e tp19 e tp3 page's lane -...
TRANSCRIPT
TP26
TP20
TP19
TP3
TP2
TP22
TP1
34.50
3
3
.
5
0
3
3
.
5
0
3
3
.7
5
3
3
.
5
0
33.75
34
Sion House
PA
GE
'S L
AN
E
The
Bungalow
Tudor
Cottage
The
Rookery
Homestead
The
Gables
Corner
Bungalow
Three
Ways
Arcadia
Rosedale
Richton
Monks
Orchard
Western House
Crane House
Hesslewell
Church End
Nursery
S21
388860.719mE
236160.764mN
34.569m
Field
Field
Field
Tudor
Cottage
A
3
8
S21
34.569m
Field
5
0
m
f
r
o
m
p
r
o
p
e
r
t
y
CHURCH
END
EE
E
EE
EE
E
A
T
W
/
3
4
/
2
Hilton Puckrup
Hall Golfcourse
SITE
ACCESS
3
4
.2
5
5
0
m
f
r
o
m
p
r
o
p
e
r
t
y
AT
W
/36/1
WMBH3
WMBH4
WMBH5
WMBH2
TRENCH TRAVELS
THROUGH A CULVERT
UNDER SITE ACCESS
GROUNDWATER
RECHARGE
TRENCH
CHANNEL TRAVELS
THROUGH A CULVERT
UNDER BUND
PROPOSED POND
(Average WL 32.0)
31.5
31.7
5
34.50
3
3
.
5
0
3
3
.
5
0
3
3
.7
5
3
4
3
3
.
5
0
33.75
34
34
3
4
.2
5
3
4
INFILLING
WASHED
MINERAL
STOCK PILES
MOBILE PLANT RELOCATED
DURING PHASE 2 MINERAL
EXTRACTION
CONVEYANCE
CHANNEL
PROPOSED
POND
(Average WL 32.0)
EXTRACTION
VOID
KEYBOUNDARY:APPLICATION SITE
PROPOSED TREEAND SHRUBPLANTING
BOUNDARY:LAND IN THE CONTROLOF THE APPLICANT
EXISTINGSPOT LEVELS
EXISTINGCONTOURS
34.25
TRIAL PIT LOCATIONAND REFERENCE
OVERHEADELECTRICITYCABLE
E
EXISTING PUBLICRIGHT OF WAYAND REFERENCE
ATW/34/2
INDICATIVE BASEOF OVERBURDENCONTOURS
33.25
INDICATIVE BASEOF MINERALCONTOURS
31.25
EXISTINGVEGETATION
PROPOSEDRESTORATIONCONTOURS
33.25
WATER MONITORINGBOREHOLE, REFERENCEAND CASE TOP LEVEL
BOUNDARY:PROPOSED EXTENTS OFMINERAL EXTRACTION
TP1
WMBH1
GRASS SEEDEDACOUSTIC SCREENBUND
CONVEYANCECHANNEL
DAVID JARVIS ASSOCIATESplanning development landscape environment
DAVID JARVIS ASSOCIATES LIMITED1 Tennyson Street Swindon Wiltshire SN1 5DTTel: 01793 612173 Fax: 01793 613625Email: [email protected]
Drawing No.
1800/CQ/14E
Date
Drawing Title
Project
1:1250 at A3 FEB 2011
LAND AT CHURCH END,TWYNING
MORETON C CULLIMORE(GRAVELS) LTD
0
Reproduced with the permission of the controller of HMSO.Licence No: AR 189685
10 25 50m
Client
■ Drawing based on Shyres Rural Ltd drawing reference SRL.115.10, dated
21.10.2010 and D & H Surveys Topographical survey, dated May 2007.
■ Hydrological channel based on GWPC drawing reference CHURCHE1210 14B,
dated 20.12.2012.
RevisionsE 28.01.13 Scheme revised following comments from GWPC
in reference to Groundwater Conveyance ChannelD 02.01.12 General amendmentsC 23.10.12 General amendmentsB 14.08.12 General amendmentsA 28.06.12 Scheme of working revised
PHASE 2 EXTRACTION &RESTORATION WORKS