  • 7/31/2019 EA Cakes-Case Analysis

    1/26

    Sagar Talele- 12Shalvi Gautam-13

    Snehlata Jha-14Soumillya Chandra-15

  • 7/31/2019 EA Cakes-Case Analysis

    2/26

    Index

    Organization background

    Current system description

    Objective

    Problem definition and way ahead Implementation of Business process

    Conclusion and Learning

  • 7/31/2019 EA Cakes-Case Analysis

    3/26

    Organization Background

    EA Cakes Ltd., New Zealand, is a successful foodmanufacturing company

    Major share of the market in New Zealand and

    the Asia-Pacific region.

    It produces over 400 different kinds of fresh and

    frozen food products

  • 7/31/2019 EA Cakes-Case Analysis

    4/26

  • 7/31/2019 EA Cakes-Case Analysis

    5/26

    Production Planning System

  • 7/31/2019 EA Cakes-Case Analysis

    6/26

    Faults in the Present System

    The lack of communication between the salesand marketing staff on the one hand, and

    operations on the other hand.

    The time interval for budgeting was too long.

    The supply of raw and packaging materials

    required a longer time horizon.

  • 7/31/2019 EA Cakes-Case Analysis

    7/26

    Ineffectiveness of System

    Losses in production

    Excessive use of overtime

    High labour cost variances

    Low machine capacity utilisation Decline in sales

  • 7/31/2019 EA Cakes-Case Analysis

    8/26

    Complete redesign of its production planning system,which was an integral part of an ERP system that usedSAP software

    Objective

  • 7/31/2019 EA Cakes-Case Analysis

    9/26

    What managerial, organisational, and technological

    issues are related to this case?

    EA Cakes Ltd. had decided to change its production and salesstrategy for long and medium shelf-life products from MTO to MTS.

    The MTS strategy costs more in inventory than MTO, but it has two

    benefits:

    Increased speed to market allows expanding the market share

    by attracting new customers and by catching unexpected

    opportunities, and

    Capacity may be utilised more efficiently using the inventory

    cushions instead of capacity cushions.

    The decision to change the strategy from MTO to MTS involves not

    only companys decision to invest much more money in

    accumulation and keeping stocks of finished goods, it requires a

    complete redesign of its production planning system.

  • 7/31/2019 EA Cakes-Case Analysis

    10/26

    What is the overall problem(s) in this case?

    IT specialists were sure that existing SAP software could provide

    adequate computer support.

    The authors of the new production planning system, had a rather

    firm position that their planning processes were the most efficient

    for EA Cakes Ltd.

    The management of EA Cakes Ltd. was presented with thefollowing dilemma:

    Believing the IT specialists and continuing to implement the

    existing SAP modules on comparatively low cost, but facing all

    the risks of losses due to planning inefficiency Believing the planning staff and ordering high cost computer

    support in addition to existing SAP system

  • 7/31/2019 EA Cakes-Case Analysis

    11/26

    How does the change of strategy affect the

    information technology applications?

    There are several major reasons for making significant changes inproduction planning and IT applications:

    MTO is driven by customers orders, MTS is triggered byforecasts; a forecasting system had to be designed andimplemented.

    There are no significant stocks of finished goods under MTO, so

    there is no need for stock management; for MTS, an inventorymanagement system for finished goods had to be developed.

    Under MTO, there are no significant information links between the

    company planning and shop floor production planning. Under MTS,

    it is vital that the planning system preserves continuity. Thatmeans the plans produced by each level are detailed plans of the

    top level. Also, there must be feedback continuity: feedback of thetop levels is an aggregation of bottom level feedback.

  • 7/31/2019 EA Cakes-Case Analysis

    12/26

    What are the possible alternatives, and their pros and cons, facingthe organisation in dealing with the problem(s) related to the case?

    The management of EA Cakes had two alternatives:

    To substitute the business processes of the company for

    the business processes implemented in SAP, and

    To create additional special software for providingcomputer support to production planning.

    The production planning system described in the case

    carries specific features of production planning of EA Cakes

    Ltd. Standard software (and SAP by definition is standard

    software), on the other hand, comprises programmes

    developed for an anonymous market.

  • 7/31/2019 EA Cakes-Case Analysis

    13/26

    What are some of the emerging technologies that shouldbe considered in solving the problem(s) related to thecase?

    Business Process Implementation Collection of interrelated Tasks initiated in response to an eventthat achieves a specific result for the customer of the process

    The concept is central to many areas of business systemsdesign; specifically to business systems based on modern

    information technology Substitution for previous functional design

    Business process involves several functional areas, andfunctions within those areas.

    Business Process in EA Cakes ( Production Planning System) Long-term company level

    Medium-term aggregate level

    Short-term shop level

  • 7/31/2019 EA Cakes-Case Analysis

    14/26

  • 7/31/2019 EA Cakes-Case Analysis

    15/26

    AGGREGATE CAPACITY

    PLANNING

    Sales Budget development

    Optimum production strategy or level strategy

    Optimum mixed strategy

  • 7/31/2019 EA Cakes-Case Analysis

    16/26

    Sales budgeting development

    Sales budget is a management tool for control of

    company performance by BOD.

    Input comes in form of KIP by the board and

    marketing department. 2 budgets 1.)current rollover budget 2.) full budget

    two versions are than prepared.

    Sales budget aggregate production plan.

  • 7/31/2019 EA Cakes-Case Analysis

    17/26

  • 7/31/2019 EA Cakes-Case Analysis

    18/26

    Level strategy planning

    Planning starts from defining optimum productionstrategy that follows the demand pattern month

    by month.

  • 7/31/2019 EA Cakes-Case Analysis

    19/26

    Optimum mixed strategy

    Optimum mixed strategy is converted to ACP.

    It combines stock accumulation with overtime. It

    plans some overtime at peak seasons and

    decreased resource utilization at the beginning of

    the year.

    The planner uses :

    Conversion table, using unit prices

    Capacity tables which show the lines capacity(units/hours)

    Labor contents tables(labour hours/ machine

    hours)

  • 7/31/2019 EA Cakes-Case Analysis

    20/26

  • 7/31/2019 EA Cakes-Case Analysis

    21/26

    Master Production Scheduling

    MPS gives the ability to ensure that available

    capacity is allocated with a customer service focus.

    MPS inputs :Aggregate capacity plan for the next two

    months

    Actual stock level

    Short-term demand forecastMain Run-Scheduling performed at the

    beginning of the planned week

    Control RunWhen the feedback on actual

    production as available

  • 7/31/2019 EA Cakes-Case Analysis

    22/26

    Inventory Model

    Opening stock +Production-Sales

    Forecast=Closing Stock

  • 7/31/2019 EA Cakes-Case Analysis

    23/26

    Functions of MPS

    1

    Produce feasible assignments forall product lines

    2 Keep desirable stock levels

    3 Implement a speed-to-market

    principle

  • 7/31/2019 EA Cakes-Case Analysis

    24/26

    Shop Floor Scheduling

    Performs actual scheduling for the week(with

    daily subdivision) as specified by production

    lines.

    Scheduling constraints have been worked out. Set-up time, planned downtime are known. Main Run-Scheduling performed at the

    beginning to work out an optimal weekly

    schedule. Control Run-When feedback on actual

    production becomes available, the procedure is

    run for the rest of the period

  • 7/31/2019 EA Cakes-Case Analysis

    25/26

    What is the final solution that can be recommended to themanagement of the organisation described in the case?

    The final solution is to use SAP.

    After implementation

    The master scheduler has to check the capacity and to change the

    production volumes according to available capacity. Then he must agree

    the changes with the Sales Department and the Production Department.

    This process will get automated.

    Presently at EA Cakes Ltd., scheduling is only done on finished items.After implementation to scheduling can be done components

    production level as well.

    A reliable method for checking inventory will be available

    The manufacturing process requires an updated short-term forecast

    each week. Sales managers must produce the forecast, and then it is

    automatically processed within the Master Production Scheduling. Sales

    figures for individual products have to be provided on a weekly basis for

    the current month and the next month. Actual sales made each week

    are captured and available for reporting on the following morning. Sales

    staff compares actual sales with long-term forecasts . Currently,

    forecasts are prepared manually and then put into the database. Itneeds computer support to relieve sales personnel and to eliminate data

  • 7/31/2019 EA Cakes-Case Analysis

    26/26

    Thank

    you