dtcs-750-02-qr-02 dtcs-750-04-qr-02 dtcs-750 · pdf filesendiri / own sewa / rent lain-lain...

15
Version 10_non Domestik_NSC Baharu UNTUK KEGUNAAN PEJABAT/FOR OFFICE USE No. Contract Account No.Contract No. SN Z1 Berkelompok No. Meter No. SN Z2 1A. Gelaran / Salutation (Encik/Puan/Cik/Gelaran Lain ) (Mr./Mrs./Miss/Other Salutation) Nama Pemohon / Syarikat/ Applicant's /Company's Name No. K/P Lama / Old IC No. No.K/P Baru / New IC No. - - atau / or No.Paspot / Passport No. No. Pendaftaran Syarikat / No. Perniagaan / Co. Registration No/Business Registration No. Nama Syarikat / Company's Name 1B. Bil dihantar ke / Bill send to Alamat Premis / Premise Address Alamat Surat Menyurat / Mailing Address Alamat Premis Bagi Permohonan Bekalan Elektrik / Premise Address Alamat Surat Menyurat / Mailing Address No. / No. Tingkat / Floor Alamat /Address Bangunan / Building Nama Jalan / Street Name Taman/Seksyen / Garden/Section Poskod / Postcode Bandar / Town Poskod / Postcode Negeri / State Bandar / Town Telefon (R) / Telephone (H) Negeri / State Telefon (P) / Telephone (O) Telefon (R) / Telephone (H) Telefon Bimbit / Handphone Telefon (P) / Telephone (O) Fax / Telefax Telefon Bimbit / Handphone E-mel / E-mail Fax / Telefax E-mel / E-mail Status Premis / Premise Status Sendiri / Own Sewa / Rent Lain-lain / Others Borang permohonan ini boleh dimajukan ke Pejabat Kawasan SESB yang berhampiran dengan premis anda. / This application form should be submitted to the nearest SESB regional office. Borang permohonan ini diberi secara percuma. / This application form is distributed free of charge. Borang permohonan ini boleh diisi samada menggunakan pen mata bulat atau bertaip. / This application form is to be filled with either ball point pen or typewritten. BUTIR PEMOHON/APPLICANT'S DETAIL No Akaun Bank Nama Bank No. Contact Log Permohonan (BORANG INI HENDAKLAH DIISI DENGAN HURUF BESAR) : (FORM TO BE COMPLETED IN CAPITAL LETTERS) No.Lot:No.Pangsapuri / Lot No.;Apartment No. ALAMAT/ADDRESS No. Pendaftaran GST Individu DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750-06-QR-02 PERMOHONAN BEKALAN ELEKTRIK BUKAN DOMESTIK NON DOMESTIC ELECTRICITY SUPPLY APPLICATION BAHAGIAN 1 : UNTUK DIISI OLEH PEMOHON/SECTION 1 : TO BE COMPLETED BY APPLICANT Business Area Business Partner Setem Hasil/Stamp Duty RM 10.00 ( Setem Hasil akan dimatikan setelah deposit dibayar sepenuhnya) Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB 1

Upload: vuongcong

Post on 07-Feb-2018

380 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

UNTUK KEGUNAAN PEJABAT/FOR OFFICE USE

No. Contract Account

No.Contract

No. SN Z1

Berkelompok No. Meter

No. SN Z2

1A.

Gelaran / Salutation (Encik/Puan/Cik/Gelaran Lain )

(Mr./Mrs./Miss/Other Salutation)

Nama Pemohon / Syarikat/ Applicant's /Company's Name No. K/P Lama / Old IC No.

No.K/P Baru / New IC No. - - atau / or

No.Paspot / Passport No.

No. Pendaftaran Syarikat / No. Perniagaan / Co. Registration No/Business Registration No.

Nama Syarikat / Company's Name

1B.

Bil dihantar ke / Bill send to Alamat Premis / Premise Address Alamat Surat Menyurat / Mailing Address

Alamat Premis Bagi Permohonan Bekalan Elektrik / Premise Address Alamat Surat Menyurat / Mailing Address

No. / No. Tingkat / Floor

Alamat /Address

Bangunan / Building

Nama Jalan / Street Name

Taman/Seksyen / Garden/Section

Poskod / Postcode

Bandar / Town

Poskod / Postcode Negeri / State

Bandar / Town Telefon (R) / Telephone (H)

Negeri / State Telefon (P) / Telephone (O)

Telefon (R) / Telephone (H) Telefon Bimbit / Handphone

Telefon (P) / Telephone (O) Fax / Telefax

Telefon Bimbit / Handphone E-mel / E-mail

Fax / Telefax

E-mel / E-mail

Status Premis / Premise Status

Sendiri / Own Sewa / Rent Lain-lain / Others

• Borang permohonan ini boleh dimajukan ke Pejabat Kawasan SESB yang berhampiran dengan premis anda. / This application form should be submitted to the nearest SESB

regional office.

• Borang permohonan ini diberi secara percuma. / This application form is distributed free of charge.

• Borang permohonan ini boleh diisi samada menggunakan pen mata bulat atau bertaip. / This application form is to be filled with either ball point pen or typewritten.

BUTIR PEMOHON/APPLICANT'S DETAIL

No Akaun Bank

Nama Bank

No. Contact Log

Permohonan

(BORANG INI HENDAKLAH DIISI DENGAN HURUF BESAR) : (FORM TO BE COMPLETED IN CAPITAL LETTERS)

No.Lot:No.Pangsapuri / Lot No.;Apartment No.

ALAMAT/ADDRESS

No. Pendaftaran GST

Individu

DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750-06-QR-02

PERMOHONAN BEKALAN ELEKTRIK BUKAN DOMESTIK

NON DOMESTIC ELECTRICITY SUPPLY APPLICATION

BAHAGIAN 1 : UNTUK DIISI OLEH PEMOHON/SECTION 1 : TO BE COMPLETED BY APPLICANT

Business Area

Business Partner

Setem Hasil/Stamp Duty RM 10.00

( Setem Hasil akan dimatikan setelah deposit

dibayar sepenuhnya)

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

1

Page 2: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

1C.

Bil

1D. JENIS PERMOHONAN / TYPE OF APPLICATION * Sila tandakan ( / ) pada pilihan / Please select ( / )

Bekalan Elektrik Baru (Tetap) / New Electricity Supply Bekalan Elektrik Sementara / Temporary Supply Dari

Hingga

Bekalan Elektrik Tambahan / Additional Electricity Supply Penukaran Pengguna / Penukaran Tarif (Bahagian 4 tidak perlu diisi) /

Lain-lain / Others______________________________ Change of Tenancy / Change Of Tariff (Do not fill Section 4)

1E.

Persendirian / Sole Proprietorship Berhad / Public Listed

Perkongsian / Partnership Kerajaan / Government

Sendirian Berhad / Private Lain-Lain / Others

Aktiviti perniagaan / Business activity :

1F.

Tarikh Bekalan Diperlukan / Date Supply Required / /

hh/dd bb/mm tttt/yyyy

1G.

1

2

3

4

5

6

7

Tandatangan / Signature

Nama Pemohon / Name of Applicant

Tarikh / Date

JENIS PERNIAGAAN / TYPE OF BUSINESS * sila tandakan (/) pada pilihan / please select (/)

TARIKH BEKALAN / SUPPLY DATE

PERAKUAN PEMOHON / APPLICANT DECLARATION

Saya mengesahkan bahawa saya telah membaca, memahami dan

bersetuju dengan struktur tarif kadar SESB seperti yang terdapat dalam

Bahagian 6.

6 I declare that I have read, understand and agree to the SESB's tariff

structure and rates as stated in Section 6.

Saya mengesahkan maklumat yang saya berikan di atas adalah benar dan

SESB berhak mengambil apa-apa tindakan yang sewajarnya jika

maklumat yang diberikan adalah didapati tidak benar.

7 I hereby acknowledge that all information given are true and SESB shall

have the right to take any action if the information given are false.

Saya bersetuju membantu SESB untuk mendapatkan kelulusan tuan

punya tanah / premis bagi menyambung bekalan ke premis tersebut.

4 I hereby agree assist SESB to obtain the landlord's permission to connect

the supply to the said premise.

Saya tidak ada halangan bagi SESB menggunakan laluan sesalur kakilima

di premis saya.

5 I have no objections for SESB to ulitize the five-foot Verendah Mains in my

premise.

I hereby attest that the contractor appointed by me / housing developer as

named herein is a contractor registered with Energy Commission and

SESB. I also give permission to the contractor to do all necessary works

related to my application.

Saya bersetuju dengan semua syarat bekalan elektrik SESB seperti di

dalam Syarat - Syarat Bekalan bagi pengguna Bukan Domestik dan Surat

Akujanji dan Tanggungan Rugi.

2 I hereby agree to bound by all terms and conditions relating to electricity

supply of SESB as in Conditions of Supply for Non-Domestic Consumers

and Undertaking and Indemnity Letter.

Saya bersetuju untuk membayar / menyelesaikan semua bayaran

sambungan bekalan (jika berkaitan) dan semua wang cagaran sebelum

bekalan diberikan.

3 I hereby agree to pay / settle all connection charge (if any) and deposits

prior to the electricity supply.

Nama / Name No. Kad Pengenalan / IC No. Telefon / Telephone No. Alamat Rumah / Home Address

MAKLUMAT PENGARAH/KELUARGA/SAUDARA TERDEKAT/DIRECTOR'S INFORMATION/FAMILY OR RELATED PERSON

1

Dengan ini : Whereby :

Saya memperakui bahawa kontraktor yang saya lantik atau yang dilantik

oleh Pemaju yang dinamakan di belakang ini adalah kontraktor yang

berdaftar dengan Suruhanjaya Tenaga dan SESB. Saya juga memberi

kebenaran kepada kontraktor ini untuk menguruskan kerja-kerja berkaitan

dengan permohonan saya ini.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

2

Page 3: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

DEFINITIONS

1 CONNECTED LOAD CHARGE (CLC)

2 CONNECTION CHARGES

3 CONTRACT

Comprising the Contract of Electricity Supply, Non Domestic Electricity Supply Application Form and Undertaking and Indemnity Letter.

4 ELECTRICITY SUPPLY

5 HIGH VOLTAGE (HV)

6 INSTALLATION

7 LIQUIDATED DAMAGES (LD)

8 LOW VOLTAGE

9 MEDIUM VOLTAGE (MV)

10 MINIMUM MONTHLY CHARGE (MMC)

11 NON DOMESTIC CONSUMER

12 PROJECT MINIMUM MONTHLY CHARGES (PMMC)

13 REGISTERED ELECTRICAL CONTRACTOR

14 SESB

15 STATUTORY AUTHORITY

16 TARIFF

A. CONSUMER’S COVENANT

1.0 TO TAKE SUPPLY

2.0

3.0 CONNECTION CHARGE

The Consumer who applies the medium voltage or high voltage supply shall have to pay Connection Charge subject to the prevailing policy of SESB’s

connection Charge and Tariff, additional PMMC and LD, if any.

To pay SESB the Connection Charge in full (if any) and such payment to be paid before any work is commenced by SESB as provided in the Electricity

Supply Act 1990.

Person holds a valid certificate of registration as an electrical contractor issued under Electricity Regulations 1994.

Sabah Electricity Sdn Bhd (462872-W) a company incorporated in Malaysia under the Companies Act 1965 with its registered address at Wisma

SESB, Jalan Tunku Abdul Rahman, 88673 Kota Kinabalu.

Any prevailing Government and/or statutory bodies and/or agency who acts as statutory authority established under the relevant Acts.

The rates to be charged to the Consumer for the consumption of electricity as stipulated under Section 6 of the Application Form, as provided by the

Electricity Supply Act 1990 and approved by the Government of Malaysia from time to time.

To take supply from SESB at the Consumer’s premises at the determined Tariff structure and rates and pursuant to the provision of the Electricity

Supply Act 1990 and any modification thereof.

MEDIUM VOLTAGE OR HIGH VOLTAGE SUPPLY

A sum of money chargeable to the Consumer who fails or ceases to take supply for three (3) years after signing of this Contract.

In the context of tariff classification means a supply voltage not exceeding 1,000 volts.

In the context of tariff classification means a supply voltage from 11,000 volts to 33,000 volts.

A monthly charge applicable to a Consumer in the event his monthly total electricity bill (kW and/or kWh) is less than the stated amount as stipulated in

the Tariff Structure and Rate.

A person and/or entity who is registered and entered into this Contract with SESB (the details are specified in the Application Form) other than

domestic consumers and supplied with electricity or whose premises / occupied premises are at the material time connected for the purpose of supply

of electricity from SESB’s installation subject to rules and conditions imposed by SESB and Electricity Supply Act 1990 and its regulations made

thereunder.

Imposition on Consumer in order to ensure the capital invested by SESB in supplying electricity to the Consumer gives the minimum revenue required.

BAHAGIAN 2 : TERMA DAN SYARAT / SECTION 2 : TERMS AND CONDITIONS

A chargeable Maximum Demand (MD) when the actual MD measured in any one month does not reach 75% of the declared MD.

To pay to SESB a Connection Charge in full (if any) and such payment to be paid before any work is. commenced by SESB, as provided by Electricity

Supply Act 1990.

Either permenant or temporary electricity supply subject to the consumers application to SESB.

In the context of tariff classification means a supply voltage of 66,000 volts and above.

The whole of any plant consists of primary and secondary equipment designed for the supply or to generate or to use of electricity including prime

movers with all necessary plant, buildings and land in connection therewith pipeline, supply line and consuming apparatus in accordance with the

Electricity Supply Act 1990 and its regulations made thereunder and modification made thereto.

CONDITIONS OF SUPPLY FOR NON-DOMESTIC CONSUMER

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

3

Page 4: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

4.0 DEPOSIT

a)

b)

c)

d)

e)

f)

g)

5.0 MINIMUM MONTHLY CHARGE

6.0 ACCESS

a)

b)

7.0 NO INTERFERENCE OF SUPPLY TO OTHER CONSUMERS

8.0 UPKEEP AND MAINTENANCE OF SESB’S INSTALLATION

a)

b)

c)

9.0 NO OBSTRUCTION TO SESB’S INSTALLATION

a)

b)

c)

10.0 TERMINATION BY THE CONSUMER

a)

b)

11.0 DISCONNECTION FEE

a)

b)

c)

d)

12.0 VACATION OF PREMISE

a)

b)

13.0 RESPONSIBILITY TO MAKE GOOD ALL DAMAGE

14.0 APPLICANT DECLARATION

The Consumer shall pay for all damages to SESB’s installation within the Consumer’s premises or due to Consumer’s negligence or any persons

under the Consumer’s control or supervision.

The Consumer shall be bound and abide at all times to the Applicant Declaration as stipulated in Section 1 of the Application Form, the conditions of

this Contract, the Electricity Supply Act 1990 and any rules and regulations and amendment made hereunder.

If the electricity supply is disconnected from the Consumer’s premises due to failure to pay electricity bill or additional amount of deposit; or

If the electricity supply is disconnected from the Consumer’s premise due to change of Consumer and change of Tariff; or

If the electricity supply is disconnected from the Consumer’s premise due to failure in renewing the Bank Guarantee which has been expired.

Upon occurrence of any Event of Default prescribed in Clause 23.0 herein.

If the Consumer vacates or quits the premise without giving a minimum three (3) days written notice to SESB, the Consumer shall be liable to pay

all charges in respect of the supply of electricity to the premises accruing until the installation is disconnected and terminated or new Consumer

applies for electricity supply to that premise and enters into a new Contract with SESB.

SESB shall have the right not to provide new electricity supply to any premises until the aforesaid Consumer has made the full payment of the

outstanding electricity bill.

The Consumer shall not create any obstruction and/or commence any activity in the vicinity of any SESB’s installation and/or place any equipment

which may endanger life or properties.

SESB has the right to take any reasonable action to remove any obstruction created by the Consumer or representatives and/or his agent and/or

any other person under Consumer’s supervision/control.

SESB shall not be liable to pay any compensation for any losses and/or damages to the Consumer due to the said removal.

The Consumer may terminate this Contract by giving written notice to SESB at least three (3) working days and delivered in the manner stipulated

in Clause 32.0 in this Contract.

Any termination of supply shall not discharge the Consumer for all obligations and liabilities including any claim or any other charges imposed by

SESB prior to such termination.

The Consumer will be charged by SESB with an appropriate fee in the event as follows:-

To permit SESB to cut down any trees on Consumer’s property or premises for the purpose of safety, clearance or maintenance of the service

lines to Consumer premises from time to time without any compensation from SESB.

The Consumer agrees to use electricity supply so as not to interfere with the supply of electricity to any other Consumers.

Consumer agrees;

to upkeep the SESB’s installation and to take steps to ensure that no damage occurred to the said installation.

to allow SESB including its authorized employees, agents, contractor and/or representatives of SESB to maintain any electrical installation within

the Consumer’s premises at any time for safety purpose.

if there is any defect or abnormality on the installation, SESB shall have the right to make good the defects without being liable for any damages

whatsoever unless proven otherwise.

The required deposit shall be a security and not a payment in advance and shall not relieve the Consumer from any liability to pay the monthly

electricity bill and any other charges due and payable by the Consumer to SESB.

SESB shall pay to the Consumer subject to such conditions and at such rates as may be prescribed by the Statutory Authority, a sum equivalent to

the annual interest on the cash deposit only as a rebate.

Upon termination by either Party SESB shall refund the deposit to the Consumer after the deduction of any amount due and payable by the

Consumer to SESB.

Consumer agrees to pay SESB the Minimum Monthly Charges commencing from the supply of electricity to the Consumer’s premises.

The Consumer agrees with SESB that the authorized employees, agents, contractor and/or representatives of SESB shall be permitted to have access

to the premises of the Consumer at all reasonable time in any manner howsoever under any circumstances whatsoever:-

To carry out their duties and/or inspection and/or test and/or construction and/or other things relevant to the supply and disconnection to the

Consumer’s premises.

Consumer shall pay the required deposit to cover the estimated charge for two (2) months monthly electricity consumption before the supply is

connected, provided that SESB shall have the right to revise the amount of required deposit from time to time.

The Consumer may opt to provide the required deposit by way of bank guarantee or cash. In the event the Consumer opts to provide for bank

guarantee and fails to renew the bank guarantee upon expiry date, SESB shall have the right to disconnect the supply to the Consumer’s

premises.

In the event the Consumer applies for temporary supply, however subject to SESB’s approval, the Consumer shall pay the required deposit to

cover the estimated charge for six (6) months monthly electricity consumption before the supply is connected, provided that SESB shall have the

right to revise the amount of required deposit from time to time.

In the event the Consumer fails to increase the deposit amount as advised by SESB upon revision on the deposit stipulated in Clause 4.0 (a)or(c)

above, SESB shall have the right to disconnect the supply to the Consumer’s premises.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

4

Page 5: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

B. SESB COVENANT

15.0 LOCATION OF INSTALLATION

a)

b)

16.0 USAGE OF INSTALLATION FOR OTHER CONSUMERS

17.0 INSPECTION BY SESB

a)

b)

c)

18.0 TEMPORARY SHUTDOWN OF SUPPLY

a)

b)

C. IT IS HEREBY AGREED BY BOTH PARTIES

19.0 RISING AND LATERAL MAINS

(a)

(b)

20.0 TEMPORARY SUPPLY

21.0 BILLING AND PAYMENT

a)

b)

c)

d)

e)

f)

g)

h)

22.0 REMOVAL OF SESB’S INSTALLATION

23.0 EVENT OF DEFAULT

a)

b)

c)

d)

e)

f)

In failure or refusal or negligence of the Consumer or the Consumer’s guarantor in presenting the Bank guarantee in accordance with SESB’s

bank guarantee’s format as provided;

The Consumer has obtained consent for the appointment of or the taking of possession by a receiver or liquidator of itself or of all or a substantial

part of its property;

The Consumer acknowledges in writing its inability to pay its debts as such debts become due;

The Consumer makes a general assignment or an arrangement or composition with or for the benefit of its creditors;

SESB shall have the right to make adjustment and update of Consumer’s account whenever necessary.

If the Consumer or the owner of the premises requests SESB to remove or relocate the SESB‘s installation within or outside the Consumer’s premises,

subject to consent by SESB first had and obtained, all costs of executing the removal or relocation shall be fully borne by the Consumer or the owner

as the case may be.

The occurrence of any one of the following shall constitute an event of default under this Contract and it is not limited to:

Act or default of the Consumer affecting the efficiency and/or safety of SESB‘s installation;

The Consumer has failed to comply or breach with any of such provisions in this Contract and/or the Electricity Supply Act 1990 and any rules and

regulations made thereunder and subsequent amendment made thereto;

Notwithstanding anything hereinbefore mentioned, SESB shall have the right to impose Minimum Monthly Charge as stipulated in Tariff structure

and rates.

SESB shall have the right to impose surcharge of one percent (1%) monthly on the outstanding amount calculated until the date of full payment.

The Consumer shall be liable for the electricity bills issued by SESB insofar as the account is registered under the Consumer even the

consumption of electricity is by any third party.

The Consumer shall be responsible to repay the amount in the electricity bills rendered by SESB including any other relevant charges for any

invalid payment made by the Consumer through false credit card, bounce cheque and any other invalid payment.

Consumer shall inform SESB of any proposed extensions or alterations to the installations so that SESB may make inspection and test of the

proposed extension or alteration if SESB so desires.

SESB shall not be liable for any loss or damage caused by or occurs during or after test due to any defect in the installation. Any test carried out by

SESB is for SESB’s purposes only and does not imply any warranty that the installation is suitable for the Consumer’s purposes or that it fully

complies with the Electricity Supply Act 1990 or any rules and regulation made thereunder.

In the event the Consumer fails to make payments on the amount as per Clause 21 (a),(b) and (c) hereof, SESB shall have the right to disconnect

electricity supply of the Consumer’s premise or any other premises which is registered under the Consumer’s name.

The Consumer shall be liable for any arrears of electricity bill and/or loss suffered by SESB by reason of dishonest consumption of electricity

supply in all circumstances.

SESB may temporarily shutdown the electricity supply for purposes of maintenance, testing, inspection or any other purpose whatsoever

connected with the proper working of or in relation to SESB’s duties to provide electricity supply or reasonable requirement of SESB system by

giving at least forty eight (48) hours prior written notice by way of personal or substitute services before the intended temporarily shutdown.

SESB is not under obligation to provide alternative source of supply during such shutdown.

For single individual premises, the part of the installation, comprising service lines and other ancillary equipment up to and including the meter

shall be the property of SESB.

For multitenant premises where part of the supply is intended for including but not limited to the owner, developer, management or landlord and

the rest for the tenants in the building, the landlord’s supply and each of the tenants will have its own electricity bill by SESB. The owner,

developer, management, landlord or their respective agents shall provide, own, maintain and repair at his own expense the electrical systems in

the buildings including adequate and necessary rising and lateral mains. The design, installation and operating of such electrical systems shall

comply with the requirements of all the relevant Statutory Authority and SESB’s requirements.

If the Consumer or the owner of premise applies for temporary electricity supply is allowed and approved with the conditions by SESB, the Consumer

or the owner of premise will be charged according to the tariff rates as stipulated in Section 6 of Application Form Electricity Supply Contract on its total

monthly bill.

All electricity bills rendered by SESB to the Consumer shall be paid by the Consumer within the stipulated period mentioned in the electricity bill.

SESB shall determine the position of the end connection of entry route of the service lines or cables including cut-out fuses, meters and others to

the Consumer’s premises.

In the event the Consumer or owner of the premises wishes to remove or relocate the SESB’s installation within or outside the Consumer’s

premises, authorization of SESB must be first obtained and all costs of removal or relocate shall be fully borne by the Consumer or the owner. Any

removal or relocation made without written authorization shall entitle SESB to disconnect the supply without any notice.

SESB may use part of its installation to supply electricity to other Consumers in the area.

SESB may need to inspect and test all installation before connection of supply. However, it is the responsibility of the Registered Electrical

Contractor to ensure that the installations are safe to use.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

5

Page 6: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

g)

h)

i)

j)

k)

l)

24.0 DISCONNECTION OF SUPPLY

a)

b)

c)

d)

25.0 TERMINATION BY SESB

a)

b)

c)

d)

26.0 FORCE MAJEURE

27.0 TRANSFER OF OUTSTANDING AMOUNT AND BALANCE DEPOSIT

a)

b)

i)

ii)

28.0 LIQUIDATED DAMAGES

29.0 CONNECTED LOAD CHARGE

30.0 POWER FACTOR

31.0 INDEMNITY AND NO LIABILITY CLAIM

a)

b)

c)

D. MISCELLANEOUS

32.0 NOTICE

i.

ii.

iii.

The Consumer hereby agrees further that SESB shall not be liable for any cost incurred, loss and/or damage of industrial goods, product, property

or life of the Consumer as a result of any unavoidable accident, voltage fluctuation, interruption, reduction and/or cessation of the electricity supply,

fire or accident that may occur in consequence of the supply or the use or misuse which is not due to the negligence or willful act of SESB and/or

its employees.

Unless and otherwise provided under the Electricity Supply Act 1990, its rules and regulations made thereunder and any clause stated under this

Contract, any notice, demand or other communication which is required or allowed to be given or made under this Contract shall be in writing and shall

be served and deemed to have been duly received as follows:-

If by hand delivery , duly acknowledged or at the time of such delivery;

If by way of prepaid registered or ordinary post, upon the expiry of three(3) working days from the date of posting;

If by facsimile transmission, upon receipt of transmission confirmation slip indicating that the notice has been transmitted in its receiver’s facsimile

number.

Provided always that the amount and the payment of Liquidated Damages shall be subjected to the prevailing policy of Connection Charges and Tariff.

The Consumer may be required to pay a Connected Load Charge (if any) when taking supply at medium or high voltage based on the prevailing policy

of Connection Charges and Tariff.

The Consumer shall at all times use its best endeavor to obtain the highest power factor possible close to unity power factor lagging in the operation of

the Consumer’s electrical installations. A penalty shall be imposed based on the prevailing rates as approved pursuant to the Electricity Supply Act

1990 its rules and regulation made thereunder and subsequent amendment made thereto if the power factor in any month falls short of the minimum

power factor set under the existing SESB Tariff Book.

The Consumer agrees to indemnify and keep indemnified (indemnifying) SESB from and against all and/or any claims, actions, compensations,

suits, proceedings, demands and all legal costs incurred thereby, brought against SESB, its servants or agents by a third party to which SESB

shall or may be or become liable in respect of or arising from the performance of this Contract.

The Consumer hereby agrees that neither SESB nor its employees, servants, agents, representatives shall be liable and/or make good the

Consumer in respect of any damage, injury or loss to any of the Consumer‘s property and/or life unless such damage, injury or loss have been

proven as a result of any willful act, negligence, omission and/or failure to comply with any safety measures as provided under any written law.

SESB shall not be liable to the Consumer for any breach of terms and conditions of this Contract due to any of this event which shall include but not

limited to national emergency, war, hostilities, riot, civil commotion, earthquake, flood and disposition or fire accident that may occur in consequences

of the supply or the use or misuse thereof which does not result from SESB's negligence or by compliance with any order of government, local or any

other relevant authorities.

SESB shall have right to transfer any outstanding amount of electricity bills from any inactive account of the Consumer to any active account

registered under the Consumer’s name.

If there is any balance of the deposit from an inactive account of the Consumer, SESB shall have the right to use the balance of the deposit for the

purpose of:

Offsetting any outstanding amount/charges for the inactive accounts.

For any active account, balance of deposit from inactive account can be transferred to any active account of the Consumer, if any.

In the event the Consumer fails or ceases to take supply for three (3) years after signing of this Contract, the Consumer shall pay Liquidated Damages

to SESB.

SESB shall have the right to disconnect the supply without giving prior written notice in any situations mentioned below:-

Any default by the Consumer under Clause 23.0 above and such default are not remedied within the stipulated period, if any.

By court order / Judgment.

If in the opinion of SESB that the continuation of the supply will jeopardize the safety, reliability or security of SESB‘s system or presents an

imminent physical threat or endanger the safety, life or health of any person.

Any right to disconnect the supply without notice as provided under the Electricity Supply Act 1990, its rules and regulation made thereunder and

subsequent amendment made thereto.

SESB may terminate this Contract at any time upon giving not less than seven (7) working days notice in writing of its intention to do so.

SESB may terminate this Contract upon the circumstances stipulated under Clause 24.0 above except for the event of default in Clause 23.0 (a),

(b) and (c) of this Contract where the termination shall effect from the date of expiry of the remedy period.

If the Consumer renders to SESB a temporary notice of disconnection of supply thereby it shall be considered as a notice of termination of the

Contract subject to the issuance of notice under Clause 25 (a) hereof.

If SESB discovers that the information given by the Consumer is false and/or is disputed with the existence of prima facie proof relating to the

supply, SESB shall have the right to terminate this Contract upon giving a written notice of not less than 24 hours.

The consumer is declared bankrupt or wound-up or liquidated by the Court;

Upon the Consumer dissolution or death;

Failure to pay the electricity bills and whatsoever as stipulated under Clause 21.0 above;

Consumption of electricity in any dishonest manner;

On such effective date of termination hereof, SESB shall be discharged from any obligations and liabilities under this Contract including any claim for

damages without prejudice to SESB’s rights to make such claim due to the disconnection of the supply and the termination of this Contract.

Instituting a case voluntarily or filing a petition against any party seeking for benefit of any law relating to bankruptcy, insolvency, reorganization of

its debts, winding up or composition;

The Consumer is under receivership or under special administration or liquidation;

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

6

Page 7: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

33.0 SERVICES OF LEGAL PROCESS

34.0 GOVERNING LAW

35.0 AMENDMENT AND MODIFICATION

36.0 ASSIGNMENT

37.0 WAIVER

38.0 TIME PERIOD

39.0 SUCCESSORS-IN-TITLE

40.0 STAMP DUTY

41.0 SEVERABILITY

42.0 INSTALLATION OF EQUIPMENT TO GENERATE ELECTRICITY

43.0 POWER QUALITY

44.0 CONFIDENTIAL INFORMATION

45.0

a)

b)

46.0

The Consumer shall inform SESB on any equipment installed at his premise for the purpose of generating electricity.

The Consumer shall use its best endeavor to ensure all its electrical installations have sufficient ride-through capability against slight voltage transient

and shall not generate other significant power quality voltage signatures that might have detrimental effects to the electrical supply system.

Except as it is or becomes a part of the public domain, all information provided by either Party under this Contract shall be confidential at all times

unless specified otherwise in writing.

ON-SITE TECHNICAL WORKS

In the event of failure to make good and remedy as above, SESB shall reserve the right to cease electricity supply and/or terminate this Contract.

In the event that SESB is unable to commence and/or complete the installation caused by insufficient and/or inaccurate information under Section

4 of this Contract given by the Contractor, the Consumer shall ensure the same is remedied within two (2) days from the date of the said

notification.

DATA PROTECTION

The Consumer has explicitly consented for SESB to collect, record, hold and/or store Consumer's personal data for the purpose of supplying of

electricity to the Consumer's premises, tariff review and/or wiring guideline scheme for rural area. The consumer has further consented for SESB to

continue processing and/or share and disclose such personal data to any other parties for the purposes as stipulated in SESB Personal Data

Protection Privacy Notice and/or any other purposes that legally permitted by any laws.

The Consumer shall not assign any of the rights or obligations arising under this Contract to any third party without the prior consent in writing of SESB.

Knowledge or acquiescence by SESB of or in breach of any of the conditions or covenants herein contained shall not operate as or be deemed to be

waiver of such conditions or covenants or any of them and notwithstanding such acknowledge or acquiescence, SESB shall be entitled to exercise its

rights under this Contract.

Time wherever mentioned shall be the essence of this Contract.

This Contract shall be binding upon the successors-in-title and permitted assigns of the respective Parties hereto.

The stamp duty in respect of this Contract shall be borne and fully paid by the Consumer.

If any one or more of the provisions or part thereto contained in this Contract should be or become invalid or unenforceable due to whatsoever reasons

this shall not in any way affect or impair the validity or enforceability of the remaining provision hereof.

The services of any legal process shall be by way of prepaid registered post sent to the address as stated in this Contract. Proof of posting will be

regarded as proof of acceptance and the said services shall be deemed to have been duly served and duly received upon the expiry of five (5) days

from the date of posting.

This Contract shall be governed by and construed in accordance with the Electricity Supply Act 1990 and any regulations made thereunder including

any modification thereof.

SESB may introduce new terms, amend or modify existing terms of this Contract from time to time, and such new, amended or modified terms, to the

extent not inconsistent with the Electricity Supply Act 1990 and any regulations made thereunder, shall be deemed incorporated into this Contract.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

7

Page 8: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

47.0 1)

a)

b)

c)

d)

e)

f)

g)

2)

This clause shall only apply upon the implementation date of the GST legislation in Malaysia. The parties acknowledge and agree

that this clause may be subsequently revised to be in compliance with the prevailing GST legislation at the material time.

GOODS AND SERVICES TAX (“GST”)

All amounts stated in this Agreement are exclusive of GST, unless otherwise clearly stated that they are intended to be GST inclusive.

The tax invoice, which shall be in the form of a full or simplified tax invoice as per the prevailing GST guide at the material time, to be

issued after the imposition of GST and the receipt or any other documents to be issued after the payment for the supply by the

supplier to the recipient shall identify the amount of GST payable.

The parties acknowledge and agree that if GST is imposed on any supplies made by the supplier under this Agreement, the supplier shall have

the right to increase the consideration payable on the supply by an amount equal to the GST imposed. The supplier shall be entitled

to recover the increased amount from the recipient of the supply as if the same were part of the consideration of the supply.

OTHER TAXES AND LEVIES

The consideration for such supply shall be increased by an amount calculated as follows:

A x R

Where:

A is the consideration payable for the supply; and R is the applicable rate of the GST prevailing at the time of supply (hereinafter referred

to as the “GST Amount”)

The recipient shall pay the GST Amount at the same time and in the same manner as the consideration for the supply provided under

this Agreement.

If a party must reimburse the other party for a cost or expenses, the amount to be reimbursed shall be calculated net of any GST input

tax credits that the party seeking reimbursement is entitled to in respect of the cost or expense incurred.

In order to further protect SESB’s interest, the Team also has agreed that it is pertinent to incorporate a saving clause on other taxes or

levies which might be imposed by law in future in all SESB’s supply contract. However, please take note that this Other Taxes Clause

shall only be applicable when SESB is the party who is supplying the goods or services, not otherwise. This Other Taxes Clause shall

not be incorporated when SESB is the acquiring party. Kindly find below the agreed Other Taxes Clause which to be incorporated only in SESB’

supply contracts.

Except as provided for otherwise, the Custome / Consumer shall be responsible for all present and future taxes, duties, levies, and other

similar charges including any related interest and penalties, howsoever designated (hereinafter referred to as “Other Taxes”), arising out or in

connection with the supply of any kind imposed by law.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

8

Page 9: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

SURAT AKUJANJI DAN TANGGUNGAN RUGI

1

2

3

4

5

6

7

8

9

10

11

12

Akujanji dan Tanggungan Rugi ini adalah mengikat pewaris, wasi, pentadbir, pengganti hakmilik dan wakil-wakil yang dilantik oleh pihak

*kami/saya.

Akujanji dan Tanggungan Rugi ini adalah merupakan sebahagian daripada dokumen permohonan Bekalan Elektrik kepada SESB.

BAHAGIAN 3 : SURAT AKUJANJI DAN TANGGUNGAN RUGI / UNDERTAKING AND INDEMNITY LETTER

*Kami/Saya juga bersetuju dan berakujanji akan menanggung dan/atau menggantirugi segala kos perbelanjaan, gantirugi dan/atau sebarang

kerugian yang ditanggung oleh SESB terhadap apa-apa tuntutan dan/atau dakwaan daripada pemunya sah Premis tersebut dan/atau mana-

mana pihak kelak yang timbul akibat daripada pemberian perkhidmatan bekalan elektrik oleh SESB dan/atau pendaftaran akaun baru di

atas nama *kami/saya bagi Premis tersebut.

*Kami/Saya juga bersetuju dan berakujanji untuk menjelaskan apa-apa bayaran termasuk amaun bil elektrik dan apa-apa caj berkaitan yang

dikenakan oleh SESB bagi perkhidmatan pembekalan elektrik di Premis tersebut sehingga tarikh Akaun Kontrak Bekalan ditamatkan samada

bagi akaun Kontrak Bekalan tetap atau Bekalan sementara.

Kepada :

Sabah Electricity Sdn Bhd,

Jalan Tunku Abdul Rahman,

88673 Kota Kinabalu.

*Kami/Saya juga bersetuju dan berakujanji untuk membenarkan SESB membuat pemindahan apa-apa tunggakan amaun atau caj-caj

berkaitan perkhidmatan pembekalan elektrik daripada akaun *kami/saya yang telah ditutup atau ditamatkan kedalam Akaun Kontrak Bekalan

atau mana-mana akaun *kami/saya yang masih aktif dengan SESB.

*Kami/Saya juga bersetuju dan berakujanji untuk membenarkan SESB menggunakan deposit Akaun Kontrak Bekalan atau mana-mana

Akaun Kontrak Bekalan *kami/saya yang masih aktif dengan SESB untuk menolak dan/atau membayar apa-apa tunggakan amaun atau caj

bagi akaun *kami/saya yang telah ditutup atau ditamatkan. Sekiranya terdapat pengurangan deposit bagi Akaun Bekalan Kontrak

disebabkan penolakan dan/atau pembayaran apa-apa tunggakan yang berkaitan maka *kami/saya bersetuju untuk menambah jumlah

deposit tersebut menurut jumlah yang dinyatakan oleh SESB.

*Kami/Saya juga bersetuju dan berakujanji akan menanggung apa-apa kerugian atau perbelanjaan termasuk kos guaman SESB dalam

menguatkuasakan Akujanji dan Tanggungan Rugi ini di mahkamah.

Klausa-Klausa di dalam Akujanji dan Tanggungan Rugi ini pada bila-bila masa adalah berasingan dan berbeza di antara satu sama lain.

Sekiranya terdapat salahsatu atau lebih daripada mana-mana klausa di dalam Akujanji dan Tanggungan Rugi ini menjadi tidak sah dari segi

undang-undang, maka ketidaksahan tersebut tidak sama sekali memberi kesan kepada Klausa-Klausa yang lain.

*Kami/Saya juga bersetuju dan mengesahkan bahawa Akujanji dan Tanggungan Rugi ini ditandatangani secara sukarela tanpa apa-apa

elemen paksaan, ugutan atau dorongan daripada mana-mana pihak dan *kami/saya menyedari, mengetahui dan memahami segala

implikasi daripada Akujanji dan Tanggungan Rugi ini.

*Kami/Saya dengan ini bahawasanya mengakui menduduki premis yang beralamat di

______________________________________________________ (selepas ini di rujuk sebagai ‘Premis tersebut’) pada

_______________________________________________________ premis tersebut digunakan oleh *kami/saya bagi mendaftarkan akaun

Kontrak Bekalan elektrik no: ___________________________________________________ (selepas ini dirujuk sebagai ‘Akaun Kontrak

Bekalan’).

*Kami/Saya bersetuju dan berakujanji bahawa sekiranya didapati perakuan yang dinyatakan pada Klausa 1 di atas adalah tidak benar

dan/atau tidak sah dan/atau dipertikaikan oleh pemunya sah Premis tersebut atau *kami/saya tidak lagi menduduki Premis tersebut, maka

perkhidmatan bekalan elektrik yang sedang dibekalkan ke Premis tersebut boleh dihentikan oleh SESB dan Akaun Kontrak Bekalan boleh

ditamatkan oleh SESB secara bertulis tidak kurang daripada 24 jam selepas tarikh pemberian notis samada secara pos atau serahan tangan

kepada *kami/saya atau pihak lain yang menduduki Premis tersebut atau notis ditampal di Premis tersebut.

*Kami/saya juga bersetuju dan berakujanji bahawa *kami/saya tidak akan menuntut daripada SESB apa-apa kerugian yang dialami oleh

pihak *kami/saya akibat daripada pemberhentian perkhidmatan bekalan elektrik dan/atau penamatan Akaun Kontrak Bekalan oleh SESB

seperti yang dinyatakan pada Klausa 2 di atas.

*Kami/Saya ____________________________________________________ ( *No.Kad Pengenalan/ No. pendaftaran syarikat

/perniagaan ________________________________________________ yang beralamat di

__________________________________________________________________________________________ sesungguhnya bersetuju

dan berakujanji dengan Sabah Electricity Sdn Bhd ( No. Pendaftaran Syarikat:462872-W ) ( selepas ini dirujuk sebagai ‘SESB’ ), sebuah

syarikat yang diperbadankan di Malaysia di bawah Akta Syarikat 1965, yang mempunyai alamat berdaftar di Wisma SESB, Jalan Tunku

Abdul Rahman, 88673 Kota Kinabalu, Sabah, Malaysia dan mempunyai cawangan yang beralamat di Pejabat Kawasan

__________________________________________ seperti berikut:-

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

9

Page 10: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

Ditandatangani *oleh/bagi pihak:

Nama;

No.Kad Pengenalan;

*No. Pendaftaran syarikat/Perniagaan;

*Cop Syarikat ;

Disaksikan Oleh ,

Nama;

No. Kad Pengenalan;

Jawatan;

*Potong mana yang tidak berkenaan.

AKUJANJI DAN TANGGUNGAN RUGI ini dilaksanakan pada tarikh ………………………….. tahun………………………………….

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

10

Page 11: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

4A. BEKALAN ELEKTRIK TERDEKAT/NEAREST ELECTRICITY SUPPLY

*Sila tandakan ( / ) : Please tick ( / )

: _______________________kW

amps

: amps Maximum Demand : _______________________kW

4D. MAKLUMAT TEKNIKAL PERMOHONAN BAGI CAJ SAMBUNGAN PENGGUNA

Satu Fasa / 1 Phase

Total Connected Load

Tiga Fasa / 3 Phase :

Saiz CT Meter / CT Meter Size

Cadangan Tarif / Proposed Tariff

KAEDAH BEKALAN/TYPE OF SUPPLY 4C.

BAHAGIAN 4 : UNTUK DIISI OLEH KONTRAKTOR YANG BERDAFTAR /

SECTION 4 : TO BE COMPLETED BY REGISTERED ELECTRICAL CONTRACTOR

No. BP Kontraktor / Contractor BP No.

4B.

No Meter terdekat / Nearest Meter No. No. Tiang Elektrik Terdekat / Nearest Electrical Pole No.

BUTIRAN BEBAN/LOAD DETAIL

No. Meter Sedia Ada / Existing Meter No.

A. Maklumat Permohonan

i) Jenis Fasa dan Anggaran Beban (Sila tandakan jenis fasa dan isi anggaran beban )

a) 1-Fasa _________________ kW

b) 3-Fasa _________________ kW

ii) Jenis Permohonan (Sila tandakan jenis pengguna )

a) Domestic (DM) * Permohonan Pertama (Sila Tanda) □b) Non - Domestic (CM atau ID) Komersil (CM)

Industri (ID)

iii) Keperluan Permohonan (Panjang dalam Meter (M) adalah jarak dari Premis pemohon ke talian sedia ada SESB) )

a) Permohonan dawai serbis sahaja (Service Line only) _________________ M

b) Memerlukan tiang baru _________________ M

Jumlah Tiang diperlukan: _________________ Tiang

c) Kabel bawah tanah voltan rendah

d) Memerlukan tiang baru dan kabel bawah tanah voltan rendah

iv) Sistem Talian Voltan Rendah Sedia ada SESB perlu dinaiktaraf? (Sila tandakan berdasarkan maklumat daripada Unit Teknikal )

Ya

Tidak

v) Status Lokasi Premis

Rural

Sub-Urban

Urban

vi) Jenis Bangunan Premis : (Rujuk Schedule 2: Assigned Load For Type Of Premises For CCC Charging )

_______________________________________________________________

B. Permohonan bagi kriteria seperti di bawah adalah memerlukan anggaran kos sebenar di tapak daripada anggota kerja teknikal SESB

a) Permohonan yang memerlukan lebih daripada lima (5) tiang

b) Permohonan beban melebihi 50kVA (70A)

c) Permohonan bekalan elektrik sementara

d) Permohonan yang menggunakan kabel bawah tanah

e) Permohonan yang melibatkan talian atas voltan rendah dan perlu menggunakan kabel bawah tanah

f) Permohonan melibatkan pepasangan pencawang yang perlu dinaiktaraf, pencawang baru, sistem HV 11kV perlulah berhubung dengan

Unit Perancangan

vii) Sekiranya permohonan melibatkan kriteria di atas, mohon pihak tuan/puan/cik menghubungi pihak kami untuk membuat temujanji

berhubung anggaran kos caj sambungan.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

11

Page 12: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

PETANDA LEGENDS

o o

• •

Kuantiti ________________Batang Quantity ______________Pole

. . . Bawah Tanah _______ Meter . . .Underground ___________Meter

-X-X-X Talian Atas _________Meter

— ---Proposed Service

Nyatakan jarak ____________Meter Specify length ____________Meter

→ Source Of Supply

¥  Dahan Perlu Dicantas ¥    Branches For Clearance

→ Punca Bekalan

— --- Cadangan Servis.

Cadangan Talian, Nyatakan Proposed Line, Please Specify

♣ Pokok Perlu Ditebang ♣ Trees To Be Cut Down

-X-X-X Overhead

Line_________Meter

__________Talian Sedia Ada ___________ Existing line

Lokasi _________________ Location _____________

4E. PELAN TAPAK/SITE PLAN

Signature, Name Of Signatory, I/C No. & Stamp, Address, Tel

Tiang Sedia Ada Existing Pole

Tandatangan, Nama Penandatangan, No. K/P & Cop Syarikat

No. Tel, No. Sijil Pendaftaran JBEG/ST

Premis Perlu Bekalan Premise That Require SupplyNo Registration Copy of JBEG/ST

Cadangan Tiang, Nyatakan Propose Pole, Indicate

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

12

Page 13: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

4F. SENARAI SEMAK PERMOHONAN BEKALAN ELEKTRIK BAGI BEKALAN <50kVA

i.

ii.

:

:

:

:

Bagi Pendaftaran Di Bawah Pemilikan Tunggal/Perkongsian/ Enterprise

i.

ii.

:

:

iii.

i.

ii.

:

*

iii.

i.

ii.

iii.

i.

ii.

iii.

iv.

i.

i.

Salinan Surat Receivers & Managers (R&M)

Dokumen Kod Tataamalan Perlindungan Data Peribadi/The Personal Data Protection Code Of Practice

Borang Persetujuan Pemprosesan Data Peribadi Oleh Pemohon Bekalan Elektrik

Form of Consent to Process The Applicant's Personal Data For Supply Of Electricity

Salinan Borang G (Perakuan Penyelidikan Dan Penyiapan)

Salinan Borang H (Perakuan Ujian)

Badan Kerajaan - Jadual 3 Yang Disahkan Oleh Jabatan Kastam Diraja Malaysia

Gambar Sokongan

Gambar Premis

Keterangan: Gambar tersebut perlu menunjukkan keseluruhan premis dan lokasi panel meter dapat dilihat dengan jelas

Perjanjian Sewa (Disetemkan )

Lesen Perniagaan

Bagi Pendaftaran Di Bawah Pemilikan Bukan Individu

Surat Kuasa Pemohon

Salinan Borang Pendaftaran (yang mana berkenaan)

*Syarikat Sdn Bhd/Berhad Borang 9, 13, 24 & 49 (Lama)bersama Cop Syarikat

Section 17/15,78,58,28/Section 14(Superforms) berkuatkuasa selepas 31 Januari 2017

(Bagi Penubuhan Syarikat Baru)bersama Cop Syarikat

(Hendaklah Berumur 18 Tahun Ke Atas)

Salinan Bukti Pemilikan / Penyewaan Premis ( yang mana berkenaan)

Milik Sendiri Geran / Hak Milik Tanah atau

Salinan kad Pengenalan/ Pasport Yang Sah dan cop Perniagaan

Makluman:

Borang senarai ini dan dokumen-dokumen yang dinyatakan dibawah perlu dimajukan bersama ketika membuat permohonan. Mana-mana dokumen yang

tidak lengkap boleh mengakibatkan permohonan tersebut ditolak.

Dokumen Pemohon (tandakan √)

Bagi Pendaftaran Di Bawah Pemilikan Individu

Salinan kad Pengenalan/ Pasport Yang Sah

(Hendaklah Berumur 18 Tahun Ke Atas)

Salinan Bukti Pemilikan / Penyewaan Premis ( yang mana berkenaan)

Gambar Pepasangan Elektrik SESB Yang Berdekatan

Borang PD9 ( Untuk permohonan Beban lebih 50 kVA)

Dokumen Khas Bagi Premis Yang Mempunyai Kes Mahkamah

Salinan Surat Kebenaran Mahkamah atau

Gambar Panel Meter

Spesifikasi meter panel: Berpandukan Kepada Buku ESAH 2008

Salinan disahkan benar oleh Setiausaha Syarikat

Lesen Perniagaan

*Nota : Bagi Permohonan Baru di W.P.Labuan, hendaklah menyertakan salinan surat kebenaran Perbadanan Labuan

Dokumen Kontraktor Yang Dilantik Oleh Pemohon

Perjanjian Jual Beli (Disetemkan )

*Borang Kebenaran Mendapatkan Bekalan Elektrik (Hak Milik tanah lebih dari satu (1) Penama)

Bukan Milik Sendiri

*Borang Kebenaran Mendapatkan Bekalan Elektrik (Hak Milik tanah lebih dari satu (1) Penama)

Bukan Milik Sendiri Perjanjian Sewa (Disetemkan )

Borang Permohonan Perkhidmatan Bekalan Elektrik Bagi Premis Dibina Di atas Tanah Kerajaan

(Rezab)

Surat kebenaran pemilik / pemilik- pemilik

Milik Sendiri Geran / Hak Milik Tanah atau

Perjanjian Jual Beli (Disetemkan )

*Salinan Geran disahkan benar oleh Jab. Tanah & Ukur/Pejabat Daerah

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

13

Page 14: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

BAHAGIAN 5 : UNTUK KEGUNAAN PEJABAT / SECTION 5 : FOR OFFICE USE

No. Pepasangan / Installation No :

No. MRU / MRU No :

Connection Object :

No. Premis/Premise No :

Tarikh Bekalan Diberikan/ Tarikh Kontrak : / /

Date of Supply / Contract Date : hh/dd bb/mm

Nama Penyuap / Nama / No. Pencawang No. Peti Pembekal /

Feeder Name Substation Name / No. Feeder Pillar No.

Disemak Oleh Jurutera/Penolong Jurutera/Juruteknik / Checked By Engineer/Asst Engineer/Technician :

Nama Pekerja / Staff Name

No. Pekerja / Personal No.

Tandatangan / Signature

Tarikh / Date

Disemak Oleh Kerani Kaunter / Checked By Counter Clerk : Diluluskan Oleh / Approved by:

Nama Pekerja / Staff Name Pegawai Yang Dikuasakan / Authorise Officer

No. Pekerja / Personal No. No. Pegawai / Personal No.

Tandatangan / Signature Tandatangan / Signature

Tarikh / Date Tarikh / Date

1. Talian Aduan SESB- 15454 / Complaint Hotline SESB- 15454

2. Talian Pusat Pelanggan Setempat – 088-282500 / One Stop Customer Centre Telephon (OSCC) – 088-282500

3. Cara- Cara Pembayaran Bil Elektrik / Electricity bill payment methods :

·         Debit Terus Kad Kredit / Credit Card Direct Debit

·         Sistem Bayaran Pukal / Pukal Payment System

·         Laman Web, Bank Dan Agensi Kutipan / Website, Bank and Collection Agencies

·         Kutipan Di Kaunter Bank / Bank Collection Counter

·         Pusat Kutipan Setempat / One-Stop Collection Centre

4. Untuk Keterangan Lanjut, Layari Laman Web SESB di http://www.sesb.com.my / For further enquiries, visit SESB Website at http://www.sesb.com.my

Alamat Elektrik /

Electrical Address :

Maklumat Am / GENERAL INFORMATION

5B. UNTUK KEGUNAAN FO DAN KELULUSAN /FOR FRONT OFFICE AND APPROVAL

Jumlah/ Total

tttt/yyyy

Caj Sambungan

(RM) /

Connection

Charges (RM)

Tunai / Cash

Jaminan

Bank / Bank

Guarantee

Kod Projek /

Project Code

Sediaada /

Existing

Tambahan /

Additional

Sediaada /

Existing

Tambahan /

Additional

Baru / New

Pengesahan Kerja

Tapak

5A. UNTUK KEGUNAAN UNIT TEKNIKAL/FOR TECHNICAL UNIT USE

No. Anggaran /

Estimate No.

Tarif / Tariff

Wang Cagaran / Security Deposit

Sediaada /

Existing

Baru / New

Sediaada /

Existing

Baru / New

Baru / New

Saiz Jangka/

Meter Size

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

14

Page 15: DTCS-750-02-QR-02 DTCS-750-04-QR-02 DTCS-750 · PDF fileSendiri / Own Sewa / Rent Lain-lain ... to pay / settle all connection ... registration as an electrical contractor issued under

Version 10_non Domestik_NSC Baharu

1 Tariff DM - Domestic Tariff

For the first 100 kWh (1-100 kWh) per month Sen/kWh

For the first 100 kWh (101-200 kWh) per month Sen/kWh

For the first 100 kWh (201-300 kWh) per month Sen/kWh

For the first 200 kWh (301-500 kWh) per month Sen/kWh

For the first 500 kWh (501-1000 kWh) per month Sen/kWh

For the next kWh (1001 kWh onwards) per month Sen/kWh

The Minimum Monthly Charge is RM5.00

2 Tariff CM1 - Low Voltage Commercial Tariff

For the first 200 kWh (1-200 kWh) per month Sen/kWh

For the next kWh (201 kWh onwards) per month Sen/kWh

The Minimum Monthly Charge is RM15.00

3 Tariff CM2 - Medium Voltage General Comercial Tariff

For each kilowatt of maximum demand per month RM/kW

For all kWh Sen/kWh

The Minimum Monthly Charge is RM1,000.00

4 Tariff CM3 - Medium Voltage Peak/Off-Peak Commercial Tariff

For each kilowatt of maximum demand per month during Peak Period RM/kW

For all kWh during the Peak Period Sen/kWh

For all kWh during the Off-Peak Period Sen/kWh

The Minimum Monthly Charge is RM1,000.00

5 Tariff ID 1 - Low Voltage Industrial Tariff

For all kWh Sen/kWh

The Minimum Monthly Charge is RM15.00

6 Tariff ID 2 - Medium Voltage General Industrial Tariff

For each kilowatt of maximum demand per month RM/kW

For all kWh Sen/kWh

The Minimum Monthly Charge is RM1,000.00

7 Tariff ID 3 - Medium Voltage Peak/Off-Peak Industrial Tariff

For each kilowatt of maximum demand per month during Peak Period RM/kW

For all kWh during the Peak Period Sen/kWh

For all kWh during the Off-Peak Period Sen/kWh

The Minimum Monthly Charge is RM1,000.00

8 Tarif PL - Tarif Lampu Jalanraya

For all kWh

(without maintenance) Sen/kWh

For all kWh

(including maintenance) Sen/kWh

The Minimum Monthly Charge is RM15.00

9 Temporary Electricity Supply

Nota/Note:

STRUKTUR DAN KADAR TARIF SABAH & WP LABUAN / SABAH & WP LABUAN TARIFF STRUCTURE AND RATES

-

19.50

37.60

17.50

18.50

- Temporary Worksites, Festivals, & Celebrations ( on total monthly bill )

18.00

20.30

36.30

-Six Month (6) Tariff Category + Surcharge 33%

28.00

28.60

38.50

39.50

23.20

32.40

32.60

NO KATEGORI TARIF KADAR UNIT

BAHAGIAN 6 : STRUKTUR TARIF / SECTION 6 : TARIFF STRUCTURE

32.40

21.75

26.80

44.50

45.00

47.00

33.00

Kadar dan struktur tarif ini tertakluk kepada perubahan kadar dan struktur tarif SESB dari masa ke semasa mengikut Seksyen 26, Akta Bekalan Elektrik 1990 dan

Peraturan 11- Peraturan-peraturan Bekalan Pemegan Lesen/This tariff rate and structure is subject to changes from time to time in pursuant to Section 26, Electricity

Supply Act 1990 and Peraturan-peraturan Bekalan Pemegang Lesen.

Dikeluarkan Oleh Jabatan Pengurusan Komersil, Bahagian Pembahagian, SESB / Published by Commercial Management Department, Distribution Division, SESB

15