E944 Volume 1 MINISTRY OF SETTLEMENT AND REGIONAL INFRASTRUCTURE DIRECTORATE GENERAL OF URBAN AND RURAL DEVELOPMENT JI. Pattimura 20 Kebayoran Baru, Jakarta 12110, Telp. 72796588 Fax. 72796588 CONSOLIDATED ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PDAMs BOGOR, KAB. LEBAK, CIREBON, BANJARMASIN, PONTIANAK, MAKASSAR, KENDARI, AND JAMBI (English translation) March 26, 2004 URBAN WATER AND SANITATION IMPROVEMENT AND EXPANSION PROJECT EnvironmentalImpact Assessment for PDAM Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: lelien

Post on 29-Aug-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

E944Volume 1

MINISTRY OF SETTLEMENT AND REGIONAL INFRASTRUCTUREDIRECTORATE GENERAL OF URBAN AND RURAL DEVELOPMENTJI. Pattimura 20 Kebayoran Baru, Jakarta 12110, Telp. 72796588 Fax. 72796588

CONSOLIDATED

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

FOR

PDAMs BOGOR, KAB. LEBAK, CIREBON, BANJARMASIN, PONTIANAK,

MAKASSAR, KENDARI, AND JAMBI

(English translation)

March 26, 2004

URBAN WATER AND SANITATIONIMPROVEMENT AND EXPANSION PROJECT

Environmental Impact Assessment for PDAM

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

LIST OF CONTENTS

I. INTRODUCTION

1.1 BACKGROUND

1.2 OBJECTIVES

II. PROJECT DESCRIPTION

II. ENVIRONMENTAL SCREENING

2.1 REGULATIONS

2.2 SCREENING PROCESS

2.3 ACTIVITIES THAT CAUSE IMPACT

2.4 IMPACTS ON ENVIRONMENT

IV. MITIGATION AND MONITORING OF ENVIRONMENTAL IMPACT

V. EVALUATION AND RECOMMENDATION

ATTACHMENT

1. LIST OF ATTENDANCE

1.1. Kab.Lebak

1.2. Kota Cirebon

1.3. Kota Pontianak

1.4. Kota Banjarmnasin

1.5. Kota Makassar

1.6. Kota Kendari

1.7. Kota Jambi

Environmental Impact Assessment for PDAM 2

I. INTRODUCTION

1.1 BACKGROUND

The project is to improve and expand the service delivery of water supply bystrengthening the PDAM to become more operationally efficient and financially sustainable. It isa "fast track" operation for those PDAMs that have been ready and are committed to improveand expand service delivery. The schedule is to complete this assignment by end February 2004.

1.2 OBJECTIVE OF PREPARING EMP

The potential impact of project activities is limited and measures for mitigating theenvironment impact is relatively simple and well known. The EMP is prepared to predict specialpotential environmental impact. The environmental screening is carried out to find out ifANDAL or UKLIUPL is required. The review will be made in accordance with OP/BP/GP 4.01on Environemntal assessment, as well as other relevant government regulations onenvironmental assessment.

II. PROJECT DESCRIPTION (taken from draft PAD)

Water supply component comprises system improvements for the participating PDAMswhich are diversely located on the islands of Sumatra (Jambi), Java (Cirebon and KabupatenLebak), Kalimantan (Banjarmasin and Pontianak), and Sulawesi (Makassar, Manado andKendari). The investment plans for each PDAM (in constant price) are included in Tables 2.1 to2.8. Common physical elements of the investment program under the Bank loan in each cityinclude:

* Distribution system construction: Planned distribution improvement works in each cityincludes system expansion and optimization, and an unaccounted for water (UFW) reductionprogram. System expansion includes laying new pipelines to increase the area coverage ofthe reticulation system to meet the demands in new areas and so increase revenue throughincreased sales. It also includes new connections for infill in areas that presently havedistribution pipelines but only few house connections. A water loss program will beconducted in all cities except Cirebon where the UFW is reportedly already well below 20%.The unusually low UFW for Cirebon will be verified. The exact nature of the UTFW in thecities is unknown at this stage. Therefore, the UFW reduction program will includedetermining the nature of the UFW - proportion of illegal connections, physical leakage andadministrative errors due to inaccurate meters and meter readings, to ascertain the mosteffective means of loss reduction; installing or replacing bulk water meters and eventually allolder service connection meters; procurement of leak detection equipment; and prioritizingthe service area by blocks for action.

* Headworks construction: The headworks improvements generally involve upgrading ofintake and or transmission pipelines and rehabilitation of the treatment facilities. Expansionwill only be considered after efficiency gains have been made and implemented. Newsources are required in Cirebon as the existing spring sources are fully developed, and in

Environmental Impact Assessment for PDAM 3

Lebak where the existing river intake would be eventually abandoned and moved upstreamof the city. The rehabilitation of the treatment plants in four of the cities - Banjarmasin,Jambi, Kendari and Manado, will increase the treatment capacity by as much as 50%, thusproviding a cost effective means of increasing supply. All of the cities, except for Kendari,will require expansion of the treatment plant capacities.

Table 2.1 PDAM Banjarmasin Investment Plan

Activity Cashflow Projection (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Optimization study and corporate plan upgrade 1,000 1,000* Design and construction supervision 1,110 250 250 250 240 120* UFW supervision consultant 350 150 100 50 50* Project implemetation adviser 250 60 60 60 40 30

Headworks* Raw water transmission upgrade 26,500 15,900 10,600* Optimizing Ahmad Yani WTP 5,000 5,000* WTP capacity upgrade 25,000 3,750 11,250 5,000 5,000

Distribution System* Distribution system expansion 41,000 8,200 20,500 12,300* New house connections* 14,850 0 675 2,835 4,253 4.253 2,835* UFW reduction program 8,000 1,600 2,400 2,400 1,600ANNUAL TOTALS 123,060 0 23,385 40,695 32,513 23,483 2.985* Funding of new connectoins under the project starts in 2005

Table 2.2 PDAM Cirebon Investment Plan

Activity Cashflow Projection (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consukants* Feasibility study Being undertaken under separate budget* Detail design and construction supervision 3,230 650 970 970 320 320* Project implemetation adviser 250 60 60 60 40 30

Headworks

* Replace older raw water transmision from Paniis* 5,200 2,600 2,600* Captation of intakes at new sources (3 springs) 2,500 2,500* Construct aeration/disinfection facilities for new source 1,500 1.500* Construct transmission main from new source 35,000 20,000 15.000

Distribution System* Distribution system expansion 10,200 2,550 2,550 2,550 2,550* New house connections 4,455 165 165 825 1,650 1,650* UFW reduction program 0

ANNUAL TOTALS 62335 0 3,475 8,845 24,405 21,060 4,550* Excluding Rp2,100 million received from KIMRASWIL.

Environmental Impact Assessment for PDAM 4

Table 2.3 PDAM Jambi Investment Plan

Activity Cashflow Projecdon (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Corporate plan review 600 600* Detail design and construction supervision 1,200 40 400 400 240 120* Project implemetation adviser 250 60 60 60 40 30Headworks* Upgrade works at intakes 1,950 750 1,200* Rehabilitate and upgrade Broni WTP 3,000 1,000 2,000* Rehabilitate and upgrade Tanjung Johor WTP 250 250* Rehabilitate and upgrade Benteng WTP 10,000 2,000 4,000 4,000* Construct new Sijinjang WTP for East Jambi 16,000 6,000 6,000 4,000Distribution System* Distribution system expansion 12,000 1,500 1,500 3,000 3,000 3,000* New house connections* 12,800 2,000 2,400 2,800 2,800 2,800* UFW reduction program 8,300 2,300 2,200 1,400 1,400 1,000

ANNUAL TOTALS 66,350 0 16,500 19,760 15,660 7,480 6,950* New connections in 2004 are financed from funds other than the project.

Table 2.4 PDAM Kendari Investment Plan

Activity Cashflow Projecton (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Corporate plan upgrade study 600 600* Detail design and construction supervision 1,250 650 240 120 120 120* Project implementation adviser 250 60 60 60 40 30Headworks* Upgrade pumps at intake and booster pump stations 2,000 1,200 800* Rehabilitate existing WTP 5,000 500 2,500 2,000Distribution System* Distribution system expansion 5,500 700 600 1,400 1,400 1,400* New house connections* 5,225 0 550 550 1,375 1,375 1,375* UFW reduction program 2,820 620 600 600 600 400

ANNUAL TOTALS 22,645 0 4,880 5,350 5,555 3,535 3,325* In year 2004 assume no new connections, funded under the investment project.

Environmental Impact Assessment for PDAM 5

Table 2.5 PDAM Kabupaten Lebak Investment Plan

Activity Cashflow Projection (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Corporate plan upgrade study 600 600* Detail design and construction supervision 1,750 1,150 120 240 120 120* Detail design and construction supervision Maja system 750 500 130 120* Project implemetation adviser 250 60 60 60 40 30

Headworks

* Purchase land for new WTP complex 1,620 1,620* Expand existing WTP capacity 0* Relocate existing WTP to new site 3,500 3,500* Construct new WTP 12,500 1,000 7,750 3,750* Reabilitate Kota Maja WTP 2,000 2,000* Integrate Rangkasbitung and Warunggunung systerms 800 200 600

Distribution System* Construct transmission from new WTP 3,400 3,400* Distribution system expansion 4,080 300 420 840 1260 1260* Construct distribution system and connections in Maja 2,700 675 1350 675* UFW reduction program 3,900 900 900 700 700 700* New house connections* 6,870 270 1,650 1,650 1,650 1,650

ANNUAL TOTALS 44.720 1,620 7,455 12,580 12,035 7,270 3,760*Project funding of new connections commences in 2005.

Table 2.6 PDAM Makassar Investment Plan

Activity Cashflow Projection (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Review corporate plan 0* Detail design and construction supervision 9,000 4,500 3,300 400 400 400* Project implemetation adviser 250 60 60 60 40 30Headworks

* Connect Panaikang WTP to transmission from Bili Bili 57,000 27,000 30,000* Add 50 L/s to Antang WTP 0* Add 500 LUs to Panaikang WTP 35,000 15,000 20,000

Distribution System* Distribution system expansion 24,000 6,000 6,000 6,000 6,000* New house connections* 27,500 5,500 5,500 5,500 5,500 5,500* UFW reduction program 20,000 5,500 4,000 3,500 3,500 3,500

ANNUAL TOTALS 172,750 0 15,560 18,860 57,460 65,440 15,430* Project starts to fund new connections in 2005

Environmental Impact Assessment for PDAM 6

Table 2.7 PDAM Manado Investment Plan

Activity Cashflow Projection (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year 5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Corporate plan review and update 600 600* Design review and construction supervision consultant 1,760 1,040 240 240 120 120* Project implemetation adviser 250 60 60 60 40 30

Headworks* Upgrade raw water transmission to Lotta WTP 2,550 2,550* Rehabilitate and expand Lotta WTP 1,400 1.400* Rehabilitate transmission from Pancuran to Winangun 750 750* Rehabilitate and expand Paal 11 WTP 7,500 4,000 3,500* Upgrade capacity of Malalayang WTP 600 600

Distribution System* Distribution system expansion 11,640 770 2,690 2,690 2,350 3,140* New house connections 17,500 3,500 3,500 3,500 3,500 3,500* UFW reduction program* 13,500 3,600 3,600 2,100 2,100 2,100

ANNUAL TOTALS 58,050 0 16,120 15,740 9,190 8,110 8,890* Funding of new house connections under the project commences in 2005.

Table 2.8 PDAM Pontianak Investment Plan

Activity Cashflow Projection (Rp million)Total Year 1 Year 2 Year 3 Year 4 Year5 Year 6

2004 2005 2006 2007 2008 2009Engineering Consultants* Corporate plan review and update 300 300* Design review and construction supervision consultant 1,200 300 300 240 180 180* Project implemetation adviser 250 60 60 60 40 30

Headworks* Construct raw water transmision (800 dia) 64,420 20,000 20,000 24,420* New raw water transmision from Biyung to Penepat 0* Extend raw water transmision Imam Bonjol to Sei Jawi 7,160 3,160 4,000* Expand Selat Panjang WTP 0* Expand Sei Jawi Luar WTP 5,000 5,000

Distribution System* Distribution system expansion/optimization 8,000 2,000 2,000 2,000 2,000* Add distribution system reservoirs 8,400 3,950 4,450* New house connections* 9,900 1,650 1,650 3,300 1,650 1,650* UFW reduction program 8,550 1,600 1,800 1,800 1,800 1,550

ANNUAL TOTALS 113,180 0 31,020 29,810 36,270 10,670 5,410* Funding of new connections under the project commences in 2005.

Apart from the above general activities, the city-specific works and measures willinclude:

* Banjarmasin: Engaging consultants to supervise the UFW reduction program, piloting azonal system to demonstrate the effectiveness of this approach not only to improve pressuresbut in facilitating the control of UFW, and the construction of a treated water transmissionpipeline to provide bulk treated water to the port and peri-urban communities in the adjacentBanjar and Bariot kabupatens. These areas on the outskirts of the city currently are plaguedwith declining river and ground water quality, thus the need for new sources of clean water.

Environmental Impact Assessment for PDAM 7

• Cirebon: Developing new spring sources in the adjoining Kabupaten Kuningan which willinvolve captation of the springs and construction of treatment facilities comprising aerationand chlorination). Although the PDAM has already purchased the land on which the springsare located, it advised that land will need to be acquired for the reservoirs and break pressuretanks along the route of the transmission pipeline. The city is also expanding its servicecoverage of the adjoining Kabupaten Cirebon to meet some of the demand with concurrencefrom the PDAM Kabupaten Cirebon.

* Jambi: Constructing a new treatment facility to service the rapidly developing eastern part ofthe city. Land for the facility is owned by the PDAM so there will not be a need foracquisition.

* Kendari: Optimizing, reconfiguring and replacing the raw water transmission main pumps atthe intake and booster pumps stations. The staffing ratio will be improved to further increasethe financial efficiency of the PDAM.

* Lebak: Relocating the existing intake and treatment plant to upstream of the Ciberang Riverconfluence to ensure there will be no influence on water quality from the abandoned goldmine in the catchment of this stream. A treated water transmission main will be extended tothe nearby town of Warunggunung, which lacks reliable water sources. The partiallyconstructed treatment facilities at Maja, another town in Kabupaten Lebak, will berehabilitated to serve Maja town, thus making use of abandoned assets which are costing thePDAM (funded by an existing loan) without generating revenues. The staffing ratio will beimproved to further increase the financial efficiency of the PDAM.

* Makassar: Establishing a trial zonal system to demonstrate the effectiveness of this approach.

* Manado: Putting in place some catchment protection measures at the existing Malalayangspring sources, repairing pumps in the Pancuran to Winangun reservoir transmission pipelineto increase raw water delivery and system operation to re-establish supply to areas of the citysuffering from lack of supply due to low system pressures. The staffing ratio will beimproved to further increase the financial efficiency of the PDAM.

* Pontianak: Establishing a monitoring program at each treatment plant and along the river tothe dry-season intake to check seasonal variations in water quality of the source, constructingdistribution reservoirs in the service area to improve system pressures and security of supplyin western and northern parts of the city and duplicating the transmission main from the dryseason intake at Biyung.

The existing condition of the participating PDAMs and key features of the investmentplans are summarized in Table 2.9.

Environmental Impact Assessment for PDAM 8

Table 2.9 Summary of Investment Proposals - Water Supply Component

Item - Description Units Banjarmasin Cirebon Jambi Kendari Lebak Makassar Manado Pontianak Total (million)

Existing Status (Rp) (US$)Urban population no. 591,616 238,102 441,40 216,300 163,999 1,177,02 461,344 540,621

5 0Population served % 73 92 53 43 30 72 41 67Production capacity Us 1,051 860 753 218 125 2,340 650 910Total connections no. 72,129 51,720 43,000 15,536 8,926 120,233 33,913 60,000Average water use per connection M3/month 23 32 22 22 20 25 20 23UFW % 33 <20 40 40 45 49 59 38Staffing ratio per 1,000 connections no. 4.5 7.1 7.7 10.2 10.4 6.0 11.0 6.0Bill collection perod days 60 14 25 47 76 100 75 54Outstanding loans Rp million 61,838 2,667 11,482 14,482 32,004 118,934 19,127 32,004 292,538Debt service arrears Rp million 37,180 None 3,465 14,314 2,230 48,822 19,293 23,000 148,304

Proposed Project for FinancingHeadworks* Intake upgrade Yes/No Yes New source Yes No Relocation No Yes Yes* Raw water trunk upgrade Yes/No Yes Yes Yes Yes Yes Yes Yes Yes* Rehabilitation works at ex. WTP Yes/No Yes No Yes Yes No No Yes No* Expand production capacity by Us 500 300 380 200 250 500 275 150Distrbution System* UFW by year 2009 % 25 <20 25 30 35 25 25 30* Additional new connections Yes/No 34,500 8,400 36,000 10,000 13,000 65,000 37,000 21,000* System expansion/optimization Yes/No Yes Yes Yes Yes Yes Yes Yes YesAdditional studies/preparation Action Master plan W/P Optimize M/P M/P M/P M/Prequirements (M/P) review review pumps upgrade review review reviewSocial impact Yes/No No Reservoir land No No WTP land No No NoLoan scheduling requirement Yes/No Yes No Yes Yes Yes Yes Yes YesInvestment cost* Rp million 180,258 93,786 98,147 33,300 65,285 260,278 85,091 164,664 980,809 115.39PDAM Loan Rp million 126,181 65,650 68,703 29,970 45,700 182,195 59,564 115,265 693,228 81.56

* Costs are expressed in current prices.

Environmental Impact Assessment for PDAM

III. ENVIRONMENTAL SCREENING

3.1 REGULATORY FRAMEWORK

The regulatory framework used for EMP preparation is the regulation on environmentalmatters issued by the Government of Indonesia, combined with the requirements as defined bythe World Bank for UWSIEP:

These regulations on environment of the GOI, among others are:1. Law No 23/1997 concerning Environmental Management2. Government Regulation No. 27/1999 regarding Environmental Impact Assessment

(AMDAL)3. Decree of Ministry of Environment No. 17/2001 regarding plan of activites that will require

environmental impact assessment.4. Decree of Ministry of Public Works No. 17/KPTS/M/2003 regarding projects that will

require management and monitoring plans on environmenl (UKL/UPL)5. Decree of Head of Agency for Environmental Impact Control (BAPEDAL) No. 105/1997

regarding Guidelines on Monitoring for Implementation of Environment Management andEnvironment Monitoring Plans (RKL and RPL)

The requirements of the World Bank for UWSIEP are:1. ENVIRONMENTAL ASSESSMENT (OP/BP/GP 4.01)2. ENVIRONMENTAL SCREENING (Annex E OD 4.01)

3.2 SCREENING PROCESS

The process includes review of of potential environmental impacts generated by projectactivities of the PDAM and raise important environmental issues, mitigation and environmentalaction plan to find out if environmental impact analysis (ANDAL) is required to comply with theDecree of the Ministry of Environment No 17/2001. Further, to ensure that there is no subprojectin FY 2004 that falls under Category A of the World Bank.

Based on Decree No 17/2001, for regional infrastructure, it is listed as No. 1 and forpreliminary screening for ANDAL for water supply, listed as No 12 and 13 and for sanitation No10. For further review, the screening complies to Decree of Ministry of Public Works No17/2003, which defines activities that needs UKL/UPL as shown on Table 3.1 and Figure 3.1

Environmental Impact Assessment for PDAM 10

Tabel 3.1. Government Environmental Screening Criteria ( by Decree of the Minister of Statefor the Environment of the Republic of indonesia )

Sectors and Projects Units ANDAL(*) UKL/UPL(+) Consideration (+)

1 Water SupplyRaw Water Intake L/s More than 250 50-250 Ensuring

downstreamavailability

Transmission Km More than 10 2-10 Impacts on social,(Large towns) aesthetic, traffic

disturbanceDistribution Ha More than 500 500-100 Impacts on social,

aesthetic, trafficdisturbance

Water Treatment Plant L/s > 50 Negative impact ofsludge fromsedimentation tank

2 Wastewater & SanitationSludge treatment (IPLT) Ha More than 2 Less than 2 Impacts on social,

aestheticSewerage System Ha More than 500 Less than 500 As aboveIPAL (Wastewater Ha More than 3 Less than 3 As abovetreatment plant)

Source: (*) Decree of Min. of Environment No. 17/2001 for ANDAL ( Concerning types of Businesses ActivitiesRequired to Complete on Environmental Impact Assesment) and(+) Decree of Min. of Public Works No. 17/2003 for UKLIUPL ( Concerning Decision on Types ofActivities in the Field of Public Works that are required to Prepare UPL/UKL )

As reference, the World Bank has defined the project as Category B, where onlyUKLIUPL are to be prepared. To find out important impacts of the projects to the environment,screening of imortant environmental issues, mitigation and action plan on limited and wellknown scope. This is done through field survey on the proposed project activities that haveimportant impact during construction and operation.

For reference, the the World Bank defines the environmental-related category as follows:

Category A

The proposed project has significant important impacts. The impacts involve much largerareas beyond its physical works. Environmental assessment (EA) for this category A testspotential positive and negative impacts, compares it with other possible options (includingoption for not doing anything) and recommends measures need to avoid, mitigate, minimize orcompensate negative impacts and rectify environment performance.

Projects under Category A

(a) Dam and reservoir(b) Production Forestry Project

Environmental Impact Assessment for PDAM 11

(c) Industrial plants (large scale) and industrial area, including major expansion, rehabilitation ormodification.

(d) Irrigation, drainage and flood control (large scale)(e) Aquaculture and sea culture (large scale)(f) Land clearance and leveling(g) Mineral development (including oil and natural gas)(h) Port & harbour(i) Reclamation and new area development(j) Resettlement(k) River river basin development(1) Development or expansion of hidropower and thermalpower(m)Factory, transportation and use of pesticide or hazardous materials(n) New or improvement of highway or rural road(o) Management of hazardous waste and its selling

Category B

Project proposal is classified as Category B if potential impacts is not good for human populationor environmentally importane area is less good as compared to Category A. The impacts arespecific for certain areas, small and irreversible and in many cases the mitigation can be designedmore ready as compared to project under Category A. there will be environmental assessmentrequired, but in many cases preparation of EMP without detailed assessment, or application ofstandard procedures of environmental protection will be fulfilled.

Project under Category B(a) Agro industry (small scale)(b) Electricity transmission(c) Irigation and drainage (small scale)(d) Renewable energy (except hydroelectric dam)(e) Rural electricity(f) Tourism(g) Rural water supply and sanitation(h) Catchment area project (management or rehabilitation)(i) Protected area and biodiversity conservation(j) Rehabilitation or modifikation of industrial facility (small scale)(k) Energy efficiency and energy conservation

Figure 3.1 Overall Screening Process

Environmental Impact Assessment for PDAM 12

I

Requires ANDAL (Environmental ImpactNo Type of Activity Size h Statement),

I Water supply for large cities ' RKL (Environmental Mangement Plan), RPL/Metropolitan (Environmental Monitoring Plan)

a) Development of network, with > 500 Ha (Normally these project will be in Category A)service area

b) Transmission line, with length > 10 KM

Project will pass trough one or more of the followingWater abstraction from lake, river, > 250 L/detspring or other sources, with 1. Commercial/Resident Areaabstraction capacity 2. Productive Land

3. Monumental, Traditional Religious Building2 Wastewater and sanitation Size 4. Nature Pressure (Existing/Proposal)a) Construction of sludge TP (IPLT) IP'fL > 2 Ha 5. Wild Life Reserve

and/or wastewater treatment plant 7. Protected Area(IPAL) , with pond area IPAL> 3 Ha 8. Fauna Evacuation Area/ Wild life refugee

9. Wetland Area10. Watershed Protection Area

b) Sewer piping system, with service > 500 Ha 11. Coastline/River Borderarea 12. Lake/Basin Area

13. Water Resources Area14. Marine Reserve AreaOther waters YES15. Mangrove Area16. National Park17. Forest Park18. Nature Tourist Park19. National Culture Reserve20. Natural Hazard21. Steep Slope > 40 %

Potentially Significant Impact

NO

E .. m................ ... ............. ..... ......... ........ ..............

Environmental Impact Assessment for PDAM

I

UKL (Environmental Management Plan),UPL (Environmental Monitoring Plan)

Sectors and Projects Units UKLIUPL Considerations

1 Water SupplyRaw Water Intake LIs 50-250 Ensuring downstream

availability of waterTransmission Km 2-10 Impacts on social, aesthetic,(Large towns) traffic disturbanceDistribustion Ha 500-100 As aboveWater Treatment Plant L/s > 50 Negative impact of sludge from

sedimentation process2 Wastewater

& sanitationIPLT Ha Less than 2 Impacts o social, aestetheticSewerage System Ha Less than 500 As aboveIPAL Ha Less than 3 As above

Environmental Impact Assessment for PDAM

3.3. ACTIVITIES THAT GENERATE IMPACT/SOURCE OF IMPACT

In water supply projects, "important activities that will generate impacts" are:

1. Source and raw water transmissiona) Intake works: mobilization of equipment and materials, foundation and piles for unsatblesoils

b) Raw water transmission pipe: Mobilzation of equipment, pipe trench and excavatedmaterials

2. Water Treatment Plant: mobilization of equipment and materials. Foundation and pilesworks for unstable soil.

3. Distribution system and house connection, and reservoir: mobilization of equipment andmaterials, foundation and piling of excavated materials

Activities under UWSIEP that could create impact/source of impact is presented in Table 3.2

Table 3.2: Activities that generate impact/source of impact

Activity Impacts generatedI Mobilization of equipment and materials Damage to road, nuissance, traffic disturbance2 Excavation for foundation Landslide, erosion, discovery of antiques3 Piles construction Nuissance, air pollution4 Excavation for pipe trench Traffic disturbance, discovery of antiques5 Excavated materials Traffic disturbance, pollution, dust, erosion, landsliding

3.4. IMPACTS TO THE ENVIRONMENT

Potential impact during construction and operation can be identified as follows:

* DustDust is a small particle with very fine size that will cause problem on throat. Dust originatesfrom the results of gas emision from motorized vehicles (S02 ,NOx,CO ,C02 and HC),project vehicles, dried soil from excavation, or from materials transported by uncoveredtrucks.

* NoiseNoise originates from the use of heavy equipment or from transporting trucks, andinstallation of pile foundation in the intake and WTP. Noise will generate noise pollution,uncomfort to the people living in houses located around the project site.

* TrafficMobilization of project vehicles passing through roads will create traffic disturbance andtraffic accident. Traffic jam will occur on the trench made along the road that reduces theeffective width of the road. Traffic jam will also result in complaints from the communityand increase the use of gasoline.

* Road damages

Environmental Impact Assessment for PDAM

The use of heavy vehicles on the road will damage physical condition of the road. Theheavy vehicles could worsen the already damaged road.

* Social impactInstallation of transmission/distribution along housing area/settlement, traditional marketwill create disturbance that may affect/reduce the economic activity.

* Erosion of excavated materialsErosion is resulted from the excavation materials that are washed away by rain, or if theexcavated materials are splashing over road surface, houses and polluting rivers. Erosiondistrurbs traffic, transaction in traditional market, household activities and aesthetics.

* Landslides and SettlementsCondition of unconsolidated/unstable soil. Unstable soil makes it easily slide. Thiscondition is dangerous for workers excavating the trench for pipe laying.

* AestheticsPlacing excavated materials or construction materails on the road could cause disturbanceand aesthetic.

* Discovery of historical remnantsDiscovery of historical remnants could occur during excavation. It could be an artifact,ancient building, and other historical remnants.

* Contamination to soil and groundwater.Slduge resulted from sedimentation of WTP is categorized as hazardous waste and hasnegative impact to human and environment. The transportation and treatment of sludgecould pollute soil and water if not properly managed. Pollution occurs if the sludge spreadsover during transportation of infitration of dangerious contaminant during the treatment.

Table 3.3 Sources of potential impact on water supply development

No. Type of Impact Project stages Operation

1. Dust Yes no2. Noise Yes no3. Traffic Yes no4. Road facility Yes no5. Social impact Yes yes6. Erosion Yes no7. Landslide Yes yes8. Aesthetic yes no9 Discovery of historical yes no

remnants

10. Contamination to soil and no yeswater

Environmental Impact Assessment for PDAM 18

IV. MITIGATION AND MONITORING OF ENVIRONMENTAL IMPACT

The process of preparing the EMP matrix for EMP includes:

o Proper understanding of the water supply development proposed under UWSIEP, especialyon important subproject activities that may generate/produce impcat to the environment.

o Field checking on the proposed plan under UWSIEP and to obtain physical condition on theproposed sites that may gnenerat/produce potential impact to the environment.

o Interview with R&D staff of PDAM, understanding existing condition of PDAM especiallyproject components and their locations, interview with WTP operator, and the people thatwill be affected by the project activities.

o Overall screening process for project activities that may have potential impacts to theenvironment.

o The information obtained from the field is processed for brief presentation, that coverspotential environmental issues, mitigation and action plan (UKL/UPL). The results arediscussed with PDAM or LG, Kimpraswil and the World Bank, tabulated for eachimportant activity that has impact to the environment. The table is in the form of matrix ofEMP, consisting of source of impact, mitigation and monitoring (UKL/UPL).

o Consultation with stakeholders include the community related with the EMP (relatedagencies, local universities, NGOs, LG and Perpamsi, etc)

In the screening process, an EMP matrix was prepared on "construction and operationstages" (column) and "key activities" that could cause impact to environment. For UPL and UKLfor the Bank financed project, see Table 4.1 List of EMP matrix for EMP

Monitoring

Monitoring is carried out under agencies in-charge on the impact to the environment,such as city environmental office and other related offices (settlement and regionalinfrastructure, police and health). Monitoring of air quality, (noise, dust, air pollution, emision)and monitoring of sludge from sedimentation process are carried out by officers from cityenvironmental office, whereas monitoring of raw water and treated water quality distributed toconsumers is carried out by city health office. Monitoring of landslides, erison and workingsafety is carried out by the office of settlement and regional infrastructure. Traffic managementis done by the police.

Environmental Impact Assessment for PDAM 19

Table 4.1 List of EMP matrix for UWSIEP

No EMP for PDAMs ACTIVITIES POTENTIALLY GENERATE IMPACTS TABLEI PDAM KOTA BOGOR

Duplication of transmision raw water pipe from Ciherang intake to WTP Dekeng 4.1.1

Extend and rehabilitate Dekeng WTP 4.1.2Ekspansion of distribution system 4.1.3

2 PDAM KAB.LEBAKConstruction of new intake and raw water transmission, Bojongleles 4.2.1Construction of WTP, Bojongleles 4.2.2Treated water transmission pipe from Bojongleles to distribution system 4.2.3Ekspansion of distribution system distribusi and integration of existing system in Rangkasbitung dan Warunggunung 4.2.4

3 PDAM KOTA CIREBONReplace older raw water transmision from Paniis 4.3.1Spring capturing in three new spring sources 4.3.2Raw water transmission pipe from new springs (Cibulakan, Cigorowong and Cikepel) 4.3.3

Consruction of treament (aeration and desinfection) 4.3.4Expansion of distribution system 4.3.5

4 PDAM KOTA PONTIANAKInstallation of transmission pipe from intake, Penepat, to WTP, Iman Bonjol, eP 800 mm including three booster pump and 4.4.1modificatio of intake, PenepatTreated water transmission main from Imam Bojol WTP (Reservoir and Booster Pump Rambutan ) D 600 mm 4.4.2Upgrading of WTP 4.4.3Transmission main from Imam Bonjol WTP to Selat Panjang WTP and expansion of distribution system 4.4.4Construction new reservoirs 2 x 1000 m3 in North Potianak (JI. Budiutomo Gg.Darmaputra) and West Pontianak (JI. Yos 4.4.5Sudarso Kelurahan Sei Baliung)

5 PDAM KOTA BANJARMASIN

Raw water transmision main from Tabuk to Pematang Panjang, increase the capacity from 900 Us to 1,275 Us. 4.5.1(Construction of raw water intake and installation of pumps in Tabuk)

Upgrading of WTP, Pramuka 2 x 250 Us (new WTP I x 250 Us and upgrading of existing WTP from 500 LUs to 750 ULps

Expansion of distribution system (including conversion to establish zonal system) 4.5.3

6 PDAM KOTA MAKASSARPembangunan Pipa Transmissi dari Somba Opu ke Panaikang 4.6.1

Pembangunan IPA Baru (2 x250 Lps) di Panaikang 4.6.2

Pengembangan system distribusi 4.6.3

Environmental Impact Assessment for PDAM

7 PDAM KOTA KENDARIUpgrade pumps at Intake and booster pump stations 4.7.1

4.7.2Rehabilitate existing WTP

Pengembangan system distribusi 4.7.38 PDAM KOTA JAMBI

New Intake sinjinjang 4.8.1New WTP Tanjungsari 4.8.2

Pengembangan system distribusi 4.8.3Rehabilite works at Intake Pulau Pandan 4.8.4Rebabilite WTP Benteng and upgrade pumps 4.8.5Rehabilite WTP Broni 4.8.6

Note:The tables on EMP are prepared in accordance with the following GOI regulations

GOI Regulation No 41/1999 concerning Standards for Air Quality and National Ambient for NoiseGOI Regulation No. 85/1999 regarding National Hazardous WasteDecree of Ministry of Environment No. Kep-45/MENLHI1O/1997 on Standard Air Pollution IndexDecree of Ministry of Environment No. Kep-48/MENLH/1 1/1996 on Standard Quality for Noise LevelDecree of Ministry of Environment No. Kep-50/MENLH/1 1/1996 on Standard Quality for Smell LevelDecree of Ministry of Environment No. Kep-51/MENLH/10/1995 on Standard Quality for Liquid Waste.Decree of Ministry of Health No 907/2002 on Quality for Raw Water and Drinking Water

Environmental Impact Assessmentfor PDAM 21

Table 4.1.1. EMP Matrix for duplication of raw water transmission pipe from Ciherang intake to Dekeng WTP, PDAM Bogor

Activity Componentpotentially Environent Environmental Impact Environmental Management Plan Environmental Monitoring Plan

No Phase generates affroetedbimpPhasegeracts afthe Impact Type of Nature of Benchmark Remedial action Institution Location Time and Method Institution

_ ~ ~~~~~~________________ Impact Impact

I CONSTRUCTION

Regulation on use During the CityInfrastruct Road Volume of of heavy -PDAM Kota Along the activity by Publicure/ road damaged Permanent damaged equipment by Bogor transportatio supervising the Worksroad considering road -Contractor n route works according Dept

condition to regulation PReguatio on -PDAM Kota Tmn o

heavv Traffic Traffic jam Temporary distrbanee transportation to Bogor Location with Timigfor Polceequipment ~~~~~~~~~~~~~~~~~avoid peak hour with cautionequiipment_

Use of equipmentA. PREPARATION National to reduce -PDAM Kota CityA.i PREPRATAir/noise standard noise/gas emision Bogor above Asabove Environm

pollution Temporary for air in accordance -Contractor entalquality with national Dept.

standards

-PDAM Kota Tmn o -e ct

Labour/wor Llandslide Tamporary Accident Protection wall Bogor Location of Timvig frthPue CitPengglian ker -Contractor excavation actirvitysith Workssupervision Dept

tanal Traffic Degre of Regulation by -PDAM KotaTransporta- disturban- Temporary distturban- avoiding Bogor As above As above Policetion ce ce excavation during -Contractor

Ic I ce Ipeak hour

Environmental Impact Assessment for PDAM

i -Trafsportat Trac - r of Regulate -PDAM Kota AlongTransportat disturbanc Temporary ademt ftrench/material Bogor transmission During activity POLICEion e traffic jm filling, not reduce piewith safeguarding

road width pipa

-PDAM Kota Along the cityAccident at Construct Bogor trench for During activity Public

Installationof-Labour -Landslide Temporary work retaining wall transmission with supervision Works

B. WORKS treated water pipe Dept.transmission -PDAM Kota Along Citypipe Air Work method, Bogor transmission During activity Envirorn

-Air -Air Temporary s pipe and w s entalpollution standard such as watering people with safeguardmg Dept.

surrounding

Aesthetic, Fill in excavation -PDAM Kota Along city-Water Erosion Temporary traffic and provide Bogor transmission During activity Public

disturbance drains pipe with supervision WorksDept.

Environmental Impact Assessment for PDAM 23

4.1.2. Matrik EMP Extend and rehabilitate Dekeng WTP -UWSIEP PDAM Kota. Bogor

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

4O TAHAP DAMPAK TERKENA JENIS SIFAT WAKTU DAN(Activity Cause DAMPAK DAMPAK SIFAK TOLAK UKUR UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact

KONSTRUKSI

Pengaturan berat -PDAM Kota Selama kegiatan-Prasarana -Kerusakan -Volume material Bogor Sepanjang dengan cara/Jalan jalan yang Tetap kerusakan material BogoRoute selalu mengawasi KIMPRASKO

dilalui jalan memperhatikan angkutan kegiatan sesuaikondisi jalan ketentuan

-Tingkat -pengaturan -PDAM Kota Lokasi jalan

Mobilisasi alat -Lalu Lintas laludintas pada Sementara /gangguan menghundari Bogor yang -Waktu deuan DITLANTASdan material rute perjalanan lalu lintas' - jam padat padat pengamanan

MengunakanPenkemaran peralatan -PDAM Kota Pada lokasi

Udara/Bising Pencemaran Sementara BUdara mengeluarkan Bogor tertentu yang Wan BAPEDALKOudara/bising Nasional bising/gas buang padat pengamanan

dan sesuai baku lalulintasmutu Nasional-Mekanisme -PDAM Kota LkaiPA -atuegan

-Bakumutu tekns Boor Lkasi PA' wakt kegatan BAPEDALKOA. PERSIAPAN -Udara -Pencemaran Sementara Baku mutu tehnis Bogor dan sekitar dengan

udara u ara antara lain proyek pengamananpenyiraman air

-Penyesuaiandengan kegiatan -PDAM Kota Lokasi IPA Waktu pemakaian

.Kebisinga Pusisuaa S-Baku mutu masyarakat dan Bogor dan alat berat dengan BAPEDALKOudara pemilhan alat masyarakat cara mengukur

Penggalian pondasi memenuhi baku sekitar proyek kebisinganmutu suara

-PDAM Kota Wkukgaa

-Pekerja -Longsor Sementara Kecelakaan Membangun Bogor Lokasi Waktukegiatan KIMPRASKOpekeija dinding penahan pondasi IPA dengan

pengawasan

Estetika -Menutup tanah -PDAM Kota Lokasi Waktu kegiatan- Air Erosi Sementara ,gangguan gahan dan Bogor Gahian dengan KIMPRASKO

laluhintas membuat pant air pondasi IPA pengawasan

Environmental Impact Assessment for PDAM 24

-Tingkat -Mengatur galian -PDAM Kotaat- egaa-Ganngguan Sementara kemacetan /timbunan bahan Bogor Lokasi masuk Waktu DITLANTAS

-Transportasi lalulnta Seetra kmcea idak mengurangi Proyek IPA dna ILNAlalulintas jalan ruas yang pengamanan

ada

-penyesuaian -PDAM Kota Lokasi IPA Waktu pemakaian

B. PEKERJAAN Pekerjaan jalan Baku mutu dengan kegiatan Bogor dasyarkatbera denganmasuk, struktur Kebisingan Polusi suara Sementara masyarakat dan Bgrdnaabetdnan BAPEDALKO(pagar ,saluran Bising pe han alat yg masyarakat cara mengukur

sesuai sekitar kebisingan

Estetika -Menutup tanah -PDAM Kota Waktu kegiatan

- Air Erosi Sementara ,gangguan galian dan Bogor Lokasi IPA dengan KIMPRASKOlaluIintas membuat parit air pengawasan

PANSCAUKSI Lumpur Tanah dan air -pencemaran Pengelolaan dan -PDAM KotaKONSTRUKSI Lumpur Tanah dan air tanah dan air Sementara Baku mutu Pengolahan Bogor ProyekIPA Sampling satu BAPEDALKO

(OPERASI) sedimentasi tanah tah B3 Nasional Lumpur -bagian tugas P bulan sekaliSementasi DED

Environmental Impact Assessment for PDAM 25

Tabel 4.1.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota BogorKEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

10 TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGAEnviron. Impact DAMPAK DAMPAK CARA

I KONSTRUKSI

-Prasarana -Kerusakan PegtrnbrtSelama kegiatan/Jalan jalan yang -Volume Pengaturan berat - PDAM Kota Sepanjang dengan cara

dilalwti Tetap kermasakan memperhatikan Bogor. Route selalu mengawasi KIMPRASKOjalan kondisi jalan angkutan kegiatan sesuai

-Kemacetan -Tingkat -pengaturan PDAM Kota Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan jamg

dan material rute peijalana ~~~~~~~lalu lintas' - jam padat padat pnaaa

Mengunakan

Bakt mutu peralatan - PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Bogor. tetnu ya dengan BAPEDALKOudara/bising Nasional bising/gas buang Bogor.tret yag pengamna

dan sesuai baku lalulintas pnaaamutu Nasional

A. PERSIAPAN -Udara -Mekanisme PDAM Kota Lokasi jalur -waktu kegiatan-Pencemaran -Baku mutu teknis pengerjaan pipa dan BAPEDALKOudara Sementara udara antara lain ogor. masyarakat dengan

penyiraman air sekitar proyek pengamanan

-Penyesuaiandengan kegia tan -PDAM Kota Lokasi jalur Waktu pemakaian

Pengalan aba -ebiingn -olui uar Seentra -Baku mutu masyarakat dan Bogor. pipa dan alat berat dengan BAPEDALKOPenggahian galian -Kebisingan -Polusi suara Sementara udara pemilihan alat Bogor. masyarakat cara mengukur

memenuhi baku sekitar proyek kebisinganmutu suara

Kecelakaan Membangun PDAM Kota Lokasi Waktu kegiatan-Peker ja -Longsor Sementara pekerja dinding penahun Bogor. penggalian dengan KIMPRASKO

jalur pipa pengawasan

Environmental Impact Assessment for PDAM 26

-Mekanisme Sepanjang

-Udara -Pencemaran Sementara -Baku mutu teknis -PDAM Kota jalur pipa -waktu kegiatan BA D LK-Udara -Pencemaran Sementara udara pengerjaan Bogor. transmsi dan dengan BAPEDALKOudara antara lain masyarakat pengamanan

penyiraman air sekitar-Mengatur galian

-Ganngguan -Tingkat /timbunan bahan - PDAM Kota Lokasi masuk Waktu kegiatan-Transportasi lallintas Sementara kemacetan ,tidak mengurangi Bogor. Proyek dengan DITLANTASlalulintas jalan ruas yang Reservoir pengamanan

_____________ ~~~~~ ~~ ~~ada _ _ _ _ _ _

-penyesuaian Lokasi IPA Waktu emakaianB. PEKERJAAN Pekerijaan dengan kegiatan - PDAM Kota dan aPa bat penganpemasangan pipa Kebisingan Polusi suara Sementara Baku masyarakat dan Bogor. masyaraat cara mengukur BAPDALKO

Bising permilhan alat yg msaaa aamnuupsesuai sekitar kebisingan

Estetika -Menutup tanah PDAM Kota Waktu kegiatan-Air Erosi Seetr gangguan gafian dan Jalur pi pa Wkukgaa IPAK-AirErosiSementara ina membuat parit air Bogor. trans pssi dengan KIMPRASKO

Melewati -Pendapat an -Sosialisasi dan - PDAM Kota Lokasi jalur Sebelum dan saatpasar -Pedagang Sementara peda gang pengaturan Bogor. pipa lewat pelaksanaan PEMDAKOtradisionil) kclmenitrun pekerjaan pada psrpoepasar kecil ~~~~~~~~~~jam-jam lenggang

PASCA Kontrol Baku Konsumen -kesehatan Kemmenaka Ai Mmemno a dan PDAM Kota K nan Sampling satuKONSTRUKSI m talBakt mutu dngan Bogor. Konsumen bulan sekali (OPERASI) MtAiMnuKnuenAir Mimurn

Environmental Impact Assessment for PDAM 27

Tabel 4.2.1. Matrik EMP Pembangunan Intake baru dan Transmisi air baku IPA Bojongleles(baru)di desa Bojongleles -UWSIEP PDAM Kab.Lebak

KEGIATAN BERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN UPAYA PEMANTAUAN LINGKUNGANNO TAHAP MENIMBULKAN LINGKUNGA (Environmental Impact) LINGKUNGAN

DAMPAK/SUMBER N YANG (Environmental Management Plan) (Environmental Monitoring Plan)(Stage) DAMPAK TERKENA JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

(Activity Cause DAMPAK DAMPAK DAMPAK UKUR CARAEnviron. Impact)

I KONSTRUKSI

Pengaturan SelamaPrasarana/ Kerusakan Volume berat material -PDAM kab. Sepanjang kegiatanPralaana jalan yang Tetap kertusakan dengan Lebak Rpuengnkua dengan selalu KINMRASKABJalan dilewati jalan memperhatika pengangkuta mengawasi

n kondisi jalan kegiatan

Mengunakan

peralatanPaalks WktA. PERSIAPAN -Mobilisasi alat dan Pencemaran B t |eP eIakan PDAM k tertentu kegiatanmaterial ~ UdaralBsng uar/ising Sementara Udara bising/gas Lebak yng padat dengan BPDLAmaterial udara/bising ~~~~~~~~~~~Nasional buang dan y

sesuai baku lalulintas pengamanan

mutu Nasional

-Kemacetan -Tingkat -pengaturan Lokasi jalan -Waktulalulintas kemacetan angkutan PDAM kab. Loasijaa Wankutan

-Lalu Lintas dalrulntas Sementara /gangguan menghindari Lebak diperkirakan dengan DITLANTAS

peijalanan lalu lintas' jam jam padat pengamananpadatMekanisme Sepanjang Waktu

-Udara -Pencemaran 3Baku mutu teknis PDAM kab. jalur pipa ke'atan-Udara -Pencemaran Sementara Udara Pengerijaan al: Lebak transmisi dan degan KIMPRASKABudara Nasional bila perlu masyarakat dengan

penyiraman air sekitar pengamanan

B. PEERJAA Pengalian lubang tanah Ganga Menempatkan PDAM kab. Sepanj'ang WaktuIntake PEEJAN dan penimbunan - Air -Erosi Sementara lalulintas tanah gaaian Lebak janjpipa kegiatan KIMRASKABIntake tanah galian ,estetika jauh dan ahran transmissi dengan

air permukaan pengawasan

Kecelakaan Membangun PDAM kab. Sepanjang Waktu-Pekerja -Longsor Sementara Kecela dinding Lebak jalur pipa kegiatan KIMPRASKAB

pekeija penahan transmissi denganpengawasan

PASCA Kepmen Respon Penngambila11 KONSTRUKSI Kontrol baku mutu Air -Konsumen -Kesehatan Sementara Kes Pengolahan - PDAM Kab Intake n Sampel lx DISKESKAB

(OPERASI) baku Konsumen Baku Mutu Air dan bahan Lebak Panepat bulanAir Minum kinula

Environmental Impact Assessment for PDAM

4.2.2. Matrik EMP Pembangunan Instalasi Penjemihan Air Bonjongleles -UWSIEP PDAM Kab. Lebak

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA

( Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGCA LOKASI W ARA LEMBAGA___________ Environ. Impact DAMPAK DAMPAK TA DA

KONSTRUKSI

Penga turan berat ~~~~~Selama kegiatan-Prasarana -Kerusakan -Volume Pengaturan berat -PDAM kab. Sepanjang dengan cara/Jalan jalan yang Tetap kerusakan memperhatikan Lebak Route selalu mengawasi KIMPRASKAB

dilalui jalan kondisi jalan angkutan kegiatan sesuaiketentuan

-Kemacetan -Tingkat -pengaturan - PDAM kab. Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara /gangguan menghindan Lebak yaa dengan DITLANTASdan material rute perjalanan kgalu lan aag a iam padat padat pengamanan

Mengunakan

Baku mutu peralatan - PDAM kab. Pada lokasi Waktu kegiatanUdara/Bising Pencmara/sng Sementara Udara bisimeng/eluarkan Lebak yangentas dengan BAPEDALKAB

udara/bising Nainl bising/gas buang padat pnaaaNasional ~dan sesuai baku lalulintas pnaaa

mutu Nasional-Mekanisme

-Bakumutu teknis -PDAM kab. Lokasi IPA' -waktu kegiatan BAPEDALKABA. PERSIAPAN -Udara -Pencemaran Sementara -Baku mutu pengerijaan Lebak dan sekitar dengan

udara antara lain proyek pengamananpenyiraman air

-Penyesuaiandengan kegia tan -PDAM kab. Waktu pemakaian

-Baku mutu masyarakatdan LebAk masyarakat alat berat dengan BAPEDALKAB-Kebisingan -Polusi suara Sementara udara pemilihan alat Lebak sekitar proyek cara mengukur

Penggalian pondasi memenuhi baku kebisinganmutu suara

Kecelakaan Membangun -- PDAM kab. Lokasi Waktu kegiatan KIMPRASKAB-Pekerja -Longsor Sementara pekerja dinding penahan pondasi IPA pengawasan

Estetika -Menutup tanah - PDAM kab. Waktu kegiatan-Air Erosi Sementara ,gangguan gamban dan Lebak Lokasi dengan KIMPRASKABAir ~ ~ ~ ~ ~ ~ ~~~~~lauits membuat panit air pondasi IPA pengawsn

Environmental Impact9lalulintas pengawasan

Environmental Impact Assessment for PDAM 2

-Mengatur galian

-Ganngguan -Tingkat /timbunan bahan - PDAM Kab. Lo .si asu Waktu kegiatan-Transportasi laluhntas Sementara kemacetan ,tidak mengurangi Lebak Poyek IPA dengan DITLANTASlaluhntas jalan ruas yang pengamanan

___________ ~ad a _ _ _ _ _ _ _

-penyesuaianPekerjaan jalan pneuinLksIP WatpmkinB. PEKERJAAN Baku mutu dengan kegiatan - PDAM Kab. Lokasi IPA Waktu pemakaianmasuk, struktur Kebisingan Polusi suara Sementara masyarakat dan Lebak daniaaa bebasdenan BAPEDALKAB(pagar,saluran ~~~~~~~Bising pmlhnatygmasyarakat cara mengukur(pagar ,saluran) p~~~~~~~~~~~~ ~~~~esuiia atygsekitar kebisingan

Estetika -Menutup tanah - PDAM kab. Waktu kegiatan- Air Erosi Sementara ,gangguan gahan dan Lebak Lokasi IPA dengan KIMPRASKAB

lalulintas membuat parit air pengawasan

PASCA -pencemaran Pengelolaan dan -PDAM Kab.KONSTRUKSI Lumpur Tanah dan air tanah dan air Sementara Baku mutu Pengolahan Lebak Proyek IPA Samphng satu BAPEDALKAB(OPERASI) sedimentasi tanah tanah B3 Nasional Lumpur - bagian tugas bulan sekali

Sementasi DED

Environmental Impact Assessment for PDAM 30

Tabel 4.2.3. Matrik EMP pipa transmissi air bersih Bonjoleles Ke Sistem Distribusi integrasi (Rangaksbitung & Warunggunung)UWSIEP PDAM Kab. Lebak

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

1TA1AP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASl CARA LEMBAGAEnviron. Impact DAMPAK DAMPAK( UKUR CR

KONSTRUKSI

-selama kegiatan

Prasarana -kerusakan -Volume -Pengaturan berat -PDAM Kab. Sepanjang dengan cararasana jalan yamg Tetap kerusakan material dengan Lebak route selalPmatri-aluint -dilewati jalan memperhatikan angkutan mengawasi

kondisi jalan kegiaatan sesuaiketentuan

Mobilisasi alat dan -Kemacetan ~~~~~-Tingkat -Pengaturan PDAM Kab. Lokasi yang Waktu angkutanMobiisai aat an Lal Linas Kemcetn Smenara Kemacetan angkutan Lebakdiekran egnDILNA

material -LI its lalulints Smnaa /gangguan menghidari jam pdipriat n pengamnaDnLN'A___________ ~~~lalulintas -jam padat pdtpnaaa

Mengunakan

A. PERSIAPAN Baku mutu peralatan PDAM Kab. Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Lebak tertentu yang dengan BAPEDALKAB

udara/bising Nasional bising/gas buang padat pengamanandan sesuai baku lalulintas pnaaa

___________________ ____________ ~~~~mutu Nasional

PDAM Kab. Waktu kegiatan-Pekrja Longor Smentra Kcelaaan Membangun Lebak Lokasi/Rute egnKlNMPRASKAB

-Pekerja -Longsor Sementara pekerja dinding penahan penggalian pengawasan

Penggahan tanah -Pengaturan PDAM Kab.

Gangguan S t Tingkat dengan Lebak Lokasi/Rute Waktu kegiatan-Transportasi lauits Sementara kemacetan menghindari pngla deanDITLANTASlaluhintas laluhintas penggalian pada penggahan pengawasan

__ _ _ _ _ _ __ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ ja - a a a _ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ __ _ _ _ _ __jam -jam p ad at

Environmental Impact Assessment for PDAM 31

-Mengatur galian-Tingkat /timbunan bahan - PDAM Kab. Sepanjang Waktu kegiatan

-Transportasi -Ganngguan Sementara kemacetan ,tidak mengurangi Lebak pipa dengan DITLANTASlalulintas lalulintas jalan ruas yang transmissi pengamanan

ada

PDAM Kab. Sepanjang Waktu kegiatanl -Pekela -Longsor Sementara aKecelakaan nMembangm Lebak lbang pipa dengan KIMPRASKABpekerja dinding penahan transnmissi pengawasan

B. PEKERJAAN Pemasangan pipa ._transmisi air Bersih -Mekanisme Sepanjang

-Baku munu Steknis - PDAM kab. jalur pipa -waktu kegiatan BAPEDALKAB-Udara -Pencemaran Sementara uBakurat pengerjaan Lebak transmisi dan dengan

udara antara lain masyarakat pengamanan_ penyiraman air sekitar

Estetika -Menutup tanah -PDAM kab. J1 pipa Waktu kegiatan-Air Erosi Sementara ,gangguan gahan dan Lebak talu pengan KIMPRASKAB

lalunintas membuat parit air PDAM 32

Environmental Impact Assessment for PDAM 32

Tabel 4.2.4. Matrik EMP ekspansi system distribusi dan intergrasi system distribusi existing Rangkasbitung dan Warunggunung

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact DAMPAK DAMPAK LA DA

KONSTRUKSI

-Prasarana -Kerusakan Selama kegiatan/Jalan jalan yang -Volume material -PDAM Kab. Sepanjang dengan cara

dilalui Tetap kerusakan memperhatikan Lebak Route selalu mengawasi KIMPRASKABjalan kondisi jalan angkutan kegiatansesuai

-Kemacetan -Tingkat -pengaturan -PDAM Kab. Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan Lebak adga dengan DITLANTAS

dan material rute perjalanan /gangguan mnhdaijamdiekran pgmnndan material rute perjalana ~~~~~~~lalu lintas' - jam padat padat pnaaa

Mengunakan

Baku mutu peralatan PDAM Kab. Padalokasi Waktu kegiatanUdarafBising Pencemaran Sementara Udara mengeluarkan Lebak tertentu dengan BAPEDALKAB

udara/bising Nasional bising/gas buang padat dengamnaBPEALAdan sesuai baku laluhintasmutu Nasional

A. PERSIAPAN -Udara -Mekanisme Lokasi jalur

-Pencemaran Sementara -Baku mutu teis penger - PDAM Kab. pipa dan -waktu kegatan BAPEDALKABudara udara antara lain:Lebak masyarakat pengan

penyiraman air sekitar proyek

-Penyesuaiandengan kegiatan - PDAM Kab. Lokasi jalur Waktu pemakaian

Penggalian galian -Kebisingan -Polusi suara Sementara -Baku mutu masyarakat dan Lebak pipa dan alat berat dengan BAPEDALKABudara pemtluhansalat dbmasyarakat cara mengukur

memenuhi baku sekitar proyek kebisinganmutu suara

Kecelakaan Membangun -PDAM Kab. Lokasi Waktu kegiatanL 1 -Pekerja -Longsor | Sementara pekerelakaan dinding penLebak penggalian dengan KIMPRASKABEnvironmentalImpactAsessment f Longsor SPmentara peke33anngpenahana pipa pen

Environmental Impact Assessment for PDAM 33

-Mekanisme Sepanjang-Udara -Pencemaran Sementara -Baku mutu teknis -PDAM kab. jalur pipa -waktu kegiatan

-Udara -Pencemaran Sementara udara pengeaan Lebak jtransmsi dan dengan BAPEDALKABudara antara lain masyarakat pengamanan

penyiraman air sekitar-Mengatur galian

-Ganngguan -Tingkat /timbtuan bahan - PDAM Kab. Lokasi masuk Waktu kegiatan-Transportasi laltintas Sementara kemacetan ,tidak mengurangi Lebak Proyek dengan DITLANTASlaluhintas jalan ruas yang Reservoir pengamanan

______________ ~~~~~ ~~~ada_ _ _ _ _ _ _ _

-penyesuaian Lokasi IPA Waktu pemakaianB. PEKERJAAN Pekerjaan Baktu mutu dengan kegiatan - PDAM Kab. dan alat berat dengan

.pemasangan pipa Kebisingan Polusisuara Sementara Bising masutuakt dbmasyarakat dan Lebak dera mengan BAPEDALKOaaapp e g P sra Bising peniilihan alat yg sekitar kebisingan

sesuai _ _ _ _ _ _ _

Estetika -Menutup tanah - PDAM kab. Waktu kegiatan- Air Erosi Sementara ,gangguan galian dan Lebak Jalur pipa engan KIMPRASKAB

laltdintas membuat parit air transmissi pengawsn

Melewati -Pendapata -oilsidan -PDAM Kab. Lokasi jalur Sebelum dan saatpasar k-Pedagang Semenra pedagang pegaturan Lebak pipa lewat pelaksanaan PEMDAKABtradisionil) kPedaaniemntr pedaugan pekerjaan pada psrpoe

jam-jam lenggang p

Environmental Impact Assessment for PDAM 34

Tabel 4.3.1. Matrik EMP "Replace older raw water transmision from Paniis"-UWSIEP PDAM Kota Cirebon

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI WARA LEMBAGAEnviron. Impact DAMPAK DAMPAK UKUR CR

KONSTRUKSI

-selama kegiatan

-Kerusakan -Volume -Pengaturan berat -PDAM Kota Sepanjang dengancaraPrasarana jalan yamg Tetap kerusakan material dengan Cirebon route selalu KIMPRASKO/Jalan dilewati jalan memperhatikan angkutan mengawasi

kondisi jalan kegiatan sesuaiketentuan

-Tingkat -Pengaturan -PDAM Kota Lokasi yang Waktu angkutanMoiiateia altdan -Ll its -Kemacetan Smnaa Kemacetan angkutan Cirebon diperkirakan dengan DITLANTASmaterial -Lalu Lntas lalulintas Sementara /gangguan menghindari jam d at penganan

lalutintas -jam padat padat pengamananMengunakan

A. PERSIAPAN Baku muPtnuearanperalatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Cirebon tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanandan sesuai bakui lalulintas pnaaamutu Nasional

-PDAM Kota Waktu kegiatan

-Pekerja -Longsor Sementara Kecelakaan Membangun Cirebon Lokasi/Rute Wan KIMPRASKOpekerja dinding penahan penggalian pengawasan

Penggalian tanah ePenggalian tanah ~~~~~~~~~~~~~~-Pengaturan -PDAM Kota Wkukgaa

-Transportasi _linkatGangguan STingkat dengan Cirebon Lokasi/Rute Waktu kegiatan DTLANTAS-Trasporasi Galulinan Sementara kemacetan menghindari penggalian dna ILNAlaluhintas lalulintas penggalian pada pengawasan

Environmental ImpactjAssessmen5am-jam padat

Environmental Impact Assessment for PDAM 35

-Mengatur galian -PDAM Kota Sepanjang Waktukegiatan

-Transportasi -Ganngguan Sementara kemacetan tidak mengurang Cirebon pipa dengan DITLANTASlalulintas lalulintas jalan ruas yang transmissi pengamanan

ada

Kecelakaan Membangun -PDAM Kota Sepanjang Waktu kegiatan-Pekeqa -Longsor Sementara kelak dMmn gun na lubang pipa dengan KIMPRASKO

pekeda dinding penahan transmissi pengawasanB. PEKERJAAN Pemasangan pipa

transnmisi air -Mekanisme -PDAM Kota Sepanjang

-Baku mutu teknis Cirebon jalur pipa -waktu kegiatan BAPEDALKO-Udara -Pencemaran Sementara udara pengerjaan transmsi dan denganu d a r a u - a r a aantara lain masyarakat pengamanan

___penyiraman air sekitar

Estetika -Menutup tanah -PDAM Kota- Air ~~~~~~~~~~ ~ ~~~~~galian dan Cirebon Jalur pip at kgaaAir ~Erosi Sementara ,gangguan TdegnKIMPRASKO

lalulintas membuat parit air transmissi pengawasan

Environmental Impact Assessment for PDAM 36

4.3.2. Matrik EMP Bangunan Penangkapan 3(tiga) Mata air Baru -UWSIEP PDAM Kota. Cirebon

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASl CARA LEMBAGAEnviron. Impact DAMPAK DAMPAK TCA KRUAALMAALKS AKTRAN EBG

KONSTRUKSI

_ Pengaturanberat -PDAM Kota Selama kegiatan-Prasarana -Kerusakan -Volume material Cirebon Sepanjang dengan cara/Jalan jalan yang Tetap kerusakan memperhatikan lbRoute selalu mengawasi KIMPRASKO

dilalui jalan koemperhatlan angkutan kegiatan sesuaiketentuan

-Kemacetan -Tingka t -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan Cirebon yang dengan DITLANTASdan material rute perijalanan /gangguan menghindari jam diperkirakan pengamanan

________ ____ ___ ______ lalu lintas' - jam padat __ _ _ _ _ _ _ padat p n a a aMengunakan

Udara/Bising Pencemaran ~~Baku mutu peralatan -PDAM Kota Pada lokasi WkukgnaUdara/Bising Pencemaran Sementara Udara mengeluarkan Cirebon tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanandan sesuai baku lalulintas pnaaa

A. PERSIAPAN mutu Nasional-Penyesuaiandengan kegiatan -PDAM Kota Lokasi IPA Waktu pemakaian

.Kebisingan .Polusi suara Sementar -Baku mutu masyarakat dan Cirebon dan alat berat dengan BAPEDALKOudara pemilihan alat masyarakat cara mengukur

memenuhi baku sekitar proyek kebisingan

mutu suara

Penggalian pondasi -PDAM Kota

-Pekerija -Longsor Sementara Kecelakaan Membangun Cirebon Lokasi nWaktukegiatan KIMPRASKOpekerja dinding penahan pondasi IPA pengawasan

Estetika -Menutup tanah -PDAM Kota Lokasi Waktu kegiatan- Air Erosi Sementara gangguan Fgalian dan SCirebon Galia dengan KO

lalulintas membuat part air pondasi IPA pengawasan

Environmental Impact Assessment for PDAM 37

Tabel 4.3.3. Matrik EMP Pembangunan Transmisi utama air dar sumber Baru (Mata air Cibulakan, Cigorowong dan Cikepel)

UWSLEP PDAM Kota Cirebon

_KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA(Activity Cause DAMPAK DAMPAK SIFAT TOLAK UPAYA LEMBAGA LOKASIA CARA LEMBAGAEnviron. ImpactDAPK DM K UURCA

KONSTRUKSI

-selama kegiatan-Pengaturan berat -PDAM Kota . dengan cara

Prasarana jalan yamg Tetap kerusakan material dengan Cirebon route selalu KIMRASKO/Jalan dilewati jalan memperhatikan angkutan mengawasi

kondisi jalan kegiatan sesuaiketentuan

-Tingkat -Pengaturan -PDAM Kota Lokasi yang Waktu angkutanMobil isasi alat dan -Lalu Lintas -Kemnacetan Sementara Kemacetan angkutan Cirebondprian degn DITLANTASmaterial lalulintas /gangguan menghindari jam diperkrakan dengan an

lalulintas -jam padat padat pengamananMengunakan

A. PERSIAPAN Bakumutu peranPencemaran peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising udaran Sementara Udara mengeluarban Cirebon tertendt yang dengan BAPEDALKOudara/bising Nasional bising/gas buang padat pnaaa

dan sesuai baku lalulintas pengamananmutu Nasional

-PDAM Kota WkukgaaKecelakaan Membangun Cirebon Lokasi/Route Waktu kegiatan-Pekerija -Longsor Sementara pekera dindin enahan penalian dengan KIMPRASKO

pekerJa dmdmg penahan penggahan pengawasanPenggalian tanah -Pengaturan -PDAM Kota

-Gangguan Tinmgka t dengan Cirebon Lokasi/Route dengan DkegiNTaS-Transportasi lalulintas Sementara kemacetan menghindanr penggahan Wan DITLANTASlalulintas penggahian pada pengawasan

_______________ j___________________ ____________ ____________ lam -jam padat padat

-Mengatur galian -PDAM KotaB. PEKERJAAN Pemasangan pipa . -Ganngguan -Tingkat /timbunan bahan CPrebot Sepanjang Waktu kegiatan

B. PEKERJAAN hPeransmisi air -Transportasi laluhntas Sementara kemacetan ,tidak mengurangi pipa dengan DIANTASlalulintas jalan ruas yang transmissi pengamanan_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a d a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ad a

Environmental Impact Assessment for PDAM 38

4.3.4. Matrik EMP Pembangunan IPA Aerasi dan disinfeksi UWSIEP PDAM Kota Cirebon

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA

Environ. Impact DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

KONSTRUKSI P

-Prasarana -Kerusakan -Volume Pengaturan berat -PDAM Kota Selama kegiatan-Prasarana -Kerusakan -Volume material Cirebon Sepanjang dengan cara/Jalan jalan yang Tetap kerusakan materi a n Route selalu mengawasi KIMPRASKO

dilalui jalan kondisi jalan angkutan kegiatan sesuaikondisi jalan ~~~~~~~ketentuan_______

-Kemacetan -Tingkat -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan Cirebon yang dna DITLANTASdan material rute perjalanan /gangguan menghindari jam diperkirakan pengamanan

____________ ____________ ~~lalu lintas' - jam padat padat pnaaaMengunakan

Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Cirebon tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat BAPgaALKadan sesuai baku lalulintas pengamanan

__________________ ______________ ~~~~mutu N asionalA. PERSIAPAN -Mekanisme

-Udara -Pencemaran Sementara Baku mutu teknis -PA oa Lokasi IPA' -waktu kegiatan BAEAK-Udara -Pencemaran Sementara -Baku mutu pengerjaan Cirebon dan sekitar dengan BAPEDALKO

udara udara antara lain: proyek pengamanan

-Penyesuaian

dengan kegiatan -PDAM Kota Lokasi IPA Waktu pemakaianPenggalian pondasi . -Baku mutu masyarakat dan Cirebon dan alat berat dengan BAPEDALKO

-Kebisingan -Polusi suara Sementara udara pemilihan alat masyarakat cara mengukur

memenuhi baku sekitar proyek kebisinganmutu suara

-PDAM Kota Wkukgaa

-Pekerja -Longsor Sementara KecelaRSan Membangun Cirebon Lokas KOpekenma dinding penahan pondasi IPA dengawn

Environmental Impact Assessment for PDAM 39

Estetika -Menutup tanah -PDAM Kota Lokasi Waktu kegiatan- Air Erosi Sementara ,gangguan galian dan Cirebon Galian dengan KIMPRASKO

laluintas membuat part air pondasi IPA pengawasan

-Tingka t -Mengatur galian -PDAM Kota Wakt-Transportasi aun Sementara kemacetan tidak mengurangi Cirebon Lokasi masuk kenganatan DITLANTAS

B. PEERJA i 5ak sWukr 4 Kbisinan alusintuas ,tida*nhmenguangi Prye IP ena

lalulintas ~lalulintas jalan ruas yang PrykIA pengamanan_____________ ~~~~~ ~~~ada__ _ _ _ _ __ _ _ _ _ _ _

-penyesuaian -PDAM KotaB. PEKERJAAN Pekerjaan jalan akmuu dengan kegia tan dPA otoan iIP Wakatu bematkdenanB. PKERAAN masuk, struktur Kebisingan Polusi suara Sementara Bkmuu masyarakat dan Cirebon danaltbrat dengan BAPEDALKO

(pagar ,saluran) Bising pemilihan alat yg masyarakat caamnursesuai sekitar kebisingan

Estetika -Menutup tanah -PDAM Kota Waktu kegiatan- Air Erosi Sementara gangguan gamban dan Cirebon Lokasi IPA dengan KIMPRASKO

lalulintas membuat parit air pengawasan

PASCA Kontrol Kualitas air -Kesehatan Kepmemkes P -PDAM KotaKONSTRUKSI Produksi(air Konsumen Konsu Sementara Baku mutu Pengolahanair Cirebon. Outalet iran sali DISKESKO(OPERASI) Minun) Air Mmimum dan bDAM kS

Envi ronmental Impact Assessment for PDAM 40

Tabel 4.3.5. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Cirebon

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA

(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact DAMPAK DAMPAK

KONSTRUKSI

-Prasarana -Kerusakan Pengaturan berat Selama kegiatan

/Jalan jalan yang -Volume material - PDAM Kota Sepanjang dengan cara

dilalui Tetap kerusakan memperhatikan Cirebon. Route selalu mengawasi KIMPRASKO

jalan kondisi jalan angkutan ketentuan

-Kemacetan -Tingkat -pengaturan - PDAM Kota Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara dekairgan angkutan Cirebon. yang dengan DITLANTAS

dan material rute pedalanari /gangguan mnhdaijam dpriaa egnaadan material rute perialanan lalu lintas' - amlalu lintas' - jam padat padat pengamanan

Mengunakan

Bakut mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Ba mengeruarkan Cirebon. tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanandan sesuai baku lalulintas pnaaamutu Nasional

A. PERSIAPAN -Udara -Mekanisme - PDAMnK Lokasi jalur

-Pencemaran -Baku mtutu teknis pengerjaan CiAMebon. pipa dan -waktu kegiatan BAPEDALKOudara Sementara udara antara lain : ieo. masyaralat dengan

penyiraman air sekitar proyek pengamanan

-Penyesuaiandengan kegia tan -PDAM Kota Lokasi jalur Waktu pemakaian

Penggalian galian -Kebisingan -Polusi suara Sementara -Baku mutu masyarakat dan Cirebon. pipa dan alat berat dengan BAPEDALKOudara pemilihan alat msaaa aamnuu

memenuhi baku sekitar proyek kebisingan

mutu suara

Kecelakaan Membangu -PDAM Kota Lokasi Waktu kegiatan-PekerJa -Longsor Sementara Mekbaa dindingu pna Cirebon. penggalian dengan KIMNRASKO

pekeviardindnngenenahaaljalur pipa pengawasan

Environmental Impact Assessment for PDAM 4 1

-Mekanisme Sepanjangteknis -PDAM Kota jalur pipa -waktu kegiatan

-Udara -Pencemaran Sementara -Budara pengerijaan Cirebon. transmsi dan dengan BAPEDALKOudara antara lain masyarakat pengamanan

penyiraman air sekitar-Mengatur galian

-Transportasi -Ganngguan Sementara -Tingkat /timbunan bahan - PDAM Kota Lokasi masuk Waktu kegiatan-Transportasi lalulintas Sementara kemacetan ,tidak mengurangi Cirebon. Proyek dengan DITLANTAS

lalulintas jalan ruas yang Reservoir pengamananada

-penyesuaian PDAM Kta Lokasi IPA Waktu pemakaianB. PEKERJAAN |Pekerjaa Kebisingan PolusiBsuara Sementara Baku mutu masyaakeiatdan Cirebon a dan alat berat dengan pemasangan pipa Keiign Pls taa Smnaa Bising masy araat dn Crbn masyarakat cara mengukuLr BAE LK

pemilihn alt y seki ta r kebisingansesuai _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Estetika -Menutup tanah - PDAM Kota Waktu kegiatan-Air Erosi Sementara gangguan membuat pant Cirebon. transm ssi dengan KIMPRASKO

laluhintas pengawasan

Melewati -Pendapat an -Sosialisasi dan -PDAM Kota Lokasi jalur Sebelum dan saatpasar -Pedagang Sementara peda gang pengaturan Cirebon. Lo lewat pelaksanaan PEMIItradisionil) kctmenutrun pekerjaan pada Cieo.ppasear proeakannPE AKjam-jam lenggang psrpoe

PASCA Kontroh Baku K smen -kesehatan SmKepmmkes Pengoeahar aa P Kota KBak Sa ing seatKONERA KSI) Mutu Air linum Konsumen a ir mut dan bahan kinra Cirebon. Konsume2 bulan sekati

Environmental Impact Assessment for PDAM 42

Tabel 4.4.1. Matrik EMP Pengembangan Pipa Transmissi dari Intake Penepat - IPA Iman Bonjol 'D 800 mm termasuk 3 stasiun pompa &modifikasi intake Penepat ,UWSIEP PDAM Pontianak

KEGIATAN BERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN UPAYA PEMANTAUAN LINGKUNGANNO TAHAP MENIMBULKAN LINGKUNGA (Environmental Impact) LINGKUNGAN

DAMPAK/SUMBER N YANG (Environmental Management Plan) (Environmental Monitoring Plan)(Sltage) DAMPAK TERKENA JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

(Activity Cause DAMPAK DAMPAK DAMPAK UKUR CARAEnviron. Impact)

I KONSTRUKSI

Pengaturan Sepanjang Selama

Prasarana/ Kerusakan Voliume berat material -PDAM Kota Roue kegiatanjalan yang Tetap kerusakan dengan Pontianak utedengan selalu KIMPRASKO

Jalan dilewati jalan memperhatika pengangkuta mengawasi

n kondisi jalan kegiatan

Mengunakan

Bakumutu pengeluartan P MPada lokasi WaktuA. PERSIAPAN -Mobilisasi alat dan Pencemaran BauBuuAPEDALkn PDMKetetO eiaa

material Udara/Bising udara/bisin Sementara Udara bising/gas Pontianak ryang pdat degan BAPEDALKOudara/bising ~~~Nasional buang dan yangl pada dengamna

sesuai baku

mutu Nasional

-Kemacetan -Tingkat -pengatuanLoaijln Wktlalulintas kemacetan angkutan - PDAM Loangjaa -ankutun

-Lalu Lintas -ada Sementara menghindari Pontianak DITLANTASpada rute ~ /gangguan ja -. a diperkirakan denganDIATA

perjalanan lalu lintas' padat padat pengamanan

Mekanisme Sepanjang WaktBaku mutu teknis -PDAM Kota jalur pipa k atu

-Udara -Pencemaran Sementara Udara Pengeijaan al: Pontianak transmisi dan egiatan KIMPRASKOudara Nasional bila perlu masyarakat dengan

penyiraman air sekitar

- Pengalian lubang tanah Menempatkan Waktu

tanah gahian -Jalan, air -Erosi Sementara laluhntas tanah galian Pontianak jalur pipa kegiaan KIMPRASKOtanah galian ~ ~ ~ ~ ~ ~ ~ esetka jauh dari aliran rasl denganB. PEKERJAAN __________, air permukaan pengawasan

PIPA Membangun -PDAM kota Sepanjang Waktu

TRANSMISSI -Pekerja -Longsor Sementara pekerja dinding tnPontanak Su pdean Watan KIMPRASKO

pekerja penahan tas-si dnapengawasan

Penyesuaian Seapanjang Wakt

Te adi Baku mutu dengan -PDAM Kota jalur pemakaian-Pemasangan tiang -kebisingan kebisingan Sementara udara masyarakat Ponanak a alat berat BAPEDALDA

pancang pondasi Nasional dasyaran syar dengan cara KOTAdan pemilihan sekitar mnuubising yang keisnganusesuai mengan

Environmental Impact Assessment for PDAM

PASCA Kepmen Respon PenngambilaE KONSTRUKSI Kontrol baku mutu Air -Konsuen -Kesehatan Sementara Kes Pengolahan -PDAM Kota Intake n Sampel lx DISKESKO

(OPERASI) baku Konsmen Baku Mutu Air dan bahan Pontianak Panepat buanAir Minum kimia

Environmental Impact Assessment for PDAM 45

4.4.2. Matrik EMP Pengembangan pipa transmissi air minum dari Imam Bonjol ke Sei Jawi ( Reservoir Booster Pump Rambutan ) 4) 600 mmUWSIEP - PDAM Pontianak

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

JO TAIIAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGAEnviron. Impact DAMPAK DAMPAK CARA

I KONSTRUKSI______ ____

Pengaturanberat Selama kegiatan-Prasarana -Kerusakan -Volume Pengaturan berat -PDAM Sepanjang dengan cara/Jalan jalan yang Tetap kerusakan memperhatikan Pontianak Route selalu mengawasi KIMPRASKO

dilaltui jalan kondisi jalan angkutan kegiatan sesuaikondisi jalan ~~~~~~~ketentuan

-Kemacetan -Tingkat -pengaturan - PDAM Kota Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan Ponjeanak yang dengan DITLANTASdan material rute peijalanan /gangguan - iam padat padat pengamanan

Mengunakan

Baku mutu peralatan PDAM Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Pontianak tertentu yang BAPEDALKOudara/bising Nasional bising/gas buang padat pengamna

dan sesuai baku lalulintas pengamananmutht Nasional

-Mekanisme

-Bakumutu teknis - PDAM Kota jaurppandang -waktu kegiatan BAE LKA. PERSIAPAN -Udara -Pencemaran Sementara -Baku mubu pengeraaan -PDA ak msyrka Iat dengan

udara antara lain sekitar proyek pengamanan

penyiraman air

-Penyesuaian

dengan kegiatan - PDAM Kota Sepanjang Waktu pemakaian-Kebisingan -Polusi suara Sementara -Baku mutu masyarakat dan Pontianak jalur pipa dan alat berat dengan BAPEDALKO-Kebisingan -Polusi suaa emntra udara pemilihan alat masyarakat cara mengukurPend ahan tanah memenuhi baku sekitar proyek kebisingan

dan timbunan mt urtanah galian mutu suara

-PDAM kota Sepanjang Waktu kegiatan-Pekerja -Longsor Sementara pekeea dMndbng penahan Pontianak jalur pipa dengan KIMPRASKO

-Longsor pekeija dinding penahan ~~~~~~~yang digali pengawasan

Estetika -Menutup tanah PDAM kota Sepanjang Waktu kegiatan-Air Erosi Sementara ,gangguan gatian dan Pontianak jalur pipa dengan KIMPRASKO

lalulintas membuat part air yang digali pengawasan

Environmental Impact Assessment for PDAM 46

-Mengatur galian

-Ganngguan -Tingkat /timbunan bahan -PDAM Kota Sepanjang Waktu kegiatan-Transportasi lalulintas Sementara kemacetan ,tidak mengurangi Pontianak jalur papa dengan DITLANTAS

B.aPEKERJAaN lalulintas jalan ruas yang pengamananB. PEKERJAAN ada ______Pemasangan ada

pipa transnmisi -pneuinWaktu pemakaianBaku mutu dengan kegiatan -PDAM Kota Sepanjang alat berat dengan BAPEDALDA

Kebisingan Polusi suara Sementara masyarakat dan Pontianak jalur pipa cara mengukur KOBising pemilihan alat yg transmissi kebasmngun

sesuai kebisingan

Environmental Impact Assessment for PDAM 47

Tabel 4.4.3. Matrik EMP dari Peningkatan kapasitas IPA Sei Jawi Luar 50 lps - UWSIEP PDAM PontianakKEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

4O TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGAEnviron. Impact DAMPAK DAMPAK CARA

I KONSTRUKSI

-Prasarana -Kerusakan Penga turan -t Selama kegiatan/Jalan jalan yang -Volume Penaterian ert - PDAM Kota Sepanjang dengan cara

dilalui Tetap kerusakan memperhatikan Pontianak jalan menuju selalu mengawasi KIMPRASKOjalan kondisi jalan IPA kegiatansesuai

-Tingkat -pengaturan Lokasi jalan -Waktu angkutan-Kemncean kemacea auits- PDAM Kota yn Wkuagua

Mobilisasi alat -Lalu Lintas lalutntas jala Sementara /gangguan laluhinda Pontianak yang dengan DITLANTASdan material menujtu IPA lalu lintas' jam padat Kontraktor padat pengamanan

Mengunakan

Pencemaran ~~~~Baku mutu peralatan PDAM Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Pontianak tertentu yang dengan BAPEDALKOudara/bising Nasional bising/gas buang padat dengamna

dan sesuai baku lalulintas pnaaaA. PERSIAPAN mutu Nasional

-Udara -Mekanisme Lks P-Baku mutu teknis PDAM dLoasi PA -waktu kegiatan BAE LK

-Pencemaran Sementara udara SK peknigsaan Pontianak masyarakat dengan BAPEDALKOudara antara lain r sekitar proyek pengamanan

-PenyesuaianPenggalian tanah dengan kegiatan -PDAM Lokasi IPA Waktu pemakaiandan timbunng a-Baku mutu masyarakat dan . dan alat berat dengan BAPEDALKOtanah galian -Kebisingan -Polusi suara Sementara udara pemilihan alant Pontanak masyarakat cara mengukur

memenuhi baku sekitar proyek kebisinganmutu suara

Kecelakaan Membangun -PDAM Lokasi Waktu kegiatan KMPA O-Pekeda -Longsor Sementara pekerja dinding penahan pontianak penggalian di dengan

intake pengawasan

-Mengatur galian

B. PEKERJAAN Pekeraan jalan -Ganngguan -Tingkat /timbunan bahan - PDAM Lokasi masu Waktu kegiatanmasuk, struktur -Transportasi lGanuintan Sementara kemacetan ,tidak mengurangi Pontiank Proyek IPA dengan DITLANTAS(pagar ,saluran) laluhntas lalulintas jalan ruas yang pengamanan

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a d a _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __a a_

Environmental Impact Assessment for PDAM 48

PASCA peemrnPengelolaan dan -PDAM

KONSTRUKSI Lumpur Tanah dan air tpenmaran Baku mutu Pengolahan Pontianak ProyekIPA Sampling satu BAPEDALKO(OPERASI) sedimentasi tanah tanah B3 Nasional Lumpur bagian tugas bulan sekali

tanab ~~~~~~~~~Sementasi DED

Environmental Impact Assessment for PDAM 49

Tabel 4.4.4. Matrik EMP Optimasi pipa transmissi air bersih imam Bonjol - selat Panjang dan Ekspansi/optimasi sistem distribusi)UWSIEP PDAM Kota Pontianak

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

0 TAHAP DAMPAK TERKENA

Activity Cause DAMPAK JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact DAMPAK DAMPAK UKUR CR

KONSTRUKSI

-selama kegiatan

-kerusakan -Volurne -Pengaturan berat -PDAMSeajn dngncrPrasarana jalan yamg Tetap keruIakan menerisaik an Pontianakroute selalu KIMPRASKO

/jalan dilewati jalan kompdisaikaan angkutan mengawasikondisi jalan ~~~~~~~~kegiatan sesuai

ketentuan-Tingkat -Pengaturan -PDAM

Mobilisasi alat dan -Lalu Lintas -Kemacetan Sementara Kemacetan angkutan Pontianak Lokasi yang Waktu angkutanmaterial lalulintas /gangguan menghindari jam diperkirakan dengan an

lalulintas -jam padat padat pengamananMengunakan

Pencemaran ~~~Baku mutu peralatan PDAM Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Pontianak tertentu yang dengan BAPEDALKO

A. PERSIAPAN udara/bising Nasional bising/gas buang padat pnaaadan sesuai baku lalulintasmutu Nasional

Kecelakaan Membangun -PDAM Lokasi/Rute Waktu kegiatan-Pekerja -Longsor Sementara pekerja dinding penahan Pontianak Lokan dengan KIMPRASKO

pengawasan-Pengaturan

-Gangguan -Tigka t dengan -PDAM Lokasi/Rute Waktu kegiatan DTLNAPenggalian tanah -Transportasi - lalulintas Sementara kemacetan menghindari Pontianak penggaian dengan DITLANTAS

laluhintas penggalian pada pengawasanjam-jam padat

- Pedagang -Aktivitas -Pendapat -Sosialisasi dan -PDAM -Sebelum dan saatkecil kaki perdagangan Sementara an peda- pengaturan -PDAn -Pasar yang pelaksanaan PEMDAKOlima terganggu gang pekerjaart pada Ponalke-asar yange

menurun jam-jam lenggang proyek

Environmental Impact Assessment for PDAM 50

B. PEKERJAAN Pemasangan pipa Kecelakaan Membangun -PDAM Lokasi/Rute Waktu kegiatan

distribusi -Pekerja -Longsor Sementara peke | didig p ha Pontianak |eLgkaian dengan KIMPRASKOpengawasan

PASCA Mtitu Kualitas air Kesehatan S t Kepmen Respon -PDAM Kran air PengambilanKONSTRUKSI Minum Konsumen masyarakat Kesehatan treatment air dan Pontianak konsumen sample air 1 bulan DIS KES KO(OPERASI) bahan kimia sekali

Environmental Impact Assessment for PDAM 5 1

Tabel 4.4.5. Matrik EMP dari pembangunan reservoar sistem distribusi reservoar baru 2 x 1000 m3 , Reservoir X (pontianak Utara) lokasi j1.*Budiutomc

Gg.Darmaputra dan reservoir VII ( Pontianak Barat ) di Ji. Yos Sudarso Kelurahan sei Baliung- UWSIEP PDAM Kota Pontianak

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG ____________

iO TAIIAP DAMPAK TERKENA

( Activity Cause DAMPAK DAMPAK SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact

_ KONSTRUKSI

-Prasarana -Kerusakan Selama kegiatan

/Jalan jalan yang -Volume Pengaturan berat -PDAM Sepanjang dengan cara

dilalui Tetap kerusakan memperhatikan Pontianak Route selalu mengawasi KIMPRASKO

Mobilisasi alat jalan kondisi jalan angkutan ketentuan sesuai

dan material-Kemacetan -Tingkat -pengaturan -PDAM Lokasi jalan -Waktu angkutan

-Lalu Lintas lalulintas pada Sementara kemacetan angkutan Pontianak yang dengan DITLANTAS

rute perjalanail /gangguan menghindari jam diperkirakan pengamananlalu lintas' - jam padat padat pnaaa

IMkrd PDA Loas

-Udara -Pencemraran -Baku mutu -Mekanisme -PDAM Reservoir dan akegiatan BAPEDALKO

A. PERSIAPAN ~~~~~udara Sementara udara antara lain :Pnaak masyarakat dnapenyiraman air sekitar proyek pengamanan

-Penyesuaian

Penggalian galian dengan kegiatan -PDAM Lokasi Waktu pemakaianPenbisingan galiani suara Sementara -Baku mutu masyarakat dan Pontianak Rservoir dan alat berat dengan BAPEDALKO-Kebisingan -Polusi suara Sementara udara pemilihan alat masyarakat cara mengukur

memenuhi baku sekitar proyek kebisingan

mutu suara

Kecelakaan Mebanun -PDAM Lokasi Waktu kegiatan-Pekerja -Longsor Sementara eekerak dinding penahan Pontianak penggalian di dengan KIMPRASKO

pekeria dinding penahan ~~~reservoir pengawasan

-Mengatur galianB. PEKERJAAN Pekerjaan jalan -Gngun-Tingkat /ltimbunan bahan -PDAM Lokasi masuk Waktu kegiatan

masuk, struktur -Transportasi lanuginas Sementara kemacetan ,tidak mengurangi Pontianak Proyek dengan DITLANTAS

(pagar ,saluran) lalulintas jalan ruas yang Reservoir pengamanan

_____________ ___________ ada

PASCA Knue ksatnKepmemkes -PA11 KONSTRUKSI Kontrol Baku SKonsmen tkwhatan Sementara Baku mutu Pengolahan air Pontianak Lokasi Sampling satu BAPEDALKO

(OPERASI) Mutu Air Minul Konsumen Air Mimum dan bahan kinia -bagian tugas Reservoir bulan sekaliDED

Environmental Impact Assessment for PDAM 52

Tabel4.5.1. Matrik EMP dari Pengembangan Pipa Transmissi air baku di Tabuk Pemiatang Panjang: dari kapasitas 900 L/det. ineijadi 127S.L/det.( Pembangunan Intake Air baku dan penambahan pompa di tabuk Pematang panjang )- UWSIEP PDAM Banjarmasin

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)

TAHAP DAMPAK /SUMBER TERKENGNO DAMPAK TERKENA

(Stage) ( Activity Cause DAMPAK JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

Environ. Impact) DAMPAK DAMPAK UKUR

I KONSTRUKSI

Pengaturan berat ~~~~SelamiaKerusakan Volume Pengaan berat -PDAM kegatan

Prasarana/ jalan yang Tetap kerusakan material dengan Banjarmasin Sepanjang Rute dengan selalu KIMPRASKOJalan dilewati jalan memperhatikan pengangkutan megawan

kondisi jalan kegatan_______________ _____________ _________________ ~~~~~~k eg iatan

Mengunakan

A. PERSIAPAN - Mobilisasi alat dan Pencemaran mBaku mutu peralatan PDam Pada kang kegiatan BAPEDALKOmaterial -Udara/Bising udara/bising Sementara Udara mesngegasarkang Banjarmasin tertentu yang denganBAE LK

matenal udara /bising ~~~~Nasional bising/gas buang padat lalulintas dnadan sesuai baku pengamananmutu Nasional

-Kemacetan -Tingkat -pengaturan - PDAM Lokasi jalan -Waktu

-Lalu Lintas lalulintas Sementara kemacetan angkutan Banjarmasin yang angkutan DITLANTASpada rute /gangguan menghindari jam diperkirakan denganperjalanan lalu lintas' - jam padat padat pengamanan

Baku mutu Mekanisme -PDAM Lokasi Intake Waktu

-Udara udara Sementara Udara teknis Pengerlaan Banjarmasin masyarakta degiatan BAPEDALKOudara ~ ~ Naioal al: bila perlumayrka dnn

penyiraman air sekitar pengamanan

-Pengalian Pondasi ~~~~~~~~~~~Kekeruhan Menempatkan -PDAM Waktu-Pengalian Pondasi -Air -Erosi Sementara air tanah galian jauh BanjarMasin Lokasi intake kegiatan BAPEDALKO

ermukaan dari aliran air denganB. PEKERJAAN permukaan pengawasan

INTAKE & -PDAM Lokasi WaktuPOMN A -Pekerja -Longsor Sementara Kecelakaan Membangun BanM penggalian di kegan KIMPRASKO

pekeda dinding penahan intake denganpengawasan

Lokasi intake Waktu

- eaagntag .. Terjadi Baku Mutu Penyesuaian -PDAM dan pemakaian

Pmansangan tand -kebisingan kebisingan Sementara Nasa masyarakat dan jarmasin masyarakat alat berat BAPEDALKOpancang pondasi Nasional pemilihan bising sekitar dengan cara

yang sesuai mengukuryang sesual kebisingan

PASCA ~~~~~~~~~Ke-sehatan Kepmen tReatenp irdn -PDAM Air sungai i Pengambilan11 KONSTRUKSI Baku mutu air baku Konsumen konsumen Sementara Kesehatan breatment air dan -PDAM intake sample a I DISKES KO

(OPERASI) konsumen Kesehatan bahan kimia BanJarmasin Intake bulan sekali

Environmental Impact Assessment for PDAM 53

Tabel 4.6.1. Matrik EMP Pembangunan pipa transmisi air baku dari Kran induk Somba opu ke IPA Baru PanaikangUWSIEP PDAM Kota Makassar

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

TAHAP DAMPAK TERKENA(Activity Cause DAMPAK DENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact

KONSTRUKSI

-selama kegiatan

-kerusakan -Volume -Pengaturan berat -PDAM Kota Sepanjang dengan caraPrasarana jalan yamg Tetap kerusakan. materiatikan Makassar route selalu KIMPRASKOIJalan dilewt jala memperhatikan anktn mengawasidilewati jalan kondisi jalan angkutan kegiatan sesuai

ketentuan-Tingkat -Pengaturan -PDAM Kota Lks ag Wkuagua

Mobilisasi alat dan-Lalu Lintas -Kemacetan Kemacetan angkutan Makassar Lokasiryang Waktu angkutanmaterial lalulintas /gangguan menghindan jam padat dengan an

lalulintas -jam padat pdtpnaaaMengunakan

A. PERSIAPAN ~ ~ ~ ~ PncmaanBaku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Makassar tertentu yang Wan BAPEDALKO

udara/bising Nasional bising!gas buang padat pengamanandan sesuai baku lalulintas pnaaamutu Nasional

-PDAM Kota WkukgaaKeclakan Membangun Makasar Lokasi/Rute WaktuPRgSKta

-Pekerja -Longsor Sementara pekeija dinding penahan penggasian Wan KIMPRASKO

Penggalian tanah -Pengaturan -PDAM KotaL -Gengaimtni | angguanhs _Tingkat dengan Makassar Lokasi/Rute Waktu kegiatan-Transportasi lauingua Sementara kemacetan menghindani penggaian dengan DITLANTASlalulintas ~~~lalulintas penggalian pada pengawasan

Environmental Impact Assessment for PDAM 54

-Mengatur gahan -PDAM Kota Sepanjang Waktu kegiatan

-Ganngguan -Tingkat /timbuman bahan* Maar epaipan dWngan DkTiNTAn-Transportasi { Sementara kemacetan ,tidak mengurangi Makassa pipa dengan DITLANTAS

lalulintas lalulintas jalan ruas yang transmissi pengamanan

ada

-PDAM Kota Sepanjang Waktu kegiatan

-Pekerja -Longsor Sementara Kecelakaan Membangun Makassar lubang pipa dengan KIMPRASKOpekerja dinding penahan transnmissi pengawasan

B. PEKERJAAN Pemasangan pipatransmisi air Bersih -Mekanisme -PDAM Kota Sepanjang

-Baku mutu teknis Makassar jalur pipa -waktu kegiatan BAPEDALKO-Udara -Pencemaran Sementara u pengerjaan transmsi dan dengan

u d a r a u - a r a aantara lain masyarakat pengamananpenyiraman air sekitar

Estetika -Menutup tanah -PDAM Kota Waktu kegiatanAir Erosi aSementaa |gangguan galian dan Makassar Jalur p ipa dengat KeMPRASKO

lalulintas membuat pait air transPAssi enga sn

Environmental Impact Assessment for PDAM 55

4.6.2. Matrik EMP IPA Baru Panaikang(2 x 250 Lps) -UWSIEP PDAM Kota. Makassar

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

JO TAHAP DAMPAK TERKENA

(Activity Cause DAMPAK JENIS SIFAT TOLA K UKUR UPAYA LEMBAGDA LOKASI C AN LEMBAGAEnviron. Impact DAMPAK DAMPAK CARA

I KONSTRUKSI

Pengaturan berat -PDAM Kota Selama kegiatan-Prasarana -Kerusakan -Volume material Makassar Sepanjang dengan cara/Jalan jalan yang Tetap kerusakan memperhatika n MakRoute selalu mengawasi KIMPRASKO

dilalui jalan ~~~memperhatikan angkutan kegenatan ssadilalui jalan kondisi jalan agua eitnssa

_______________ ______________ ____________ ______________ ~keten tuan

-Kemacetan -Tingkat -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutan

Mobilisasi alat -Lalu Lintas lal-mintas pada Sementara kemacetan angkutan Makassar yang dengan DITLANTASMobiisasi ~~~~~~~~~~ ~~~~~~/gangguan menghindari jam diperkirakan dnadan material rute perjalanan lalu lintas' - jam padat padat pengamanan

Mengunakan

Peneemaran ~~~~Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Makassar tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanan

dan sesuai baku lalulintas

mutu Nasional

-Mekanisme -POAM Kota LoaiPA -atukgtn

A. PERSIAPAN -Udara -Pencemaran Sementara -Baku mutu ekanise Makassar dan setar deBAPEDALKOudara u antara lain proyek pengamanan

penyiraman air

-Penyesuaian

dengan kegiatan -PDAM Kota Lokasi IPA Waktu pemakaian-Baku mutu masyarakat dan Makassar dan alat berat dengan BAPEDALKO

-Kebisingan -Polusi suara Sementara udara pemilihan alat masyarakat cara mengukur

Penggalian pondasi memenuhi baku sekitar proyek kebisingan

mutu suara

-POAM Kota Wkukgaa

t -Pekerja -Longsor Sementara |Kecelakaan Membangum Makassar Lokasi dean KIkiRASaO-Pekerja -Longsor Sementara ~pekerja dinding penahan pondasi IPA dengawsn MPAK

Estetika -Menutup tanah -PDAM Kota Lokasi Waktu kegiatanAir Erosi Sementara ,gangguan b . Makassar Galian dengan KIMPRASKO

lalulintas membuat pant air pondasi IPA pengawasan

Environmental Impact Assessment for PDAM 56

-Mengatur galian _DMKt-Tingkat /timnbunan bahan LDokaKotamLsa k Waktu kegiatan

-Transportasi -Ganngguan Sementara kemacetan Jtidak |nengurangi Mkassar Pok IPA dengan D Alalulintas lalulintas jalan ruas yang Y pengamanan

ada

P.kerjaan .alan -penyesuaian -PDAM Kota Lokasi IPA Waktu pemakaianB. PEKERJAAN Pekerjaanujala Kebisingan Polusi suara Sementara Baku mutu dengan kegiatan Makassar dan alat berat dengan BAPEDALKO

masuk,strukur Keisingn Poluisuar Semetara isingmasyarakat dan masyarakcat cara mengukur BAE LK(pagar ,saluran g pemilihan alat yg sekitar kebisingan

sesuai

Estetika -Menutup tanah -PDAM Kota Waktu kegiatan

-Air Erosi Sementara ganggua gahman dan Makassar Lokasi IPA dengan KIMPRASKOlalulintas pengawasan

PASCA -pencemaran Pengelolaan dan -PDAM KotaK ONSTRUKSI Lumpur Tanah dan air penchedma r a mentara Baku mutu Pengotahan Makassar P k IPA Sampling satu BAPEDALKO

(OPERASI) sedimentasi tanah tanah B3 Nasional Lumpur bagian tugas bulan sekalitanah ~~~~~~~~~~Sementasi DED

Environmental Impact Assessment for PDAM 57

Tabel 4.6.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Makassar

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

iO TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGAEnviron. Impact DAMPAK DAMPAK CARA

KONSTRUKSI _

-Prasarana -Kerusakan Peg ua eatSelama kegiatan/Jalan jalan yang -Volume Pengaturan berat -PDAM Kota Sepanjang dengan cara

dilalui Tetap kermsakan matenral Makassar. Route selalu mengawasi KIMPRASKOjalan memperhatikan angkutan kegiatan sesuai

kondisi jalan ketentuan

-Kemacetan -Tingkat -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutanMobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan Makassar. yang dengan DITLANTASdan material rute perjalanan /gangguan menghindari jam Makassar.a yangmana

lalu lintas' - jam padat padat pengamanan

Mengunakan

Baku mutu peralatan - PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Makassar. tertentu yang dengan BAPEDALKOudara/bising Nasional bising/gas buang padat pengamanan

dan sesuai baku lalulintas pnaaamutu Nasional

A. PERSIAPAN -Udara -Mekanisme Lokasi jalur

-Pencemaran Sementara -Baku mutu teknis pengerjaan Makassar. pipa dan dengan BAPEDALKOudara udara antara lain : masyarakat pengamanan

penyiraman air sekitar proyek

-Penyesuaiandengan kegia tan -PA Koa Lokasi jalur Waktu pemakaian

Penggalian galian -Polusi suara Sementara -Baku mutu masyarakat dan PDAM Kota pipa dan alat berat dengan BAPEDALKO-Kebisingan -Polusi suara Sementara udara pemilihan alat masyarakat cara mengukur

memenuhi baku sekitar proyck kebisinganmutu suara

-Pekeaonor Sementara Kecelakaan Membangun PDAM Kota Lokasi Waktu kegiatan- | Pekerja -Longsor 2 Sementara pekerja dinding penahan Makassar. penggacan dengan KIMPRASKO

jalur pipa pengawasan

Environmental Impact Assessment for PDAM 58

-Mekanisme Sepanjang

-Udara -Pencemaran Sementara -Baku mutu teknis -PDAM Kota jalur pipa -waktu kegiatan-Udara Pencdmaran Sementara udara pengerjaan Makassar. transmsi dan dengan BAPEDALKO

udara antara lain masyarakat pengamananpenyirman ar sekitar

-Mengatur galian-Tingkat /timbunan bahan - PDAM Kota Lokasi masuk Waktu kegiatan

-Transportasi anngguan Sementara kemacetan tidak mengurangi Makassar. Proyek dengan DITLANTASlal ulintas lalulintas jalan ruas yang Reservoir pengamanan

_____________ ~~~~~ ~~ ~~ada_ _ _ _ _ _ _ _

-penyesuaian Lokasi IPA Waktu pemakaianB. PEKERJAAN Pekerjaan Bkmuu dengan kegiatan -PDAM Kota doan i aPAaktu peaaa

pemasangn npipa Kebisingan Polusisuara Sementara Baktt B'sg masyarakat dan Makassar. waar caraberat deng gan BAPEDALKOBising pmilihanalat ygmasyaraat caramengukur

sesuai sekitar kebisingan

Estetika -Menutup tanah -PDAM Kota Waktu kegiatan-Air Erosi Sementara Igangguan galian dan Makassar. Jalur pipa dengan KIMPRASKO

laluLintas membuat parit air transmissi pengawasan IPAK

Melewati -Pendapata Soilsi da n PDAM Kota Lokasi jalur Sebelum dan saatpasar kPeciagag Sementara -Penda t gang pengaturan Makassar. pipa lewat pelaksanaan PEMDAKOtradisonfl - edaaniemlt pedaugan pekerjaan pada psrpoe

jam-jam lenggang

PASCA Kontrol Baku Kosmn -keseha tan Smnaa Kepmemkes Pengolahan air -PDAM Kota Kran Sampling satu DSEKKONSTRUKSI KosmnSmnaa Baku mutu dnbankra Makassar. KoIumnKbEaSseaO(OPERASI) Mutu Air Minum Konsumen Air Mmimutu da bahan kimma in- bulan sekali

Environmental Impact Assessment for PDAM 59

Tabel 4.7.1. Matrik EMP Upgrade pump at intake and booster pumps stationsUWSIEP PDAM Kota Kendari

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENIS SIFAT TOLAK UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGAEnviron. Impact DAMPAK DAMPAK UKUR CARA

KONSTRUKSI

-selama kegiatan

-kerusakan -Volume -Pengaturan berat -PDAM Kota . dengan caraPrasarana jalan yamg Tetap kerusakan memperhaksan Sroute selalu KIMPRASKO

/jalan dilewati jalan kempdrhaikaan angkutan mengawasi

_______________ ~ketentuan-Tingkat -Pengaturan -PDAM Kota Lokasi yang Waktu angkutan

Mobilisasi alat dan . -Kemacetan Kemacetan angkutan Kendari diperkirakan dengan DITLANTASmaterial -Lalu Litas lalulintas Sementara /gangguan menghindari jam padat pengamanan

lalulintas -jam padat padat pengamanan

Mengunakan

A. PERSIAPAN ~ ~ ~ ~ PncmaanBaku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Kendari tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat BAPEDAanKndan sesuai baku lalulintas pengaranan

mutu Nasional

Kecelakaan Membangun -PDAM Kota L Rt Waktu kegiatan-Pekeja -ongso Semntara Keceakaan Membngun Makasar LokasiRute dengan KIMPRASKO

Pemasangan tapak -Pekerja -Longsor Sementara pekerja dinding penahan penggalian pengawasan

pompa dan sistem -Pengaturan -PDAM Kota

pipa -Transportasi _Gangguan Semetara _Tingkat dengan Kendari Lokasi/Rute Waktu kegiatanpipa G~~-Taspras alintgan eetr eaea menghindari penaanan dengan DITLANTAS-Transportasi laluhintas lalulintas penggahian pada penggahan pengawasan

jam-jam padat

Environmental Impact Assessment for PDAM 6

-Mengatur galian -PDAM Kota Sepanjang Waktu kegiatan-Ganrtgguan ~ -Tingkat /timbunan bahan Spnag Wkukgaa

-Transportasi Sementara kemacetan Jidak mengurangi Kendari pipa dengan DITLANTASlalulintas lalulintas jalan ruas yang transmissi pengamanan

ada

Kecelakaan Membangun -PDAM Kota Sepanjang Waktu kegiatan KIMRAS-Pekerja -Longsor Sementara pekeda dinding penahan Kendari lubang pipa denganKI RA O

pekerJa dinding penahan transmissi pengawasanB. PEKERJAAN Pemasangan pompa tasii pegwa

dan perpipaan -Mekanisme Sepanjang

-Baku mutu teknis -PDAM Kota jalur pipa -waktu kegiatan BAPEDALKO-Udara -Pencemaran Sementara udara pengerjaan Kendari transmsi dan dengan

udara antara lain masyarakat pengamananpenyiraman air sekitar

Estetika -Menutup tanah -PDAM Kota Waktu kegiatanAir Erosi Sementara ,gangguan gmenul t dan ai Kendari Jalpal dengan KIMPRASKO

lalulintas membuat pat air transmissi dengawn

Environmental Impact Assessment for PDAM 6 1

Tabel 4.7.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Kendari

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

Jo TAHAP DAMPAK TERKENA W( Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI CARA LEMBAGA

____________ Environ. Impact DAMPAK DAMPAKKONSTRUKSI

-Prasarana -Kerusakan b Selama kegiatan/Jalan jalan yang -Volume Pegmaterial - PDAM Kota Sepanjang dengan cara

dilaltui Tetap kerusakan materi a n Kendari. Route selalu mengawasi KIMPRASKOjalan kondisi jalan angkutan kegiatan sesuai

ketentuan

-Kemacetan ~~~~-Tingkat -pengaturan - DMKb Lokasi jalan -atungunMobilisasi alat -LalulLintas -Kemacetan Sementara kemacetan angkutan PDAM Kota yang -Waktu angkutan DITLANTAS

Mobilisasi e-Lau Lintas /gangguan menghindan jam diperkirakan denganandan material rute perjalanan lalu lintas' - jam padat padat pengamanan

Mengunakan

Baku mutu peralatan - PDAM Kota Pada lokasi Waktu kegiatan

Udara/Bising Pencemaran Sementara Udara mengeluarkan Kendari. tertentu yang dengan BAPEDALKOudara/bising Nasional bising/gas buang padat pengamanan

dan sesuai baku lalulintas

mutu Nasional

A. PERSIAPAN -Udara -Mekanisme Lokasi jalur

-Pencemaran -Baku mutu teknis pengerjaan - PDAM Kota pipa dan -waktu kegiatan BAPEDALKO

udara Sementara udara antara lain : meadsry masyarakat dengan

penyiraman air sekitar proyek pengamanan

-Penyesuaiandengan kegiatan Lokasi jalur Waktu pemakaian

Penggalian galian -Polusi suara Sementara -Baku mutu masyarakat dan -PDAM Kota pipa dan alat berat dengan BAPEDALKO-Kebisingan -Polusi suara Sementara udara pemilihan alat masyarakat cara mengukur

memenuhi baku sekitar proyek kebisingan

mutu suara

Kecelakaan Membangun - PDAM Kota Lokasi Waktu kegiatan-Pekerja -Longsor Sementara pekerja dinding penahan Kendari. penggahan dengan KIMPRASKO

_Pekeria -Longsor Sementara pekerja dinding penahan jalur pipa pengawasan

Environmental Impact Assessment for PDAM 62

-Mekan.isme Sepanjang-Udara -Pencemaran Sementara -Baku muitu teknis -PDAM Kota jalur pipa -waktu kegiatan

0 -Udara i -Pencemaran Sementara udakurautu pengerjaan Kendari. transmsi dan dengan BAPEDALKO

uaaudara antara lain masyarakat pengamananpenyiraman air sekitar

-Mengatur galian-Tingkat /timbunan bahan - PDAM Kota Lokasi masuk Waktu kegiatan

-Transportasi lalulintas Sementara kemacetan ,tidak mengurangi Kendari. Proyek dengan DITLANTAS

lalulintas jalan ruas yang Reservoir pengamanan

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ad a_ _ _ _ _ _ _ _

-penyesuaian Lks P at eaaa

B. PEKERJAAN Pekerjaan Baku mutu engan kegiatan - PDAM Kota Lokasi IPA alat berat denganpemasangan pipa Kebisingan Polusi suara Sementara Bising masyarakat dan Kendari. masyarakat cara mengkur BAPEDALKO

Bising ~pemilihan alat yg sktrkbsnasesuai sktrkbsna

Estetika -Menutup tanah - PDAM Kota Waktu kegiatan

-Air Erosi Sementara ,gangguan gamian dan Kendari. Jalur pipa dengan KIMPRASKO

lalulintas membuat pant air transmissi pengawasan

Melewati -Pendapat an -Sosialisasi dan - PDAM Kota Lokasi jalur Sebelum dan saat

pasar kecildgag Sementara pedagang pengaturan Kendari. pipa lewat pelaksanaan PEMDAKO

tradisionil) kecl menurun dlpekerjaanngad pasar proyekjam-jam lenggang psrpoe

PASCA Kontrol Baku Konsumen -kesehatan Sementara Kepmemkes Pengolahan air - PDAM Kota Kran Sampling satu DISKESKO

KONSTRUKSI Mutu Air Minum Konsumen Baku mutu dan bahan ia Kendai. Konsumen bulan sekali(OPERASI) ImpacAir Momum

Environmental Impact Assessment for PDAM 63

Tabel 4.8.1. Matrik EMP Pembangunan Intake baru Sijinjang S. BatanghariUWSIEP PDAM Kota Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)

TAHAP DAMPAK /SUMBER YANGTAHAP DAMPAK TERKENA

(Activity Cause DAMPAK DAMPA DAMPA K UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. Impact

KONSTRUKSI

-selama kegiatan

-kerusakan -Volume -Pengaturan berat -PDAM Kota Sepanjang dengan caraPrasarana jalan -Volume material dengan Jambi Se selalu Dinas PU Kota/Jalan alnyamg Tetap kerusakan m pehtknroute mnaai Da UKt

/jalan dilewati jalan memperhatikan angkutanmegwskondisi jalan kegiatan sesuai

ketentuan-Tingkat -Pengaturan -PDAM Kota Lokasi yang Waktu angkutan

Mobilisasi alat dan -Kemacetan Kemacetan angkutan..mobiisateriaalatda -Lalu Lintas eal etan Sementara Kganetan angkan Jambi diperkirakan dengan DLLAJmaterial lalulintas /gangguan menghindari jam padat pengamanan

lalulintas -jam padat

Mengunakan

A. PERSIAPAN Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Jambi tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanandan sesuai baku lalulintas pnaaamutu Nasional

Kecelakaan -PDAM Kota Waktu kegiatan-Pekerja -Longsor Sementara pada Membangun Jambi Lokasi intake dengan Dinas PU Kota

pekerija dindmig penahan pengawasan

Penggalian pondasi -Pengaturan -PDAM Kota

-Transportasi _Gangguan Se a _Tingkat dengan Jambi Lokasi/Rute Waktu kegiatan-Transportasi lalulguas Sementara kemacetan menghindari penggLoasi/at dengan DLLAJ

lalulintas penggalian pada pengawasan. ~~~~~~~~~~~~~~~~~~~~~~~~~jam-jam padat

Environmental Impact Assessment for PDAM

-Tingkat -timbunan bahan -PDAM Kob Waktu kegiatan

-Transportasi lalulintas Sementara kemacetan ,tidak mengurangi Lokasi Intake dengan DLLAJlalulintas jalan ruas yang pengamanan

_ _ _ _ _ _ _ _ _ _ _ ~ad a_ _ _ _ _ _ __ _ _ _ _ _ _

Kecelaaan Mebangun -PDAM Kota Waktu kegiatan

-Pekerja -Longsor Sementara Kecelakaan dinding penahan Jambi Lokasi Intake dengan Dinas PU Kota

B. PEKERJAAN Pembangunan I pengawasan

Intake -Mekanisme

-Udara -Pencemaran Sementara Baku mutu teknis Jambi Lokasi Intake dengan BAPEDALKOudara antara lain: pengamanan

.___________ ____________ penyiram an air

a Pencemara -Menutup -PDAM Kota Waktu kegiatan

-Air Erosi Sementara Pen air tumpukan tanah Jambi Lokasi Intake dengan Dinas PU Kota

sungai galian pengawasan

Environmental Impact Assessment for PDAM 65

Tabel 4.8.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG _______

JO TAHAP DAMPAK TERKENA

( Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

Environ. Impact DAMPAK DAMPAK CARAI KONSTRUKSI

-Prasarana -Kerusakan Selama kegiatanIJalan jalan yang -Volume angatran - PDAM Kota Sepanjang dengan cara DINAS P

dilaluli Tetap kerusakan matperhal .an Jambi. Route selalu mengawasi KOTA

jalan kmopdiialan angkutan kegiatansesuai

-Tingkat -pengaturan Lokasi jalan-Kemacetan kemutu angk- PDAM Kota yang lWaktu angiatan

Mobilisasi alat -Lalu Lintas lalulintas pada Sementara U m Jambi. angdengan DAdan material rute perjalanan /gangguan menghindari jam diperkirakan dengamnanLA

udara/bisig Nlalu lintas' -jlam padat padat pengamananMengunakan

PeA.emaran Baku mutu peralatan PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising drPencemaran Sementara Udara mengeluarkan Jambi. pa dan dengan BAPEDALKO

udarabisinaNasional bising/gas buang p.tere e pengamanandan sesuai baku lalulintas kenganmutu Nasional

A. PERSIAPAN -Udara -Mekanisme PDAM Kota Lokasi jalur Waktu kegiatan

-Pencemaran Sementara pekeu mntu teknisbi. g JambiM Ka penggahan dengan BAPEDALKO

udara Seventaantara lain : masyarakat dengamnpenyiraman air sekitar proyek pnaaa

-Penyesuaian

Penggalian jalur dengan kegia tan -PDAM Kota Lokasi jaIur Waktu pemakaian-Keisigan -Pousisuaa Smenara -Baudara u emihanyaraatda Jambi. pipa dan alat berat dengan BAPEDALKO

pipa udbsna Pls saa Smnaa -ara ut pmihasyaraatda masyarakat cara mengukurmemenuhi baku sekitar proyek kebisinganmutu suara

-Pekerja -Longsor Sementara Kecelakaan Membangun -PDAM Kota Lokasi Waktu kegiatan DINAS PU-Pekera -Lonsor Seentara pekerja dinding penahan Jambi. penggalian dengan KOTA

jalur pipa pengawasan

Environmental Impact Assessment for PDAM 66

-Mekanisme Sepanjang-Baku mutu teknis - PDAM Kota jalur pipa -waktu kegiatan

-Udara -Pencemaran Sementara -ungar a nlaa Jambi. transmsi dan dengan BAPEDALKOuaaudara antara lain masyarak~at penganianan

penyiraman air sekitar-Mengatur galian

-Tingkat /timbunan bahan - PDAM Kota Lokasi masuk Waktu kegiatan

-Transportasi lanngguan Sementara kemacetan ,tidak mengurangi Jambi. Proyek dengan DLLAJlalulintas jalan ruas yang Reservoir pengamanan

ada _ _ _ _ _ _ _

.penyesuaian LksB. PEKERJAAN Pekerjaan Baku mutu dengan kegiatan PDAM Kota Lokasi IPA Waktu pemakaian

pemasangan pipa Kebisingan Polusi suara Sementara Bu masyarakat dan Jambi. msyaralt cara mengkur BAPEDALKOBising pemilihan alat yg msaaa aamnuu

sesuai sekitar kebisingan

Estetika -Menutup tanah PDAM Kota Waktu kegiatan- Air Erosi Sementara ,gangguan galian dan J PambKot Jalur pipa Wenaktnegaa DINAS PU

lalulintas membuat parit air transmissi pengawasan KOTA

Melewati -Pendapat an pengaturasi- PDAM Kota Lokasi jalur Sebelum dan saatpasar kPedagan Smnaa pdgng pengaturan Jambi. pipa lewat pelaksanaan PEMDAKOtradisionil) kecilagng Sementara menurun pekerjaan pada pasar proyek

men_run jam-jam lenggang

PASCA Konnrumenku-kesehatan Kepmemkes Peglaa ar PDAM Kota Kran Sampling satu DSEK

__ OINSTARUKSI Mutu Air Minum Konsumen Konsumen Sementara Baku mt dan bahan kiia Jbi Konsumen bulan sekali D(OPERASI) Air Mnimum

Environmental Impact Assessment for PDAM 67

Tabel 4.8.4. Matrik EMP upgrade works at intakes Pulau Pandan S. BatanghariUWSIEP PDAM Kota Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

TAHAP DAMPAK TERKENA(Activity Cause DAMPAK DAMPAT TOLAKU UPAYA LEMBAGA LOKASIA CARA LEMBAGA

Environ. Impact

KONSTRUKSI

-selama kegiatan

-kerusakan -Volume -Pengaturan berat -PDAM Kota Sepanjang dengan caraPrasarana yamg Tetap kerusakan material dengan Jambi route selalu DINAS PU KOTA/Jalan dilewati jalan memperhatikan ankuta mengawasi

kondisi jalan kegiatan sesuai

ketentuan

-Tingkat -Pengaturan -PDAM Kota Lokasi yang Waktu angkutan

material -Lalu Lintas lalulintan Sementara Kemacetan angkutan jam Jambi diperkirakan dengan DLLAJ

lalulintas -jam padat

Mengunakan

A. PERSIAPAN P Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pengr Sementara Udara mengeluarkan Jambi tertenui yang dengan BAPEDALKO

udara/bisitng Nasional bising/gas buang padat pengamanandan sesuai baku lalulintas pnaaamutu Nasional

Kecelakaan ~~~~-PDAM Kota Waktu kegiatan-Pekerja -Longsor Sementara Keeaan Memb~angun Makasar Lokasi/Rute dengan DINAS PU KOTA

pekerja dinding penahan penggalian pnaaaPemasangan sheet

Pile Tingkat -Pengaturan -PDAMLokasi Waktukegiatan

-Transportasi -Gangguan eetaa gangguan denganJabLosiWkuegtndarat & sungai laluLintas Sementara lalulintas pemancangan Jambi pemancangan dengan DLLAJ

. meningkat pada jam tidak /route jalan pengawasanEneironmenat Isibuk Assessment for_PDAM_68

Environmental Impact Assessment for PDAM 68

a s anngguan - Mengatur -PDAM Kota Waktu kegiatan

-Transportasi lalulntas Sementara -gangguan pelaksanaan Jambi Lokasi Intake dengan DLLAJ

sungai laluhintas pemancangan pengamanan

-a Kecelakaan Membangun -PDAM Kota Waktu kegiatan

-Pekerja -Longsor Sementara pekerja dinding penahan Jambi Lokasi Intake dengan DINAS PU KOTPpekeria dundung penahan ~~~pengawasan

B. PEKERJAAN Pemasangan sheetpile

-Baku mutu -Menggunakan -PDAM Kota -waktu kegiatan BAPEDALKO

-Udaralbising -Pencemaran Sementara udara peralatan sesuai Jambi Lokasi Intake dengan

udara standart pengamanan

Pencemara -Menutup -PDAM Kota Waktu kegiatan-Air Erosi Sementara n air tumpukan tanah Jambi Lokasi Intake dengan DINAS PU KOTP

sungai galian pengawasan

Environmental Impact Assessment for PDAM 69

4.8.5. Matrik EMP Rehabilitate and upgrade Existing WTP Benteng-UWSIEP PDAM Kota. Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

4O TAIIAP DAMPAK TERKENA(Activity Cause DAMPAK DAMPAK SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASl CARA LEMBAGAEnviron. Impact

I KONSTRUKSI Selama kegiatan

Penigatturan berat -PDAM KotaSeaakgtn-Prasarana -Kerusakan -Volume material Jambi Sepanjang dengan cara DINAS PU

/Jalan jalan yang Tetap kerusakan memperhatikan lgRoute selalu mengawasi KOTA

dilaiLu jalan koemperhatian angkutan kegiatan sesuai.kondisi jalan ketentuan

-Kemacetan -Tingkat -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutan

Mobilisasi alat -Lalu Lintas lalulintas pada Sementara keacgtandengan DLLAJA. PERSIAPAN dnmtraruepalan/gangguan menghindari jam diperkirakan dengamnanLA

dan material rute pejalanan lalu lintas' - jam padat padat pengamanan

Mengunakan

Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising cudara/bnsg Sementara Udara mengeluarkan Jambi tertentu yang dega BAPEDALKO

udaraonmentglNasioial bising/gas buang padat pengamndan sesuai baku lalulintas pnaaamutu Nasional

Environmental Impact Assessment for PDAM 70

-Tingkat -Mengatur galian -PDAM Kota Waktu kegiatan-Ganngguan -Tingkat /timbunan bahan Jambi Lokasi mastk Wkukgaa

-Transportasi lalulintas Sementara kemacetan tidak menga angi Proye A dengan DLLAJlalulintas ~~~lalulintas jalan ruas yang ProyekanaA

-penyesuaian ~ ~ ~ ~ enamnapenyesuaian -PDAM Kota Lokasi IPA Waktu pemakaian

B. PEKERJAAN Retupgrade Kebisingan Polusi suara Sementara Baku mutu masyarakat dan Jambi dan alat berat dengan BAPEDALKOupgrade ~~~~~~~~~~Bising pe-lhnalat yg masyarakat cara mengukur

pemsuhan sekitar kebisingan

- Menggunakan -PDAM Kota Waktu kegiatan

-Udara Polusi udara Sementara Baku mutu peralatan sesuai Jambi Lokasi IPA dengan Bapedalkoudara standart pnaaa

PASCA pecmrnPengelolaan dan -DMKtKONSTRUKSI Lmpur Tanahir t anah pencemaran Sementara Baku mutu Pengolahan Jambi Proyek IPA Sampling satu BAPEDALKO

(OPERASI) sedimentasi tanah tanah B3 Nasional Sementasi bulan seka

Environmental Impact Assessment for PDAM 71

Tabel 4.8.5 a. Matrik EMP Rehabilitasi sistem distribusi & transmissi ke Jelutung UWSIEP PDAM Kota Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

iO TAHAP DAMPAK TERKENA

(Activity Cause DAMPAK JENIS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

Environ. Impact DAMPAK DAMPAK CARA

I KONSTRUKSI

-Prasarana -Kerusa kan Selama kegiatan

/Jalan jalan yang -Volume Pengaturn bert PDAM Kota Sepanjang dengan cara DfNAS P

dilalhii Tetap keruisakan matperial ikn ambi. Route selalu mengawasi KOTAjalan kondieihalian angkutan kegiatan sesuai

kondisi jalan ~~~~~~~ketentuan _______

-Kemacetan -Tingkat -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutan

Mobilisasi alat -Lalu Lintas lalulintas pada Sementara /gacetan angkutan Jambi. yang dengan DLLAJdan material rute perjalanan /gangguan menghindani jam diperkirakan dengamnanLA

dan material rute perjalanan lalu lintas' - jam padat padat pengamanan

Mengunakan

Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Ba mengeluarkan Jambi. tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanan

dan sesuai baku lalulintas pna~amutu Nasional

A. PERSIAPAN -Udara -Mekanisme PDAMKota Lokasi jalur

-Pencemaran -Baku mutu tekrnis penDge Kota Lokai janu wkukgaa BAPEDALKOudara Sementara udara antara lain Jambi. masyarakat aengan

penyiraman air sekitar proyek pengamanan

-Penyesuaian

Penggalian jalur dengan kegiatan - PDAM Kota Lokasi jalur Waktu pemakaianKebsinan Poluisura emenara -Baudara u pmihasyalaatda Jambi. pipa dan alat berat dengan BAPEDALKO

pipa -Kebisingan -Polusi suara Sementara udara pemilihan alat dan masyarakat cara mengukur

memenuhi baku seki tar proyek kebisinganmutu suara

Pekerja -Longsor Sementara Kecelakaan Membangun PDAM Kota Lokasi Waktu kegiatan DINAS PEnvironmentngsoraSementaralpekerja dinding penahan Jambi. penggalian dengan KOTA

jalur pipa pengawasan

Environmental Impact Assessment for PDAM 72

-Mekanisme Sepanjang-Baku mutu teknis -PDAM Kota jalur pipa -waktu kegiatan

-Udara -Pencemaran Sementara -Ba pengerjaan Jambi. transmsi dan dengan BAPEDALKOudara antara lain masyarakat pengamanan

penyiraman air sekitar-Mengatur galian

-Tingkat /timbunan bahan -PDAM Kota Lokasi masuk Waktu kegiatan

-Transportasi lanngguan Sementara kemacetan ,tidak mengurangi Jambi. Proyek dengan DLLAJlalulintas jalan ruas yang Reservoir pengamanan

ada-penyesuaian Lokasi IPA Waktu pemakaian

B. PEKERJAAN Pekerjaan Baku mutu dengan kegiatan - PDAM Kota dan alat berat denganpemasangan pipa Kebisingan Polusi suara Sementara Bmasyarakat dan Jambi. masyarakat cara mengukur BAPEDALKO

Bising pemilihan alat yg sekitca mengan

sesuai sekitar kebisingan

Estetika -Menutup tanah PDAM Kota Waktu kegiatan- Air Erosi Sementara ,gangguan galian dan Jambi. Koa Jalur p.ipa denantegaa DINAS PU

lAintas membuat parit air transmissi pengawasan KOTA

Melewati -Pendapat an -Sosialisasi dan - PDAM Kota Lokasi jalur Sebelum dan saatpasar -Pedagang Sementara peda gang pengaturan Jambi. pipa lewat pelaksanaan PEMDAKOtradisioail) kecil menurun pekerjaan pada pasar proyek

jam-jam lenggang

PASCA Kontrol Baku -kesehatan Kepmemkes Pengolahan air -PDAM Kota Kran Sampling satu DSEK

KONSTRUKSI Mut Air M um Konsumen Konsumen Sementara Baku mutu dan bahan ki Jambi. Konsumen bulan sekali D(OPERASI) Air Mnimum

Environmental Imnpact Assessment for PDAM 73

4.8.6. Matrik EMP Rehabilitate and upgrade Existing WTP Broni-UWSIEP PDAM Kota. Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

4O TAIIAP DAMPAK TERKENA

(Activity Cause DAMPAK DAMPAK SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI CARA LEMBAGAEnviron. ImpactDAPK AMA

I KONSTRUKSI P

_Penga turan berat -PDAM Kota Selama kegiatan-Prasarana -Kerusakan -Volume material Jambi Sepanjang dengan cara DINAS PU/jalan jalan yang Tetap kerusakan matperialti amniRoute selalu mengawasi KOTA

dilalui jalan memperhai kan angkutan kegiatan sesuaikondisi ialan ketentuan

-Kemacetan -Tingkat -pengaturan -PDAM Kota Lokasi jalan -Waktu angkutanA. PERSIAPAN Mobilisasi alat -Lalu Lintas lalulintas pada Sementara kemacetan angkutan Jambi yang dengan DLLAJ

A. PERSIAPAN dan matrial rute pedalanan/gangguan menghindari jam diperkirakan pengmanadan material rote perjalana lalu lintas' - jam padat .__________linja d padat pengamanan

Mengunakan

Pencemaran ~~~Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanUdara/Bising Pencemaran Sementara Udara mengeluarkan Jambi tertentu yang dengan BAPEDALKO

udara/bising Nasional bising/gas buang padat pengamanandan sesuai baku lalulintasmutu Nasional

Environmental Impact Assessment for PDAM 74

-Ganngguan Sementara -Tingkat -Mengatur galian -PDAM Kob Lokasi masuk Waktu kegiatan-Transportasi laluhntas Sementara kemacetan ,tidak mengurangi Proyek IPA dengan DLLAJ

lalulintas jalan ruas yang pengamanan

Rehabilitasi and -penyesuaian -PDAM Kota Lokasi IPA Waktu pemakaian

B. PEKERJAAN uPegranti a n Kebisingan Polusisuara Sementara Bakuimu masyarakat dan Jambi dan alat berat dengan BAPEDALKOPenggantian Bising pemiliban alat ~~~~~~~~~~masyarakat cara mengukur

pompa) sesuai ygsekitar kebisingan

- Menggunakan -PDAM Kota Waktu kegiatan

- Udara Polusi udara Sementara Baku mutu peralatan sesuai Jambi Lokasi IPA dengan Bapedalkoudara standart pengawasan

PASCA pecmrnPengelolaan dan -DMKtKONSTRUKSI Lumpur Tanah dan air tanahdarn aBr Semaentara Bku mutu Pengolahan JPDAm Koa | Sampling satu BAPEDALKO

(OPERASI) sedimentasi tanah tanah ~B3 Nasional Lumpur blnskt(OPERASI) sedimentasi tanab tanah ~~~~~~~~~Sementasi

Environmental Impact Assessment for PDAM 75

Tabel 4.8.6.a Matrik EMP dari pembangunan reservoar sistem distribusi reservoar baru 1 x 750 m3, R- UWSIEP PDAM Kota Jambi

KEGIATANBERPOTENSI KOMPONEN DAMPAK YANG AKAN TERJADI UPAYA PENGELOLAAN LINGKUNGAN UPAYA PEMANTAUAN LINGKUNGANMENIMBULKAN LINGKUNGAN (Environmental Impact) (Environmental Management Plan) (Environmental Monitoring Plan)DAMPAK /SUMBER YANG

40 TAHAP DAMPAK TERKENA(Activity Cause DAMPAK JENTS SIFAT TOLAK UKUR UPAYA LEMBAGA LOKASI WAKTU DAN LEMBAGA

Environ. Impact DAMPAK DAMPAK CARA

I KONSTRUKSI

-Prasarana -Kerusakan PegtrnbrtSelama kegiatan_;Pralanrjana -Kerukang -Volume material - PDAM Jambi Sepanjang dengan cara DINAS PU

dilalui Tetap kerusakan memperhatikan Route selalu mengawasi KOTA

Mobilisasi alat jalan kondisi alan angkutan kegiatan sesuai

dan materialkenta-Kemacetan -Tingkat -pengaturan Lokasi jalan -Waktu angkutan-LauKLimal tas Sementara kemacetan angkutan - PDAM Jambi yang dengan DLLAJ

-Lalu Lintas lalulintas pada Sementara /gangguan menghindari jam diperkirakan

rute perjalanan lalu lintas' - jam padat padat pengamanan

-Udara -Mekanisme PDMJmi Lokasi wkuegan-Pencemaran Smnaa -Baku mutu teknis pengerjaan Reservoir dan kegnaan BAPEDALKOudara Sementara udara antara lain : masyarakat penganianan

A. PERSIAPAN penyiraman air sekitar proyek

-Penyesuaian

dengan kegia tan -PDAM Jambi Lokasi Waktu pemakaian

Penggalian galian -Kebisingan -Baku mutu masyarakat dan Rservoir dan alat berat dengan BAPEDALKOPenggahangan -Polusi suara Sementara udara pemilihan alat masyarakat cara mengukur

memenuhi baku sekitar proyek kebisingan

mutu suara

Kecelakaan Membangun . Lokasi Waktu kegiatan DINAS PU-Pekera |-Longsor Sementara| pekerja |dinding penahan PDAM Jambi ^ penggalian di dengan KOTA

EnvirenmentalImpact AsLessmensfor SPmentaraDAMdindngpenahanreseor pengaia

Environmental Impact Assessment for PDAM 76

-Transportasi ~~~~~~~~~-Mengatur galian-Transportasi -Tingkat /timbunan bahan Lokasi masuk Waktu kegiatan

lGanngguan Sementara kemacetan ,tidak mengurangi - PDAM Jambi Proyek dengan DLLAJ

laluhintas lalulintas jalan ruas yang Reservoir pengamanan

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~~ad a_ _ _ _ _ _ _ _

Mengunakan

B. PEKERJAAN Konstruksi Pneaa Baku mutu peralatan -PDAM Kota Pada lokasi Waktu kegiatanRePEKERJAAN Kostrukoir Bising /udara Pencemaran Sementara Udara mengeluarkan Jambi tertentu yang dengan BAPEDALKO

Reservoir udara/bising Nasional bising/gas buang padat pengamanandan sesuai baku lalulintas pnaaa

mutu Nasional

Estetika -Menutup tanah -PDAM Kota Wkukgaa

- Air Erosi Sementara igangguan galian dan Jambi Lokasi Waktu kegiatan DINAS PU

aktivitas membuat pat air reservoir pengawasan KOTA

PASCA Kontrol Baku Konsumen -kesehatan Sementara Kepmemkes Pengolahan air - PDAM Jambi Lokasi Sampling satu BAPEDALKO

K(OPERASI) Mutu Air Minum Konsumen A ir mum dan bahan kimia -ba Reservoir bulan sekali

Environmental Impact Assessment for PDAM 77

V. EVALUATION AND RECOMMENDATION

The results from the evaluation of main activities of the project and from the matrix onEMP from each PDAM presented in Chapter IV, in accordance with Decrees of Ministry ofEnvironment No. 17 /2001 and Ministry of Public Works No. 17/2003 regarding environmentalmanagement plan and environmental monitoring plan is summarized as seen in the followingtables on evaluation and recommendation:

Table 5.1: Recommendation of EMP for PDAM Kota Bogor (UWSIEP)

Project activity Main potential impacts and suggested mitigations

Source developmentDownstream use Quality of Cisadane river is relatively sufficient, need for reliable

yield during drought, if additional raw water is needed in the futurecatchment protection will be reqired. Cisadane river is potentiallydeveloped for raw water source for Kab/kota Tangerang.

Activity during construction Temporary disturbance (traffic, air and noise pollution, landslide,(Duplicating raw transmission to erison, aesthetic and social). Mitigation under the task of contractor,Dekeng) PDAM (under DED consultant supervision) and supervision by

Environmental office and other related agenciesControl of raw water quality PDAM Kota Bogor under supervision of City Health Dept.Production processes (WTP)Activity during construction Temporary disturbance (traffic, air and noise pollution, landslide,(Extend and rehabitate Dekeng WTP) erosion, aesthetic aand social).

Mitigation under the task of PDAM, contractor under DEDconsultant supervision. Supervision by Environmental office andother related agencies

Sludge from treatment processes Potential source of pollution (facilities for sludge treatment is neededand included in the DED) under supervision of Environmental office

Service delivery to customersActivity during installation of As abovedistribution pipes and serviceconnectionsControl of raw water quality PDAM Kota Bogor under supervision of City Health Dept.

Environmental Impact Assessment for PDAM

Tabel 5.2.: Rekomendasi Kajian Lingkunagan PDAM Kab. Lebak/ KotaRangkasbitung (UWSIEP)

Project activity Main potential Impacts and suggested mitigationsSource development

Downstream use Kuantitas air s. Ciujung cukup perlu keandalan air baku musim kering(termasuk tugas konsultan). DAS cukup terlindungi,tetapi jangka panjangdiperlukanproteksi DAS

Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi , estitika(Intake , transmissi pipe) dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi

konsultan DED ) dan pengawasan pelaksana BapedalKab daninstansi terkait lainnya.

Kontrol Baku Mutu Air Baku PDAM Kab. Lebak dibawah pengawasan Dinas Kesehatan Kab.Production processes (WTP)

Activity during construction Gangguan temporel (traffic, polusi udara,bising ,Ionsor ,erosi , estitika(WTP Bojongleles) dan sosial ).

Mitigasi tugas PDAM,Kontraktor dibawah supervisi konsultan DED danpengawasan BapedalKab dan instansi terkait

Sludge from treatment processes Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpurdiperlukan dan termasuk dalam proyek DED) dan dibawahpengawasan BapedalKab

Perlindungan instrumen dan Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan danKestabilan proses water treatment dinding terbukaService delivery to customers

Activity during installation of Gangguan temporel (traffic, polusi udara,bising ,Jonsor ,erosi , estitikadistribution pipes and service dan sosial ).connections Mitigasi tugas PDAM ,Kontraktor dibawah supervisi konsultan DED dan

pengawasan BapedalKab dan instansi terkaitKontrol baku Mutu Air Minum PDAM Kab. Lebak dibawah Pengawasan Dinas Kesehatan Kab.

Environmental Impact Assessment for PDAM 79

Tabel 5.3.: Rekomendasi Kajian Lingkunagan PDAM Kota CirebonProject activity Main potential impacts and suggested mitigationsSource developmentDownstream use Kuantitas Mata air relatif cukup perlu analisa kuantitatif mata air pada akhir

musim kemarau, perhitungan pemakaian air di hilir telah diperhitungkankebutuhannya, perlindungan kontaminasi thd mata air Cikepel (tugas konsultanTeknik) .

Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi , estitika(Brontcaptering , transmissi pipe) dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi

konsultan DED ) dan pengawasan pelaksana BapedalKo dan instansiterkait lainnya.

Kontrol Baku Mutu Air Baku PDAM Kota Cirebon dibawah pengawasan Dinas Kesehatan KotaProduction processes (WTP)

Activity durng construction Gangguan temporel (polusi udara,bising).(Aeration and disinfection) Mitigasi tugas PDAM ,Kontraktor dibawah supervisi konsultan DED dan

pengawasan Bapedalko dan instansi terkaitSludge from treatment processes Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpur

diperlukan dan termasuk dalam proyek DED) dan dibawah pengawasanBapedaldako

Perlindungan instrumen dan Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan danKestabilan proses water treatment dinding terbukaService delivery to customers

Activity during installation of Gangguan temporel (traffic, polusi udara,bising ,jonsor ,erosi , estitika dandistribution pipes and service sosial ).connections Mitigasi tugas PDAM,Kontraktor dibawah supervise konsultan DED dan

Pengawasan Bapedalko dan instansi terkaitKontrol baku Mutu Air Minum PDAM Kota Cirebon dibawah Pengawasan Dinas Kesehatan kota

Environmental Impact Assessment for PDAM 80

TABLE 5..4.: Rekomendasi Kajian ,ingkungan PDAM Kota Pontianak (UWSIEP)Main potential impacts and suggested mitigations

Project activitySource development

Downstream use Kuantitas air S.Landak cukup .Tdk diperlukan mitigasi,meskipun demikian jangka panjang intrusi air laut mempergaruhiketersediaan sumber air baku ,perlu proteksi DAS

Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,(Construct raw water Transmission) estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah

supervisi konsultan DED ) dan pengawasan pelaksanaBapedaldako dan instansi terkait lainnya.

Kontrol Baku Mutu Air Baku PDAM Kota Pontianak dibawah pengawasan Dinas KesehatanKota

Production processes (WTP)Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,

estitika dan sosial ) Mitigasi tugas kontraktor,PDAM dibawah supervisikonsultan DED dan pengawasan BapedalKo dan Instansi terkait

Sludge from treatment Sumber potensial pencemaran diolah(Fasilitas Pengolahan LumpurProcesses diperlukan dan termasuk dalam proyek DED) dan dibawah

pengawasan BapedaldakoPerlindungan instrumen dan Kestabilan Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparanproses water treatment dan dinding terbukaService delivery to customers

Activity during instalation of distribution Gangguan temporel (traffic, polusi udara,bising ,Ionsor ,erosi

pipes and service connections estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah

supervisi konsultan DED ) dan pengawasan pelaksana

Bapedaldako dan instansi terkait lainnya.

Kontrol baku Mutu Air Minum PDAM Pontianak dibawa Pengawasan Dinas Kesehatan kota

Environmental Impact Assessment for PDAM 81

Tabel 5.5.: Rekomendasi Ka-ian Lingkungan PDAM Kota Banjarinasin (UWSIEP)

Project activity Main potential impacts and suggested mitigations

Sumber Air dan transmissi

Downstream use Kuantitas air S. Martapura cukup . Di hilir penggunaan air tidaksignifikan ,Tdk diperlukan mitigasi ,meskipun demikian jangkapanjang intrusi air laut mempergaruhi ketersediaan sumber air baku,jangka panjang perlu proteksi DAS

Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,Expansion Intake & pompa) estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah

supervisi konsultan DED ) dan pengawasan pelaksanaBapedaldako dan instansi terkait lainnya.

Kontrol Baku Mutu Air Baku PDAM kota Banjarmasin dibawah pengawasan Dinas KesehatanKota

Production processes (WTP)Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,

(WTP Pramuka) estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawahsupervisi konsultan DED ) dan pengawasan pelaksanaBapedaldako dan instansi terkait lainnya.

Sludge from treatment processes Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpurdiperlukan dan termasuk dalam proyek DED) dan dibawahpengawasan Bapedaldako

Perlindungan instrumen dan Kestabilan Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparanproses water treatment dan dinding terbukaService delivery to customers

Activity during installation of Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,distribution pipes and service estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawahconnections supervisi konsultan DED ) dan pengawasan pelaksana

Bapedaldako dan instansi terkait lainnya.Kontrol baku Mutu Air Minum PDAM Banjarmasin dibawa Pengawasan Dinas Kesehatan kota

Environmental Impact Assessment for PDAM 82

Tabel 5.6: Rekomendasi EMP PDAM Kota Makassar (UWSIEP)

Project activity Main potential impacts and suggested mitigations

Source developmentDownstream use Peruntukan air baku Waduk Bili-Bili 3000 Lps . yg terpakai baru 1000

Lps untuk IPA Sombu Opu, pada musim penghujan kekeruhan tinggi, untuk masa yg akan datang diperlukan proteksi DAS .

Activity during construction Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,raw transmission from Somba estitika dan sosial ). Mitigasi tugas PDAM (dibawah supervisi

Opu to Panaikang) konsultan DED ) dan pengawasan pelaksana BapedalKo daninstansi terkait lainnya.

Kontrol Baku Mutu Air Baku PDAM Kota Makassar dibawah pengawasan Dinas KesehatanKota ( pengambilan sampling)

Production processes (WTP)Activity during construction Gangguan temporel(traffic, polusi udara,bising ,lonsor ,erosi,Construit New WTP Panaikang) estitika dan sosial ).

Mitigasi tugas PDAM , dibawah supervisi konsultan DED danPengawasan Bapedalko dan instansi terkait

Perlindungan instrumen dan Proteksi terhadap cuaca (panas dan hujan ) bahan atapKestabilan proses water treatment transparan dan dinding terbuka

Sludge from treatment processes Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalamproyek DED) dan dibawah pengawasan BapedalKo dan harusdikelola dengan semestinya.

Service delivery to customersActivity during installation of Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi,distribution pipes and service estitika dan sosial gangguan aktivitas sehari- hari ).connections Mitigasi tugas PDAM , dibawah supervise konsultan DED dan

Pengawasan Bapedalko dan instasi terkait.Kontrol baku Mutu Air Minum PDAM Kota Makassar dibawah Pengawasan Dinas Kesehatan Kota

termasuk sampling ditempat.

Environmental Impact Assessment for PDAM 83

Tabel 5.7: Rekomendasi EMP PDAM Kota Kendari (UWSIEP)

Project activity Main potential impacts and suggested mitigations

Source developmentDownstream use Kapasitas debit air sungai Pohari cukup besar , perlu analisa

ketersedian air baku musim, pada musim penghujan relatif sedikitkekeruhan meningkat, kemarau untuk masa yg akan datang diperlukanproteksi DAS .

Activity during construction Gangguan temporel (traffic, polusi udara,bising, estitika danUpgrade pumps at intake and aktivitas sehari-hari terganggu ). Mitigasi tugas PDAM

Booster pump ) (dibawah supervisi konsultan DED ) dan pengawasanpelaksana BapedalKo dan instansi terkait lainnya.

Kontrol Baku Mutu Air Baku Sampling DinkesKo Kendari sebulan sekaliProduction processes (WTP)

Activity during construction Gangguan temporel(traffic, polusi udara,bising ,lonsor ,erosi,(Rehabilitate WTP) estitika dan gangguan aktivitas sehari-hari ).

Mitigasi tugas PDAM , dibawah supervisi konsultan DED danPengawasan Bapedalko dan instansi terkait

Perlindungan instrumen dan Proteksi terhadap cuaca (panas dan hujan ) bahan atapKestabilan proses water treatment transparan dan dinding terbuka

Sludge from treatment processes Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalamproyek DED) dan harus dikelola dengan semestinya dibawahpengawasan BapedalKo

Service delivery to customersActivity during installation of Gangguan temporel (traffic, polusi udara,bising ,Jonsor ,erosidistribution pipes and service estitika dan sosial gangguan aktivitas sehari- hari ).connections Mitigasi tugas PDAM, dibawah supervise konsultan DED dan

Pengawasan Bapedalko dan instasi terkait.Kontrol baku Mutu Air Minum Sampling Dinas Kesehatan Kota sebulan sekali

Environmental Impact Assessment for PDAM 84

Tabel 5.8: Rekomendasi EMP PDAM Kota Jambi (UWSIEP)

Project activity Main potential impacts and suggested mitigations

Source developmentDownstream use Kapasitas debit air sungai Batanghari cukup besar , pada musim

penghujan kekeruhan sedikit meningkat, untuk masa yg akan datangdiperlukan proteksi DAS .

Activity during construction Gangguan temporel (traffic, polusi udara,bising, estitika dan aktivitas(New Intake Sijinjang and upgrade sehari-hari terganggu ). Mitigasi tugas PDAM (dibawah supervisiworks at intake Pulau Pandan) konsultan DED ) dan pengawasan pelaksana BapedalKo dan instansi

terkait lainnya.Kontrol Baku Mutu Air Baku Sampling Bapedalko sebulan sekaliProduction processes (WTP)Activity during construction Gangguan temporel(traffic, polusi udara,bising ,lonsor ,erosi , estitika( New WTP Sijinjang & Rehabilitate dan gangguan aktivitas sehari-hari ).WTP dan upgrade pompa) Mitigasi tugas PDAM , dibawah supervisi konsultan DED dan

Pengawasan Bapedalko dan instansi terkaitPerlindungan instrumen dan Kestabilan Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan danproses water treatment dinding terbukaSludge from treatment processes Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalarn proyek

DED) dan harus dikelola dengan semestinya dibawah pengawasanBapedalKo

Service delivery to customersActivity during installation of Gangguan temporel (traffic, polusi udara,bising ,Jonsor ,erosi , estitikadistribution pipes and service dan sosial gangguan aktivitas sehari- hari ).connections Mitigasi tugas PDAM , dibawah supervise konsultan DED dan

Pengawasan Bapedalko dan instasi terkait.Kontrol baku Mutu Air Minum Sampling Dinas Kesehatan Kota sebulan sekali

Environmental Impact Assessment for PDAM 85

Attachments: List of Attendance

Lamp. 1.1: Daftar Hadir Konsultasi/Presentasi EMP PDAM Kabupaten LebakNo Nama Jabatan/Perwakilan1 H.Odih Ch.P Wakil Bupati Lebak2 H.Mulyadi J (*) Bupati Lebak3 H.Muslich Ilyas Asda II4 Hikmat Syadli BP-PDAM5 Isman K PDAM6 Alan S PDAM7 Heri A PDAM8 Itong A PDAM9 Kadirudin PDAM10 H.Ridwan PDAM11 Lili S PDAM12 R.Chandra Kabid Ek Bappeda13 Yosep M.Holis Staff Bappeda14 TB Lili S Pa Binmaret15 MABasyid Asisten konsultan16 DR. Arwin (+) Konsultan EMP17 H. Wiryadinata ASDA I18 Anik Anifah PDAM Lebak19 Tatang S20 Risyana Sukarma World Bank21 Iman Solichin PDAMNote: Konsultasi di lingkungan PDAM Kab .Lebak dilakukan 23/1 -2004

(*)Pemrimpin Sidang: Bupati dan (+)Person presentasi Tim EMP

Environmental Impact Assessment for PDAM 86

Lamp. 1.2 :Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM CirebonNo Nama Jabatan/ Perwakilan1 Hender Yogiyana Kabag Perenc.Teknik2 Moh.Asikki Kabag Keu3 Sri Supanti Dir. Tek4 Agus Salim Keuangan5 Dadang Hadi Staf PDAM6 Risyana WB Jakarta7 Arwin Konsultan EMP WB8 MA Basyid Ass Kons9 Santoso Dirut PDAM Kota CirebonNote: Konsultasi di lingkungan PDAM Kota Cirebon dilakukan 4/2 -2004

Environmental Impact Assessment for PDAM 87

Lampiran 1.3:Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Pontianak

No Nama Jabatan/ Perwakilan1 Rakhmat Konsultan2 Henky Konsultan3 Lajito PDAM4 Abdullah PDAM5 Petrus K PDAM/ Dir Um6 Arwin S Konsultan WB7 Basyid Ass KonsultanNote: Konsultasi di lingkungan PDAM Potianak dilakukan 11/2 -2004

Environmental Impact Assessment for PDAM 88

Lamp. 1.4: Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Banjarmasin

No Nama Jabatan/ Perwakilan1 Zainal Dirut PDAM Kota Banjarmasin2 Hesly Kepala Bapedalda kota Banjarmasin3 Fadjar Dirtek PDAM4 Muhidin Ka Unit IPAL PDAM5 Abdurrahman Dirum PDAM Banjarmasin5 Muslih Kabag Perencanaan Teknik

6 Farida Staf UPT PAL(IPAL)7 Arwin Konsultan EMP World Bank8 Bayu Asisten konsultanNote: Konsultasi di lingkungan PDAM Banjarmasin dilakukan 2/3 -2004

Environmental Impact Assessment for PDAM 89

Lamp. 1.5: Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Makassar

No Nama Jabatan/ Perwakilan1 DR. Arwin Sabar Konsultan EMP World Bank2 Rachmansyah Ka. Bagian Rentek PDAM3 Taufiq Amri Bagian Keuangan PDAM4 Justinus Semba Staf Bagian Rentek PDAM5 Abdul Wahid M. Staf Bagian Perlatek PDAM6 Katia Ka. Bagian Produksi PDAM

7 Teddy Prasetiawan Asisten KonsultanNote: Konsultasi di lingkungan PDAM Makassar dilakukan 18 /3 -2004

Environmental Impact Assessment for PDAM 90

Lamp. 1.6. Daftar hadir Konsultasi dengan PDAM Kota KendariNo Nama Keterangan

1 Edi Sudiro Dirut PDAM

2 Andi Solihin Dirtek

3 Jasman L. Kabag Produksi

4 Idrus Kabag Perencanaan Teknik

5 Sugito Kabag Perawatan

6 Ruslan H. Kabag Distribusi

7 Samsul Kasubag Pengawaian

8 Arwin Konsultan WB

9 Teddy Asisten Konsultan

Konsultasikan, sabtu tgl 20 Maret 2004 di PDAM Kota Kendari

Environmental Impact Assessment for PDAM 91

Lamp. 1.7 Daftar hadir Konsultasi dengan PDAM Kota Jambi

No Nama Keterangan

1 Ir. Agus Sunara Direktur Utama PDAM Jambi

2 Drs. Mahudi Dir. Adm & Keuangan

3 Ir. Firdaus Dir. Teknik

4 Drs. Yulianto Kabag Umum

5 Denny Hardi, BAc Kabag Keuangan

6 Arief Sutanto, BBA Kabag Hubungan Pelanggan

7 Sumidjan Kabag Transmisi & Distribusi

8 Sugianto Kabag Perencanaan

9 Asnawi Kepala Litbang-PDE

10 Arwin Konsultan Bank Dunia

11 Bayu Ass. Konsultan

Konsultasikan , jumat tgl 26 Maret 2004 di PDAM Kota JAM3BI

Environmental Impact Assessment for PDAM 92