Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Upload: gervase-gibbs

Post on 17-Jan-2016

241 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Page 2: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Earthwork Specs Payment based on excavation (Cut)

Specs define methods for cut and fill Typically not paid for fill

Based on “Excavation measured in place as computed from survey notes” Not weighing, counting truck rounds Look for spec allowing contractor to

dispute volumes in a certain area

Page 3: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Excavation Specs Common excavation

Determined from survey notes Describes most of work

Rock/Muck Rock requires blasting Muck requires deep dig, granular fill Before/after volume survey

Page 4: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Haul Payments Volume payments - $/cy Excavation

Separate lines for common, rock , muck Free Haul - Stations Overhaul - $/cy-stations Borrow - $/cy

Covers cost of lease, haul, reclamation Waste - $/cy

Page 5: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

End Areas Based on

Cross-sections

CL

Typical section Area – ft2

Cut Fill

Page 6: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Construction Grade Staking Based on “typical section” Stake centerline, slope “breakouts”

Page 7: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Slope Stakes

12’ + 4’(4) + 8’ + 6.3’(4) = 61.2’

Page 8: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Slope Staking

12’ + 3.7’(4) = 26.8’

Page 9: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

End Area Calculations

Page 10: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

End Area Calculations Level Sections

3-level Sections

5-level Sections

Other Sections

Triangular Sections

Page 11: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Level Sections

)()2

( cswcw

dcA

6.390)2

404.31(6.7)

2(

wdcA

6.390)5.16.740(6.7)( cswcA

Page 12: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

3-Level Sections

)(2

)(4 rLrL dd

chh

wA

34.338)6.295.30(2

8.6)4.60.7(

4

40A

Page 13: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

5-Level Sections

)(2

1rrLL dhdhcwA

2.258)3.277.61.239.6308.5(2

1A

Page 14: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Transition Sections

)(4

1)

2(2

1whh

wA

6.15)6.240(4

1cA 0.15)0.230(

4

1fA

Page 15: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

End Area Calculations Planimeter Coordinate Calculations

Similar to coordinate area Start/end at same point

)()( 1121

iiii dfdfA

Page 16: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Coordinate Areas

Assign (0, 0)30 ‘ top, left shoulder (-15, 0)

15

0

0

0

8.25

2.7

20

8.8

7.14

0.7

0.0

0.8

0.18

1.8

0.24

3.9

1.29

4.9

15

0

0

0

Page 17: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

Coordinate Calc Example

0

0

15

0

1.29

4.9

24

3.9

18

1.8

0

0.8

7.14

0.7

20

8.8

8.25

2.7

15

0

0

0

2.338

)15(0)1.29(0)24(4.9)18(3.9)0(1.8

)7.14(0.8)20(0.7)8.25(8.8)15(2.7

)15(4.9)1.29(3.9)24(1.8)18(0.8)0(0.7

)7.14(8.8)20(2.7)8.25(0)15(0

2

1

A

Page 18: Earthwork & Volumes Spec Requirements End Areas End-area Volumes Borrow Pit Volumes Mass Diagrams Cost Estimates

End-Area Volumes

AI = 390.6 ft2

AH = 338.3 ft2

AG = 144.8 ft2

AE = 15.6 ft2

AE = 15.0 ft2

AD = 113.2 ft2

AB = 258.2 ft2

AA = 338.2 ft2