Contents
● NETWORK PROBLEM IDENTIFICATION● REQUIREMENT FOR DRIVE TESTING● DRIVE TEST PROCESS● DRIVE TEST OUTPUTS● MEASUREMENT METRICS● DRIVE TEST ANALYSIS● NEPTUNE AND PROBE
![Page 3: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/3.jpg)
Network Problem Identification
● Drive Test
● OMC Statistics
● Customer feedback
![Page 4: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/4.jpg)
Requirement for Drive testing
● Test the network from the subscribers’ point of view● Test the complete system, end-to-end (mobile-to-land)● Benchmark performance against competitor networks● Test specific important routes and areas● Test in-building coverage for specific buildings (walk test)
![Page 5: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/5.jpg)
Drive Test Process
![Page 6: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/6.jpg)
Drive Test Equipments
● Data collected to find and analyze problems in the network
● Equipment Necessary for Drive testing
VehicleDrive test mobile phone External vehicle mounted GPSLaptop with drive test software and GPS connection capability
![Page 7: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/7.jpg)
Drive Test Setup
![Page 8: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/8.jpg)
General Consideration
● Routes chosen to be representative of the part of the network under study
● If possible simultaneously collect GSM speech and GPRS drive test data
● Drive test to be carried out during normal daylight hours
● Calls to be made preferably mobile-to-PSTN
● Call duration to be equal to the average call duration for the network
● At least 1000 calls required for good statistical confidence
![Page 9: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/9.jpg)
Drive Test Types
● Routine drive test
● Problem specific drive test
● Cell coverage analysis drive test
![Page 10: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/10.jpg)
Routine Drive Test
● Network to be monitored on a daily basis ● Drive test routes to include all the major roads, important locations,
etc● Routes regularly drive tested and problems further analyzed and
solved● May require removing interfering carrier, Power Change to
BTS, Frequency Plan change, Neighbor addition , etc.
![Page 11: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/11.jpg)
Problem Drive Testing
● Problems reported by statistical analysis, routine drive testing, customer care centre , alarms,etc
● Requires problem specific drive testing
● List of problematic cells identified and drive tested thoroughly to analyze the problem
● Data collection and analysis done simultaneously
![Page 12: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/12.jpg)
Cell Coverage Analysis Drive Test
● Usually carried out for new planned sites in the network
● New cells to come on air are thoroughly drive tested to determine their server and coverage areas
● Optimisation to be carried out for any major deviation from the initially planned design
![Page 13: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/13.jpg)
Optional Features
● Walk test support
● On line map display of the route
● Scan feature
![Page 14: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/14.jpg)
Drive Test Outputs
![Page 15: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/15.jpg)
Display
● Using the drive test equipment we can monitor the following ○ Status Information○ Error reports○ Layer 2 messages○ Layer 3 messages
![Page 16: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/16.jpg)
Display….. Status Information
● General Information: Includes Latitude ,longitude data, server call name, Marker ,data, time , log file name etc
● Serving cell: Includes Cell Identity, BSIC, ARFCN ,MCC, MNC, LAC
● Serving + Neighbor cell data: Includes CI, BSIC, ARFCN, Rxlev● Dedicated channel:Includes Channel number, Timeslot number,
Channel type,hopping information ● Radio Environment: Includes serving cell, Rxlev, Rxqual, TA, DTX
and RL Timeout counter information
![Page 17: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/17.jpg)
Display…..
Error reports
● Errors reported during a call can be analyzed from this report
Layer 2 messages
● Layer 2 messages can be analyzed
Layer 3 messages
● Layer 3 messages can be analyzed
![Page 18: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/18.jpg)
Measurement Metrics
![Page 19: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/19.jpg)
GSM Drive Test Metrics
● Route PlotsRxLev Full RxLev Sub RxQual FullRxQual SubFER MS TX PowerSQI
● Events Call Drops Setup Failures HO Failures HO Success
![Page 20: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/20.jpg)
GPRS Drive Test Metrics
● Route Plot UL/DL RLC Throughput: Radio Link Layer data throughputUL/DL LLC Throughput: Logical Link Layer throughput (user data)UL/DL RLC Block Error Rate (BLER): Radio Link Block Error RateUL/DL RLC Retransmission Rate: Radio Link Retransmission RateUL/DL Coding scheme used (CS1-4): Allocated Coding SchemeUL/DL Number of timeslots used: Allocated timeslots
● Events PDP Context Activation Failure: Failure to activate PDP Context (Packet Data Protocol)PDP Context Loss: Loss of PDP Context (GPRS Call Drop)
![Page 21: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/21.jpg)
Drive Test Analysis
![Page 22: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/22.jpg)
Analysis Types
● Coverage Analysis: Level AnalysisQuality Analysis
● Interference Analysis: Co-channel and adjacent channel interference
● Handover Analysis: HSR and HFR
● Neighbor Analysis: Missing neighbors
● Call Analysis: DCR,CSSR,CSR,Call Setup time,Call hold time etc.● Layer 2 Analysis
● Layer 3 Analysis
![Page 23: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/23.jpg)
Level Analysis
The level statistics refer to the received signal level for a mobile:
● Level (Full) Distribution (between -47 and -110)● Level (Sub) Distribution (between -47 and -110)● Cumulative Level Distribution● Level Banding
![Page 24: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/24.jpg)
RxLev Distribution
![Page 25: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/25.jpg)
RxQual-Quality full and Sub distribution
for both hopping and non- hopping
samples
-Cumulative Quality Distribution
-Interference
![Page 26: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/26.jpg)
Handover Analysis
● Problem areas are automatically identified ● Handover success/failure is shown on route● Position failure is located on XY graph● Cause/solution proposed for each failure● Step-by-step replay control allows every stage
of handover to be broken down for detailed analysis
● Forced Handover
![Page 27: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/27.jpg)
Handover Stats
● Handover Distribution - The number of Inter and intra cell handovers attempted, completed and failed
● Handover Performance - Inter and intra cell success rate and the total HO success rate
● Number of Handovers per call - The number of handovers that occurred per call within the testmobile survey.
![Page 28: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/28.jpg)
Neighbour Analysis
● The serving cells ID and full geographic location● The ID and full geographic location of the Neighbour cells that are
either missing or have not been measured● Problem areas are separately displayed on the 2D map view
![Page 29: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/29.jpg)
Call Analysis
● Analysis of live calls, call success, signal levels and call quality can be done
● Mean and worst call levels, quality, detailed comparative summary of cells signal strengths, analysis of sites
![Page 30: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/30.jpg)
Call Statistics
● Call Distribution - Evaluates every call and categorizes it as a Good Call or a No setup call
● Call Holding Time - Displays the duration of each call.● Call Performance - Details for the Setup rate, Failure rate
and Release rate.● Call Setup - Time Distribution Call Timers
![Page 31: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/31.jpg)
Call Performance
![Page 32: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/32.jpg)
Cell Statistics
● Cell Domination● Cell poor Quality Distribution● Cell Average Quality Distribution● Cell Average Level Distribution ● Cell Mean Call Holding Time● Cell average TA Distribution
![Page 33: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/33.jpg)
Layer2 &Layer 3 Messages
![Page 34: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/34.jpg)
Layer3 Information During Drive Test
![Page 35: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/35.jpg)
DL RLC Throughput Vs DL RLC BLER
![Page 36: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/36.jpg)
DL LLC Throughput (bytes/sec) vs DL RLC BLER
![Page 37: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/37.jpg)
NEPTUNE AND PROBE
![Page 38: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/38.jpg)
Neptune Features
● State-of- the-art PC based optimization tool delivering real time analysis capabilities
● User friendly with intuitive menu structure making it ideal for both real-time and post measurement analysis
● Automatic fault finding and problem solving diagnostic capabilities● Live call analysis● Statistical and graphical display● Long and short term cost savings due to competitive pricing and the
substantial shortening of the optimization process.● Supports additional testmobile formats, which can be loaded and
analyzed
![Page 39: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/39.jpg)
Test Mobile Import Facility
● TEMS Investigator● TOM Measurement System● GPRS and HSCSD, Nemo technologies● GSM log files from X-PLOR ANT units
![Page 40: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/40.jpg)
Probe
● Has ability to perform time-based, operator based and distance based analysis
● Statistics generated show the system’ s problems as a whole rather than pin-pointing each and every problem
![Page 41: Drivetest Final](https://reader033.vdocuments.net/reader033/viewer/2022061302/54e68bdb4a7959e23f8b48d2/html5/thumbnails/41.jpg)
Features
● Ideal for both real-time and post measurement analysis● Displays a network’s Key Performance Indicators● Key Performance Indicators are combined to produce the Network
Quality and Efficiency Factor● Statistical and graphical display● Long and short term cost savings due to competitive pricing and the
substantial shortening of the optimization process● Flexible hardware option