e t a d ng tti e l d y e y mm d e a e r e ov 23€¦ · 2’ median buffer 11 12 ... sp cial d t h...

1
2 i : P T . 375+ 14 .39 lined 21" plastic 39" rcp 36" dip 24" dip 24" rcp 75’ 75’ 75’ 75’ 75’ 90’ 60’ +00 +00 +00 +00 T.H. 23 T.H. 23 PASSING THRU/ 12’ THRU 12’ THRU 11’ BUFFER 2’ 10’ 10’ 10’ EXISTING T.H. 23 T . H . 23 - E A S T B OUN D P A S S I N G L AN E T.H. 23 PASSING THRU/ 12’ THRU 12’ THRU 11’ BUFFER 2’ 10’ T . H . 23 - W E S T B O UN D P A S S I N G L A N E 6’ 6’ BNSF RAILROAD BNSF RAILROAD C L SHLD 12’ SHLD 1.5’ 12’ 1.5’ C L . 04 .02 .02 04 . C L SHLD .02 .02 SHLD 1.5’ 1.5’ . 04 .02 04 . 1 : 3 4’ 8’ DITCH SHLD SHLD 1.5’ 1.5’ .02 . 04 .02 .02 . 04 C L C L 1 : 6 T Y P ( 1 : 4 M I N ) 1 : 6 T Y P ( 1 : 4 M I N ) VARIES 3 5 7 9 15 17 19 21 29 31 T 1 1 8 N 3 C r e 42 7 H a w k 21 0 . 6 0 . 3 R AY M OND P O P . 803 7 1 E D W A DO ME 8" WI L L I A MS CO BRO THERS E W A P I P E L I N E 23 111 B N SF E E 1 13 23 25 35 1 T 118 N 1 13 C O MPANY R a il w a y 8" S O U T H DA KO T A NOBLES J A C K S ON MARTIN M U RR AY C O TT ON W OOD BROWN R E D W OOD LYON L I N C O L N ROCK P I P E S T ON E W A T ON W AN M EE K E R R E NV I LLE KAND I YOH I C H I P P E W A LAC QUI PARLE I O W A M E D I C I N E Y ELL O W 160th Ave SE 160th Ave SE BNSF Railroad BNSF Railroad BNSF Railroad MINNESOTA 23 T.H. 23 2040 ADT = 6,400 2014 ADT = 4,700 DESIGN SPEED = 55 MPH CURRENT POSTED SPEED = 55 MPH MINNESOTA 23 T.H. 23 2040 ADT = 6,400 2014 ADT = 4,700 DESIGN SPEED = 55 MPH CURRENT POSTED SPEED = 55 MPH T . H . 23 P A S S I N G L A N E S - L A Y O U T 2 S e g m e n t 12- W . B . T . H . 2 3P A SS I NG L A N E ( 0 . 85m i l e )- C L A R A C I T Y T O R AY M OND 100 SCALE IN FEET C OUN T Y C H I PP E W A C OUN T Y C H I PP E W A 10’ SHLD 12’ 12’ 10’ SHLD t o C l a r e n ce C i t y 5 . 5 M i l e s +07.0 STA. 355+07.01 CONSTRUCTION PASSING LANE BEGIN WB TH 23 1 : 6 0 C o n s t r u c ti o n L i m i t s 6’ SHLD 12’ 10’ SHLD 2’ MEDIAN BUFFER 11 12 +86.9 24’ 1 : 5 0 SAWCUT 12’ 10 S H L D 10 S H L D 12’ t o E B P a s s i n g L a n e 1.8 Miles STA. 414+24.73 CONSTRUCTION PASSING LANE END WB TH 23 +24.7 Construction Limits +74.8 6’ SHLD 12’ 10’ SHLD 2’ MEDIAN BUFFER 12 11 20’ 6 S H L D 12’ 1 0 S H L D 2 M E D I A N B U F F E R 12 11’ +33.2 +46.5 Construction Limits (CHA: INPE) { INP. T.H. 23 (CHA: INPE) { INP. T.H. 23 1 : 4 S l o p e s S p ec i a l D i t c h G r a d e 1 : 4 S l o p e s S p e c i a l D i t c h G r a d e S p ec i a l D it c h G r a d e S p e c i a l D i t c h G r a d e 1 : 5 S l o p e 1 : 3 . 4 S l o p e EL = 1069.06 EL = 1074.68 EL = 1072 . 42 (plastic lined) 30" Culvert (plastic lined) 30" Culvert (plastic lined) 27" Culvert Approx EL = 1962.91 Approx NEW INV EL = 1962.58 EXTEND CULVERT NEW INV EL = 1070.47 EXTEND CULVERT NEW INV EL = 1074.44 EXTEND CULVERT NEW INV EL = 1073.15 EXTEND CULVERT +90.6 +24.8 6’ SHLD SHLD VARIES S H L D VA R I E S 6’ SHLD =35R =20R +63.2 +76.5 =20R =20R 1 0 5 t h Av e SW 128th St SW B N SF R a i l r o a d B N SF R a i l r o a d B N SF R a i l r o a d MINNESOTA 23 T.H. 23 2040 ADT = 7,400 2014 ADT = 5,900 DESIGN SPEED = 55 MPH CURRENT POSTED SPEED = 55 MPH MINNESOTA 23 T.H. 23 2040 ADT = 7,400 2014 ADT = 5,900 DESIGN SPEED = 55 MPH CURRENT POSTED SPEED = 55 MPH T . H . 23 P A SS I NG L AN E S - L AYOU T 2 S e g m e n t 13- E . B . T . H . 23P A SS I NG L AN E ( 1 . 1 m il e )- R AY M OND T O W I LL M A R 100 SCALE IN FEET C OUN T Y KAND I YOH I C OUN T Y KAND I YOH I t o W B P a ss i ng L a n e 1 . 8 M il e s (CHA: INPE) { INP. T.H. 23 SAWCUT STA. 130+37.13 CONSTRUCTION PASSING LANE BEGIN EB TH 23 1:50 C on s t r u c t i o n L i m it s 10’ SHLD 12’ 12’ 10’ SHLD +88.1 12’ 6’ SHLD 12’ 10’ SHLD 11’ 2 M E D I AN B U FF E R 20’ 12’ 6’ SHLD 12’ 10’ SHLD 2 M E D I AN B U F F E R 11’ 12’ 6’ SHLD 12’ 10’ SHLD 2 M E D I AN B U FF E R 11’ SAWCUT STA. 200+80.52 CONSTRUCTION PASSING LANE END EB TH 23 + 8 0 . 5 12’ 10 S H L D 10 S H L D 12’ 1:60 + 0 0 . 5 t o W i l l m a r 8 . 0 m i l e s 24 Special Ditch Grade S p ec i a l D it c h G r a d e 1:4 Slope Special Ditch Grade Special Ditch Grade 1:4 Slopes Special Ditch Grade 1:4 Slopes +37.1 EL = 1085.10 EL = 1079.78 EL = 1090.91 (plastic lined) 24" Culvert (plastic lined) 21" Culvert (plastic lined) 21" Culvert C on s t r u c t i on L i m it s C on s t r u c ti on L i m it s N E W I N V EL = 1079 . 26 EXTEND CULVERT N E W I N V EL = 1086 . 82 EXTEND CULVERT N E W I NV EL = 1092 . 75 EXTEND CULVERT +37.4 + 0 8 . 5 REPLACE 18" CMP S H L D VA R I E S 6 S H L D S H L D VA R I E S 6 S H L D =20R =20R = 1 5 R =25R L AYOUT H I S T OR Y J a nu a r y , 014 - Copy To: F or: 1 S E H I nc. Theali gnm ent and gradesshow n on thi s m ap are tentati ve and subj ectto change w ithout noti ce. Staff Approval The traffi c vol um esshow n are __________________________________ By Staff Revi ew F R OM Approx. 5 . 6 m il es NW of C l ara C it y C it yof R aym ond S . P . T. H . A. J . S . P . T. H . A. J . S . P . T. H . A. J . PP MS Acti vit y PP MS Acti vit y PP MS Acti vit y C OP Y No. L AYOUT No. T. H . VI C I NI TY OF P repared 20 S cal e:H or. 1 i nch = ft. J une 6 th 14 100 Date: 20___ Prepared _____________ L evel2 L AYOUT APP R OVAL W B T H 23 P A SS I NG L AN E S ( L A Y OU T 2 ) E B T H 23 P A S S I NG L AN E S ( L AYOU T 2 ) PROJECT LOCATION MAP NO SCALE NO SCALE PROJECT INDEX MAP LOCATION PROJECT LAYOUT 2 COUNTY CHIPPEWA COUNTY KANDIYOHI Approved By Revi ew ed By Prepared By Programm ed L etti ng Date 20 20 20 Transportati on Di stri ct Engi neer Di stri ct Traffi c Engi neer Di stri ct Desi gn or Preli m i nary Desi gn Engi neer Li censed Profess onal Engi neer Certi fi ed By: Pri nted Nam e L i c.No. 5 /30/2014 S:\KO\M\Mnt08 \127 5 69 \4 - preli m - dsgn -rprts\L ayouts\L yt_ dgn \L yt_ dgn_ envi ron m ental \1275 69_pp- L yt - 2 _ Seg- 12 - 1 3 envi ronm ental . dgn 7 /9 /2014 EXISTING T.H. 23 EXISTING T.H. 23 t o approx. 8 . 0 m il es S W of cit yof Will m ar esti m ated for year 2040 May 14 SRF - TH 23 Passi ng Lane Assesment 3405 - 93 1205 - 30 23 1140 1140 23 LAYOUT 6 L AYO U T 5 LAYOUT 4 LAYOUT 1 LAYOUT 3 350 355 360 1,084.67 1,084.51 1,084.52 1,084.15 1,084.12 1,083.92 1,083.80 1,083.58 1,083.51 1,083.40 1,083.03 1,082.98 1,082.71 1,082.67 1,082.51 1,082.33 1,082.12 1,082.20 1,081.85 1,081.82 1,081.74 1,081.69 1,081.64 1,081.35 1,081.37 1,081.50 365 370 375 1,081.46 1,081.64 1,081.41 1,081.52 1,081.51 1,081.32 1,081.43 1,081.39 1,081.46 1,081.23 1,081.41 1,081.32 1,081.21 1,081.09 1,081.30 1,081.19 1,081.14 1,081.32 1,081.36 1,081.15 1,081.16 1,081.23 1,080.97 1,081.15 1,080.89 1,080.79 1,080.94 1,080.73 380 385 390 395 400 405 410 415 420 425 430 1,080.42 1,080.27 1,080.19 1,079.91 1,079.91 1,079.62 1,079.48 1,079.39 1,079.13 1,079.05 1,078.89 1,079.00 1,078.94 1,078.79 1,078.51 1,078.58 1,079.01 1,078.88 1,079.03 1,079.20 1,079.21 1,079.29 1,079.59 1,079.50 1,079.75 1,079.78 1,080.05 1,080.04 1,080.22 1,080.30 1,080.45 1,080.77 1,080.61 1,080.69 1,081.03 1,081.20 1,081.44 1,081.63 1,081.84 1,081.83 1,082.31 1,082.62 1,082.93 1,082.85 1,083.35 1,083.32 1,083.70 1,083.62 1,083.65 1,083.84 1,083.82 1,083.92 1,083.77 1,083.74 1,083.64 1,083.35 1,083.08 1,083.01 1,082.86 1,082.48 1,082.04 1,081.69 1,081.50 1,080.98 1,080.45 1,080.10 1,079.63 1,079.17 1,078.95 1,078.44 1,078.10 1,077.47 1,077.33 1,077.02 1,076.86 1,076.47 1,076.51 1,076.24 1,076.39 1,076.32 1,076.58 1,076.49 1,076.38 1,076.52 1,076.80 1,076.95 1,077.06 1,077.15 1,077.22 1,077.32 1,077.62 1,077.64 1,077.68 1,077.89 1,077.92 1,078.03 1,078.23 1,078.25 1,078.21 1,078.49 1,078.69 1,078.75 1,078.78 1,078.87 1,079.16 1,079.23 1,079.18 1,079.26 1,079.54 1,079.51 1,079.44 1,079.43 1,079.51 1,079.45 1,050 1,060 1,070 1,080 1,090 1,100 1,050 1,060 1,070 1,080 1,090 1,050 1,060 1,070 1,080 1,090 1,100 Sta. 355+07.01 Construction Begin WB TH 23 Sta. 414+24.73 Construction End WB TH 23 C L C L C L C L Sta. 412+74 Culvert C L C L Sta. 365+27 (Right) Field Entr. Sta. 368+78 160th Ave SE C L Sta. 396+09 (Right) Field Entr. C L C L Sta. 405+03 (Right) Driveway Entr. Sta. 406+37 (Right) Driveway Entr. Sta. 396+11 (Left) Field Entr. C L Sta. 411+70 (Right) Field Entr. Sta. 382+89 (plastic lined) 27" Culvert Sta. 369+98 (plastic lined) 30" Culvert Sta. 359+62 (plastic lined) 30" Culvert 125 1,082.57 1,082.73 1,083.31 1,083.74 1,083.88 1,084.08 1,084.51 130 135 140 145 150 155 160 165 170 1,084.71 1,084.81 1,085.33 1,085.33 1,085.55 1,085.82 1,085.79 1,086.36 1,086.22 1,086.35 1,086.90 1,086.67 1,086.83 1,086.86 1,086.97 1,086.97 1,086.81 1,086.87 1,086.91 1,086.80 1,086.77 1,086.79 1,086.47 1,086.35 1,086.25 1,086.30 1,086.13 1,086.08 1,086.19 1,086.08 1,086.10 1,086.12 1,086.31 1,086.30 1,086.24 1,086.55 1,086.52 1,086.76 1,086.76 1,086.70 1,086.78 1,086.89 1,087.06 1,087.12 1,087.37 1,087.48 1,087.63 1,087.88 1,088.08 1,088.17 1,088.61 1,088.99 1,089.44 1,089.71 1,089.84 1,090.07 1,090.55 1,090.70 1,090.88 1,091.19 1,091.46 1,091.56 1,091.75 1,091.87 1,091.96 1,092.01 1,092.37 1,092.45 1,092.21 1,092.43 1,092.30 1,092.42 1,092.26 1,092.19 1,092.16 1,092.05 1,091.99 1,092.06 1,092.12 1,092.21 1,092.35 1,092.47 1,092.77 1,092.81 1,093.32 1,093.58 1,094.12 1,094.67 1,095.16 1,095.70 1,096.02 1,096.41 1,097.20 175 180 1,097.56 1,097.87 1,098.34 1,098.73 1,098.95 1,099.29 1,099.57 1,099.88 1,099.91 1,100.22 1,100.49 1,100.59 1,100.63 1,100.85 1,100.78 1,100.82 1,100.93 1,100.93 1,100.94 1,100.99 1,101.23 1,101.38 185 190 195 200 1,101.30 1,101.39 1,101.46 1,101.44 1,101.35 1,101.24 1,101.29 1,101.20 1,101.06 1,100.92 1,100.72 1,100.65 1,100.60 1,100.36 1,100.09 1,099.97 1,099.50 1,098.98 1,098.55 1,098.01 1,097.22 1,096.20 1,095.50 1,094.41 1,093.79 1,092.86 1,092.03 1,091.40 1,090.70 1,090.06 1,089.70 1,089.47 1,089.03 1,089.05 1,088.82 1,088.77 1,088.34 1,088.30 1,088.22 1,088.04 205 1,087.83 1,087.84 1,087.74 1,087.61 1,087.43 1,087.48 1,060 1,070 1,080 1,090 1,100 1,110 1,060 1,070 1,080 1,090 1,100 1,060 1,070 1,080 1,090 1,100 1,110 Sta. 130+37.13 Construction Begin EB TH 23 Sta. 200+80.52 Construction End EB TH 23 C L Sta. 202+88 (Right) Field Entr. C L C L C L Sta. 153+00 (Right) Field Entr. (Left) 128th St. SW Sta. 183+41 (Right) Driveway Entr. Sta. 184+12 (Left) Field Entr. C L C L C L Sta. 139+65 (plastic lined) 24" Culvert Sta. 167+65 (plastic lined) 21" Culvert Sta. 182+00 (plastic lined) 21" Culvert +50 100 75 390175 . 73 +07 +32 175’ 50’ 75’ 75’ 50’ 50’ 75’ 75’ 75’ 50’ 100’ +50 100’ 75 + 00 50’ LEGEND WETLANDS CONSTRUCTION LIMITS EXISTING RIGHT OF WAY PROPOSED AGGREGATE SURFACING PROPOSED SHOULDER PROPOSED ROADWAY LEGEND WETLANDS CONSTRUCTION LIMITS EXISTING RIGHT OF WAY PROPOSED AGGREGATE SURFACING PROPOSED SHOULDER PROPOSED ROADWAY ENVIRONMENTAL CONCERNS LEGEND SNOWMOBILE TRAIL STATE PARK SPLIT ROCK CREEK WATER COURSE BIODIVERSITY PRAIRIE NATIVE PLANTS ENVIRONMENTAL CONCERNS LEGEND SNOWMOBILE TRAIL STATE PARK SPLIT ROCK CREEK WATER COURSE BIODIVERSITY PRAIRIE NATIVE PLANTS MINNESOTA 23 MINNESOTA 23 MINNESOTA 23 MINNESOTA 23 350 355 360 365 370 375 380 385 390 395 400 405 410 415 420 425 430 CURVE 2050 PI 353+53.20 X 649,133.871 Y 190,630.493 T 776.13’ L 1,551.99’ R 34,377.47’ PC 345+77.07 PT 361+29.06 CURVE 2060 PI 371+28.90 X 650,622.033 Y 191,599.758 T 385.52’ L 771.01’ R 34,377.47’ PC 367+43.38 PT 375+14.39 350 355 360 Sta 361+29.06 BK = EQUATION: Sta 361+29.05 AH PI PT. 361+29.06 365 PC. 367+43.38 370 375 S t a 375 + 14 . 39 B K = E QUA T I ON: S t a 375 +15 . 59 A H PI 380 385 390 395 400 405 410 415 420 425 430 CURVE 2 05 0 P I 1 23 + 15 . 0 0 X 3 7 6 , 86 0 . 8 35 Y 148 , 148 . 053 T 3 75 . 18 L 7 5 0 . 1 0 R 11 , 459 . 16 P C 1 1 9 + 3 9 . 8 2 CURVE 2060 PI 169+00.00 X 380,508.649 Y 150,928.316 T 424.73’ L 849.35’ R 22,918.31’ PC 164+75.28 PT 173+24.63 CURVE 2070 PI 180+02.00 X 381,408.697 Y 151,563.001 T 423.82’ L 847.55’ R 22,918.31’ PC 175+78.17 PT 184+25.72 CURVE 2080 PI 199+97.00 X 383,156.835 Y 152,895.166 T 227.43’ L 454.81’ R 11,459.16’ PC 197+69.57 PT 202+24.38 125 Sta 126+89.92 BK = EQUATION: Sta 126+88.64 AH PI PT. 126+89.92 130 135 140 145 150 155 160 PC. 1 6 4+75. 2 8 165 170 Sta 173+24.63 BK = EQUATION: Sta 173+25.40 AH PI PT. 173+24.63 175 PC. 175+78.17 180 St a 184+ 25.72 BK = EQUATION: St a 18 2 + 22.9 5 AH PI PT. 184+25. 72 185 190 195 PC. 197+ 69.57 200 Sta 202+24.38 BK = EQUATION: Sta 202+24.85 AH PI PT. 202+24.38 205

Upload: phamduong

Post on 29-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

ek

2

i

:

PT.

37

5+

14.

39

lined

21"

plastic

39"

rcp

36"

dip

24"

dip

24"

rc

p

75’

75’

75’

75’

75’

90’

60’

+0

0

+0

0

+0

0

+0

0

T.H. 23

T.H. 23

PASSING

THRU/

12’

THRU

12’

THRU

11’

BUFFER

2’

10’

10’

10’

EXISTING T.H. 23

T.H. 23 - EASTBOUND PASSING LANE

T.H. 23

PASSING

THRU/

12’

THRU

12’

THRU

11’

BUFFER

2’

10’

T.H. 23 - WESTBOUND PASSING LANE

6’

6’

BNSF RAILROAD

BNSF RAILROADCL

SHLD

12’

SHLD

1.5’

12’1.5’

CL

.04 .02 .02 04.

CL

SHLD

.02.02

SHLD1.5’ 1.5’

.04 .02 04.

1:34’

8’

DITCH

SHLD SHLD1.5’1.5’

.02 .04.02.02.04

CLCL

1:6TYP (1:

4 MIN)

1:6 TYP (1:4 MIN)

VARIES

3

5

7 9

1517

19

21

29

31

T118

N

3

Cre

42

7

Hawk

21

0.6

0.3

RAYMONDPOP.803

7 1

E D W A

DO

ME

8"

WIL

LIA

MS

CO

BR

OT

HERS

EW

A

PIPELI

NE

23111

BNSF

E E

1

13

23

25

35

1

T118

N

1

13

CO

MPANY

Railway

8"

SO

UT

HD

AK

OT

A

NOBLESJACKSON MARTIN

MURRAY

COTTONWOOD

BROWN

REDWOODLYONLINCOLN

ROCK

PIPESTONE

WATONWAN

MEEKER

RENVILLE

KANDIYOHI

CHIPPEWA

LAC

QUI

PARLE

IO W A

MEDICINE

YELLOW

160th

Ave

SE

160th

Ave

SE

BNSF Railroad BNSF Railroad BNSF Railroad

MINNESOTA

23

T.H. 23

2040 ADT = 6,400

2014 ADT = 4,700

DESIGN SPEED = 55 MPH

CURRENT POSTED SPEED = 55 MPH

MINNESOTA

23

T.H. 23

2040 ADT = 6,400

2014 ADT = 4,700

DESIGN SPEED = 55 MPH

CURRENT POSTED SPEED = 55 MPH

T.H.23PASSING LANES-LAYOUT2Segment12-W.B.T.H.23PASSING LANE(0.85mile)-CLARACITYTO RAYMOND

100

SCALE IN FEET

COUNTYCHIPPE

WA

COUNTYCHIPPE

WA

10’ SHLD

12’

12’

10’ SHLD

to Clarence City

5.5 Miles

+07.0

STA. 355+07.01

CONSTRUCTION

PASSING LANE

BEGIN WB TH 23

1:60Construction

Limits

6’ SHLD

12’

10’ SHLD

2’ MEDIAN BUFFER

11

12

+86.9

24’

1:50 SAWCUT

12’

10’ SHLD

10’ SHLD

12’

to EB Passing Lane

1.8 Miles

STA. 414+24.73

CONSTRUCTION

PASSING LANE

END WB TH 23

+24.7

Construction Limits

+74.8

6’ SHLD

12’

10’ SHLD

2’ MEDIAN BUFFER

12

11

20’

6’ SHLD

12’

10’ SHLD

2’ MEDIAN BUFFER

12

11’

+33.2+46.5

Construction Limits

(CHA: INPE)

{ INP. T.H. 23

(CHA: INPE)

{ INP. T.H. 23

1:4 Slopes

Special Ditch Grade

1:4 Slopes

Special Ditch GradeSpecial Ditch Grade Special Ditch Grade

1:5 Slope

1:3.4 Slope

EL = 1069.06

EL = 1074.68

EL = 1072.42

(plastic lined)30" Culvert

(plastic lined)30" Culvert (plastic lined)

27" Culvert

Approx EL = 1962.91

Approx NEW INV EL = 1962.58

EXTEND CULVERT

NEW INV EL = 1070.47

EXTEND CULVERTNEW INV EL = 1074.44

EXTEND CULVERT

NEW INV EL = 1073.15

EXTEND CULVERT

+90.6

+24.86’ SHLD

SHLD VARIES

SHLD VARIES 6’ SHLD

=35’

R

=20’

R+63.2

+76.5

=20’

R

=20’

R

105th

Ave

SW

128th

St

SW

BNSF Railroad

BNSF Railroad

BNSF Railroad

MINNESOTA

23

T.H. 23

2040 ADT = 7,400

2014 ADT = 5,900

DESIGN SPEED = 55 MPH

CURRENT POSTED SPEED = 55 MPH

MINNESOTA

23

T.H. 23

2040 ADT = 7,400

2014 ADT = 5,900

DESIGN SPEED = 55 MPH

CURRENT POSTED SPEED = 55 MPH

T.H.23PASSING LANES-LAYOUT2Segment13-E.B.T.H.23PASSING LANE(1.1mile)-RAYMOND TO WILLMAR

100

SCALE IN FEET

COUNTYKANDIYOHI

COUNTYKANDIYOHI

to WB Passing Lane

1.8 Miles

(CHA: INPE)

{ INP. T.H. 23

SAWCUT

STA. 130+37.13

CONSTRUCTION

PASSING LANE

BEGIN EB TH 23

1:50

Construction Limits

10’ SHLD

12’

12’

10’ SHLD

+88.1

12’

6’ SHLD

12’

10’ SHLD

11’

2’ MEDIAN BUFFER

20’

12’

6’ SHLD

12’

10’ SHLD

2’ MEDIAN BUFFER

11’

12’

6’ SHLD

12’

10’ SHLD

2’ MEDIAN BUFFER

11’

SAWCUT

STA. 200+80.52

CONSTRUCTION

PASSING LANE

END EB TH 23

+80.5

12’

10’ SHLD

10’ SHLD

12’

1:60

+00.5

to Willmar8.0 miles

24’

Special Ditch GradeSpecial Ditch Grade

1:4 Slope Special Ditch Grade

Special Ditch Grade

1:4 Slopes

Special Ditch Grade

1:4 Slopes

+37.1

EL = 1085.10

EL = 1079.78

EL = 1090.91(plastic lined)24" Culvert

(plastic lined)21" Culvert

(plastic lined)21" Culvert

Construction LimitsConstruction Limits

NEW INV EL = 1079.26

EXTEND CULVERT

NEW INV EL = 1086.82

EXTEND CULVERT

NEW INV EL = 1092.75

EXTEND CULVERT+37.4

+08.5

REPLACE 18" CMP

SHLD VARIES 6’ SHLD

SHLD VARIES

6’ SHLD

=20’

R

=20’

R

=15’

R =25’

R

LA

YO

UT

HIS

TO

RY

January,

014

-

Co

py

To:

For:

1

SE

HInc.

The

align

me

nt

and

grades

sho

wn

on

this

map

are

te

ntativ

e

and

subject

to

change

wit

ho

ut

notic

e.

Staff

Appro

val

The

traffic

volu

mes

sho

wn

are

__________________________________

By

Staff

Re

vie

w

FR

OM

Appro

x.5.6

miles

NW

of

Clara

Cit

y

Cit

yof

Ray

mo

nd

S.P.

T.H.

A.J.

S.P.

T.H.

A.J.

S.P.

T.H.

A.J.

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

CO

PY

No.

LA

YO

UT

No.

T.H.

VICINIT

YO

F

Pre

pare

d20

Scale:

Hor.1in

ch

=ft.

June

6th

14

100

Date:

20___

Pre

pare

d_____________

Le

vel2

LA

YO

UT

AP

PR

OV

AL

WBTH2

3PASSI

NGLANES

(LAYOUT2)

EB

TH23

PASSI

NG

LA

NES(L

AY

OUT

2)

PROJECT LOCATION MAP

NO SCALE

NO SCALE

PROJECT INDEX MAP

LOCATION

PROJECT

LAYOUT 2

COUNTY

CHIPPEWA

COUNTY

KANDIYOHI

Appro

ve

dBy

Re

vie

we

dBy

Pre

pare

dBy

Pro

gra

mm

ed

Lettin

gDate

20

20

20

Transportatio

nDistrict

En

gin

eer

District

Traffic

En

gin

eer

District

Desig

nor

Preli

min

ary

Desig

nEn

gin

eer

Lic

ense

dProfess

onalEn

gin

eer

Certifie

dBy:

Printe

dNa

me

Lic.

No.

5/30/2014

S:\

KO\

M\

Mnt08\127569\4-preli

m-dsgn-rprts\

Lay

outs\

Lyt_dgn\

Lyt_dgn_e

nvir

on

me

ntal\

127569_pp-

Lyt-2_Se

g-12-13

envir

on

me

ntal.dgn

7/9/2014

EXISTING T.H. 23

EXISTING T.H. 23

to

appro

x.8.0

miles

SW

of

cit

yof

Willm

ar

estim

ate

df

or

year

2040

May

14

SR

F-

TH

23

Passin

gLane

Asses

me

nt

3405-93

1205-30

23

1140

1140

23

LA

YO

UT

6

LAYOUT5

LA

YO

UT

4

LA

YO

UT

1

LA

YO

UT

3

350 355 360

1,

08

4.

67

1,

08

4.

51

1,

08

4.

52

1,

08

4.

15

1,

08

4.

12

1,

08

3.

92

1,

08

3.

80

1,

08

3.

58

1,

08

3.

51

1,

08

3.

40

1,

08

3.

03

1,

08

2.

98

1,

08

2.

71

1,

08

2.

67

1,

08

2.

51

1,

08

2.

33

1,

08

2.

12

1,

08

2.

20

1,

08

1.

85

1,

08

1.

82

1,

08

1.

74

1,

08

1.

69

1,

08

1.

64

1,

08

1.

35

1,

08

1.

37

1,

08

1.

50

365 370 375

1,

08

1.

46

1,

08

1.

64

1,

08

1.

41

1,

08

1.

52

1,

08

1.

51

1,

08

1.

32

1,

08

1.

43

1,

08

1.

39

1,

08

1.

46

1,

08

1.

23

1,

08

1.

41

1,

08

1.

32

1,

08

1.

21

1,

08

1.

09

1,

08

1.

30

1,

08

1.

19

1,

08

1.

14

1,

08

1.

32

1,

08

1.

36

1,

08

1.

15

1,

08

1.

16

1,

08

1.

23

1,

08

0.

97

1,

08

1.

15

1,

08

0.

89

1,

08

0.

79

1,

08

0.

94

1,

08

0.

73

380 385 390 395 400 405 410 415 420 425 430

1,

08

0.

42

1,

08

0.

27

1,

08

0.

19

1,

07

9.

91

1,

07

9.

91

1,

07

9.

62

1,

07

9.

48

1,

07

9.

39

1,

07

9.

13

1,

07

9.

05

1,

07

8.

89

1,

07

9.

00

1,

07

8.

94

1,

07

8.

79

1,

07

8.

51

1,

07

8.

58

1,

07

9.

01

1,

07

8.

88

1,

07

9.

03

1,

07

9.

20

1,

07

9.

21

1,

07

9.

29

1,

07

9.

59

1,

07

9.

50

1,

07

9.

75

1,

07

9.

78

1,

08

0.

05

1,

08

0.

04

1,

08

0.

22

1,

08

0.

30

1,

08

0.

45

1,

08

0.

77

1,

08

0.

61

1,

08

0.

69

1,

08

1.

03

1,

08

1.

20

1,

08

1.

44

1,

08

1.

63

1,

08

1.

84

1,

08

1.

83

1,

08

2.

31

1,

08

2.

62

1,

08

2.

93

1,

08

2.

85

1,

08

3.

35

1,

08

3.

32

1,

08

3.

70

1,

08

3.

62

1,

08

3.

65

1,

08

3.

84

1,

08

3.

82

1,

08

3.

92

1,

08

3.

77

1,

08

3.

74

1,

08

3.

64

1,

08

3.

35

1,

08

3.

08

1,

08

3.

01

1,

08

2.

86

1,

08

2.

48

1,

08

2.

04

1,

08

1.

69

1,

08

1.

50

1,

08

0.

98

1,

08

0.

45

1,

08

0.

10

1,

07

9.

63

1,

07

9.

17

1,

07

8.

95

1,

07

8.

44

1,

07

8.

10

1,

07

7.

47

1,

07

7.

33

1,

07

7.

02

1,

07

6.

86

1,

07

6.

47

1,

07

6.

51

1,

07

6.

24

1,

07

6.

39

1,

07

6.

32

1,

07

6.

58

1,

07

6.

49

1,

07

6.

38

1,

07

6.

52

1,

07

6.

80

1,

07

6.

95

1,

07

7.

06

1,

07

7.

15

1,

07

7.

22

1,

07

7.

32

1,

07

7.

62

1,

07

7.

64

1,

07

7.

68

1,

07

7.

89

1,

07

7.

92

1,

07

8.

03

1,

07

8.

23

1,

07

8.

25

1,

07

8.

21

1,

07

8.

49

1,

07

8.

69

1,

07

8.

75

1,

07

8.

78

1,

07

8.

87

1,

07

9.

16

1,

07

9.

23

1,

07

9.

18

1,

07

9.

26

1,

07

9.

54

1,

07

9.

51

1,

07

9.

44

1,

07

9.

43

1,

07

9.

51

1,

07

9.

45

1,050

1,060

1,070

1,080

1,090

1,100

1,050

1,060

1,070

1,080

1,090

1,050

1,060

1,070

1,080

1,090

1,100

Sta.

35

5+

07.

01

Co

nstr

ucti

on

Be

gi

nW

BT

H2

3

Sta.

41

4+

24.

73

Co

nstr

ucti

on

En

dW

BT

H2

3

CL

CL

CL

CL

Sta. 412+74

Culvert

CL CL

Sta. 365+27

(Right)

Field Entr.

Sta. 368+78

160th Ave SE

CL

Sta. 396+09

(Right)

Field Entr.

CLCL

Sta. 405+03

(Right)

Driveway Entr.

Sta. 406+37

(Right)

Driveway Entr.Sta. 396+11

(Left)

Field Entr.

CL

Sta. 411+70

(Right)

Field Entr.Sta. 382+89

(plastic lined)

27" Culvert

Sta. 369+98

(plastic lined)

30" Culvert

Sta. 359+62

(plastic lined)

30" Culvert

125

1,

08

2.

57

1,

08

2.

73

1,

08

3.

31

1,

08

3.

74

1,

08

3.

88

1,

08

4.

08

1,

08

4.

51

130 135 140 145 150 155 160 165 170

1,

08

4.

71

1,

08

4.

81

1,

08

5.

33

1,

08

5.

33

1,

08

5.

55

1,

08

5.

82

1,

08

5.

79

1,

08

6.

36

1,

08

6.

22

1,

08

6.

35

1,

08

6.

90

1,

08

6.

67

1,

08

6.

83

1,

08

6.

86

1,

08

6.

97

1,

08

6.

97

1,

08

6.

81

1,

08

6.

87

1,

08

6.

91

1,

08

6.

80

1,

08

6.

77

1,

08

6.

79

1,

08

6.

47

1,

08

6.

35

1,

08

6.

25

1,

08

6.

30

1,

08

6.

13

1,

08

6.

08

1,

08

6.

19

1,

08

6.

08

1,

08

6.

10

1,

08

6.

12

1,

08

6.

31

1,

08

6.

30

1,

08

6.

24

1,

08

6.

55

1,

08

6.

52

1,

08

6.

76

1,

08

6.

76

1,

08

6.

70

1,

08

6.

78

1,

08

6.

89

1,

08

7.

06

1,

08

7.

12

1,

08

7.

37

1,

08

7.

48

1,

08

7.

63

1,

08

7.

88

1,

08

8.

08

1,

08

8.

17

1,

08

8.

61

1,

08

8.

99

1,

08

9.

44

1,

08

9.

71

1,

08

9.

84

1,

09

0.

07

1,

09

0.

55

1,

09

0.

70

1,

09

0.

88

1,

09

1.

19

1,

09

1.

46

1,

09

1.

56

1,

09

1.

75

1,

09

1.

87

1,

09

1.

96

1,

09

2.

01

1,

09

2.

37

1,

09

2.

45

1,

09

2.

21

1,

09

2.

43

1,

09

2.

30

1,

09

2.

42

1,

09

2.

26

1,

09

2.

19

1,

09

2.

16

1,

09

2.

05

1,

09

1.

99

1,

09

2.

06

1,

09

2.

12

1,

09

2.

21

1,

09

2.

35

1,

09

2.

47

1,

09

2.

77

1,

09

2.

81

1,

09

3.

32

1,

09

3.

58

1,

09

4.

12

1,

09

4.

67

1,

09

5.

16

1,

09

5.

70

1,

09

6.

02

1,

09

6.

41

1,

09

7.

20

175 180

1,

09

7.

56

1,

09

7.

87

1,

09

8.

34

1,

09

8.

73

1,

09

8.

95

1,

09

9.

29

1,

09

9.

57

1,

09

9.

88

1,

09

9.

91

1,

10

0.

22

1,

10

0.

49

1,

10

0.

59

1,

10

0.

63

1,

10

0.

85

1,

10

0.

78

1,

10

0.

82

1,

10

0.

93

1,

10

0.

93

1,

10

0.

94

1,

10

0.

99

1,

10

1.

23

1,

10

1.

38

185 190 195 200

1,

10

1.

30

1,

10

1.

39

1,

10

1.

46

1,

10

1.

44

1,

10

1.

35

1,

10

1.

24

1,

10

1.

29

1,

10

1.

20

1,

10

1.

06

1,

10

0.

92

1,

10

0.

72

1,

10

0.

65

1,

10

0.

60

1,

10

0.

36

1,

10

0.

09

1,

09

9.

97

1,

09

9.

50

1,

09

8.

98

1,

09

8.

55

1,

09

8.

01

1,

09

7.

22

1,

09

6.

20

1,

09

5.

50

1,

09

4.

41

1,

09

3.

79

1,

09

2.

86

1,

09

2.

03

1,

09

1.

40

1,

09

0.

70

1,

09

0.

06

1,

08

9.

70

1,

08

9.

47

1,

08

9.

03

1,

08

9.

05

1,

08

8.

82

1,

08

8.

77

1,

08

8.

34

1,

08

8.

30

1,

08

8.

22

1,

08

8.

04

205

1,

08

7.

83

1,

08

7.

84

1,

08

7.

74

1,

08

7.

61

1,

08

7.

43

1,

08

7.

48

1,060

1,070

1,080

1,090

1,100

1,110

1,060

1,070

1,080

1,090

1,100

1,060

1,070

1,080

1,090

1,100

1,110

Sta.

130

+37.

13

Constr

ucti

on

Be

gi

nE

BT

H23

Sta.

200

+80.

52

Constr

ucti

on

End

EB

TH

23

CL

Sta. 202+88

(Right)

Field Entr.

CLCL

CL

Sta. 153+00

(Right)

Field Entr.

(Left)

128th St. SW

Sta. 183+41

(Right)

Driveway Entr.

Sta. 184+12

(Left)

Field Entr.

CL

CL

CL

Sta. 139+65

(plastic lined)

24" Culvert

Sta. 167+65

(plastic lined)

21" Culvert

Sta. 182+00

(plastic lined)

21" Culvert

+50

100’75’

390’

175.73’

+07

+32

175’

50’

75’

75’

50’

50’

75’ 75’

75’

50’

100’

+50

100’

75’

+0

0

50’

LEGEND

WETLANDS

CONSTRUCTION LIMITS

EXISTING RIGHT OF WAY

PROPOSED AGGREGATE SURFACING

PROPOSED SHOULDER

PROPOSED ROADWAY

LEGEND

WETLANDS

CONSTRUCTION LIMITS

EXISTING RIGHT OF WAY

PROPOSED AGGREGATE SURFACING

PROPOSED SHOULDER

PROPOSED ROADWAY

ENVIRONMENTAL CONCERNS LEGEND

SNOWMOBILE TRAIL

STATE PARK

SPLIT ROCK CREEK

WATER COURSE

BIODIVERSITY

PRAIRIE

NATIVE PLANTS

ENVIRONMENTAL CONCERNS LEGEND

SNOWMOBILE TRAIL

STATE PARK

SPLIT ROCK CREEK

WATER COURSE

BIODIVERSITY

PRAIRIE

NATIVE PLANTS

MINNESOTA

23

MINNESOTA

23

MINNESOTA

23

MINNESOTA

23

350 355360

365370 375 380 385 390 395 400 405 410 415 420 425 430

CURVE 2050

PI 353+53.20

X 649,133.871

Y 190,630.493

T 776.13’

L 1,551.99’

R 34,377.47’

PC 345+77.07

PT 361+29.06

CURVE 2060

PI 371+28.90

X 650,622.033

Y 191,599.758

T 385.52’

L 771.01’

R 34,377.47’

PC 367+43.38

PT 375+14.39

350 355360

Sta

361

+29.06

BK

=

EQ

UA

TI

ON:

Sta

361

+29.05

AH

PI

PT.

361

+29.06

365

PC.

367

+43.38

370 375

Sta

37

5+

14.

39

BK

=

EQ

UA

TI

ON:

Sta

37

5+

15.

59

AH

PI 380 385 390 395 400 405 410 415 420 425 430

CUR

VE

2050

PI

123+15.00

X

376,860.835

Y

148,148.053

T

375.18’

L

750.10’

R

11,459.16’

PC

119+39.82

CURVE 2060

PI 169+00.00

X 380,508.649

Y 150,928.316

T 424.73’

L 849.35’

R 22,918.31’

PC 164+75.28

PT 173+24.63

CURVE 2070

PI 180+02.00

X 381,408.697

Y 151,563.001

T 423.82’

L 847.55’

R 22,918.31’

PC 175+78.17

PT 184+25.72

CURVE 2080

PI 199+97.00

X 383,156.835

Y 152,895.166

T 227.43’

L 454.81’

R 11,459.16’

PC 197+69.57

PT 202+24.38

125

Sta

126

+89.92

BK

=

EQ

UA

TI

ON:

Sta

126

+88.

64

AH

PI

PT.

126

+89.92

130135

140145

150155

160

PC.

164

+75.2

8

165 170

Sta

173

+24.63

BK

=

EQ

UA

TI

ON:

Sta

173

+25.40

AH

PI

PT.

173

+24.63

175

PC.

175

+78.17

180Sta

184

+2

5.7

2B

K=

EQ

UA

TI

ON:

Sta

18

2+2

2.9

5A

HPI

PT.

184

+25.

72

185190

195

PC.

197

+6

9.57

200

Sta

202

+24.38

BK

=

EQ

UA

TI

ON:

Sta

202

+24.85

AH

PI

PT.

202

+24.38

205