EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan [email protected]

Upload: virginia-stewart

Post on 22-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

EARTHBLOCKS IN THE SUDD:FINDING SOLUTIONS ON UNLIKELY TERRAIN

Chris Rollins, P.E.Senior Engineer, AECOM International South Sudan

[email protected]

Page 2: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The SUDD

Page 3: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The PROBLEM

Page 4: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The SOIL

Page 5: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The CATTLE

Page 6: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The YOUTH

Page 7: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The ROADS

Page 8: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The AID

Page 9: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The GOVERNMENT

Page 10: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

The SOLUTION?

Page 11: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

10 similar projects in 2013, 20+ in 2014 +/-$150k each

Dablual - Galvanized roof

Manajoka - Concrete block

Jaac - Largest roof overhang

Alor - Average construction

Page 12: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

How to achieve quality in this environment:• Modular 3m x 4m layout• Reinforced Concrete frame with CEB non-load bearing wall• All rebar sizing & detailing SAME throughout• Prefab steel doors and windows in city• QA/QC manual with photos• 1200W PV System, Rainwater Catchement, VIP Latrine

Page 13: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Energy considerations:• Building at +/- 10˚N Latitude – sun on S and N!• Passive Cooling principles – venting, shading, light colored roof, reduce reflected

radiation• Orient building on E-W axis for shade and max PV energy production

Page 14: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 15: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Blockmaking

Makiga Engineering (Nairobi) block press replicates size and shape of Hydraform block (Johannesburg).

Page 16: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Confined Masonry

Generally a good idea, but in area of extreme wet and dry cycles (and no seismic problems), this constraining can cause cracking in plaster between dry stack joints when blocks contract when dry.

Page 17: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Typical Construction

Page 18: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

2013 Best Practices GrantWHAT

• Identify methods and materials to develop standards for rural South Sudano Theoretical AND practical o Pave way for future building code?

WHY• Current construction is very low quality• Keep pre-fabs (‘containers’) and air conditioning (‘split units’) out of the bush• Big Picture - Promote good ideas in a warming world

HOW• Energy study with temperature and humidity data analysis• Soil stabilization study with CBR and compression testing• Earthbag prototypeOther topics in Best Practices Grant:• PV system optimization, ferrocement and CEB water storage tanks• QA/QC manual, seminars, training, networking with government and industry

RAISE THE BAR SO THAT OTHERS MUST FOLLOW.

Page 19: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Temperature and Humidity Data Study

Page 20: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

• How does the current design perform?• How can the design be improved?

Temperature and Humidity Data Study- Questions

Page 21: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Temperature and Humidity Study- Answers

• Buildings cooler than ambient by as much as 12°C• Galvanized roof has significantly lower temperatures.• Concrete Masonry Units underperform CEB buildings –

hotter day AND night.• 2-hour lag between the hottest ambient (2:30 p.m.) and

the hottest interior (4:30 p.m.) o Good for office building

• Nighttime interior temp 2-3°C higher than ambient o Poor for housing o May not find more efficiency without active cooling

Page 22: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

7:30 a.m.

9:30 a.m.

11:30 a.m. 12:30 p.m. 2:30 p.m.

3:30 p.m. – hottest time of day

4:30 p.m.5:30 p.m.

Page 23: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 24: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 25: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

0 10 20 30 40 500.0000

0.0020

0.0040

0.0060

0.0080

0.0100

0.0120

0.0140

0.0160

0.0180

0.0200

0.0220

Psychrometric Chart at 95.5 kPa

Dry Bulb Temperature (°C)

Hum

idity

Rati

o (k

gw/k

gda)

RH=100

%

ASHRAE Comfort Zone

RH=30%

Manajoka

Alor

Jaac

Dablual

• Cannot hit ASHRAE zone without reducing humidity!

Page 26: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Performance in afternoon sun

• Shade from water tank lowers building surface temp up to 10˚C• Should emphasize landscaping and/or curtain wall going forward.

Page 27: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Soil Stabilizer Study

Page 28: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Soil Stabilizer Study –Questions

• What compression strength are we achieving with current techniques and mixes?

(10-12% cement by volume)• What compression strength is possible?• Can we use CBR data to infer compression strength?• What alternative stabilizers might be stronger, more

durable, easier to use, and cheaper?

Page 29: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Soil Stabilizer Study –Answers

• Current compression strength is terrible: <1 MPa.• Lime has very good CBR results but poor

compression testing results(no correlation between CBR and compression methods)

• Liquid stabilizers (Earthzyme and Claycrete) appear to achieve 2Mpa strength at much lower cement %

• Weatherization study ongoing – which stabilizer will return best long term results in this wet/dry cycle?

Page 30: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Traditional Authority Center 2011

Oldest building in program, built in most unfavorable conditions.

Page 31: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Cohesion and Adhesion Failure

Is this due to salt build-up, use of cement bag wash, internal wet/dry cycles in block, or combination?

Page 32: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

GRADATION TEST• South Sudan is a swamp - soils are very fine due to low energy• Inconsistent results on same sample from three different labs (See

Gudele samples)

Page 33: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 34: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

California Bearing Ratio test

Page 35: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

CBR test measures pressure required to penetrate a soil sample (soaked in water); divide by the pressure required for equal penetration

on a standard crushed rock material.

Page 36: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 37: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 38: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Compression Testing

Page 39: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 40: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Hydraform block press (Johannesburg) used to make blocks for more consistent ‘laboratory’ conditions.

Page 41: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Curing is typical

Page 42: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Hydraform block testing machine (Johannesburg) will be used solely for field testing in future, but a more accurate test device must be procured first.

Page 43: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Compression testing results are not consistent with CBR data, and also not rational – must repeat.

Page 44: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Blocks are currently curing for long term (90-day) compression testing, one sample of each removed from tarp for weatherization study.

Page 45: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

4% cement

Claycrete + 4% cement4% lime

4% ANSS

Page 46: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Earthbag Prototype –Questions

• Are earthbags a suitable alternative to chemical stabilization?

• Is this cheaper (product + transport + labor)?• Can local people use this technology at home?• Could this create cottage industry making

bags?

Page 47: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Earthbag Prototype –Answers

• Very difficult getting outside expert to assist, therefore project was not managed.

• AECOM team and local community very enthusiastic about technology:

‘I am going to build my house like this!’• Problems filling bags in rainy weather,

resorted to 1:12 stabilized sand.• Will try again in dry season on larger project.

Page 48: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Bags from Eternally Solar in Capetown

Page 49: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 50: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 51: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com
Page 52: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

What’s Next?

• Soils lab necessary for accurate engineering study!• Build 1-2 buildings with earthbags, using better management

and outside expert.• Build 1-2 buildings with different stabilizers: Claycrete, other.• Study stabilizer combinations (i.e. lime + cement)• Attempt some kind of active cooling system – undecided

o floor - earth temp may be higher than ambient at night!o evaporative – potential mold problems, legionnaires’ disease?

• Emphasize landscaping or low-cost curtain wall to reduce reflected and direct radiance.

• Try new ideas from US, Germany, Mexico, Brasil, Spain, etc.

Page 53: EARTHBLOCKS IN THE SUDD: FINDING SOLUTIONS ON UNLIKELY TERRAIN Chris Rollins, P.E. Senior Engineer, AECOM International South Sudan cebengineering@gmail.com

Chris Rollins, P.E.Senior Engineer, AECOM International South [email protected]