D S T 2 0 1 7 / 1 8 A n n u a l P e r f o r m a n c e P l a n
31 May 2017Dr Phil MjwaraSelect Committee Briefing
PRESENTATION OUTLINE
2017/ 18 Planning contextNational alignment (NDP, MTSF, 9 Point Plan) APP 2017/ 18Strategic OverviewProgramme Performance InformationBudgetLinks to other plansEntity OversightBudget cut implications
Provincial reflections Conclusion
PLANNING CONTEXT
• National Treasury framework for APP and Strat Plans
• National Development Plan (NDP) – Medium Term Strategic Framework (MTSF)– 9 Point Plan
• MPAT Standards– evolving planning environment across government
• Alignment across Department planning documents (2015-2020 Strategic Plan; DST 2017/ 18 Annual Performance Plan; and ENE)
3
PREVAILING CONDITIONS…(1)
• The 2017/18 planning cycle wasundertaken with the following issues forconsideration:– Year three of strategic plan implementation. An evident ramp
up in performance is anticipated (marking progress towards attainment of 2020 targets i.e are there indicators that align to and contribute to all proxy indicators)
– Budget cuts and the implications these would bear on both the attainment of targets and concomitant HR resources needed for implementation
4
PREVAILING CONDITIONS…(2)
• The 2017/18 planning cycle wasundertaken with the following issues forconsideration:– Increased traction on implementation of government’s 9 point
plan and growing appreciation of the potential contribution of STI towards socio-economic transformation
– Growing appreciation of the Operation Phakisa methodology and DSTs participation in all to date
– A number of policy related initiatives underway (White Paper Review, STIIL Review etc)
5
STRATEGIC INTEGRATION
• National Development Plan–3 phases and STI contribution
• Support to several Government Outcomes
• STI in the Nine Point Plan
6
SOUTH AFRICA’S STI: WHERE TO GO?
• Use of knowledge forefficiency gains in theeconomy- Drawing on progressachieved thus far, the NSI willexpand research capacity (humancapital development) and institutionbuilding, build on what it has learntabout commercialising ideas fromresearch, and continue to supportexisting economic sectors (such asagriculture, forestry, agroprocessing,aquaculture, manufacturing andmining) and emerging sectors (suchas minerals beneficiation, greenerenergy (hydrogen and fuel cells), andactive pharmaceutical ingredientmanufacturing) throughtechnological innovation.
Phase One
(2012-2017)
8
• Industrialisation enhanced byknowledge- the NSI will continue toaccelerate the transformation of theSTI sector (i.e. demographicrepresentivity) and enhance efficiencyin the economy through knowledge.The government will continue toincrease R&D investment andcommercialisation, and optimise theutilisation of inbound technology
Phase Two (2018-2023)
SOUTH AFRICA’S STI: WHERE TO GO?
9
• knowledge-based economy-The number of knowledge workers and high-technology industries will have increased and boosted exports and increased the capacity to commercialise indigenous or local technologies. Efforts will be directed at sustaining and expanding this progress.
Phase Three
(2023-2030)
SOUTH AFRICA’S STI: WHERE TO GO?
OVER THE 2014- 2019 MTSF, THE DEPARTMENT WILL HAVE CONTRIBUTED TO AND REPORTED ON THE FOLLOWING GOVERNMENT OUTCOMES:
Outcome 2: A long and healthy lifefor all South Africans.
Outcome 2: A long and healthy lifefor all South Africans.
Outcome 3: All people in South Africaare and feel safe
Outcome 3: All people in South Africaare and feel safe
Outcome 4: Decent employment through inclusive economic growth.
Outcome 4: Decent employment through inclusive economic growth. 10
The DST’s contribution to Government Outcomes (1)
OVER THE 2014- 2019 MTSF, THE DEPARTMENT WILL HAVE CONTRIBUTED TO AND REPORTED ON THE FOLLOWING GOVERNMENT OUTCOMES:
Outcome 5: A skilled and capable workforce tosupport an inclusive growth path
Outcome 5: A skilled and capable workforce tosupport an inclusive growth path
Outcome 6: An efficient, competitive andresponsive economic infrastructure network.
Outcome 6: An efficient, competitive andresponsive economic infrastructure network.
Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all.
Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all.
Outcome 10: Environmental assets and natural resources that are well protected and continually
enhanced.
Outcome 10: Environmental assets and natural resources that are well protected and continually
enhanced. 11
The DST’s contribution to Government Outcomes (2)
GOVERNMENT’S NINE POINT PLAN
JOB DRIVERS• Oceans Economy• Higher impact IPAP• Revitalising Agriculture
• Advancing Beneficiation
• Unlocking SMME, co‐ops, township and rural enterprises’ potential
JOB DRIVERS• Oceans Economy• Higher impact IPAP• Revitalising Agriculture
• Advancing Beneficiation
• Unlocking SMME, co‐ops, township and rural enterprises’ potential
ENABLERS• Resolving the energy challenge
• Mediating workplace conflict
• Crowding in private sector investment
ENABLERS• Resolving the energy challenge
• Mediating workplace conflict
• Crowding in private sector investment
CROSSCUTTERS• Science, Technology and Innovation
• Transport Infrastructure
• State Owned Company Reforms
• Water and sanitation
• Broadband rollout
CROSSCUTTERS• Science, Technology and Innovation
• Transport Infrastructure
• State Owned Company Reforms
• Water and sanitation
• Broadband rollout
12
SUPPORTING THE 9 POINT PLAN (1)
STI supports the 9 Point Plan by:
Supporting and directing the National System of Innovation(NSI)
Mandating publicly funded science, technology andinnovation (STI) institutions to support government priorityoutcomes
Developing research capacity
Using knowledge and innovation for economicdevelopment
Using knowledge and innovation for inclusive development Using science to inform policy
13
SUPPORTING THE 9 POINT PLAN (2)
Strategic stand alone STI Commitments Improve the Gross Expenditure on Research and Development
(GERD) to Gross Domestic Product (GDP) ratio- 1.5% by 2019
Improve and optimise the usage of available resources forresearch and development (Budget coordination)
Develop a framework for the deployment of new locallydeveloped innovations
Accelerate the establishment of a sovereign innovation fund
Develop a plan of action to manage the current intellectualproperty (IP) leakages from South Africa
14
DST PROGRAMMES
165/25/2017
DST Administration (1)
Technology Innovation(2)
International Cooperation
and Resources (3)
Research Development Support (4)
Socio-Economic Innovation
Partnerships (5)
Increased well-being and prosperity through
science, technology and innovation (STI).
Provide leadership, an enabling environment,
and resources for science, technology and innovation in support of
South Africa’s development
Professionalism; Innovation;
Ethical behaviour; and Knowledge sharing.
Vision, Mission, Values
VISION MISSION VALUES
STRATEGIC OVERVIEW (1)
The Department has prioritised the following policy initiatives for the 2017/18 fiscal year i.e.
• Establishment of a Sovereign Innovation Fund
• Expansion of the Sector Innovation Funds
• Review of the Intellectual Property Rights from Publicly Financed Research and Development Act
• Expansion of Hydrogen South Africa Programme
STRATEGIC OVERVIEW (2)
The Department has prioritised the following policy initiatives for the 2017/18 fiscal year i.e.
• Finalisation of the Innovation for Inclusive Development Strategy
• Development of a new White Paper on Science, Technology and Innovation (STI) and the finalisation of the STI Institutional Landscape Review
• Completion of 64 MeerKAT antennae commissioned for a single polarisation array
APP 2017/ 18 INDICATORS
2017/18 APP has 49 indicatorsProg 1= 6
Prog 2= 10
Prog 3= 10
Prog 4= 11
Prog 5= 12
25
INDICATORS OVER 3 YEARS
26
0 10 20 30 40 50 60
Administration
Technology Innovation
International Cooperation and Resources
Research Development and Support
Socio‐Economic Innovation Partnerships
Total
2017/18 2016/17 2015/16
PROGRAMME 1 –6 PERFORMANCE INDICATORS
PERFORMANCE INDICATOR 5‐yeartarget
2016/17 2017/18
DST public entities’ annual performance plans and annual reports approved by the Minister and the CSIR shareholder compact signed by the Minister and the chairperson of the board.
by 31 March 2020
by 31 March 2017
by 31 March 2018
Vacancy rate reduced to a set rate. 6% Retained6%
Capped at 10%
Combined assurance annual report on the status of combined assurance presented to the Risk and Audit Committees
N/A (not a strategic indicator
2 1
PROGRAMME 1 –6 PERFORMANCE INDICATORS
PERFORMANCE INDICATOR 5‐year target
2016/17 2017/18
Number of media articles written to raise the DST’spublic profile.
104 16 24
Number of public participation programmes held. 50 10 10
Unqualified audit (clean audit) opinion with nofinancial matters in the audit report.
Unqualified audit opinion with no financial matters in the audit report
Unqualified audit opinion with no financial matters issued by AG
Clean audit opinion with no financial matters
TECHNOLOGY INNOVATION-10 PERFORMANCE INDICATORS
PERFORMANCE INDICATOR 5‐year target
2016/17 2017/18
Number of instruments funded in support ofknowledge utilisation
90 25 19
Number of knowledge outputs generated 683 119 148
Number of strategic policy directives in designatedareas in support of economic sectors
25 5 7
Number of new disclosures reported by publiclyfunded institutions
1 405 275 280
Number of regulatory recommendations for decisionsupport by government
108 27 27
TECHNOLOGY INNOVATION (2)
PERFORMANCE INDICATOR 5‐yeartarget
2016/17 2017/18
Number of trainees attending training initiativesin designated areas
1 180 280 240
Number of knowledge application productsfunded in designated areas
29 4 6
Number of commercial outputs in designatedareas
21 8 4
Number of decision support interventionsdeveloped or maintained
8 2 2
Number of postgraduate students (master’s anddoctoral) funded in designated areas
1 789 292 355
INTERNATIONAL COOPERATION & RESOURCE – 10 PERFORMANCE
INDICATORS
PERFORMANCE INDICATOR 5‐year target 2016/17 2017/18
Amount (expressed in rand millions) ofinternational funds directly invested inresearch, innovation and STI HCDprogrammes as well as researchinfrastructure investments in South Africa aspart of cooperation initiatives implementedby the DST
R2 120b R400m R420m
Amount (expressed in rand millions) of fundsinvested by international partners in theirown organisations and initiatives but targetedat cooperation in research, innovation andSTI HCD with South African partners as partof cooperation initiatives implemented by theDST
R1 280b R230m R250m
INTERNATIONAL COOPERATION & RESOURCE – 10 PERFORMANCE
INDICATORSPERFORMANCE INDICATOR 5‐year target 2016/17 2017/18
Number of South African students acceptedinto international training programmesoffering a postgraduate qualification as partof cooperation initiatives facilitated by theDST
1 880 150 350
Number of international partnerorganisations (i.e. legal entities) collaboratingwith South African partners within theformalised framework of collaborativeresearch, innovation or STI HCD projectscounted as part of cooperation initiativesfacilitated by the DST
2 500 450 500
INTERNATIONAL COOPERATION AND RESOURCES (2)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
Number of dedicated international technicalexchanges such as workshops, seminars ortraining programmes to reinforce SouthAfrica’s capacities in key STI domainsspecifically referenced in the DST StrategicPlan, undertaken with the support ofinternational partners and facilitated by theDST
100 15 20
Number of research, innovation and STI HCDcooperation projects, co-funded or supportedin kind by the DST and at least one otherAfrican partner
300 30 50
Amount (expressed in rand millions) ofinternational funds directly invested in Africanregional and continental research, innovation,STI HCD or research infrastructureprogrammes as a result of DST facilitation
R380m R70m R80m
INTERNATIONAL COOPERATION AND RESOURCES (3)
PERFORMANCE INDICATOR 5‐year target
2016/17 2017/18
Number of AU or SADC STI initiatives,including programmes, projects or governanceframeworks, endorsed at AU or SADCministerial level supported (financially or inkind) by the DST
70 10 16
Number of formally recorded decisions madein intergovernmental STI forums, such asmultilateral organisations, with a direct bearingon resource allocation to support priorities ofgovernment’s Programme of Action followingspecific DST intervention
20 4 4
Number of leadership positions occupied bySouth Africa in international STI governancestructures relevant to influencing resourceallocation to support priorities of government’sProgramme of Action following specific DSTintervention
18 4 4
RESEARCH DEVELOPMENT AND SUPPORT – 11 PERFORMANCE INDICATORS
PERFORMANCE INDICATOR 5‐year target 2016/17 2017/18
Total number of PhD students awardedbursaries annually as reflected in thereports from the NRF and relevantentities
15 840 3 136 No fewer than 3 100
Total number of pipeline postgraduatestudents awarded bursaries annually asreflected in the reports from the NRF andrelevant entities
54 392 10 996 No fewer than 10 800
Total number of graduates and studentsplaced in DST-funded work preparationprogrammes in SETI institutions
3 440 840 800
Number of research infrastructure grantsawarded per award letters annually
220 70 30
RESEARCH DEVELOPMENT AND SUPPORT (2)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
Total number of researchers awardedresearch grants through NRF-managedprogrammes as reflected in the NRF projectreports
22 578 4 539 No fewer than 4 500
Number of research articles published byNRF-funded researchers and cited in theThomson Reuters Web of Science CitationDatabase as reflected in the NRF projectreports
35 000 7 000 No fewer than 7 000
Number of antennas commissioned for asingle polarisation array
64 32 64
RESEARCH DEVELOPMENT AND SUPPORT (2)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
A climate change research network in place A climate changeresearch network in place by 31 March 2018 (MTSF target)
Submission to the DDG of a report on existing climate research initiatives and networks by 31 March 2017
A climate changeresearch network formalised in SA through an MoU by 31 March 2018
RESEARCH DEVELOPMENT AND SUPPORT (3)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
Number of biennial reports on the state of climate change S&T in South Africa submitted to Cabinet
Two biennialreport on the state of climate change S&T in South Africa for Cabinet approval
1st biennialreport on the state of climate change S&T in South Africa finalised and submitted to Cabinet approval by 31 March 2017
A plan for compiling the second biennial report on the state of climate change S&T in South Africa approved by Excoby 31 March 2018
RESEARCH DEVELOPMENT AND SUPPORT (4)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
Approximate number of participants in science awareness and engagement programmes annually as reflected in the project reports of the NRF and other service providers.
8 179 000 1 200 000 Approx. 2 millionparticipants
Total available broadband capacity providedby SANReN per annum
3 500 Gbps 3 500 Mbps 3 200 Gbps totalavailable broadbandcapacity
SOCIO-ECONOMIC INNOVATION PARTNERSHIPS – 12 PERFORMANCE
INDICATORSPERFORMANCE INDICATOR 5‐year target 2016/17 2017/18
Number of learning interventions(seminars, briefs, policy papers) generated
45 9 9
Number of honours, master’s and doctoralstudents fully funded or co-funded indesignated niche areas
375 55 90
Number of knowledge and innovationproducts (patents, prototypes, technologydemonstrators or technology transferpackages) added to the IP portfoliothrough fully funded or co-funded researchinitiatives
22 4 4
SOCIO-ECONOMIC INNOVATION PARTNERSHIPS – 12 PERFORMANCE
INDICATORS (2)PERFORMANCE INDICATOR 5‐year target 2016/17 2017/18
Number of high-level research graduates(master’s and doctoral students) fullyfunded or co-funded in designated nicheareas (advanced manufacturing, aerospace,chemicals, mining, advanced metals, ICTsand sector innovation funds (SIFs)
1 454 290 288
Number of interns fully funded or co-funded in R&D related to design,manufacturing and product development
590 200 100
SOCIOECONOMIC INNOVATION PARTNERSHIPS (3)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
Number of knowledge and innovationproducts (patents, prototypes, technologydemonstrators or technology transferpackages) added to the innovation productportfolio through fully funded or co-fundedresearch initiatives
22 4 4
Number of instruments funded in support ofincreased localisation, competitiveness andR&D-led industry development in aerospace,advanced manufacturing, chemicals, mining,advanced metals and ICTs
9 9 6
Number of innovation-support interventionsfunded or co-funded that strengthen provincialor rural innovation systems
12 2 2
SOCIOECONOMIC INNOVATION PARTNERSHIPS (4)
PERFORMANCE INDICATOR 5 year target 2016/17 2017/18
Turnaround time for providing preapprovaldecisions on applications for the R&D taxincentive
90 days 120 days 90 days
Number of knowledge products oninnovation for inclusive developmentpublished
26 4 6
Number of decision-support interventionsintroduced and maintained
10 7 8
Number statistical reports and policy briefssubmitted to Cabinet
29 6 6
LONG-TERM INFRASTRUCTURE PLANS
Name of theproject
Municipality Outputs Project cost
SKA Kareeberg LocalMunicipality (partof the Pixley kaSeme DistrictMunicipality)
The completionof 64 MeerKATantenna
R3,67bn by 2018/19
MTEF ALLOCATION (1)
Economic classification
R'000 2017/18 2018/19 2019/20
Current payments 575 769 611 337 584 257 Compensation of employees 315 527 327 690 352 671
Goods and services 260 242 283 647 231 586 Transfers and subsidies 6 960 482 7 292 494 7 604 421 Payments for capital assets 20 978 12 194 2 673
Total 7 557 229 7 916 025 8 191 351
MTEF ALLOCATIONS (2)
Programmes R’000
MTEF ALLOCATIONS
2017/18 2018/2019 2019/2020
Administration 383 720 401 613 349 267
Technology Innovation 1 073 621 1 129 364 1 195 030
International Cooperation and Resources 128 705 135 169 144 425
Research Development and Support 4 348 859 4 467 126 4 756 959
Socio-Economic Innovation Partnerships 1 622 324 1 782 753 1 745 670
Total 7 557 229 7 996 025 R8 191 351
ENTITY OVERSIGHT (1)
Name of the Entity Budget Institutional Review
South African National Space Agency R131 226m None
Academy of Science of South Africa R25 261m 2016
National Research Foundation R925 964m 2016
Council for Scientific and Industrial Research
R915 645m 2009
Human Sciences Research Council R304 656m 2010
Technology Innovation Agency R396 732m 5-year economic impact assessment of TIA in 2013
ENTITY OVERSIGHT (2)
Non- scheduled entities
National Advisory Council on Innovation
19 506 N/A
South African Council for Naturaland Scientific Professions
4 200 N/A
NIPMO 46 824 2017
INDICATOR 2016/17 TARGET
2017/18 TARGET
Research Development and Support
Number of research infrastructure grants awarded as per award letter annually
70 30
Socio-Economic Innovation Partnerships
Number of innovation products added to the IP innovation product portfolio through fully funded or co-funded research initiatives
35 17
High level graduates fully funded or co-funded in designated niche areas
290 288
50
IMPLICATIONS OF BUDGET CUTS (1)
Budget cuts have affected the department in 2 ways:Vacancies (moratorium on hiring)= 42 vacanciesReduction of targets in a number of indicators (compared to
2016/17)
INDICATOR 2016/17 TARGET
2017/18 TARGET
Technology Innovation
Number of postgraduate students (master’sand doctoral) funded in designated areas
392 355
Number of instruments funded in support ofknowledge utilisation
25 19
Number of trainees attending traininginitiatives in designated areas
280 240
51
IMPLICATIONS OF BUDGET CUTS (2)
INDICATOR 2016/17 TARGET
2017/18 TARGET
Socio-Economic Innovation Partnerships
Number of instruments funded in support ofincreased localisation, competitiveness andR&D led industry development
9 6
Number of knowledge and innovationproducts (patents, prototypes, technologydemonstrators or technology transferpackages) added to the innovation productportfolio through fully funded or co-fundedresearch initiatives
35 17
Number of interns fully funded or co-fundedin R&D related to design, manufacturing andproduct development
200 100
52
IMPLICATIONS OF BUDGET CUTS (3)
PROVINCIAL REFLECTIONS
National Department with no concurrent functions
National footprint established through:Entities
Project implementation
Innovation integration into regional plans
53
PROVINCIAL FOOTPRINT (SOME EXAMPLES)
54
• Installation of five energy solutions at five schools (three 5kW hydrogen fuel cell units at three schools and two 3kW Solar PV systems at two schools) in Cofimvaba district through public private partnerships
• IK-based Food and Nutraceuticals Platform
• Implementation and validation on m-health solutions to assist the Department of Health
• A skin-tone candidate product, between a cosmeceuticals consortium and the community of Kubandakazi
• Regional Innovation Forum (RIF) aims to stimulate, support and promote innovation
PROVINCIAL FOOTPRINT (SOME EXAMPLES)
55
• The South African San Institute- hosts the Northern Cape IKSDC
• Broadband For All (BB4All) Initiative in the JT GaetseweDistrict
• Carnavon Science Centre
• Square Kilometre Array
• Students supported for undergraduate Science studies
PROVINCIAL FOOTPRINT (SOME EXAMPLES)
56
• Southern Gauteng Regional Innovation forum (SGRIF)
• mLab Southern Africa (SA)
• Establishment of a plant processing facility in a community of Mamelodi, Pretoria for IK-based Cosmeceuticals
• Installation of a 5kW hydrogen fuel cell at Windsor East Clinic in Randburg, in collaboration with Anglo Platinum, Air Products and Gauteng Provincial Department of Health.
PROVINCIAL FOOTPRINT (SOME EXAMPLES)
57
• Establishment of a plant processing facility at the Nkomazi District for IKS based tech transfer
• Broadband For All (BB4All) Initiative
CONCLUSION
2017/18 is three years into the DST Strategic Plan 2015- 2020
2017/18 APP has 49 indicatorsReduction from 2016/17
Increased appreciation for the role of S & T across government9 Point PlanOperations Phakisa
Changing Policy contextNew White Paper Decadal Plan