dt-em2 13/12/2011 12/13/11dt-em2. meeting with ph (retreat) dt is foreseen to stabilize at just...
TRANSCRIPT
DT-EM2
DT-EM213/12/2011
12/13/11
DT-EM2
Meeting with PH (retreat)
DT is foreseen to stabilize at just above 70 staff.
12/13/11
DT-EM2
New DT building!
12/13/11
DT-EM2
New member (?)
Mechanical Technician /Technicien(ne) en mécanique
Technician in the field of Mechanics in the Physics Department (PH), Detector Technology Group (DT) Technicien(ne) en mécanique dans le Département de physique (PH), groupe Technologie des détecteurs (DT)
Programme: Staff Staff Category: Technicians Number of posts: 1 Posted Date: 11/11/2011 Closing Date: 05/01/2012 Reference: PH-DT-2011-239-LD
12/13/11
DT-EM2
Higgs???!
12/13/11
Higgs Detection: H -> ggRare decay channel: BR~10-
3
Look for mass peak Demand for excellent ECAL
performance
12/13/11DT-EM2
events
Mass
background
Higgs signal
The combined energies of the signal photons would cluster at the mass of the Higgs boson. In contrast, background events include photon pairs with a variety of energies.
CMS detector
DT-EM2
The Higgs search as of 18/11/2011
12/13/11To be continued……..
DT-EM2 12/13/11
Neutrinos faster than light ??
OPERA (Oscillation Project with Emulsion-tRacking Apparatus)
DT-EM2 12/13/11
Present status"One of the eventual systematic errors is now out of the way, but the search is not over. They are more checks of systematics currently under discussion, one of them could be a synchronisation of the time reference at CERN and Gran Sasso independently from the GPS, using possibly a fiber" said Jacques Martino, Director of National Institute of Nuclear and Particle Physics of French CNRS
BUT, neutrino oscillations indicates a non-zero masss!!!
Solution: New independent experiment!
~25ppm !
DT-EM2
AOB
12/13/11