eaa projects

88

Upload: emre-arolat-architects

Post on 30-Mar-2016

229 views

Category:

Documents


1 download

DESCRIPTION

EAA short overview

TRANSCRIPT

Page 1: EAA Projects
Page 2: EAA Projects
Page 3: EAA Projects

...In our studio, where we produce many different subjects and on many different scales, we aim to maintain an architectural design practice focused on situation and to develop this through the potentials inherent to it. This is a practice based on identifying the individual problems of each project, of each special situation, distinguishing their particular inputs, and looking for answers to the situation that has now become specific through a description that is as stratified as possible. Familiar styles, motivations of architectural movements, and design conventions are introduced at times, however, a noteworthy investment in these are put off each time. This tendency also problematizes a sort of aspiration to be consistent, which is rather widespread in the milieu and which pins its hopes on the kinship in the appearance of buildings produced.We believe that the situation of being chosen in a mechanical way, which is the fundamental characteristic of the seemingly antipodal two attitudes, uproots them both from the real world and renders them no different from one another.

And we hope that our design tendency, which could be called a sort of tropism, will be able to reach the marks of its inherent consistency – if there is such a thing – through the quest for awareness in the process of redefining each time what is to be conceived. This is an attitude in which the creative subjects–the persons in charge of the design, just like the product they create, feel that they themselves are not entirely free of these nonconformities, in which they question each time both the situation and themselves instead of forming consistent systems, instead of playing it safe, and contenting themselves with what suits their best interest...

Page 4: EAA Projects
Page 5: EAA Projects

Profile

Emre Arolat Architects was founded in May 2004 by Emre Arolat and Gonca Paşolar in Istanbul, as the continuation of Emre Arolat’s architectural practices which he started at Arolat Architects as an associate designer in 1987. Arolat Architects was founded in 1961 and the group has drawn significant professional experience from regular contributions to architectural competitions and executed significant housing, tourism facilities, leisure centers, administrative buildings and sports grounds projects. The practice is being continued with the same range of projects in EAA-Emre Arolat Architects with the contributions of other partners, Neşet Arolat, Şaziment Arolat, Sezer Bahtiyar and a professional architectural staff in its office in Istanbul.

2004

2008

2009

Awards

European Union Prize Mies van der Rohe Award 2005 Minicity Model Park

2006 Architectural Review Awards for Emerging Architecture (Highly Commended)Dalaman International Airport

2008 Architectural Review Awards for Emerging Architecture (Commended) Minicity Model Park

Cityscape Dubai Special Award 2008Zorlu Center

MIPIM Architectural Review Future Project Awards (Commended)Tekfen Kağıthane Offices and Milas Golf Hotel

European and African Property Awards 2009Zorlu Konak Residences

European and African Property Awards 2009Zorlu Center, Lara Kervansaray Hotel & Convention Center and Santralistanbul Museum of Contemporary Arts

2009 Emirates Glass Leaf Awards Mixed Used Building of the Year 7800 Çeşme Residences & Hotel

2010 Europe 40 Under 40 Awards received by Gonca Paşolar and Kerem Piker

2010 International Architecture Awards Santralistanbul Museum of Contemporary Arts

2010 European Property Awards (Highly Commended)Tekfen Kağıthane Offices, Raif Dinçkök Yalova Cultural Center, 7800 Çeşme Residences and Folkart Narlıdere Housing

Aga Khan Awards for Architecture 2010İpekyol Textile Factory

2010 MIPIM AR Future Project Awards Zorlu Center and Varyap Merkez Shopping and Cultural Center

Green Good Design Awards 2010, 2011Zorlu Center, Yalıkavak Residences, Sinpas EcoTown and Izmir Fair Complex

Page 6: EAA Projects

SELECTED PROJECTS

Page 7: EAA Projects

RAIF DINCKOK CULTURAL CENTERLoCAtIon Yalova, Turkey

CLIEnt Akkök Group

tIME 2007-2008

AREA 7800 m2

PRoGRAM Cultural center with galleries,

conference hall, library, cafe

StAtUS Built

...The fact that the facade is perforated provide the surface to dissolve at the night time like a tulle curtain and the inner would to be perceived easily. The user enters the building from its mouth. There is not a door or a barrier. The metal tulle now transforms into a protector. It leaves the negative impacts of rain, sun and wind but it does not transform into an interior space because of it semi-transparent nature. The air ventilates freely in this area...

Page 8: EAA Projects
Page 9: EAA Projects

ASY MIXED & L IKOR PROJECT

...As one of the most important decisions related to the general settlement strategy, it was proposed that approximately ten thousand square meters area on the northern part of the land to turn into a city park by integrating with the existing green area on the adjacent parcel and designed large public space came into existence by this way to generate a kind of breathing zone between dense urban blocks of Mecidiyeköy...

LoCAtIon Istanbul, Turkey

CLIEnt Viatrans - Meydanbey (Likör)Torunlar, Aşçıoğlu, Kapıcıoğlu (ASY)

tIME 2008-2011

AREA 185.000 m2 (Likör), 268.000m2 (ASY)

PRoGRAM Mixed-use development

StAtUS Under construction

Page 10: EAA Projects
Page 11: EAA Projects

ANTAKYA MUSEUM HOTEL

...The configuration of the artifacts discovered on site determines the exact location of the columns. The canopy supported by these columns acts both as a marker for the archeological park and as a platform housing program elements such as the ballroom, meeting rooms, swimming pool and fitness center. Slits on the platform act as skylights for the archeological site below and provide a visual connection inside the building...

LoCAtIon Antakya, TurkeyCLIEnt ASF Tourism Company

tIME 2011-2012

AREA 34.100 m2

PRoGRAM Museum and hotel on an archeological site

StAtUS Under construction

Page 12: EAA Projects
Page 13: EAA Projects

ARKETIP HOUSING

...The main façade materials include natural stone, wood, and concrete, which are materials that age well with time. The private gardens at the ground level are replaced with large terraces at the upper levels. The mobile screens that surround these terraces provide protection from wind and light, as well as form a unique and shifting aesthetic construction, by their various ways of usage...

LoCAtIon Istanbul, Turkey

CLIEnt Metal Yapı

tIME 2006-2011

AREA 78.470 m2

PRoGRAM Housing and social facilities

StAtUS Built

Page 14: EAA Projects
Page 15: EAA Projects

BERGAMA CULTURAL CENTER

...This arcade creates an interior space that seems like a courtyard by surrounding the area from three sides. The stores which work both ways bring life into the courtyard. The three masses which rise from the arcade and become visible from the avenue, represent their functions with their strong geometries and reveal rich spaces open for public use in the voids generated between each other...

LoCAtIon Bergama, Turkey

CLIEnt Bergama Municipality

tIME 2010

AREA 8.500 m2

PRoGRAM Cultural center with commercial activities, cinema and library

StAtUS Under construction

Page 16: EAA Projects
Page 17: EAA Projects

BODRUM VICEM RESIDENCES

...The tension that is arises from the conflict of the coast’s untouched quality and the presumable dense physical pattern that is going to be built on the site, emerges as the most crucial fact of the design. In this sense, the settlement scheme is treated as an experimentation of mass fragmentation that loosens the phenomenon of the stereotypical large single house that also deals with the three dimensional topographic problem...

LoCAtIon Bodrum, Turkey

CLIEnt Vicem Yachting, Sanko Holding

tIME 2010

AREA 12.900 m2

PRoGRAM Housing

StAtUS Under construction

Page 18: EAA Projects
Page 19: EAA Projects

CUKUROVA REGIONAL AIRPORT

...Formation of atopography-building is proposed to meet the facts of the context and place. The main green shell acts as a second roof that fade away and become permeable at some places in the passenger terminal and allow natural air ventilation in space. Produced with similar ecological intentions, large inner gardens form attractive perspectives inside the main space and carry the sunlight to the furthest corners...

LoCAtIon Tarsus, Turkey

CLIEnt General Directorate of State Airports Administration

tIME 2010

AREA 376.200 m2

PRoGRAM Airport domestic and international terminals, service facilities

StAtUS On board

Page 20: EAA Projects
Page 21: EAA Projects

EYUP MUNICIPALITY CULTURAL CENTER AND MARRIAGE HALL

...The Marriage Hall project has been considered as a kind of structural landscape component combining the level difference between the pedesterian way and the sea with a walking ramp on the waterfront of Golden Horn, in Eyup.With its composition is been located between the platforms at different levels and its scenario composes the various functions of marriage hall as the component of structural landscape...

LoCAtIon Istanbul, Turkey

CLIEnt Eyüp Municipality

tIME 2006-2011

AREA 6840 m2

PRoGRAM Multi purpose hall, marriage hall and service facilities

StAtUS Under construction

Page 22: EAA Projects
Page 23: EAA Projects

KAGITHANE OFFICEPARK

...In the first phase of the design, the site and its surrounding has been analyzed in depth. As one of the most critical decisions of the project, the various possibilities of the fragmentation that is the derived from the surrounding building pattern was elaborated rather than the totalitarian approach of the familiar office buildings. Parallelly, this abstraction process was utilized by slenderizing the decisions related to surfaces...

LoCAtIon Istanbul, TurkeyCLIEnt Tekfen Holding

tIME 2007-2011

AREA 30.000 m2

PRoGRAM Office and commercial functions StAtUS Completed

Page 24: EAA Projects
Page 25: EAA Projects

LE MÉRIDIEN ISTANBUL ETILER

...Three masses, having the scale of surrounding buildings approximately, were separated from each other vertically and large terrace gardens were created in-between. In common with the other parts of the city, this attack which even more liberalizes the buildings from each other strengthened the dialogue of the building with its location as a reference to the environmental texture. Exterior surfaces of the masses were differentiated in such a way that increases the effects of this separation...

LoCAtIon Istanbul, Turkey

CLIEnt Makyol

tIME 2007-2009

AREA 65.000 m2

PRoGRAM Hotel and commercial functions

StAtUS Built

Page 26: EAA Projects
Page 27: EAA Projects

MACKA HOTEL

...The facade of the hotel that faces Maçka Valley is exposed to ‘nature’ –sun and wind- as well as the Istanbul scene which has been naturalised with the distance brought by the green gap in-between. The screen is fragmented into smaller louvres to let the visitors manipulate the screen. Thus, facade of Maçka Street becomes a living facade, a changing composition due to time of day, weather and user preferences...

LoCAtIon Istanbul, Turkey

CLIEnt Makyol

tIME 2007-2009

AREA 65.000 m2

PRoGRAM Hotel and commercial functions

StAtUS Under construction

Page 28: EAA Projects
Page 29: EAA Projects

FOLKART NARLIDERE HOUSING

...On the rear facade of the buildings, the promenades that provide horizontal circulation were separated from the main masses and leaned against the wall with rosebays. The inner spaces that were created after this decision appeared as a place beyond an ordinary apartment hallway by means of the light roof skin, structural features that allow air circulation and microclimatic effects of the cooling pools that were designed at the base of these spaces...

LoCAtIon Izmir, TurkeyCLIEnt Folkart Construction company

tIME 2007-2008

AREA 70.000 m2

PRoGRAM Housing and social center

StAtUS Built

Page 30: EAA Projects

SANCAKLAR MOSQUE

...The high walls surrounding the park on the upper courtyard of the mosque depict a clear boundary between the chaotic outer world and the serene atmosphere of the public park. The building blends in completely with the topography and the outside world is left behind as one moves through the landscape, down the hill and in between the walls to enter the mosque. The interior of the mosque, a simple cave like space, becomes a dramatic and inspiring place to pray and be alone with God...

LoCAtIon Istanbul, TurkeyCLIEnt Sancak HoldingtIME 2011

AREA 1.500 m2

PRoGRAM Mosque and social facilities

StAtUS Under construction

Page 31: EAA Projects

MASLAK NO.1 OFFICE TOWER

...Apart from the other projects along the Buyukdere Avenue, which is the main business district of Istanbul, Maslak No.1 Office Tower was designed to enrich the quality of the typical office space by vertical gardens. The envelope acting as a secondary facade in south and west direction is detached from the building up to 17 meters wide letting vertical gardens in 20 meters high. The space, in-between two facades, was considered as a buffer both for the acoustical and the climatic sense...

LoCAtIon Istanbul, Turkey

CLIEnt Saral - Ciya

tIME 2009-2011

AREA 29.000 m2

PRoGRAM Multi-story office building

StAtUS Under construction

Page 32: EAA Projects

ULUS SAVOY RESIDENCES

...It was envisaged that it would be an important characteristic for the settlement that the shells, which are the main material of the exterior landscape, would, in places, be present in all there hardness and sharpness, though most often partly concealed by the layer of vegetation growing over them, while they would still remain legible in some way from all points of the area...

LoCAtIon Istanbul, Turkey

CLIEnt Çarmıklı Saruhan Partnership

tIME 2005-2011

AREA 83.500 m2

PRoGRAM Housing and social facilities

StAtUS Under construction

Page 33: EAA Projects

ZORLU CENTER

...The shell emerges from the ground. Inversely, it comes from high above and collides with the ground. As it rises it evolves into a tribune. As it rises the green texture interferes with the stone and slowly expands and spreads to the surface. In this sense, this hard shell evolves into a soft and green hill. The hole in the middle is taken out , potentially becomes a space that can have multiple uses...

LoCAtIon Istanbul, Turkey

CLIEnt Zorlu Holding

tIME 2007-2011

AREA 620.000 m2

PRoGRAM Shopping mall, offices, hotel, residences and performance hall

StAtUS Under construction

Page 34: EAA Projects
Page 35: EAA Projects

...The courtyard, the heart of shopping center and around which the green cover has been formalized has been covered with a pergola in order to associate it to the ground floor that has been formed with a one-way shopping arrangement instead of a mutual one and in order to create shaded interspaces for making the usage of the building eligible during hot summer. Continuity of internal circulation has been provided with the pedestrian bridges passing over this garden...

LoCAtIon Istanbul, Turkey

CLIEnt Varlıbaşlar Holding

tIME 2010

AREA 90.000 m2

PRoGRAM Shopping mall and social facilities

StAtUS Proposal

VARYAP SHOPPING AND L IFESTYLE CENTER

Page 36: EAA Projects
Page 37: EAA Projects

SEKA INDUSTRIAL HERITAGE ZONE URBAN RENEWAL PROJECT

...Thus the factory land which will become an area that can be walk through, will not be an area identifiable with the borders of the untouchable factory buildings that have become museum objects inside. It will bring life both to its environment and to itself inside. It will evolve into an area that can be stepped on everywhere with its provocative factory buildings, a part of city that’s boundaries have been lifted in everyway...

LoCAtIon Kocaeli, Turkey

CLIEnt Kocaeli Municipality

tIME 2010

AREA 450.000 m2

PRoGRAM Museum, archeological park, conference hall,

social and recreational facilities

StAtUS Organizational procedures

Page 38: EAA Projects
Page 39: EAA Projects

...Main mass has been set back, frontal beach and the natural environment has left as is exists as possible. Instead of being self-centralized and prominent by visual structural form, attractive and awaiting to gain its power by this kind of attention, what is aimed in the project is a kind of structure that tends to hide behind the landscape layer which covers it and by this way choose to get rid of all the burden of concepts that might be defined as style, taste and genre of architecture...

LoCAtIon Izmir, Turkey

CLIEnt Çarmıklı, Kalyoncu, Tamtex tIME 2007

AREA 15.750 m2

PRoGRAM Hotel, residence and social facilities

StAtUS Built

7800 CESME RESIDENCES AND HOTEL

Page 40: EAA Projects
Page 41: EAA Projects

...Semi-open shaded spaces that enable multiple uses are placed rather than masses with uninterrupted facades. Seperating the functions to different blocks in plan level, creates irreparable division and divergence in the city texture. For this reason, instead of following a zoning strategy in plan, the strategy of seperating functions in section was accepted as a way to sustain the mixed function building in the whole area...

LoCAtIon Istanbul, Turkey

CLIEnt KAYADER

tIME 2011

AREA 332.000 m2

PRoGRAM Mixed-use development and recreation

StAtUS Proposal

CENDERE VALLEY URBAN DESIGN PROJECT

Page 42: EAA Projects
Page 43: EAA Projects

...A calm architectural language which made use of contemporary production techniques instead of an eclecticist attitude, encountered so frequently in these surroundings that they constitute a norm. Designed as terrace-houses, the duplexes in the lower section open out on their own private gardens which have the quality of thresholds being detached from the public garden using the difference in elevation formed on the site...

LoCAtIon Istanbul, Turkey

CLIEnt Metal Yapı

tIME 2004-2006

AREA 40.000 m2

PRoGRAM Housing and social facilities

StAtUS Built

KEMERLIFE XXI HOUSING

Page 44: EAA Projects
Page 45: EAA Projects

...The administrative section, which commonly is detached from the production building due to the conventional approach, was more directly associated with production in this project. The mass was implicitly loosened thanks to linear gardens located between sections. These gardens are used by the staff during breaks and that natural light and air enter work places; it was intended that the gardens separate areas and that thanks to their transparent frames visual fluidity would be achieved...

LoCAtIon Edirne, Turkey

CLIEnt Ipekyol Textile Company

tIME 2004-2006

AREA 20.000 m2

PRoGRAM Factory and social facilities

StAtUS Built

IPEKYOL TEXTILE FACTORY

Page 46: EAA Projects
Page 47: EAA Projects

...The cover, which was designed by detaching it from the main building both on the horizontal and vertical planes, was intended to create its own microclimate through the gap between the two roofs and through sunbreakers; and the system, which opened up to the wind and thus could breath, was intended to create a holistic serenity through its regular repetition along the fragmented masses...

LoCAtIon Dalaman, Turkey

CLIEnt General Directorate of State Airports Administration, AtMtIME 2004-2006

AREA 85.000 m2

PRoGRAM Airport terminal and service facilities

StAtUS Built

DALAMAN INTERNATIONAL AIRPORT

Page 48: EAA Projects
Page 49: EAA Projects

...The main mass was shaped according to the premise that the width of the front elevation and that all rooms would have a view of the sea.The choice of construction materials, the questioning of covering and concealing habits, which dominate customary design strategies, and the repeating load-bearing system which optimizes construction techniques made it possible to build the complex with a relatively low budget and in a short time compared to similar buildings...

LoCAtIon Antalya, Turkey

CLIEnt Kervansaray Hotels

tIME 2000-2005

AREA 87.000 m2

PRoGRAM Hotel, convention center and social facilities

StAtUS Built

LARA KERVANSARAY HOTEL AND CONVENTION CENTER

Page 50: EAA Projects
Page 51: EAA Projects

...New structures are composed of a dense and heavy inner core and a light, semi-transparent exterior sheathing that covers the core without touching to the possible extend. A metal mesh that this time homogenises the sense of the whole building is simply placed on the concrete base. It was considered that the buildings should evoke a kind of insignaficance by intervening into the aura of the environment at daytime, but should turn out to be a simple lighthouse with the interior lighting of the museum that makes the metal mesh invisible at night time...

LoCAtIon Istanbul, Turkey

CLIEnt Istanbul Bilgi University

tIME 2004-2007

AREA 120.000 m2

PRoGRAM Museum and galleries

StAtUS Built

SANTRALISTANBUL MUSEUM OF CONTEMPORARY ARTS

Page 52: EAA Projects

...A carefully-established renovation style, which would take into account the situation and the object at hand, and which at each specific encounter would reconsider them and give them their due, was accepted as the common denominator for the different components of this project...

LoCAtIon Istanbul, Turkey

CLIEnt Istanbul Bilgi University

tIME 2004-2007

AREA 400 m2

PRoGRAM Infobox

StAtUS Built

SANTRALISTANBUL INFOBOX

Page 53: EAA Projects
Page 54: EAA Projects

SALVARAGA RESIDENCES

...On Salvaraga Hill, where Bodrum Büyük Kulüp Project has been settled, a kind of existence form, which hides itself by growing into a ‘landscape-building’ rather then to be visible, which aims to continue its relation structurally with the topography and to give back the identity of topography even though rebuilding, can be summerize as the main approach of the project...

LoCAtIon Bodrum, Turkey

CLIEnt Çağdaş Construction Company

tIME 2009-2011

AREA 4.000 m2

PRoGRAM Hotel and social facilities

StAtUS Under construction

Page 55: EAA Projects
Page 56: EAA Projects

...Designed as the headquarters of a shipping firm, this building was intended to have a calm and clear presence in contrast to the unplanned and chaotic pattern of its neighborhood. The spare prismatic mass formed within this context, manifested itself as an exposed concrete outer shell thanks to which its interior order.The simple rectangular plan formed in accordance with the boundaries of the site, consists of vertical transportation and service areas at the back and an open work area on the side facing the road...

LoCAtIon Bodrum, TurkeyCLIEnt Aksay Shipping

tIME 1998-1999

AREA 1.600 m2

PRoGRAM Office building

StAtUS Built

AKSAY SHIPPING HEADQUARTERS

Page 57: EAA Projects
Page 58: EAA Projects

...Areas for joint use such as auditorium, seminar halls, dining rooms, cafeteria, library, and exhibition hall are situated in the plaza, which is two stories high and situated beneath the square masses that were designed as the offices of three different exporters associations. These masses start at the plaza’s gallery and become dissociated and individualized toward the upper stories; the spatial voids formed by the atria at there center having translucent covers above them enable natural light to diffuse homogenously into the offices from the interior surfaces as well...

LoCAtIon İstanbul, Turkey

CLIEnt Exporters Association

tIME 1997-1998

AREA 240.000 m²PRoGRAM Office building

StAtUS Built

ITKIB FOREIGN TRADE COMPLEX

Page 59: EAA Projects
Page 60: EAA Projects

LoCAtIon Bursa, Turkey

CLIEnt Selim SayılgantIME 1997-1998

AREA 1.200 m²

PRoGRAM Residence

StAtUS Built

SAYILGAN RESIDENCE

...Instead of compromising with the dense landscape and of disintegrating, this conflict, which developed through the reflective power of the artificial and bright materials, defined a new area of conciliation which was created by the landscape felt through the deep slits on the main house. The conception of the interior the fluidity achieved through the vertical slits and the natural light would homogenizes their diffusion; and that at night the building shines like a big lantern among the trees...

Page 61: EAA Projects
Page 62: EAA Projects

...The distinguishing characteristics of this prototype building, which was designed taking into account the inputs of this specific location, were deck-like terraces which were detached from the ground as alternative gardens on this highly inclined lot, articulated terrace roofs as the fifth façade which formed the view of the residence behind it, modular materials which allow for industrial production, interior and exterior spaces which can easily be separated or brought together through sliding systems...

LoCAtIon Çubuklu-İstanbul, Turkey

CLIEnt Yüksel Construction CompanyTime 2000-2001

AREA 40.000 m²PRoGRAM Housing

StAtUS Built

CUBUKLU VADI HOUSES

Page 63: EAA Projects
Page 64: EAA Projects

...The Maksimum Houses project, whose design was initiated in 2001 was accepted in order to question whether or not a settlement, which is supposed to be produced within conditions that were not derived from the realities of architecture itself, could be the subject of architecture in any way. It was envisaged that the folding sliding panels, designed to prevent the negative effects of both the sun from the west and the noise produced from the beltway very nearby, would transform the façades of the buildings into a changeable surface...

LoCAtIon İstanbul, Turkey

CLIEnt Kayı Construction Company

tIME 2003-2006

AREA 5.500 m2

PRoGRAM Housing

StAtUS Built

MAXIMUM HOUSES

Page 65: EAA Projects
Page 66: EAA Projects

...The sales office building was built with the aim to market the residences in the actual buildings. Limitations such as its relationship with the topography, the size of the block, and the shape of the roof did not apply to the sales office building due to its advantage of being temporary. All the decisions regarding these limitations were emphasized solely through the aesthetic channels of architecture...

MAXIMUM HOUSES SHOWROOM

LoCAtIon İstanbul, Turkey

CLIEnt Kayı Construction Company

tIME 2009-2011

AREA 100 m2

PRoGRAM Showroom, office

StAtUS Built

Page 67: EAA Projects
Page 68: EAA Projects

...The most noteworthy inputs for the design were the historical traces on the existing building and the industrial spirit which is legible even today. The foremost data, which were charged with all sorts of excitement and inspiration were the lofty inner and outer surfaces adorned with the patina of long years, the alluring luminosity of the gigantic interior space, and the rails stretching out as if at any moment a train might suddenly appear out of a cloud of steam...

LoCAtIon Brussels, Belgium

CLIEnt tour&taxis

tIME 2003-2004

AREA 56.000 m2

PRoGRAM Commercial space

StAtUS Built

RENOVATION OF BRUSSELS ENTREPôT ROYAL

Page 69: EAA Projects
Page 70: EAA Projects

...The main input for the design was the dichotomy between indoor and outdoor space which emerged from the investor’s request that on the one hand the park attract the tourist consumer’s attention and become a famous monument that would turn into a landmark. A long interface on the south separates the park, which was made private through the above-mentioned process, from the public area; by bringing this interface to a channel outside of the structural codes familiar to it...

LoCAtIon Antalya, Turkey

CLIEnt Antalya Metropolitan Municipality

tIME 2003-2004

AREA 55.000 m2

PRoGRAM Open air scale model exhibition park and recreational areas

StAtUS Built

MINICITY THEME PARK

Page 71: EAA Projects
Page 72: EAA Projects

...Treated within this context while accepting the obdurate development of the surroundings, the design took shape through an inward-turned homogenous mass structure rather than scattering and staggering individual apartment buildings, which are usually shaped according to conventions of the construction sector in Turkey with windows, balconies, roofs and eaves peculiar to it. The large area in the middle of the housing blocks was transformed into an uninterrupted interior space consisting of private areas on the peripheries and communal areas in the lowered middle portion...

LoCAtIon Çekmeköy, İstanbul, Turkey

CLIEnt Yapı Kredi Koray Gyo & Garanti Gyo

tIME 2004-2005

AREA 100.000 m2

PRoGRAM Housing and social facilities

StAtUS Built

EVIDEA HOUSING

Page 73: EAA Projects
Page 74: EAA Projects

...The gallery formed by the removal of the part of the cantilever/projection between the first and fifth floors on the long side of the building which has a rectangular plan, was envisaged to activate all sorts of relations that could be established, and, by employing retractable systems, it was intended that this space, which has a vertical effect and stands as an interface between the main facility areas and the city, would also contribute when necessary to the way the interior of the building is used...

LoCAtIon Gayrettepe, İstanbul, Turkey

CLIEnt Yorum Advertising

tIME 2005

AREA 1.800 m2

PRoGRAM Office building

StAtUS Built

YORUM ADVERTISING AGENCY HEADQUARTERS

Page 75: EAA Projects

...Converted from a building whose structural construction has been completed, the office block is designed in such a way that it has voids and light penetrating to the office space and while it has a curtain wall facade like the conventional office buildings in the neighbourhood, it has a visual and tactile relationship with its surrounding...

LoCAtIon Istanbul, Turkey

CLIEnt EAA

tIME 2010

AREA 1.500 m2

PRoGRAM Office building

StAtUS Built

EAA LEVENT OFFICE

Page 76: EAA Projects
Page 77: EAA Projects

...The design of the mixed-use complex with shopping center, office and residences, the main consideration was to keep the green hill on which the new complex will be built in memory and produce an interpretation of a artificial topography through the figure of the hill and let the high rise block like a crystal reaching to the sky. The shopping mall with its spatial qualities of a generous void will draw an outline for a new typology for the program...

LoCAtIon Istanbul, Turkey

CLIEnt Eroğlu Group

tIME 2010

AREA 300.000 m2

PRoGRAM Residential, office, commercial, retail

and recreational areas

StAtUS Proposal

SEYRANTEPE MIXED USE COMPLEX

Page 78: EAA Projects
Page 79: EAA Projects

...The design is driven by the question of how to belong to the site while facing the discourse about being Turkish in a foreign land. The answer has been searched in the structuralist approach of the modernist interpretation of Turkish regionalist architecture which is constituted on the structural grid used as a construction technique in traditional Turkish houses. The building is divided into four pieces to be able to merge its site while having this structural grid as an abstract image about Turkish architecture...

LoCAtIon Prague, Czech Republic

CLIEnt Turkish Embassy of Prague

tIME 2011-2012

AREA 4.400 m2

PRoGRAM Embassy and offices

StAtUS On board

PRAGUE TURKISH EMBASSY

Page 80: EAA Projects
Page 81: EAA Projects

...The impressive scene formed by the landscape of masts of the yachts on the marina has been the inspiration of the project where the main restaurant and the social area are programmed on the main land. In the island part, an artificial landscape of rocks, having been cut in orthogonal shapes and have been laid with a masonry work creates different levels where pools, shadings, pavements and decks are...

LoCAtIon Bodrum, Mugla, Turkey

CLIEnt Palmali Group

tIME 2011-2012

AREA 8.500 m2

PRoGRAM Marina, retail and recreational areas

StAtUS Built

YALIKAVAK MARINA

Page 82: EAA Projects
Page 83: EAA Projects

...While designing the transformation of the former antrepot building into an art museum which will be home for a collection of 15.000 pieces which are considered as the most important examples of Turkish art for last two decades, the structure of the building which is the most prominent character has been kept and containers which will be the exhibition spaces for the art pieces are inserted inside the grid while having some paths, galleries and hall inside the complex...

LoCAtIon Istanbul, Turkey

CLIEnt Mimar Sinan G.S.Ü.

tIME 2012

AREA 23,600 m2

PRoGRAM Museum and recreational areas

StAtUS On board

ISTANBUL MUSEUM OF CONTEMPORARY ARTS

Page 84: EAA Projects
Page 85: EAA Projects

...In the proposal designed for Yenikapı, the city archives structure blends into a texture including a transfer station below ground, commercial units also in relation with other levels on the ground, and an urban canopy at the upper level. Museum space is totally particularized and spread over the area. The canopy serves as a clear separator between the commercial activity on the ground level and the museum level, while forming a platform for pedestrian traffic...

LoCAtIon Istanbul, Turkey

CLIEnt Istanbul Municipality

tIME 2012

AREA 63.350 m2

PRoGRAM Urban planning and museumStAtUS Competition proposal

YENIKAPI ARCHEOPARK PROJECT

Page 86: EAA Projects
Page 87: EAA Projects

...Transformation of the existing textile factory from 1930’s into a university campus triggered the problematization of the relationship between historical and new-comer as two entities that merge into each other. Older one of the two existing buildings have been kept as it is while the other was articulated with a new structure in such a way that it creates an inhabitable in between space in the existing composition of the site...

LoCAtIon Kayseri, Turkey

CLIEnt Abdullah Gül University

tIME 2012

AREA 350.000 m2

PRoGRAM Abdullah Gül University campus resorationStAtUS On board

AGU CITY CAMPUS PLANNING PROJECT

Page 88: EAA Projects

EAA - Emre Arolat ArchitectsNispetiye Mah. Aytar Cad. No:24 Kat 3-41.Levent, 34340 İstanbulT: 0212 284 70 73F: 0212 284 70 63www.emrearolat.com