earthwork estimation
TRANSCRIPT
-
7/27/2019 Earthwork Estimation
1/12
F.L.sd B sd
d
sd B sd
s:1s:1
N.S.L.
F.L.
ds:1s:1
X-Section in Banking/Filling
X-Section in Cutting
sd B sd
N.S.L.
F.L.
s:1
s:1
X-Section in Cut & Fill
N.S.L.
-
7/27/2019 Earthwork Estimation
2/12
N.S.L.
F.L.Rise, s:1 Fall, s:1
L-Section in Banking/Filling
N.S.L.
F.L.Rise, s:1
Fall, s:1
L-Section in Cutting
N.S.L.
F.L.
Rise, s:1
Fall, s:1
L-Section in Cut & Fill
Rise, s:1
-
7/27/2019 Earthwork Estimation
3/12
LongitudinalSectioning
CrossSectioning
PLAN VIEW
-
7/27/2019 Earthwork Estimation
4/12
(a) Mid-Sectional Area Method
(m) (m) (m) (m) (m) (m) (m
2
) (m
2
)- - - -
(b) Mean-Sectional Area Method
(m) (m) (m) (m) (m) (m2) (m
2) (m
2)
-
(c) Prismoidal Formula Method
(m) (m) (m) (m) (m2) (m
2) (m
2) (m
2)
- - - - - -
Area of Side Sloping Surface
Sloping Breadth
d*(s2+1)
(m) (m) (m)
- - -
Total =
(m2)
-
d22 d1d2
Station/
R.D.
Total Area of Side Slopes
2*L*d*(s2+1)
Mean
Height/Depth
dm
Length
b/w
stations,
L
Height/
Depth,
d
Side
Area, As
(sd2)
Total X-
Area, A
(Ac+As)
Station/
R.D.
Length
b/w
stations,
L
Height/
Depth, d(d1+d2)/2
Central Area, Ac
B*(d1+d2)/2d1
2
Station/
R.D.
Length
b/w
stations,
L
F.L. N.S.L.Height/
Depth, d
Central
Area, Ac
(Bd)
Station/
R.D.
Length
b/w
stations,
L
F.L. N.S.L.Height/
Depth,d
Mean
Height/
Depth
(dm)
Central
Area, Ac
(B*dm)
Side
Area, As
(s.dm2)
-
7/27/2019 Earthwork Estimation
5/12
Cutting Filling
(m
2
) (m
3
) (m
3
) Area of Mid-Section: Area of rec- - -
= Bdm+1/2sd
= Bdm+sdm2
Quantity = L*(Bdm+sd
Cutting Filling
(m2) (m
3) (m
3)
- - - Mean-Sectional Area: A=(A1+A2)/
A1= Bd1+s
Quantity = L*(A1+A2)/2
Cutting Filling
(m2) (m
3) (m
3) Quantity or Volume = L/6 (A1+A2
- - -
= {B(d1+d2)/2
= (Sectional
Total =
Total =
Total =
Side Area, As
s*{(d12+d2
2+d1d2)/3}
Earthwork
(Ac+As)*L
Mean X-Area, Am
Earthwork
(A*L)
Earthwork
(A*L)Total X-Area, A (Ac+As)
-
7/27/2019 Earthwork Estimation
6/12
tangular portion + area of two triangular portions
m2+1/2sdm
2
m2)
12, A2=Bd2+sd2
2
4Am)
+ s(d1 +d2 +d1d2)/3}*L
rea of central portion + sectional area of side slope portions) * Length
-
7/27/2019 Earthwork Estimation
7/12
Design Problem-1
Calculate the quantity of earthwork for 200m length for a portion of a road in an unifor
at the two ends being 1.00m and 1.60m. The formation width is 10m and side slopes
Assume that there is no transverse slope.
Design Problem-2
Reduced level (R.L.) of ground along the centre line of a proposed road at 30m interv
The formation level (F.L.) at R.D. of 300m is 107.0m and the road is in downward gra
420m and then the gradient changes to 1 in 100 downward. Formation width of the ro
banking are 2:1 (H:V).i) Draw longitudinal section of the road and a typical cross section. Also, determine th
ii) For estimation of turfing on side slopes, find out the area of side slopes as well.
R.D. (m) 300 330 360 390 420 450 480
R.L. of NSL (m) 105.0 105.6 105.44 105.9 105.42 104.3 105.0
R.L. of F.L. (m) 107.0
Design Problem-3
Estimate the quantities of earthwork for a portion of road for 400m length from the foll
Formation width is 10m. Side slopes are 2:1 and 1.5:1 in banking and cutting, respect
Draw the longitudinal section and typical cross sections.
35 1400 50.6
Fall, 1 in 200
34 1360 51.0
33 1320 51.3
32 1280 51.4
31 1240 51.2
30 1200 50.7
29 1160 50.6
28 1120 50.8
27 1080 50.5
26 1040 50.9
25 1000 51.0
Station No. R.D (m)R.L. of N.S.L.
(m)
R.L. of F.L.
(m)
52.0
Fall, 1 in 150
-
7/27/2019 Earthwork Estimation
8/12
Design Problem-
R.D. (m)
m ground, the heights of banks R.L. of NSL (m)
2:1 (H:V). R.L. of F.L. (m)
Height/Depth (m)
al are given below.
ient of 1 in 150 upto R.D. of
ad is 10m and side slopes of
e quantity of earthwork involved.
510 540 570 600
104.1 104.62 104.0 103.3
owing data.
ively.
Fall, 1 in 100
-
7/27/2019 Earthwork Estimation
9/12
300 330 360 390 420 450 480 510 540
105.0 105.6 105.44 105.9 105.42 104.3 105.0 104.1 104.62
107.0 106.8 106.6 106.4 106.2 105.9 105.6 105.3 105.0
2.0 1.2 1.2 0.5 0.8 1.6 0.6 1.2 0.4
107.0
106.0
105.0
104.0
103.0
Datum
F.L.
N.S.L.
F.L.
sd 10m sd
d 2:12:1
X-Section in Banking/Filling
N.S.L.
Longitudinal Section
-
7/27/2019 Earthwork Estimation
10/12
570 600
104.0 103.3
104.7 104.4
0.7 1.1
-
7/27/2019 Earthwork Estimation
11/12
-
7/27/2019 Earthwork Estimation
12/12