Drought Mitigation in Umkhanyakude DM
8 March 2017
Presenter: Ashley Starkey
PRESENTATION TITLE
Presented by:
Name Surname
Directorate
Date
Content :
Rainfall & SPI
Drought management
Interventions in Umkhanykude DM systems
Effects of Drought
KZN Households Affected by drought Demographics
Province Affected Local
Municipalities
District / Metropolitan Number of Affected
Settlements
Affected Households Affected Population
Kwazulu-Natal Abaqulusi Zululand 47 19,898 97,499
Kwazulu-Natal Dannhauser Amajuba 48 10,417 52,085
Kwazulu-Natal eDumbe Zululand 13 5,653 28,310
Kwazulu-Natal Emadlangeni Amajuba 20 3,001 16,342
Kwazulu-Natal eThekwini eThekwini Metro 83 703,819 2,533,745
Kwazulu-Natal Hlabisa uMkhanyakude 230 12,388 70,821
Kwazulu-Natal Jozini uMkhanyakude 35 1,340 6,433
Kwazulu-Natal KwaDukuza iLembe 73 70,284 231,183
Kwazulu-Natal Mandeni iLembe 107 38,225 138,057
Kwazulu-Natal Maphumulo iLembe 214 19,962 96,737
Kwazulu-Natal Mfolozi uThungulu 149 24,343 116,918
Kwazulu-Natal Mkhambathini uMgungundlovu 5 2,756 11,776
Kwazulu-Natal Mpofana uMgungundlovu 43 1,219 4,385
Kwazulu-Natal Msinga uMzinyathi 31 777 3,656
Kwazulu-Natal Mthonjaneni uThungulu 111 8,980 41,154
Kwazulu-Natal Mtubatuba uMkhanyakude 183 34,761 174,705
Kwazulu-Natal Ndwedwe iLembe 181 29,193 140,827
Kwazulu-Natal Newcastle Amajuba 22 5,495 24,929
Kwazulu-Natal Nkandla uThungulu 420 22,041 112,251
Kwazulu-Natal Nongoma Zululand 283 24,220 137,305
Kwazulu-Natal Nquthu uMzinyathi 147 8,360 43,777
Kwazulu-Natal Ntambanana uThungulu 147 9,775 56,695
Kwazulu-Natal The Big 5 False Bay uMkhanyakude 41 6,454 28,839
Kwazulu-Natal Ulundi Zululand 149 11,138 60,147
Kwazulu-Natal Umdoni Ugu 9 14,618 50,034
Kwazulu-Natal uMhlathuze uThungulu 70 86,360 333,529
Kwazulu-Natal uMlalazi uThungulu 415 45,049 213,587
Kwazulu-Natal uMngeni uMgungundlovu 43 13,772 41,616
Kwazulu-Natal uMshwathi uMgungundlovu 229 28,710 108,421
Kwazulu-Natal Umvoti uMzinyathi 164 10,626 40,375
Kwazulu-Natal Umzumbe Ugu 6 3,532 16,247
Kwazulu-Natal uPhongolo Zululand 3 409 1,799
Kwazulu-Natal Vulamehlo Ugu 8 1,388 6,663
Total: 3,729 1,278,963 5,040,847
Total South Africa: Affected 4,197 1,657,655 6,365,048
Drought Management • Provincial Disaster declared and KZN Provincial Disaster Management
Centre is the coordinating Hub for all sector departments
• DWS leads District and Supply System Joint Operating Committees
(JOCs) which are established to monitor critical systems, develop
interventions and monitor implementation of interventions Viz.:
1. North Coast JOC - Hazelmere, Maphumulo, KwaDukuza
2. Ugu JOC including Umzinto, Harding Weza, Umzimkhulu
3. Mhlathuze JOC - Uthungulu, City of Mhalthuze, Chamber of
Business, Irrigators
4. Mgeni JOC - Umsunduzi, Ethekwini, Ugu, Ilembe, Irrigators
5. Zululand JOC - Vryheid, Ulundi, Paulpietersburg
6. Umkhanyakude JOC - All areas
7. Hluhulwe JOC - Umkhanyakude, rate payers and irrigators
8. Umzinyathi JOC - Greytown, Dundee, Glencoe, Nqutu
9. Amajuba JOC – Amajuba & Newcastle
10. Uthukela JOC – Uthukela DM area
11. King Cetshwhayo/ Uthungulu JOC
Critical Systems :Umkhanykude DM
Hluhluwe –Mthubathuba
Drought Disasters Declared
Province Date Declared District Municipalities Comments
Kwa-Zulu Natal
17 Dec 2014 Umkhanyakude, iLembe, uThukela, Ugu, uThungulu, uMzinyathi, uMgungundlovu, Harry Gwala, Zululand (9)
Provincial Gazette 167
Hluhluwe
Dam 16
Umkhanya-
kude 20% 80% 20%
Gazetted 24 March 2016
No. 39860
Intervention by Restrictions & Shedding
8
Standard Precipitation Index
Northern KZN : Rainfall
• Drought remains extreme over northern
KZN
• Recent rains have brought relief with
overall level of DWS storage in KZN about
2% better than the same time last year but
still 18% lower than 2015
• Rainfall received in 2016/17 season
nearing normal but impact of the drought
still evident
10
Status of DWS reservoirs: KZN
FSC in
106m³ Feb-15 Mar-15 Feb-16 Mar-16 Feb-17 27 Feb
Midmar Mgeni 235.4 73.8 75.4 46.83 46.11 59.16 71.2
Nagle Mgeni 23.26 85 72.1 82.5 74.54 75.7 100.19
Albert Falls Mgeni 288.4 71.8 75 37.89 36.82 25.05 32.38
Inanda Mgeni 237.4 89.6 94.5 80.9 78.4 60.5 65.38
Hazelmere Mdloti 17.66 37.6 46.6 35.39 34.44 63.61 94.86
Spioenkop Tugela 270.4 101.1 100.3 58.99 63.49 62.05 101.14
Driel Barrage Tugela 8.694 95.9 97.9 105.04 103.36 103.36 87.22
Woodstock Tugela 373.5 97.4 94.9 70.94 76.73 85.46 100.39
Craigie Burn Mnyamvubu 22.46 88.3 96.1 65.43 65.13 58.86 80.82
Mearns Mooi 5.163 101.2 86 103.21 49.65 68.02 116.11
Spring Grove Mooi 139.2 93.9 97 78.58 85.26 56.35 79.45
Ntshingwayo Ngagane 194.6 81.6 80 55.54 55.66 60.58 97.03
Zaaihoek Slang 184.3 93.5 92.1 58.98 58.42 52.29 51.9
Wagendrift Boesmans 55.9 100.8 101 98.98 100.75 101.31 102.65
Goedertrouw Mhlatuze 301.26 51 47.7 27.1 23.97 27.47 29.39
Klipfontein Wit Mfolozi 18.08 85 72.1 19.82 19.66 35.04 54.22
Hluhluwe Hluhluwe 25.89 60 54.7 19.48 17.67 21.79 29.1
Pongolapoort Phongolo 2 267 62 62.3 48.35 46 38.06 38.93
4 669 3 399 3 403 2 458 2 423 2 204 2 577
100 72.8 72.9 52.7 51.9 47.2 55.2
% Capacity
Percentage
Dam Name River Name
Total Capacity in 106m³
11
Status of DWS reservoirs - Hluhluwe
Mitigation measures • Drought operating rules
• Determine the time and level at which water users need to be
restricted in order to “stretch water” until the dams can recover
• Optimize operations
• Reduce losses
• Active leak detection and pressure reduction
• War on leaks programme underway
• Implement and enforce restrictions
• Voluntary restrictions
• Mandatory restrictions and rationing by limiting water production,
fitting restrictors and fines
• Augment supplies
• Implement schemes to augment supplies from boreholes,
desalination and reuse, and transfer schemes from neighbouring
catchments
• Provide emergency level of service – Water tankers and tanks
“.”
DWS Support Projects
SUB-PROJECTS Final Budget Amount Paid % Spent
UMKHANYAKUDE 111 419 928R 97 155 752.69R 87.2%
Boreholes 17 101 900R 14 880 315.87R 87.0%
Refurbishment & Upgrade 54 700 704R 43 142 507.69R 78.9%
Water Tanks 2 000 000R 1 974 711.17R 98.7%
NWRI Water Tanker Procurement 22 311 396R 22 311 396.00R 100.0%
Phase 2-Interim Water Tankering 15 305 928R 14 846 821.96R 97.0%
DWS paid R 97 155 752.89 in 15/16 Balance was paid under WSIG in 16/17
Project were completed after end of financial year but with UKDM financial year
Tanker Purchase
8 Additional rented tankers deployed • 5 Umkhanykude DM • 3 Zululand DM, Abaqulisi LM
WSA Number Budget Tankers
Delivered
Drivers Average hh
served per
month
Ugu DM 8 11 899 411 8 10 486
Uthukela DM 9 13 386 838 9 9 878
Umkhanyakude DM 15 22 311 396 15 19 544
Uthungulu DM 7 10 411 985 7 5 463
Ilembe DM 3 4 462 279 3 3 486
Harry Gwala 3 4 462 279 3 3 375
66 934 188 45 49 3 233
Water tank installations
Municipality Number of Jojo tanks allocated
Completion Order Value
UMkhanyakude Offices 2 with Steel Stands Delivered on the
14.07.2015
R33 669.98
Umhlabuyalingana 10 Jojo tanks Completed R73 530.00
Umhlabuyalingana 10 concrete stands Completed R115 000.00
Umhlabuyalingana Ward 2;
5; 7& 16
10 Jojo tanks with concrete
stands
Completed on the
08.07.2015
R188 100.00
Jozini Ward 17; 10; 08; 07 & 01
10 Jojo tanks with concrete stands
Completed on the 10.07.2015
R198 600.00
Jozini Ward 18; 20; 09; 12;
15; 05; & 14
10 Jojo tanks with concrete
stands
Completed on the
14.07.2015
R180 000.00
Big 5 False Bay 9 Jojo tanks with concrete stands Completed on the 08.07.015
R180 000.00
Mtuba Ward 13; 14; 17; 18
& 19
10 Jojo tanks with concrete
stands
Completed on the
16.07.2015
R194 500.00
Mtuba Ward 3,4,6,8,11 and 13
10 Jojo tanks with concrete stands
Completed on the 09.07.2015
R171 000.00
Hlabisa 05 Jojo tanks with concrete
stands
Completed on the
05.07.2015
R100 000.00
05 Jojo tanks with concrete stands
Completed on the 03.07.2015
R100 000.00
TOTAL
79 Jojo tanks with concrete
stands & 2 Jojo tanks and 2 steel stands
Completed on the
16.07.2015
1,534,399.98
Refurbishment and Upgrades
• Contracts awarded late
• Projects that were not completed by
end March, were being completed
under WSAs grants
SUB-PROJECTS Budget
Refurbishment & Upgrade 51 746 827.00R
KDR010 - Ingwavuma 5 497 135.00R
KDR011 - Mtuba to KwaMasane 22 766 508.00R
KDR012 - Hluhluwe upgrade 13 177 327.00R
KDR013 - Phase 4 Mtuba emergency 10 305 857.00R
Boreholes
• 74 Boreholes drilled. • 10 dry boreholes • 64 boreholes equipped (functional
Boreholes). All the boreholes were equipped with hand pumps. Testing, Drilling equipping , hydrological services
Umgeni Water Interventions for all Local Municipalities
Local Municipality Project
Jozini Local Municipality
Shemula System - parallel line and replacement of auxiliary valves (Resilient seated and Air Valves)
Jobe Malobeni – pipe leaks and t-piece to feed reservoir
Qondile Borehole - Hand pump converted to production borehole
Ophande – repaired vandalized pump station
Hlalanathi - Install dedicated pipeline from package plant to Hlalanathi
Umgeni Water Interventions for all Local Municipalities
Local Municipality Project
Jozini Local Municipality
Shemula System - parallel line and replacement of auxiliary valves (Resilient seated and Air Valves)
Jobe Malobeni – pipe leaks and t-piece to feed reservoir
Qondile Borehole - Hand pump converted to production borehole
Ophande – repaired vandalized pump station
Hlalanathi - Install dedicated pipeline from package plant to Hlalanathi
Umgeni Water Interventions for all Local Municipalities
Local Municipality Project
Jozini Local Municipality
Shemula System - parallel line and replacement of auxiliary valves (Resilient seated and Air Valves)
Jobe Malobeni – pipe leaks and t-piece to feed reservoir
Qondile Borehole - Hand pump converted to production borehole
Ophande – repaired vandalized pump station
Hlalanathi - Install dedicated pipeline from package plant to Hlalanathi
Umgeni Water Interventions for all Local Municipalities
Local Municipality Project
Mtubatuba Local Municipality
KwaBhoboza line - Repair 3No. leaks & broken auxillary services
Repair to 350mm ac pipe leak
Northdale Township - 1 No Sewer Pump and Electrical Panel replaced
KwaMsane Township leaks
Mtuba WTP - 2No. boreholes
Nkolokotho WTP – redirect raw water to abstraction point
Mtuba WWTP – replace the electrical panels and new sewerage pumps
St. Lucia line- repair auxiliary valves
Nkombose - Supply and install 2No. Jojo tanks
Umgeni Water Interventions for all Local Municipalities
Local Municipality Project
Big Five Local Municipality
To commence with Borehole drilling at the following: Mnqobokazi, Mduku (Nomtshwiliza), Qomukuphila in 1st week of February 2016
Hlabisa Local Municipality
Sitezi – New pump motor for production borehole
Siyathuthuka - New pump motor for production borehole
Siyaphambili - New pump motor for production borehole
Umgeni Water Interventions for all Local Municipalities : Summary
• Rehabilitation of ground water sources (production boreholes, hand pumps, windmills etc);
• Shemula bulk line rehabilitation;
• Jozini rising main to the command reservoir to feed the Machibini area;
• Sewerage treatment ponds in Mtubatuba, St Lucia, KwaMsane and Mosvoldt Hospital;
• Various leaks within the bulk reticulation;
• Installation of 107 jojo tanks;
• Repairs to moveable assets viz the water tankers and;
• Supply of diesel generators -single and three phase for areas where there is no power supply or where there was a conversion from hand pumps to production boreholes.
Thank You