drilled shafts with a center-to-center spacing of one shaft diameter

• With every shaft reinforced, this is the strongest type of drilled shaft retaining wall

• Very expensive to construct

Page 88: drilled shaft slope stabilization

Tangent Pile Wall

Page 89: drilled shaft slope stabilization

Plug Pile Wall

• Similar to Tangent Pile Wall with a center-to-center spacing of one shaft diameter

• However, every other shaft is reinforced

• Unreinforced shafts are generally shorter (they do not penetrate into bedrock) and serve the purpose of lagging

• Quick and easy wall

Page 90: drilled shaft slope stabilization

Plug Pile Wall

Page 91: drilled shaft slope stabilization

Secant Pile Wall

• Drilled shafts with a center-to-center spacing of less than one shaft diameter (the drilled shafts overlap)

• Every other shaft is reinforced, and unreinforced shafts serve the purpose of lagging

• Primary “King” and Secondary shafts

• Water-tight wall

• Very expensive and difficult to construct

• Not usually used for landslide stabilization

Page 92: drilled shaft slope stabilization

Secant Pile Wall

Page 93: drilled shaft slope stabilization
Page 94: drilled shaft slope stabilization
Page 95: drilled shaft slope stabilization
Page 96: drilled shaft slope stabilization

Photographic Credits

• U.S. Army Corps of Engineers, Huntington District

• C.R. Neale, W.Va. Towboat Photos (wvtowboats.com)

• Chris Merklin, P.E., Design Section Head,ODOT Office of Geotechnical Engineering

• Dave Nicklaus, Geologist,ODOT Office of Geotechnical Engineering

• Joe Smithson, P.E.,ODOT District 8 Geotechnical Engineer

• Jason Wise, P.E.,ODOT District 12 Geotechnical Engineer

Page 97: drilled shaft slope stabilization

References• AASHTO (2010). LRFD Bridge Design Specifications, 5th Edition, American Association of State

Highway and Transportation Officials.

• AISC (2008). Steel Construction Manual, 13th Edition, Fourth Printing, American Institute of Steel Construction, Inc.

• FHWA (2010). Geotechnical Engineering Circular No. 10, Publication FHWA-NHI-10-016, Drilled Shafts: Construction Procedures and LRFD Design Methods, Federal Highway Administration.

• Liang, R. (2002). “Drilled Shaft Foundations for Noise Barrier Walls and Slope Stabilization.” Ohio Department of Transportation and U.S. Department of Transportation, Federal Highway Administration.

• Liang, R. (2010). “Field Instrumentation, Monitoring of Drilled Shafts for Landslide Stabilization and Development of Pertinent Design Method.” Ohio Department of Transportation and U.S. Department of Transportation, Federal Highway Administration.

• Liang, R. and Zeng, S. (2002). “Numerical study of soil arching mechanism in drilled shafts for slope stabilization.” Soils and Foundations, Japanese Geotechnical Society, 42(2), pp. 83-92.

• Merklin, C., Geiger, E.C., Liang, R., and Yamin, M. (2007) “Design Methodology for Drilled Shafts to Stabilize a Slope.” 1st North American Landslide Conference.

• Reese, L. C., Isenhower, W. M., and Wang, S.-T. (2006) “Analysis and Design of Shallow and Deep Foundations.” John Wiley & Sons, Inc.

• Richardson, T.M. (2005). “A Design Model for Pile Walls Used to Stabilize Landslides.” WVDOH RP #121, 5th Technical Forum, Appalachian Coalition on Geohazards in Transportation.

• Zeng, S. and Liang, R. (2002). “Stability analysis of drilled shafts reinforced slope.” Soils and Foundations, Japanese Geotechnical Society, Vol. 42, No. 2, pp. 93-102.

Page 98: drilled shaft slope stabilization

Questions?