T H E S U P E R F U N D P R O G R A M protects human health and the environment by investigating and cleaning up often-abandoned hazardous waste sites and engaging communities throughout the process. Many of these sites are complex and need long-term cleanup actions. Those responsible for contamination are held liable for cleanup costs. EPA strives to return previously contaminated land and groundwater
to productive use.
U . S . E P A | H A Z A R D O U S W A S T E P R O G R A M A T E P A N E W E N G L A N D
t printed on 100% recycled paper, with a minimum of 50% post-consumer waste, using vegetable-based inks
July 2018
S I T E U P D A T ECleaning Up New England
Durham Meadows Superfund SiteDurham, CT
SITE DESCRIPTION: The Site includes an area of groundwater contamination generally centered on Main Street in Durham. The Site is centered around the Durham Manufacturing Company, an operating manufacturer, and the former location of Merriam Manufacturing Company, both located on Main Street. Both companies manufactured metal cabinets, boxes and other items. The compa-nies’ past disposal of wastewater to the soil and inadequate drum storage practices at Merriam Manufacturing Company, among other things, contributed to the contamination at each facility and in the overall area of groundwater surrounding both facilities.
K E Y C O N T A C T S :
KATE MEL ANSONEPA Community Involvement Coordinator (617) 918-1491 [email protected]
ED HATHAWAY EPA Project Manager(617) 918-1372 [email protected]
G E N E R A L I N F O :
E P A T O L L - F R E E C U S T O M E R S E R V I C E 1-888-EPA-7341
L E A R N M O R E A T :www.epa.gov/superfund/durham
STATUS OF WORK:EPA continues to work to implement the water line project at the Durham Meadows Superfund Site. This update provides summary of the current activities at the Site. The two current activities are the installation of a series of monitoring wells and the procurement of a contractor to implement the water line project.
A well drilling program will be implemented in Durham in July and August 2018 to install a series of monitoring wells to provide a baseline for groundwater flow and contamination prior to the installation of the water line and the abandonment of the existing private wells in Durham. These wells are also intended to document the outer limit of groundwater contamination. A map with the approximate location of the wells is attached.
WHAT RESIDENTS SHOULD EXPECT:The former Merriam Manufacturing location on Main Street (Route 17) will be used as the staging area for the monitoring well program. The staging area will be fenced. A construction trailer, drilling equipment, and drilling waste will be stored within the fenced area.
A drill rig will spend about 1 week at each loca-tion to install an open borehole to provide access to the bedrock groundwater. Once the bore-holes are installed a series of investigations will be performed at each location. The investigations include: lowering instruments down each bore-hole to identify the location of fractures that may transmit water (downhole geophysics); collection and analysis of water from these fractures (packer
continued >
testing); installation of 1-4 monitoring wells in the open borehole to provide long-term monitoring locations to obtain water quality samples and assess groundwater flow directions. These investigations will extend into the Fall 2018 and should be completed by the end of 2018.
NEXT STEPS:The United States Army Corps of Engineers (USACE) issued the solicitation for the water line project on June 14, 2018. Once the solicitation period closes, USACE will evaluate and award a contract for the implementation of the water line project. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov).
! A
! A
! A
! A
! A! A
! A
! A
! A
Ham
let M
anor
Res
iden
tial S
uppl
y W
ells
Daisy Ln
Clem
ente
l Dr
Talc
ott L
n
Old
Cem
eter
y R
d
Ham
let M
anor
Mar
ina
Pl
Town House Rd
Dunn Hill Rd
Cherry Ln
Sycam
ore Dr
Bear
Roc
k Rd
Fow
ler A
ve
Guire Rd
Tuttle Rd
Brick Ln
Wheeler Hill Dr
Pick
ett L
n
Had
dam
Qua
rter
Rd
Mai
den
Ln
State Hwy 17
Main St
Maple Ave
Wal
lingf
ord
Rd
Stat
e Hw
y 68
MW
-1
MW
-2
MW
-10
MW
-9
MW
-3
MW
-8
MW
-7
MW
-6
FG-2
1013
000
1013
000
1014
000
1014
000
1015
000
1015
000
1016
000
1016
000
1017
000
1017
000
1018
000
1018
000
1019
000
1019
000
1020
000
1020
000
1021
000
1021
000
1022
000
1022
000
1023
000
1023
000
1024
000
1024
000
732000
732000
733000
733000
734000
734000
735000
735000
736000
736000
737000
737000
Figu
re 2
File
: DM
S_D
urha
m_C
T_F3
_MW
_FG
.mxd
Dat
e: 0
6/29
/201
80
800
400
Feet
Site
Pla
n
Gro
undw
ater
Mon
itorin
g
Dur
ham
Mea
dow
s Su
perf
und
Site
Con
trac
t No.
Des
crip
tion
Coo
rdin
ate
Syst
em
Sour
ces
1026
-122
GW
MW
Map
Dur
ham
, Con
nect
icut
NAD
_198
3, S
tate
Pla
ne,
Con
nect
icut
, in
feet
DB
Dat
eR
ev.
App.
By
Dat
eÜ
Lege
nd
Proj
ect S
tagi
ng A
rea
(281
Mai
n St
reet
)
Ball
Broo
k Fa
ult
Estim
ated
Ext
ent o
fG
roun
dwat
er C
onta
min
atio
n
! A ! A
Mon
itorin
g W
ell L
ocat
ion
Exis
ting
Fairg
roun
d M
onito
ring
Wel
l
Tran
spor
tatio
n
Prim
ary
Rou
te
Seco
ndar
y R
oute
Loca
l Roa
dEs
ri, D
igita
lGlo
be, G
eoE
ye, E
arth
star
Geo
grap
hics
, CN
ES
/Airb
us D
S,
USD
A,U
SG
S,A
eroG
RID
,IG
N,a
ndth
e G
IS U
ser C
omm
unity
Dur
ham
Mea
dow
s Su
perf
und
Site
D
urha
m, C
onne
ctic
ut
_̂̂ _
Are
a of
Det
ail
Con
nect
icut
JS Roth River Road Wells and
Treatment Facility
Existing Long Hill Water Tank
‐EL 320
750 GPM
Talcott Lane
Maple Ave
Wallingford Rd
Rt
68
Maide
n Lane
Strong Middle School
KornElementary School
CoginchaugHigh School
Durham Manufacturing
Mill Pond Ln Allyn Brook
Durham Center Water
System474’ 16”
Durham Library
12” 8”
Main Street
8” 1987’
12”679’
12” 2065’ 12”
6”
Water Main Connectionto Fairgrounds
Allyn Brook
8”
South Main St Main St
Talcott Ridge Dr.‐16" 2196’ Talcott Ridge Cul de Sac EL 410
Water Tank
‐EL 442
20" ‐2318’
16” 3718’ 16” 1957’
16” 2631’
Water Meter Vault
Pressure Reducing Vault
8”613’
Maple Ave
Maple Ave
12”Pickett Lane
363’ 919’ 16”
Long Hill Pump Station and
Chlorination Booster
12" 4300’
Durham Meadows Waterline Schematic Drawing
Not to Scale
1180’ 16” 16”
Connection to Existing Water
Main
Connection to Existing Water
Main
GROUNDS
8”
Talcott RidgeBooster Station
8” 8”
45 GPM