dt3506 ***** nddot rims highway projects - highway ... · hwy: 94 suf: dir: e reg: w dist: 1 loc e...

96
DT3506 ***** NDDOT RIMS HIGHWAY PROJECTS - HIGHWAY COMPONENTS ***** DT3506M1 Nov 14,19 - HIGHWAY COMPONENTS INQUIRY - 1 more > *PRIORITIES *PROPOSED ENGLISH SUBSEGMENT *JUMP HWY: 94 SUF: DIR: E REG: W DIST: 1 LOC E BISMARCK INT-PRE CONC CONT STRING FR RFPT: 161.439 OFF: 0.0000 MI TO RFPT: 161.439 OFF: 0.0000 MI LEN: 0.0000 MI LSHL DRLN RSHL SURF BASE GRAD FIN PVMT EFF LAST PVMT PVMT *PTY INTL PREV LTST WDTH WDTH WDTH DPTH DPTH WDTH WDTH AGE AGE SEAL TYPE DESC SYS CONS CONS CONS 55 55 0 CONCR CRCP UI 1964 1964 1964 *DISTRESS: NA *RIDE: N/A *ESALS: 1703 *AADT: N/A *AVG RUT (IN) : N/A 4 OCCRS PRPI N/A IRI N/A LSHL RDWY RSHL *MAINT: 0.00 4YR MAINT: 0.00 DPTH WDTH WDTH WDTH OIL/CON CLS COST DSN (IN) COMPONENTS (FT) (FT) (FT) TYPE AGG YEAR THOUS LFE PCN SUB H STRUCTURE 30.0 1964 STANDARD BARRIER 1995 STRUCTURAL WIDENING 80.0 1995 APPROACH SLAB 1995 Enter-PF1---PF2---PF3---PF4---PF5---PF6---PF7---PF8---PF9---PF10--PF11--PF12--- confm help retrn quit P/MIQ flip pref bkwrd frwrd left right main Scrolling performed.

Upload: others

Post on 23-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • DT3506 ***** NDDOT RIMS HIGHWAY PROJECTS - HIGHWAY COMPONENTS ***** DT3506M1 Nov 14,19 - HIGHWAY COMPONENTS INQUIRY - 1 more > *PRIORITIES *PROPOSED ENGLISH SUBSEGMENT *JUMP HWY: 94 SUF: DIR: E REG: W DIST: 1 LOC E BISMARCK INT-PRE CONC CONT STRING FR RFPT: 161.439 OFF: 0.0000 MI TO RFPT: 161.439 OFF: 0.0000 MI LEN: 0.0000 MI LSHL DRLN RSHL SURF BASE GRAD FIN PVMT EFF LAST PVMT PVMT *PTY INTL PREV LTST WDTH WDTH WDTH DPTH DPTH WDTH WDTH AGE AGE SEAL TYPE DESC SYS CONS CONS CONS 55 55 0 CONCR CRCP UI 1964 1964 1964 *DISTRESS: NA *RIDE: N/A *ESALS: 1703 *AADT: N/A *AVG RUT (IN) : N/A 4 OCCRS PRPI N/A IRI N/A LSHL RDWY RSHL *MAINT: 0.00 4YR MAINT: 0.00 DPTH WDTH WDTH WDTH OIL/CON CLS COST DSN (IN) COMPONENTS (FT) (FT) (FT) TYPE AGG YEAR THOUS LFE PCN SUB H STRUCTURE 30.0 1964 STANDARD BARRIER 1995 STRUCTURAL WIDENING 80.0 1995 APPROACH SLAB 1995 Enter-PF1---PF2---PF3---PF4---PF5---PF6---PF7---PF8---PF9---PF10--PF11--PF12--- confm help retrn quit P/MIQ flip pref bkwrd frwrd left right main Scrolling performed.

    darneText BoxConstruction History of Structure 94-161.439