drilling mud waste water treatment using aop methods

8

Click here to load reader

Upload: anto-tri-sugiarto

Post on 26-Mar-2015

73 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Drilling Wastewater Treatment Unit

Plasma Centre IndonesiaWisma Bumi Putera lt. 15, Jln. Jendral Sudirman kavling 75,

Jakarta 12910

Plasma Centre Indonesia Simplify process

Page 2: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Drilling mud wastewater

wastewater

Page 3: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Basic Concept

Drilling wastewater pit Clean water

ECO-MOBILE is in-situ treatment process.

It was designed to treat wastewater which

generated from drilling process

in out

3

Page 4: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

In-Direct plasma treatment concept

InletIn-DirectChamber

Filter

Ozone Generator

Water in

Water out

Plasma-UV

Ozone

Ozone generation using non-thermal plasma

Outlet

Page 5: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Treatment Concept

wastewater AOP Coag/sed filtration clearwater

Reduced organic and inorganic compounds

Reduced metals and solid particles

Reduced various micro particles

COD =100 (%) COD <10 (%) COD <1 (%) COD < 0.5 (%)

4

Page 6: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Drilling mud wastewater treatment

Drilling mud wastewater

Chemical

In-direct plasma

Treated water

Mud formation

Oil Industry

AC filter

COD removalDeodorizing

Neutralizing

Solid removal

In-situ drilling wastewater treatment

Page 7: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Treatment handling services

• Treatment Capacity : 1000 bbl/day• Wastewater type : Drilling mud• Inlet profile : various max COD 15.000 ppm• Outlet profile : COD 200 ppm (government

regulations)• Services cost : USD/IDR• Customer responsible : Drilling company

– Mob-deMob• PCI responsible :

– Electricity– Plasma Unit– Chemical– Operator

before after

Page 8: Drilling Mud Waste Water Treatment Using AOP Methods

Plasma Centre Indonesia Simplify process

Thanks