Bologna – 08/05/2013
E-ELT Concept
-‐ Embedded single layer AO correc4on
-‐ Configura4on: Folded 3-‐mirros anas4gmat with 2 flat folding mirrors (M4 and M5)
-‐ M4 is adap4ve with 8000 voice-‐coil actuators over an area of 2.3x2.3 m2. M5 provides 4p/4lt
-‐ Nearly diffrac4on limited 10 arcmin diam. FoV
Bologna – 08/05/2013
Foci
Alt-‐Az,2 Nasmyth focal sta4ons distributed by ad Adaptor Rotator, provision for a Coudè Focus
Bologna – 08/05/2013
Recent History
• Born as the merging of the Euro50 and OWL • Final Design Study in the years 2005-2010 • Passed Final Design Review in September 2010 • “Extension” of detailed design phase in 2011 (Risks, Cost,
Schedule. • Revised Baseline endorsed by ESO council in June 2011 • Preparatory work financed in 2012 (Armazones, Key
Technologies)
Bologna – 08/05/2013
Driving Science
• Extra-Solar Planets – Discovery of small (earth-like) planets. Characterization of Planets
Atmospheres……
• Resolved Stellar Population – Reconstructing the formation and evolution of a representative sample of
galaxies in the nearby Universe by studying their resolved stellar populations
• Physics of High redshift Galaxies – Formation and evolution of galaxies in the high redshift Universe.
• Cosmology and Fundamental Physics – Distant Supernovae – Dark Energy – Intergalactic Medium – Variation of the
Physical Constants
Bologna – 08/05/2013
Instrument Studies
• CODEX: Ultra Stable HR VIS Spectrograph • EAGLE: AO-assisted Multi-integral field NIR spectrometer • EPICS: Planet Imager, Spectr. Imaging Polarimeter with XAO • HARMONI: Single Field Integral Field Spectrograph • METIS: Mid IR Imager Spectrograph with AO • MICADO: Imager and Slit Spectrograph • DIORMAS: Wide-Field Imager & Low-Med. Res. Slit Spectrograph • EVE: Optical-NIR Fibre-based MOS • SIMPLE: Cross-dispersed NIR Echelle Spectrograph • ATLAS: Laser Tomography AO Module • MAORY: Multi Conjugate AO Module
Bologna – 08/05/2013
Construction Proposal
• First Issue 2010 • Consolidate Issue (de-‐scoped) 2011 • Science Case • Technical Overview • Results o Industrial Preliminary Ac4vi4es • Trade-‐Offs • Roadmap to construc4on • Management Plan • Project Organiza4on
Bologna – 08/05/2013
Instrument RoadMap
• The first light instruments will be an IFU and a diffrac4on limit camera (HARMONI, MICADO like).
• MCAO and LTAO modules also foreseen at first light
• Soon a_er a HIRES a MOS will be kicked-‐off the order depending on TRL level and general decision process.
• There is room for a “new” instrument and PCS will follow at the end
• Redefini4on, priori4za4on, et…
Bologna – 08/05/2013
Status of the project
• E-ELT requires the consensus of 10 out of 16 participating countries: – “to consent” means to pay an
additional contribution in cash plus an increase in the annual contribution to ESO budget
• E-ELT requires to have 90% of the expected cost (1083 M€) available to commence
-- 650 M€ (60%) are secured today
June ‘12 Dec ‘12 Today
Bologna – 08/05/2013
Problems
• Brazil Started the nego4a4on to join ESO in 2009
• On Dec 30, 2010 President Lula da Silva signed the membership agreement
• Since then the agreement is pending approval of the Parliament
• Earlier 2013 the first “wrigen statement” was issued.
• The agreement could be possibly be signed during this year
• Any “Serious” ac4vity is delayed to 2014
Bologna – 08/05/2013
Opportunities
• Industrial – Participation to the construction of the Telescope: M4, M1, Main
Structure, etc. – Participation (or leading) the construction of the instruments: Large
Free-Form Optics, Advanced AO instrument, Holography and new materials - high added-value expertise.
• Science – Leading MAORY, coordinating HIRES and participating to MOS
• Political/Financial – Participating to a recognized European Infrastructure – Access to E-
I support money at National and International level