e-title survey module (etsm)

30
DEVELOPMENT OF NATIONAL DIGITAL CADASTRAL DATABASE (NDCDB) IN JUPEM PERAK SR JOHN ELVIS KOH, S.I.S., P.P.T., F.R.I.S.M. PENGARAH JABATAN UKUR & PEMETAAN NEGERI PERAK

Upload: phungthuy

Post on 23-Jan-2017

292 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: E-Title survey module (ETSM)

DEVELOPMENT OF NATIONAL DIGITAL CADASTRAL DATABASE (NDCDB) IN JUPEM PERAK

SR JOHN ELVIS KOH, S.I.S., P.P.T., F.R.I.S.M.

PENGARAH JABATAN UKUR & PEMETAAN NEGERI PERAK

Page 2: E-Title survey module (ETSM)

VISION MAKING JUPEM’S AN EMINENT ORGANISATION IN PROVIDING OUTSTANDING SURVEY AND MAPPING SERVICES

AS WELL AS GEOSPATIAL DATA MANAGEMENT TOWARDS FULFILLING THE NATION’S VISION.

MISSION PROVIDING A QUALITY SURVEY AND MAPPING AND SERVICES AND GEOSPATIAL DATA MANAGEMENT VIA FIRST-

RATE SYSTEM, COMPETENT HUMAN RESOURCE AND CONDUCIVE WORKING ENVIRONMENT.

MOTTO THE CATALYST FOR NATIONAL DEVELOPMENT AND CITIZEN’S PROSPERITY

OBJECTIVES • TO ENSURE THE PRODUCTS AND LAND SURVEY AND MAPPING SERVICES MEETS THE QUALITY ACCEPTANCE

AND CUSTOMER’S NEEDS.

• TO ENSURE A WELL MAINTAIN,UP-TO-DATE CADASTRAL AND MAPPING DATABASE TO MEET NEEDS OF THE

NATIONAL GEOSPATIAL INSFRASTRUCTURE.

• TO MAKE JUPEM AS AN EXCELLENT REFERENCE CENTRE IN THE FIELD CADASTRAL SURVEY AND MAPPING.

• TO SURVEY DETERMINE,DEMARCATE STATE AND INTERNATIONAL BOUNDARIES.

JUPEM

Page 3: E-Title survey module (ETSM)

CARTA ORGANISASI JABATAN UKUR DAN PEMETAAN NEGERI

CAWANGAN PU

SEKSYEN HAKMILIK

TANAH

PEJABAT UKUR DAERAH SEKSYEN KHIDMAT SISTEM SEKSYEN PENTADBIRAN

DAN KEWANGAN

SEKSYEN STRATA /

STRATUM /MARIN

CAWANGAN SSM

CAWANGAN CRM CAWANGAN

INSPEKTORAT

SEKSYEN NDCDB SEKSYEN PDUSSM

CAWANGAN

STANDARD NDCDB CAWANGAN

STANDARD PDUSSM

CAWANGAN

PEWARTAAN

CAWANGAN

MULTIPURPOSE

KADASTER

CAWANGAN KHIDMAT

PELANGGAN

CAWANGAN PELAN

BERDIGIT

PENGARAH UKUR DAN PEMETAAN NEGERI

TIMBALAN PENGARAH UKUR DAN

PEMETAAN (Pangkalan Data)

TIMBALAN PENGARAH UKUR DAN

PEMETAAN (Penawanan Data)

Page 4: E-Title survey module (ETSM)

What we produce now?

• (photo of modern CP in digital form)

• Ultimate cadastre product : B1.tiff for Title

• (photo of Title wt B1)

• Pg.269

B1 plan

Page 5: E-Title survey module (ETSM)

Then

• Cadastral survey

activities carried

out to produce

Certified Plan

(Pelan Akui)

• Certified Plan was

painstakingly

hand-drawn and

produced in

hardcopy.

Page 6: E-Title survey module (ETSM)

What we produce then?

• (photo of historic CP)

• hardcopy

Page 7: E-Title survey module (ETSM)

Now • Survey activities

carried out in a digital environment

• Survey ASCII is imported and processed in a GIS environment and stored in database.

• Certified Plans are extracted from database.

• This database is called NDCDB

Total Station:

measure distances

and angles of lines

Toughbook:

equipped with eTSM

for data recording

Page 8: E-Title survey module (ETSM)

eKadaster

•RMK-9 Project

•Three main components: • Virtual Survey System (SUM)

• Cadastral Data Integrity System (SKDK)

• Coordinated Cadastre System (CCS)

Page 9: E-Title survey module (ETSM)

SKDK

CCS

SUM

Concepts of eKadaster

Page 10: E-Title survey module (ETSM)

eKadaster Objectives • The objective of eKadaster project is to drastically

improve the time frame of delivery system of land title survey.

• To develop National Digital Cadastral Database (NDCDB) for Peninsular Malaysia and W.P. Labuan.

• To develop Strata/Stratum/Marin Database (PDUSSM)

• To integrate eKadaster with e-Tanah in spatial information sharing

• To provide GIS ready infrastructure and information

• To apply GNSS technology in cadastral survey

Page 11: E-Title survey module (ETSM)

•eLodgement

•eKadasOnLine

JUPEM2U

CSRS

Notification

Web

GIS

•eCadasonline

•eKiosk

•eReporting

•eMonitoring

•eNotification

eCRM

eTSM

eSSM

Field

Strata • Strata

•Strata Data Entry

LS

Strata

GIS

SUM

eQC

eSPEK

SPEK

• SUM LSA

Database

•Watchguard

•Fortigate

•SPAK HQ

•SPAK LS

•SPAK

•eSigning

•eVerifier

•2D Barcode

•eAnotation

eReporting

eSupport

ePKI eMedmAS

• eReporting

•eReporting HQ

Non GIS

SPAK

Security SPPK •SPPK

•SPPK HQ

ePU DRP

eGLMS

Desktop

GIS •ePU

•eJalan

•eTownKg

•eAdminBdy

•eHidrografi

•eBangunan

•eWarta

•eGrid

•ePA, ePA(B)

•ePA(S),

•ePA(W), eB1

•eB4, ePA(M)

•ePetakadas eFEE

• eFee

GLMS

PDUSSM

NDCDB

eSPID

APPLICATION MODULES

• eSPID

Page 12: E-Title survey module (ETSM)

CSRS/JUPEM2U

Page 13: E-Title survey module (ETSM)

CSRS/ JUPEM2U USERS

JURUUKUR

BERLESEN

CSRS/

JUPEM2U JURUUKUR

DAERAH

INSPEKTORAT

eSSM

PENGARAH

UKUR

PENGUKUR

eCRM

PENGUKUR

eTSM

PTG / PTD

JUPEM

HQ

eCadasOnline

Download B1 Tiff

eCadasOnline

eMonitoring

eCadasOnline

eMonitoring

Upload Strata XML

Download Strata

XML eCadasOnline

eMonitoring

Download CRM Job

Upload Survey CRM

Job

eCadasOnline

Download Job

Download NDCDB &

CRM

Upload for SUM

processing

View SUM Report

Append

Minute/Attachment

eCadasOnline

eMonitoring

Assign Job

Assign CRM

Define

CRM Point

Checking

Minute

Job Mobilization

View Job status

eCadasOnline

Upload Precomp

Download

lot numbers & Precomp

Upload Strata

Upload for SUM

Processing (Checking)

Upload for SUM

Processing

(Lodgement)

View SUM Report

Digital Signing

Fieldbook

eCadasOnline

eMonitoring

Approval PreNDCDB

Approval Strata

Page 14: E-Title survey module (ETSM)

eSPEK

Page 15: E-Title survey module (ETSM)

LAYER LOT C3

LAYER WARTA

LAYER JALAN

LAYER TOWN KG

LAYER ADMINBOUNDARY

EGLMS

Page 16: E-Title survey module (ETSM)

Milestone to NDCDB

Page 17: E-Title survey module (ETSM)

CREATION OF NDCDB

• Since 2010.

• GIS-ready homogeneous database with geocentric datum.

• To adapt the use of GNSS technologies.

• NDCDB is the gist of eKadaster

• NDCDB developed under eKadaster Project (RMK9) to

replace DCDB (PDUK) which is not homogenous and

isolated.

Page 18: E-Title survey module (ETSM)

GIS Interface in NDCDB: Lot layer

Page 19: E-Title survey module (ETSM)

Stone Layer (stn)

Page 20: E-Title survey module (ETSM)

Boundary (bdy) Layer

Page 21: E-Title survey module (ETSM)

WHY NDCDB?

RIGID

COORDINATE Homogenous and Systematically Adjusted

PLOTTING

COORDINATE For cadastral map plotting purposes

SYSTEM

COORDINATE System/Software generated coordinate

based on features location

Rigid Coordinate Plotting Coordinate System Coordinate

Page 22: E-Title survey module (ETSM)

CLEANING

CP BY CP

CCI-LAYER R&R

BLOCK ADJ

Re

Coordination

Re

Population

Adjust Block

Using 4 control point

And re-coordination

based on GDM 2000

Repopulation of

Pre-NDCDB and

Field Validation NDCDB

Append Traverse

and Point

Add Connection line

Cleaning

- Direction

- Bearing

- Distance

Adjust CP by CP

using LSA

Validation

By PPSME

Reconnaissance

Monumentation

Tie-UP

GPS-Obs

QC

How is NDCDB established?

Page 23: E-Title survey module (ETSM)

Perak NDCDB Statistics New_NDCDB

Parameters

30th April 2012 19 July 2016

Adjustment Blocks 644 Blocks 644 Blocks

Cadastral Control Marks 2,591 Points 6431 Points

NDCDB Lots 961,468 Lots 1,012,064 Lots

NDCDB Lots (3rd Class) 40,217 Lots 36,744 Lots

Boundary Marks 2,548,208 Points 2,598,279 Points

Page 24: E-Title survey module (ETSM)

Establishment of Cadastral Control Infrastructure (CCI)

Page 25: E-Title survey module (ETSM)

CRM Distribution for Perak (until 15 July 2016

644 Blocks

6431 points

CRM

Page 26: E-Title survey module (ETSM)

2.GNSS Observation

Stone ID :7281747956

U64797.675

T-37278.467

1.Adjustment

Stone ID :7281747956

U 64797.675

T -37278.512

3.Difference:

Jarak :0.045

Bearing :270.0000

Concept of GP Ground Proofing

Page 27: E-Title survey module (ETSM)

Workflow of Title Survey

Page 28: E-Title survey module (ETSM)

The way forward • Upgrading of eKadaster

• Strengthening Infrastructure of eKadaster

• SmartKadaster phase II

• Study on Development of 3D Cadastral Database and Land

Administration Domain Model ( LADM ) In Open Source

• Outsource the upgrading of substandard lots (Demarcation

and 3rd class)

Page 29: E-Title survey module (ETSM)

Conclusion

• GIS technology increases cost-effectiveness and

result in significant improvement in productivity.

• GIS technology significantly changes and improves

JUPEM delivery system.

• Important role of Cadastral layer in SDI

Page 30: E-Title survey module (ETSM)

THANK YOU

[email protected]

jupem.gov.my