Duke Energy Seminar September 3 – 5, 2008 Concord, NC

Upload: trandung

Post on 03-May-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

Duke Energy SeminarSeptember 3 – 5, 2008Concord, NC

Page 2: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

Wet Scrubber System Fundamentals

Vic Adamson

WPCA/Duke SeminarSeptember 3-5, 2008

Page 3: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 2

Scrubber Fundamentals

In what decade was the first wet FGD system commissioned?

The 1930s

Page 4: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 3

Where was the first wet FGD system commissioned?

Battersea Power

Station in London

Page 5: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 4

When, where, and by whom was the first US WFGD system commissioned?

1968 in Lawrence, Kansas by

Alstom

Page 6: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 5

Agenda

• Introduction

• Major Process Equipment

• Operation

• Secondary Emissions

• Summary

Page 7: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 6

US FGD Systems

DFGD6%

WFGD94%

Sodium4%

Limestone61%

Other5% Alkaline Ash

8%

Lime22% Alkaline Ash

LimeLimestoneSodiumOther

Total US Scrubbed Capacity – Approx. 100 GW

Page 8: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 7

• Over 94 GW of WFGD systems in US; first units installed in 1960s

• SO2 removal efficienciesgreater than 98%

• Availability greater than 98%

• Experience with wide range of fuels

• Reagent flexibility (lime, limestone, ammonia, alkaline ash)

• Marketable product or landfill

US WFGD Experience

Duke EnergyMarshall Units 1-4Terrell, NC

Page 9: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 8

Agenda

• Introduction

• Major Process Equipment

• Operation

• Secondary Emissions

• Summary

Page 10: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 9

MAKE-UP WATER TANK

CHLORIDE PURGE

HYDROCLONE

BELT FILTER

SPRAY TOWER ABSORBER

ELECTROSTATIC PRECIPITATOR

STACKWATER

AIR

LIMESTONE

BALL MILL

TO BALL MILL

FROM MW TANK

GYPSUM

LSFO Process Diagram

REAGENT PREPARATION

ABSORBER

DEWATERING

Page 11: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 10

SO2(Sulfur dioxide)

H2O(Water)

CaCO3(Calcium carbonate,

limestone)

O2(Oxygen)

CaSO4•2H2O(Calcium sulfate,

gypsum)

CO2(Carbon dioxide)

SO2 + CaCO3 + ½O2 + H2O → CaSO4•2H2O + CO2

Limestone/Forced Oxidation

Page 12: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 11

Absorber Island

Absorber

Oxidation Compressors

Spray Pumps

Switchgear

Page 13: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 12

Absorber Unit Operations

Unit Operations

• Inlet – gas distribution, humidification

• Spray zone – gas/liquid contact

• Mist eliminator zone –liquid/gas separation

• Reaction tank – oxidation, dissolution, crystallization

Design Goals

• Lowest lifecycle cost− Capital− O&M

• High reliability

Page 14: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 13

Absorber Designs

Jet Bubbling ReactorTray Tower

Fountain TowerOpen Spray Tower

Page 15: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 14

• Materials− Stainless steel− Alloy− FRP− Rubber-lined carbon steel

• Self-supporting or internal supportbeams or trusses− Absorber diameter− Material of construction

• Staggered arrangement

Spray Headers

Page 16: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 15

• Dedicated recirculation pump at eachspray header

• Performance enhancement plates

• Excellent gas / liquid contact assureshigh SO2 removal efficiencies

• Lowest draft loss

• Highest reliability

• Low scaling potential

• Excellent turndown reduces operatingcosts over 100–0% load range

Spray Zone

Page 17: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 16

• Multiple counter-current spray elevations

• Nozzle type− Top elevation—single orifice

hollow cone− Lower elevations—dual orifice

hollow cone• Sauter mean droplet diameter of

~2,000 micron at 8 psig

• Silicon carbide construction

Spray Nozzles

Page 18: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 17

• Functions− Limestone dissolution− Oxidation− Gypsum crystallization

• Side entry agitators withair lances for oxidation− 4–6 agitators/lances− Simple, reliable and proven

design − Excellent turndown at lower

boiler loads and inlet SO2loading

− Minimizes plugging potential− Easy inspection during

scheduled outages

Reaction Tank

Page 19: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 18

• Two stages of vertical-flow chevron vanes

• Construction− Polypropylene− Polysulfone− FRP− Alloy/stainless steel

Spray Zone

Mist Eliminator

Flue Gas Flow

Mist Eliminator

Page 20: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 19

• Fresh water wash on intermittent basis− First stage washed from below (1.5

gpm/ft2) and above (0.75 gpm/ft2)− Second stage washed from below

(0.75 gpm/ft2)

• Construction− Piping: FRP, polypropylene, alloy/SS− Nozzles: polypropylene, alloy/SS

Mist Eliminator Wash System

Page 21: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 20

• Typical size: 50,000–85,000 gpm at 55–85 TDH

• Pump Efficiency: 87–90+%

• 800–1,500 hp (~1 MW)

• Horizontal, centrifugal

• Rubber-lined casing

• Metal Impeller

• Mechanical Seal

Absorber Recycle Pump

Page 22: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 21

Shell• Rubber-lined carbon steel• Flakeglass-lined carbon

steel• Stainless steel (317LMN)• Duplex stainless steel

(2205, 255)• Nickel-based alloy• Roll-clad alloy• Lined concrete (tile, rubber)

External Spray Piping• FRP• Rubber-lined carbon steel• SS/alloy

Mist Eliminators• FRP• Polypropylene• Polysulfone• SS/alloy

Inlet• C-276

Headers• Rubber-lined carbon

steel• FRP• Stainless steel

(317LMN)• Duplex stainless steel

(2205, 255)• Nickel-based alloy

Materials of Construction

Page 23: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 22

Organic Acid Enhancement

• Organic acids (e.g. adipic, dibasic) increase the scrubbing capacity of limestone slurry

• Relatively low dosage rates (e.g. 300 -700 ppm)

• Can be used to improve efficiency or reduce operating costs

• Most effective for high sulfur fuels

• Widely used commodity chemical− Nylon manufacture− Food additive− Curing agents/plasticizers

• Environmentally friendly− Initial use promoted by US EPA− Approved by US FDA as food

additive

Page 24: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 23

Chlorides in WFGD Systems

• Chlorides concentrated in WFGD system due to evaporation

• Chlorides leave WFGD system via:− Moisture in gypsum filter

cake• Disposal gypsum• Wallboard gypsum

− Liquid carryover from absorber (insignificant)

− Unabsorbed HCl (insignificant)

• Purge stream required for wallboard gypsum production

Flue gas

MU Water

Limestone

Flue gas

Carryover

Cake Moisture

Purge Stream

Chloride Balance

Page 25: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 24

Effect of Chlorides on Process

• Impact on SO2 removal− Chloride from flue gas accumulates as soluble CaCl2

2HCl + CaCO3 → CaCl2 + CO2 + H2OCaCl2 → Ca+2 + 2Cl–

− High Ca+2 concentration depresses pH and alkaline species such as HCO3–, SO3-2, HSO3–

− Result is lower removal efficiency/higher L/G− Chlorides that accumulate as NaCl (e.g. from make-up water)

have much less impact

Page 26: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 25

Effect of Chlorides on Materials

• Soluble chlorides known to attack steel/alloys− General corrosion− Pitting− Stress corrosion cracking

• Aggravated by− Low pH− Deposits− Stagnant liquids

• Material selection must consider− Service/operating

conditions− Availability requirements− Cost

WFGD Materials of Construction

0 20000 40000 60000 80000 100000

316L

317L

317LM

317LMN

AL6XN

Alloy G

C-276

RLCS

Flakeglass

Chl

orid

e (p

pm)

Page 27: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 26

Reagent Preparation Island

Day Bin

Ball MillFeed Tank

Classifier

Page 28: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 27

• Truck, rail, or barge delivery

• ¾” x 0” (20 x 0 mm) crushed limestone

• Outdoor long-term storage feasible in most areas

• Indoor storage in harsh/wet climates

Limestone Delivery/Storage

Page 29: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 28

Limestone Silo

• Provide buffer between limestone pile and ball mill operation

• 16-24 hr capacity

• Carbon steel construction with polymer or stainless steel hopper lining

• Fluidized bottom/mechanicalactivation

• Vent filter for fugitive dust control

Page 30: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 29

• Limestone grinding− Horizontal/vertical

wet ball mills− On-site vs. off-site

preparation• Product ground to

90-95% < 40 μ; 30-35% solids

• Rubber-lined with hardened steel balls

Limestone Preparation

Page 31: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

Pre-Ground Limestone Injection

• Dry, pre-ground limestone feed options− Pneumatic injection into reaction tank below slurry level− Pre-slurry in small tank

• Advantages− Low capital cost (i.e. no ball mills, auxiliary equipment,

buildings, etc.)− Less equipment to maintain

• Disadvantages− Higher delivered cost

• Lifecycle cost evaluation on case-by-case basis

WPCA/Duke Seminar - September 5, 2008 - P 30

Page 32: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 31

Dewatering Island

Hydroclone

Belt Filter

Vacuum Pump

Page 33: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 32

• Primary dewatering:− Hydrocyclone− Absorber - 15% solids

Overflow - 3% solidsUnderflow - 55% solids

• Secondary dewatering:− Commercial gypsum –

vacuum belt filter @ 10% moisture

− Landfill gypsum – vacuum drum filter @ 15% moisture

Dewatering

Page 34: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 33

• Typical specification:− >95% CaSO4•2H2O− <0.5–1.0% CaSO3•½H2O− <100 ppm Cl− <10% moisture− pH 6–8− 30–40µ MMD

• Requires:− High purity limestone (95–

96%)− High efficiency ESP/FF− 99+% oxidation− Belt filter− Cake washing

Wallboard Gypsum

Page 35: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 34

• Covered storage options− Direct discharge to bunker/

manual reclaim− Convey to dome/manual

reclaim− Convey to building or silo/

automated reclaim• Open pile

− Feasible− Possible issues: moisture,

fugitive dust, leaching• Selection depends on:

− On-site storage requirement− Gypsum contract

Gypsum Storage/Handling

Page 36: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 35

Agenda

• Introduction

• Major Process Equipment

• Operation

• Secondary Emissions

• Summary

Page 37: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 36

Centralia Operations Summary

• Start-up− Unit 2 and common

equipment – October 2001− Unit 1 – July 2002

• 100% availability on both units since start-up

• Emissions and performance well within required limits

• Absorber opened for first time during planned Unit 2 boiler/turbine outage in April 2003 Centralia Steam Plant

Page 38: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 37

Absorber After 11,000 Hours

September 2001 April 2003

Page 39: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 38

Unit 2 Absorber Outage

Page 40: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 39

Unit 2 Absorber Outage

Page 41: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 40

WFGD Operations Staff

Position Description No. CoverageFGD Supervisor 1 1 shift, 5 days/week FGD Operator 1 3 shifts, 7 days/week FGD Mechanic 1 1 shift, 5 days/week FGD Computer Tech 1 1 shift, 5 days/week FGD Specialist 1 1 shift, 5 days/week FGD Material Handling 1 3 shifts, 7 days/week

Page 42: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 41

Agenda

• Introduction

• Major Process Equipment

• Operation

• Secondary Emissions

• Summary

Page 43: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

Sulfuric Acid Mist

WPCA/Duke Seminar - September 5, 2008 - P 42

• SO3 inlet concentration o <1 ppm for western sub-bituminous coalo >50 ppm for eastern bituminous

• Sulfuric acid (H2SO4) mist created due to rapid quenching of flue gas in absorber

• Fine droplets (< 0.5 micron) are difficult to collect

• Control techniqueso Alkali injection (e.g. lime, trona, sodium

carbonateo Wet electrostatic precipitator

Page 44: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

Slide 43

Mercury

•WFGD systems remove 70-90% of incoming HgCl2, but very little Hgo

− HgCl2 water soluble and is absorbed efficiently− Removal not strong function WFGD design

•Effluent flue gas contains mostly elemental, vapor-phase Hg

•Mercury can also enter WFGD with limestone and/or make-up water

•Fate of mercury− Purge stream− Gypsum

•Do WFGD systems re-emit Hg?

Page 45: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

Mercury

• Oxidized mercury readily absorbed by WFGD system; elemental mercury is not

• Oxidized Hg entering WFGD is a function of:− Fuel (i.e. Hg, Cl, Br)− Boiler operating conditions (e.g. unburned carbon)− Upstream equipment (e.g. SCR, ESP, FF)

• Oxidized mercury captured by WFGD can be reduced to elemental mercury and re-emitted− Re-emission additives− Oxidation/reduction potential

• Fate of mercury− Gypsum− Purge stream

WPCA/Duke Seminar - September 5, 2008 - P 44

Page 46: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 45

Agenda

• Introduction

• Major Process Equipment

• Operation

• Secondary Emissions

• Summary

Page 47: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 46

WFGD Rules of Thumb

Limestone Usage 1.7 ton limestone/ton SO2 removed

Limestone Cost $10-20/ton

Gypsum Production 3.1 ton gypsum/ton SO2 removed (95% purity, 10% moisture)

Gypsum Value -$10 to +$5/ton

Water Consumption 1.5-1.8 gpm/MW

Power Consumption Low S – 1.2-1.5% generationHigh S – 1.5-2.0% generation

Page 48: Duke Energy Seminar - WPCAwpca.info/pdf/presentations/Duke_Sept2008/Vic_Adamson-Wet_Scrub… · PREPARATION ABSORBER ... 2003 Centralia Steam Plant. WPCA/Duke Seminar - September

WPCA/Duke Seminar - September 5, 2008 - P 47

Unit Size 600 MWNumber of Units 1Fuel Sulfur Content 1.5 %SO2 Loading 18,000 lb/hrSO2 Removal Efficiency 98 %

Limestone Purity 96 %Limestone Consumption 30,000 lb/hrGypsum Purity 95 %Gypsum Production @ 10% Moisture 55,000 lb/hrWater Consumption 960 gpmPower Consumption 9 - 12 MW

Cost 90.0 MUSD

600 MW WFGD System