LR/EILS Event 8/4/2011 – LR and EILS deployed More inline with expected EILS event – Unfolded gradually – Limited duration LRs dispatched first - will likely change with NPRR379 LRs recalled first No firm load shed LREILS 880 MWs434 MWs 14:30:45 through 17:51:2015:42:04 through 18:07:58 16:03:04 through 18:07:58

TRANSCRIPT

Page 1: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

DSWG Update to WMS8/10/2011

Page 2: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

DSWG Goals# DSWG Goal Deliverable

Target Date

Primary Owner

Team Members Status

1 SCED Load Participation Complete analysis of issues and develop business requirements and a draft NPRR

End of 3rd Quarter

John Varnell

Mark P, Tim C, Jay Z,

Eric G, Mark S, Floyd

In Progress

2 Review CAISO RDRP and identify potential parallel effort that could take place in ERCOT Report to DSWG on feasibility and scope End of 3rd

Quarter Paul W.  

3 Advance Notice of Real Time Energy Prices Analyze potential solutions and report on feasability

End of 4th Quarter Mark Smith All Moved to

QSTF

4 NERC Issues (Functional Model WG, DADS, CIP Standards for UFLS) Monitor and Report to DSWG End of 4th

QuarterPaul

Wattles John VarnellIn

Progress 

5 Explore opportunity to deploy EILS via XML (or other electronic messaging) Identify issues, cost, timelines End of 3rd

Quarter Bob P ERCOT Staff  

6 EILS Improvements EILS Subgroup Report to the DSWG End of 4th Quarter

Alberto Marinez All

In Progress

 

7 Greater participation of small and midsize loads in ERCOT markets.

Identify potential opportunities and any barriers to entry; Report to WMS

End of 4th Quarter Jay Z

Robert H., Eric G, Tim C,

ERCOT staff

 In Progress

8Investigate Load Participation issues with Nodal Market Implementation( e.g. NOM updates, outage impacts)

Identify Issues, develop potential solutions and report to DSWG and WMS On-Going Tim Carter

Mary Anne, Nelson,

ERCOT staff 

  4CP and Price Responsive Load Analysis Report and Presentation to the DSWG      Defer to

sometime in 2012

• Next meeting on 9/30/2011 (high chance of being moved up)

Page 3: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

LR/EILS Event

• 8/4/2011 – LR and EILS deployed

• More inline with expected EILS event– Unfolded gradually– Limited duration

• LRs dispatched first - will likely change with NPRR379• LRs recalled first• No firm load shed

LR EILS

880 MWs 434 MWs

14:30:45 through 17:51:20 15:42:04 through 18:07:58

16:03:04 through 18:07:58

Page 4: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

AMIT/DSWG Workshop• Aug 30th and 31st here at Met Center• Smart meters and DR

– What are barriers to DR participation?

• Agenda near completion

Morning of 30th

AMIT updateDSWG UpdateERCOT overview

Afternoon of 30th

Vendor presentations (technology, analytical services)REPs

Morning of 31st

Facilitated discussion

Page 5: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

Load Resources in SCED (LRIS)

What we are trying to do:• Demand response offers economically dispatched by

SCED for energy or as ancillary resource similar to generation resource today

Page 6: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

Load Resources in SCED (LRIS)

Why are we doing this?• Helps cure unintended consequence of price

suppression when DR is dispatched during shortage conditions

• Price certainty to loads to loads responding to price• Enables greater load participation in the market• Increasing reliability and market competition by

adding additional resources available to SCED

Page 7: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

Load Resources in SCED (LRIS)

Key issues:• Settlements• M&V algorithms• Dispatch methodology• Aggregated Loads

– Network modeling

Page 8: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

Load Resources in SCED (LRIS)

Choices:• Settlements

– Option 1 – “Volumetric Flow”• Same as “LMP – G”• Value is difference between high energy cost and retail rate• Provides separate channel of curtailed usage to REPs

– Option 2 – “Full LMP”• Pay full LMP for curtailed usage• Value is energy payment and avoided costs

Page 9: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

Load Resources in SCED (LRIS)

Choices:• To include in initial project:

– Option 1 – Individual Resources• Much simpler

– Option 2 – Include aggregations• SB1125• Possibly more Resources

Page 10: DSWG Update to WMS 8/10/2011. DSWG Goals #DSWG GoalDeliverable Target Date Primary Owner Team MembersStatus…

Load Resources in SCED (LRIS)

Suggestions from DSWG:• Looking for endorsement and direction from WMS

on where this goes from here– Expect ROS involvement at minimum– Suggest ERCOT look at as part of “Look ahead SCED”