36+500 37+000 1,235.93 1,235.93 - 1,235.93 -
37+000 37+500 1,289.72 1,289.80 - 1,289.80 (0.08)
37+500 38+000 995.60 1,344.66 - 1,344.66 (349.06)
38+000 38+500 1,076.12 1,076.18 - 1,076.18 (0.06)
38+500 39+000 1,360.52 1,360.52 - 1,360.52 -
5,957.89 6,307.09 - 6,307.09 (349.20)TOTAL
Chainage CS Qty.Previous Paid
Qty.(IPC)
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.
2.1.1 Clearing and grubbing
-
7/27/2019 Earth work qty
2/21
36+500 37+000 300.38 276.61 58.72 217.89 82.49
37+000 37+500 291.03 141.94 5.69 136.25 154.78
37+500 38+000 280.34 390.22 48.30 341.92 (61.58)
38+000 38+500 264.89 273.14 10.82 262.32 2.57
38+500 39+000 280.31 280.31 - 280.31 -
1,416.95 1,362.22 123.53 1,238.69 178.26TOTAL
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.Chainage CS Qty.Previous Paid
Qty.(IPC)
3.1.4 Roadway excavation, unsuitable soil
-
7/27/2019 Earth work qty
3/21
36+500 37+000 - - - - -
37+000 37+500 - - - - -
37+500 38+000 - - - - -
38+000 38+500 - - - - -
38+500 39+000 - - - - -
- - - - -TOTAL
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.Chainage CS Qty.Previous Paid
Qty.(IPC)
3.1.5 Roadway excavation, sub grade replacement
-
7/27/2019 Earth work qty
4/21
36+500 37+000 1,597.93 853.75 - 853.75 744.18
37+000 37+500 1,732.46 835.82 - 835.82 896.64
37+500 38+000 1,187.57 1,227.05 - 1,227.05 (39.48)
38+000 38+500 1,137.23 916.74 - 916.74 220.49
38+500 39+000 1,190.58 1,190.58 - 1,190.58 -
6,845.77 5,023.94 - 5,023.94 1,821.83TOTAL
Chainage CS Qty.Previous Paid
Qty.(IPC)
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.
3.1.7 Prepare sub grade in cut areas
-
7/27/2019 Earth work qty
5/21
36+500 37,000.00 1,219.89 1,322.89 - 1,322.89 (103.00)
37+000 37,500.00 1,334.96 1,248.82 - 1,248.82 86.14
37+500 38,000.00 976.88 960.02 - 960.02 16.86
38+000 38,500.00 1,064.17 1,064.17 - 1,064.17 -
38+500 39,000.00 1,327.36 1,327.36 - 1,327.36 -
5,923.26 5,923.26 - 5,923.26 (0.00)TOTAL
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.Previous Paid
Qty.(IPC)Chainage CS Qty.
3.3.12 Trim, level and compact roadbed
-
7/27/2019 Earth work qty
6/21
36+500 37+000 962.57 866.96 58.72 808.24 154.33
37+000 37+500 913.58 969.75 5.69 964.06 (50.48)
37+500 38+000 580.62 402.54 48.30 354.24 226.38
38+000 38+500 803.89 577.69 10.82 566.87 237.02
38+500 39+000 663.67 599.96 - 599.96 63.71
3,924.33 3,416.90 123.53 3,293.37 630.96TOTAL
Chainage CS Qty.Previous Paid
Qty.(IPC)
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.
3.3.13 Embankment construction, Type 1
-
7/27/2019 Earth work qty
7/21
36+500 37+000 82.18 39.88 - 39.88 42.30
37+000 37+500 176.18 116.13 - 116.13 60.05
37+500 38+000 16.52 - - - 16.52
38+000 38+500 68.68 68.72 - 68.72 (0.04)
38+500 39+000 53.65 47.08 - 47.08 6.57
397.21 271.81 - 271.81 125.40TOTAL
Deductions
(Ppckets &
Others)
Actual
Previous Paid
Qty.
Balance Qty.Previous Paid
Qty.(IPC)Chainage CS Qty.
3.3.14 Embankment construction, Type 2
-
7/27/2019 Earth work qty
8/21
36+500 37+000 929.69 928.68 1.01
37+000 37+500 993.88 989.76 4.12
37+500 38+000 929.13 - 929.13
38+000 38+500 944.63 - 944.63
38+500 39+000 857.96 - 857.96
4,655.29 1,918.44 2,736.85TOTAL
Chainage CS Qty.Previous Paid
Qty.Balance Qty.
4.1.1 Sub base as compacted in position
-
7/27/2019 Earth work qty
9/21
36+500 37+000 648.00 - 648.00
37+000 37+500 648.00 - 648.00
37+500 38+000 648.00 - 648.00
38+000 38+500 648.00 - 648.00
38+500 39+000 648.00 - 648.00
3,240.00 - 3,240.00TOTAL
Chainage CS Qty.Previous Paid
Qty.Balance Qty.
4.1.4 Dense graded aggregate base
-
7/27/2019 Earth work qty
10/21
36+500 37+000 127.92 - 127.92
37+000 37+500 2.56 - 2.56
37+500 38+000 - - -
38+000 38+500 - - -
38+500 39+000 - - -
130.48 - 130.48TOTAL
CS Qty.Previous Paid
Qty.Balance Qty.Chainage
4.3.6 Earthen shoulder as compacted in position
-
7/27/2019 Earth work qty
11/21
36+500 37+000 3,950.00 - 3,950.00
37+000 37+500 3,950.00 - 3,950.00
37+500 38+000 3,950.00 - 3,950.00
38+000 38+500 3,950.00 - 3,950.00
38+500 39+000 3,950.00 - 3,950.00
19,750.00 - 19,750.00TOTAL
Balance Qty.Chainage CS Qty.Previous Paid
Qty.
4.4.13 Bituminous Prime Coat
-
7/27/2019 Earth work qty
12/21
36+500 37+000 3,950.00 - 3,950.00
37+000 37+500 3,950.00 - 3,950.00
37+500 38+000 3,950.00 - 3,950.00
38+000 38+500 3,950.00 - 3,950.00
38+500 39+000 3,950.00 - 3,950.00
19,750.00 - 19,750.00TOTAL
Chainage CS Qty.Previous Paid
Qty.Balance Qty.
4.4.15 Bituminous Tack Coat
-
7/27/2019 Earth work qty
13/21
36+500 37+000 3,950.00 - 3,950.00
37+000 37+500 3,950.00 - 3,950.00
37+500 38+000 3,950.00 - 3,950.00
38+000 38+500 3,950.00 - 3,950.00
38+500 39+000 3,950.00 - 3,950.00
19,750.00 - 19,750.00TOTAL
CS Qty.Previous Paid
Qty.Balance Qty.Chainage
4.5.21 Asphalt concrete
-
7/27/2019 Earth work qty
14/21
36+500 37+000 1,235.93 1,235.93 - 36+500 37+000 1,219.89 1,322
37+000 37+500 1,289.72 1,289.80 (0.08) 37+000 37+500 1,334.96 1,248
37+500 38+000 995.60 1,344.66 (349.06) 37+500 38+000 976.88 960
38+000 38+500 1,076.12 1,076.18 (0.06) 38+000 38+500 1,064.17 1,064
38+500 39+000 1,360.52 1,360.52 - 38+500 39+000 1,327.36 1,327
5,957.89 6,307.09 (349.20) 5,923.26 5,923
36+500 37+000 300.38 217.89 82.49 36+500 37+000 962.57 808
37+000 37+500 291.03 136.25 154.78 37+000 37+500 913.58 964
37+500 38+000 280.34 341.92 (61.58) 37+500 38+000 580.62 354
38+000 38+500 264.89 262.32 2.57 38+000 38+500 803.89 566
38+500 39+000 280.31 280.31 - 38+500 39+000 663.67 599
1,416.95 1,238.69 178.26 3,924.33 3,293
36+500 37+000 1,597.93 853.75 744.18 36+500 37+000 82.18 39
37+000 37+500 1,732.46 835.82 896.64 37+000 37+500 176.18 116
37+500 38+000 1,187.57 1,227.05 (39.48) 37+500 38+000 16.52
38+000 38+500 1,137.23 916.74 220.49 38+000 38+500 68.68 68
38+500 39+0001,190.58 1,190.58 -
38+500 39+00053.65 47
6,845.77 5,023.94 1,821.83 397.21 271
3.3.13 Embankment construction, Type
Chainage CS Qty.
Actual
Previous Pa
Qty.
TOTAL
TOTAL
3.3.12 Trim, level and compact roadbe
Chainage CS Qty.
Actual
Previous Pa
Qty.
TOTAL
3.3.13 Embankment construction, Type
Chainage CS Qty.
Actual
Previous Pa
Qty.
TOTAL
3.1.7 Prepare sub grade in cut areas
Chainage CS Qty.
TOTAL
Actual
Previous Paid
Qty.
Balance Qty.
TOTAL
3.1.4 Roadway excavation, unsuitable soil
Chainage CS Qty.
Actual
Previous Paid
Qty.
Balance Qty.
2.1.1 Clearing and grubbing
Chainage CS Qty.
Actual
Previous Paid
Qty.
Balance Qty.
-
7/27/2019 Earth work qty
15/21
36+500 37+000 929.69 928.68 1.01
37+000 37+500 993.88 989.76 4.12
37+500 38+000 929.13 - 929.13
38+000 38+500 944.63 - 944.63
38+500 39+000 857.96 - 857.96
4,655.29 1,918.44 2,736.85TOTAL
4.1.1 Sub base as compacted in position
Chainage CS Qty.
Actual
Previous Paid
Qty.
Balance Qty.
-
7/27/2019 Earth work qty
16/21
(103.00)
86.14
16.86
-
-
(0.00)
154.33
(50.48)
226.38
237.02
63.71
630.96
42.30
60.05
16.52
(0.04)
6.57
125.40
Balance Qty.
Balance Qty.
Balance Qty.
-
7/27/2019 Earth work qty
17/21
-
7/27/2019 Earth work qty
18/21
m lhs rhs lhs rhs lhs
a b c (b1+b2)/2 (c1+c2)/2 f=axd
30 500 0 0 0 1.98 1.98 -
30 520 20 3.95 3.95 3.95 3.95 79.00
30 540 20 3.95 3.95 3.95 3.95 79.00
30 560 20 3.95 3.95 3.95 3.95 79.00
30 580 20 3.95 3.95 3.95 3.95 79.00
30 600 20 3.95 3.95 3.95 3.95 79.00
30 620 20 3.95 3.95 3.95 3.95 79.00
30 640 20 3.95 3.95 3.95 3.95 79.00
30 660 20 3.95 3.95 3.95 3.95 79.00
30 680 20 3.95 3.95 3.95 3.95 79.00
30 700 20 3.95 3.95 3.95 3.95 79.00
30 720 20 3.95 3.95 3.95 3.95 79.00
30 740 20 3.95 3.95 3.95 3.95 79.00
30 760 20 3.95 3.95 3.95 3.95 79.00
30 780 20 3.95 3.95 3.95 3.95 79.00
30 800 20 3.95 3.95 3.95 3.95 79.00
30 820 20 3.95 3.95 3.95 3.95 79.00
30 840 20 3.95 3.95 3.95 3.95 79.00
30 860 20 3.95 3.95 3.95 3.95 79.00
30 880 20 3.95 3.95 3.95 3.95 79.00
30 900 20 3.95 3.95 3.95 3.95 79.00
30 920 20 3.95 3.95 3.95 3.95 79.00
30 940 20 3.95 3.95 3.95 3.95 79.00
30 960 20 3.95 3.95 3.95 3.95 79.00
30 980 20 3.95 3.95 3.95 3.95 79.00
31 0 20 3.95 3.95 1.98 1.98 39.50
avg.area
as p
ar
Total Qty
Previous Paid Qty
length
Chainage
as per cs
area
-
7/27/2019 Earth work qty
19/21
Balance Qty
-
7/27/2019 Earth work qty
20/21
rhs lhs rhs
g=axe f=axd g=axe
- - - 50% - 1
79.00 79.00 79.00 50% 79.00 2
79.00 79.00 79.00 50% 79.00 3
79.00 79.00 79.00 50% 79.00 4
79.00 79.00 79.00 50% 79.00 5
79.00 79.00 79.00 50% 79.00 6
79.00 79.00 79.00 50% 79.00 7
79.00 79.00 79.00 50% 79.00 8
79.00 79.00 79.00 50% 79.009
79.00 79.00 79.00 50% 79.00 10
79.00 79.00 79.00 50% 79.00 11
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
79.00 79.00 79.00 50% 79.00
39.50 39.50 39.50 50% 39.50
r c/s
1,935.50
3,000.00
aRemarks
up to this month
area
m
-
7/27/2019 Earth work qty
21/21
(1,064.50)