east savanna river · 2. construction mats will be installed in wetlands as described in the epp....

12
EAST SAVANNA RIVER MDNR ID 57 / SURVEY ID s-51n21w20-a ST. LOUIS COUNTY, MINNESOTA S20-T51N-R21W HALDEN TWP MN-SL-007.000

Upload: others

Post on 22-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

EAST SAVANNA RIVER

MDNR ID 57 / SURVEY ID s-51n21w20-a

ST. LOUIS COUNTY, MINNESOTA

S20-T51N-R21W HALDEN TWP

MN-SL-007.000

AutoCAD SHX Text
MN-SL-007.000
AutoCAD SHX Text
MN-SL-006.000
AutoCAD SHX Text
MN-SL-008.000
AutoCAD SHX Text
1235
AutoCAD SHX Text
1240
AutoCAD SHX Text
1245
AutoCAD SHX Text
1235
AutoCAD SHX Text
1240
AutoCAD SHX Text
1245
AutoCAD SHX Text
-5+96
AutoCAD SHX Text
-5+00
AutoCAD SHX Text
-4+00
AutoCAD SHX Text
-3+00
AutoCAD SHX Text
-2+00
AutoCAD SHX Text
-1+00
AutoCAD SHX Text
0+00
AutoCAD SHX Text
1+00
AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
4+00
AutoCAD SHX Text
5+00
AutoCAD SHX Text
6+00
AutoCAD SHX Text
6+91
AutoCAD SHX Text
CHANNEL PROFILE (A -A )1-A )
AutoCAD SHX Text
A 1
AutoCAD SHX Text
WATER SURFACE
AutoCAD SHX Text
THALWEG
AutoCAD SHX Text
A
AutoCAD SHX Text
HDD ENTRY*
AutoCAD SHX Text
HDD EXIT*
AutoCAD SHX Text
*SEE DRAWING D1085 FOR HDD PLAN & PROFILE
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
150
AutoCAD SHX Text
75
AutoCAD SHX Text
0
AutoCAD SHX Text
CHANNEL CROSS SECTION (B -B )B -B )1-B ))
AutoCAD SHX Text
B 2
AutoCAD SHX Text
B 1
AutoCAD SHX Text
A 1
AutoCAD SHX Text
A 1
AutoCAD SHX Text
B 1
AutoCAD SHX Text
B 2
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
ADDITIONAL TEMPORARY WORKSPACE
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
WETLAND BOUNDARY
AutoCAD SHX Text
EAST SAVANNA RIVER
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE OTHER PIPELINE PERMANENT RIGHT OF WAY TEMPORARY WORKSPACE WATERBODY (ROSGEN SURVEY - THALWEG) OVERHEAD POWER TRACT BOUNDARY WETLAND ADDITIONAL TEMPORARY WORKSPACE TRACT ID ROSGEN SURVEY POINT - WATER SURFACE ROSGEN SURVEY POINT - RIVER BOTTOM (THALWEG) HDD ENTRY EXIT POINT
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MN-XX-XX-XXX.XXX
AutoCAD SHX Text
REVISION-DESCRIPTION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHK'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DWN. BY:
AutoCAD SHX Text
PROJ. ENGR.
AutoCAD SHX Text
CLIENT APP.
AutoCAD SHX Text
PROJ. MGR.
AutoCAD SHX Text
CHK.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
FOR ENVIRONMENTAL REVIEW PURPOSES ONLY
AutoCAD SHX Text
IMAGERY
AutoCAD SHX Text
CHANNEL CROSS SECTION NOTE: 1. CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON TOPOGRAPHIC/BATHYMETRIC SURVEY(S), AND AS SUCH DO NOT REFLECT CHANGES TO THE CHANNEL THAT MAY HAVE OCCURRED SINCE THAT TIME
AutoCAD SHX Text
B-93-5.84-MDNR-57-S22D-0
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
PRIMARY METHOD - HDD
AutoCAD SHX Text
CROSSING OF EAST SAVANNA RIVER
AutoCAD SHX Text
ENBRIDGE MP 1085.9
AutoCAD SHX Text
ST. LOUIS COUNTY, MINNESOTA
AutoCAD SHX Text
NOTED
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
0
AutoCAD SHX Text
ISSUED FOR PERMIT APPLICATION
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
BAB
AutoCAD SHX Text
BAB
AutoCAD SHX Text
2018
AutoCAD SHX Text
2018 SUMMER
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
95' TEMPORARY
AutoCAD SHX Text
95' TEMPORARY
AutoCAD SHX Text
NOTES 1. BANKFULL DATA NOT AVAILABLEBANKFULL DATA NOT AVAILABLE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
1230
AutoCAD SHX Text
1235
AutoCAD SHX Text
1240
AutoCAD SHX Text
1245
AutoCAD SHX Text
1250
AutoCAD SHX Text
1230
AutoCAD SHX Text
1235
AutoCAD SHX Text
1240
AutoCAD SHX Text
1245
AutoCAD SHX Text
1250
AutoCAD SHX Text
-3+22
AutoCAD SHX Text
-3+00
AutoCAD SHX Text
-2+50
AutoCAD SHX Text
-2+00
AutoCAD SHX Text
-1+50
AutoCAD SHX Text
-1+00
AutoCAD SHX Text
-0+50
AutoCAD SHX Text
0+00
AutoCAD SHX Text
0+40
Page 2: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

PROJECT NO.

SHEET NO.

APP

.B

YC

HK

'DR

EV

ISIO

N D

ESC

RIP

TIO

ND

AT

EN

O.

2424

Eas

t 21s

t Stre

etSu

ite 5

10Tu

lsa,

Okl

ahom

a 7

4114

RE

VIS

ION

SCA

LE

APP

RO

VE

DC

HE

CK

ED

DR

AW

ING

LA

BE

L

LO

CA

TIO

N:

DA

TE

DR

AW

N

J.D.H

air&

Associates,Inc.

Con

sulti

ng E

ngin

eers

PL

AN

AN

D P

RO

FIL

E36

-IN

CH

PIP

EL

INE

CR

OSS

ING

OF

TH

E S

AV

AN

NA

RIV

ER

BY

HO

RIZ

ON

TA

L D

IRE

CT

ION

AL

DR

ILL

ING

Enbridge\1404

LIN

E 3

PIP

EL

INE

PR

OJE

CT

D1085

AutoCAD SHX Text
P1
AutoCAD SHX Text
SAVANNA RIVER
AutoCAD SHX Text
08/30/18
AutoCAD SHX Text
KWW
AutoCAD SHX Text
SHOWN FOR D-SIZED PLOT
AutoCAD SHX Text
GENERAL LEGEND
AutoCAD SHX Text
PROTECTION OF EXISTING FACILITIES CONTRACTOR SHALL UNDERTAKE THE FOLLOWING STEPS PRIOR TO COMMENCING DRILLING OPERATIONS. 1. CONTACT THE UTILITY LOCATION/NOTIFICATION CONTACT THE UTILITY LOCATION/NOTIFICATION SERVICE FOR THE CONSTRUCTION AREA. 2. POSITIVELY LOCATE AND STAKE ALL EXISTING POSITIVELY LOCATE AND STAKE ALL EXISTING UNDERGROUND FACILITIES. ANY FACILITIES LOCATED WITHIN 10 FEET OF THE DESIGNED DRILLED PATH SHALL BE EXPOSED. 3. MODIFY DRILLING PRACTICES AND DOWNHOLE MODIFY DRILLING PRACTICES AND DOWNHOLE ASSEMBLIES AS NECESSARY TO PREVENT DAMAGE TO EXISTING FACILITIES.
AutoCAD SHX Text
DRILLED PATH NOTES 1. DRILLED PATH STATIONING IS IN FEET BY DRILLED PATH STATIONING IS IN FEET BY HORIZONTAL MEASUREMENT AND IS REFERENCED TO CONTROL ESTABLISHED FOR THE DRILLED SEGMENT. 2. DRILLED PATH COORDINATES REFER TO CENTERLINE OF DRILLED PATH COORDINATES REFER TO CENTERLINE OF PILOT HOLE AS OPPOSED TO TOP OF INSTALLED PIPE.
AutoCAD SHX Text
1140
AutoCAD SHX Text
1160
AutoCAD SHX Text
1180
AutoCAD SHX Text
1200
AutoCAD SHX Text
1220
AutoCAD SHX Text
1240
AutoCAD SHX Text
1260
AutoCAD SHX Text
1280
AutoCAD SHX Text
1280
AutoCAD SHX Text
1260
AutoCAD SHX Text
1240
AutoCAD SHX Text
1220
AutoCAD SHX Text
1200
AutoCAD SHX Text
1180
AutoCAD SHX Text
1160
AutoCAD SHX Text
20+00
AutoCAD SHX Text
20+00
AutoCAD SHX Text
15+00
AutoCAD SHX Text
15+00
AutoCAD SHX Text
10+00
AutoCAD SHX Text
10+00
AutoCAD SHX Text
5+00
AutoCAD SHX Text
5+00
AutoCAD SHX Text
1140
AutoCAD SHX Text
0+00
AutoCAD SHX Text
ENTRY POINT @ 10° 0+00.00, 1244.28 N 469926.94, E 2641362.40
AutoCAD SHX Text
0+00
AutoCAD SHX Text
P.C. 10° SAG BEND 0+29.54, 1239.07 RADIUS = 3,600'
AutoCAD SHX Text
P.C. 8° SAG BEND 7+54.68, 1184.38 RADIUS = 3,600'
AutoCAD SHX Text
P.T. 10° SAG BEND 6+54.68, 1184.38
AutoCAD SHX Text
P.T. 8° SAG BEND 12+55.70, 1219.41
AutoCAD SHX Text
SCALE: 1"=100' HORIZONTAL
AutoCAD SHX Text
%%uPROFILE
AutoCAD SHX Text
1"= 20' VERTICAL
AutoCAD SHX Text
EXIT POINT @ 8° 14+46.98, 1246.29 N 469909.97, E 2642809.28
AutoCAD SHX Text
%%uPLAN
AutoCAD SHX Text
SCALE: 1"=100'
AutoCAD SHX Text
ACM
AutoCAD SHX Text
JSP
AutoCAD SHX Text
DESIGNED DRILLED ALIGNMENT
AutoCAD SHX Text
200
AutoCAD SHX Text
100
AutoCAD SHX Text
0
AutoCAD SHX Text
50
AutoCAD SHX Text
20
AutoCAD SHX Text
0
AutoCAD SHX Text
10
AutoCAD SHX Text
DRILLED PATH ENTRY/EXIT POINT
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
ST.LOUIS COUNTY, MINNESOTA
AutoCAD SHX Text
NOTE: PLACEMENT OF HORIZONTAL DRILLING RIG IS NOT FIXED BY DESIGNATION OF ENTRY AND EXIT POINTS. DRILLING RIG PLACEMENT AND/OR THE USE OF DUAL RIGS SHALL BE AT CONTRACTOR'S OPTION.
AutoCAD SHX Text
TOPOGRAPHIC SURVEY NOTES 1. TOPOGRAPHIC SURVEY DATA PROVIDED BY ENBRIDGE, TOPOGRAPHIC SURVEY DATA PROVIDED BY ENBRIDGE, SUPERIOR, WISCONSIN. 2. NORTHINGS AND EASTINGS ARE IN U.S. SURVEY FEET NORTHINGS AND EASTINGS ARE IN U.S. SURVEY FEET REFERENCED TO MINNESOTA STATE PLANE COORDINATES, NORTH ZONE, NAD 83. 3. ELEVATIONS ARE IN FEET REFERENCED TO NAVD 88.ELEVATIONS ARE IN FEET REFERENCED TO NAVD 88.
AutoCAD SHX Text
DESIGNED DRILLED PROFILE 36" O.D., 0.750" W.T., API 5L X-70, STEEL LINE PIPE
AutoCAD SHX Text
PROPOSED CENTERLINE 36" LINE 3 PIPELINE
AutoCAD SHX Text
PILOT HOLE TOLERANCES THE PILOT HOLE SHALL BE DRILLED TO THE TOLERANCES LISTED BELOW. HOWEVER, IN ALL CASES, RIGHT-OF-WAY RESTRICTIONS AND CONCERN FOR ADJACENT FACILITIES SHALL TAKE PRECEDENCE OVER THESE TOLERANCES. 1. ENTRY POINT: AS STAKED BY COMPANY ENTRY POINT: AS STAKED BY COMPANY 2. EXIT POINT: UP TO 10 FEET SHORT OR 20 FEET LONG EXIT POINT: UP TO 10 FEET SHORT OR 20 FEET LONG RELATIVE TO THE DESIGNED EXIT POINT; UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT 3. ELEVATION: UP TO 2 FEET ABOVE AND 10 FEET BELOW ELEVATION: UP TO 2 FEET ABOVE AND 10 FEET BELOW THE DESIGNED PROFILE 4. ALIGNMENT: UP TO 5 FEET RIGHT OR LEFT OF THE ALIGNMENT: UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT 5. CURVE RADIUS: NO LESS THAN 2,400 FEET BASED ON CURVE RADIUS: NO LESS THAN 2,400 FEET BASED ON A 3-JOINT AVERAGE (ASSUMING RANGE 2 DRILL PIPE)
AutoCAD SHX Text
PROPOSED ATWS
AutoCAD SHX Text
SAVANNA RIVER
AutoCAD SHX Text
EXISTING GRADE BASED ON SURVEY POINTS
AutoCAD SHX Text
PROPOSED ATWS
AutoCAD SHX Text
B
AutoCAD SHX Text
PROPOSED BORING
AutoCAD SHX Text
B
AutoCAD SHX Text
PROPOSED BORING
AutoCAD SHX Text
PROPOSED BORING
AutoCAD SHX Text
PROPOSED BORING
AutoCAD SHX Text
WETLAND (TYPICAL)
AutoCAD SHX Text
TEMPORARY WORKSPACE
AutoCAD SHX Text
WETLAND BOUNDARY (TYPICAL)
AutoCAD SHX Text
APPROX. BORING DEPTH = 108'
AutoCAD SHX Text
ELEV. = 1,134
AutoCAD SHX Text
POWER POLE (TYPICAL)
AutoCAD SHX Text
ASSUMED WATER SURFACE
AutoCAD SHX Text
JSP
AutoCAD SHX Text
KWW
AutoCAD SHX Text
DLB
AutoCAD SHX Text
REMOVE LONGER HDD OPTION
AutoCAD SHX Text
09/13/18
AutoCAD SHX Text
P1
AutoCAD SHX Text
APPROX. BORING DEPTH = 111'
AutoCAD SHX Text
ELEV. = 1,134
babergland
Text Box
MDNR ID No. 57
Page 3: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

s-51n20w27-a

1093.8

1093.9

1094

1094.1

1094.2

Unnamed Stream

95’

120’

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/3

0/2

01

8)

S

ourc

e: Z

:\C

lient

s\E

_H

\En

brid

ge

\Lin

e_

3_

Fu

ll_R

ep

lace

me

nt\

Pe

rmitt

ing

\Sta

te\P

ubl

ic_

Wa

ters

\No

v_2

01

8\L

3R

_W

ate

rs_

Ap

plic

atio

n_

Ma

pse

t_D

ry_

Cro

ssin

g_

No

v20

18

.mxd

Milepost

Proposed L3R Centerline

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

Bridge

PWI Watercourse

Field Delineated Waterbody

Delineated Wetland

PEM

PFO

PSS

November 2018

For Environmental Review Purposes Only

Unnamed Stream at MP 1094.0ID#: 58T51N, R20W, S27, SWNW, Forty - 23, Govt. Lot - 0Survey No. s-51n20w27-aMDNR Kittle No. - S-002-028Crossing Method - Dry Crossing

Notes:1. Bridge location approximate.2. Bridge will be constructed in accordance with the EPP.3. Construction mats will be installed in wetlands as described in the EPP.4. ECDs will be installed as described in the EPP.5. Construction timing will be based on permit conditions.6. Streambed and bank restoration will be completed as described in the EPP.7. Permanent right-of-way width at crossing will be 50 feet.

Line 3 Replacement Project

Environmental Crossing Plan

ID# 58 Survey No. s-51n20w27-a

Unnamed Stream

St. Louis County, Minnesota

Page 4: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

s-51n20w35-a

1095.7

1095.8

1095.9

1096

1096.1

1096.2

Unnamed Stream

95’

120’

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/30

/201

8)

S

ourc

e: Z

:\Clie

nts\

E_H

\Enb

ridge

\Lin

e_3_

Full_

Rep

lace

men

t\Per

mitt

ing\

Stat

e\Pu

blic

_Wat

ers\

Nov

_201

8\L3

R_W

ater

s_Ap

plic

atio

n_M

apse

t_D

ry_C

ross

ing_

Nov

2018

.mxd

Milepost

Proposed L3R Centerline

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

Bridge

PWI Watercourse

Field Delineated Waterbody

Delineated Wetland

PEM

PUB

November 2018

For Environmental Review Purposes Only

Unnamed Stream at MP 1095.9ID#: 59T51N, R20W, S35, NESW, Forty - 31, Govt. Lot - 0Survey No. s-51n20w35-aMDNR Kittle No. - S-002-027Crossing Method - Dry Crossing

Notes:1. Bridge location approximate.2. Bridge will be constructed in accordance with the EPP.3. Construction mats will be installed in wetlands as

described in the EPP.4. ECDs will be installed as described in the EPP.5. Construction timing will be based on permit conditions.6. Streambed and bank restoration will be completed as

described in the EPP.7. Permanent right-of-way width at crossing will be 50 feet.

Line 3 Replacement Project

Environmental Crossing Plan

ID# 59 Survey No. s-51n20w35-a

Unnamed Stream

St. Louis County, Minnesota

Page 5: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

s-50n20w2-a

1096.5

1096.6

1096.7

1096.8

1096.9

Ahmik River

95’

120’

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/3

0/2

01

8)

S

ourc

e: Z

:\C

lient

s\E

_H

\En

brid

ge

\Lin

e_

3_

Fu

ll_R

ep

lace

me

nt\

Pe

rmitt

ing

\Sta

te\P

ubl

ic_

Wa

ters

\No

v_2

01

8\L

3R

_W

ate

rs_

Ap

plic

atio

n_

Ma

pse

t_W

et_

Op

en

_C

ut_

No

v20

18

.mxdMilepost

Proposed L3R Centerline

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

Bridge

PWI Watercourse

Field Delineated Waterbody

Delineated Wetland

PEM

PFO

PSS

November 2018

For Environmental Review Purposes Only

Line 3 Replacement Project

Environmental Crossing Plan

ID# 60 Survey No. s-50n20w2-a

Ahmik River

St. Louis County, Minnesota

Ahmik River at MP 1096.7ID#: 60T50N, R20W, S2, NENE, Forty - 11, Govt. Lot - 1Survey No. s-50n20w2-aMN DNR Kittle No. - S-002-026Crossing Method - Wet Open Cut

Notes:1. Bridge location approximate.2. Bridge will be constructed in accordance with the EPP.3. Construction mats will be installed in wetlands as described in the EPP.4. ECDs will be installed as described in the EPP.5. Construction timing will be based on permit conditions.6. Streambed and bank restoration will be completed as described in the EPP.7. Permanent right-of-way width at crossing will be 50 feet.

Page 6: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

STONEY BROOK

MDNR ID 61 / SURVEY ID MN_NHD_22

CARLTON COUNTY, MINNESOTA

S6-T49N-R18W NORTH CARLTON TWP

T-0140-C

AutoCAD SHX Text
T-0140-C
AutoCAD SHX Text
T-0140-A
AutoCAD SHX Text
T-0140
AutoCAD SHX Text
1280
AutoCAD SHX Text
1285
AutoCAD SHX Text
1290
AutoCAD SHX Text
1280
AutoCAD SHX Text
1285
AutoCAD SHX Text
1290
AutoCAD SHX Text
-2+00
AutoCAD SHX Text
-1+00
AutoCAD SHX Text
0+00
AutoCAD SHX Text
1+00
AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
4+00
AutoCAD SHX Text
CHANNEL PROFILE (A -A )1-A )
AutoCAD SHX Text
A 1
AutoCAD SHX Text
WATER SURFACE
AutoCAD SHX Text
THALWEG
AutoCAD SHX Text
A
AutoCAD SHX Text
CHANNEL CROSS SECTION (B -B )B -B )1-B ))
AutoCAD SHX Text
B 2
AutoCAD SHX Text
B 1
AutoCAD SHX Text
A 1
AutoCAD SHX Text
A 2
AutoCAD SHX Text
B 1
AutoCAD SHX Text
B 2
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
ADDITIONAL TEMPORARY WORKSPACE
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
WETLAND BOUNDARY
AutoCAD SHX Text
STONEY BROOK
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE OTHER PIPELINE PERMANENT RIGHT OF WAY TEMPORARY WORKSPACE WATERBODY (ROSGEN SURVEY - THALWEG) TRACT BOUNDARY TEMPORARY MAT ROAD AND SPAN BRIDGE WETLAND ADDITIONAL TEMPORARY WORKSPACE TRACT ID ROSGEN SURVEY POINT - WATER SURFACE ROSGEN SURVEY POINT - RIVER BOTTOM (THALWEG)
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MN-XX-XX-XXX.XXX
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
100
AutoCAD SHX Text
50
AutoCAD SHX Text
0
AutoCAD SHX Text
25
AutoCAD SHX Text
TEMPORARY MAT ROAD AND SPAN BRIDGE WITH IN-STREAM SUPPORT
AutoCAD SHX Text
NOTES 1. NO FEMA DIGITAL FLOODPLAIN DATA AVAILABLE NO FEMA DIGITAL FLOODPLAIN DATA AVAILABLE 2. BANKFULL DATA NOT AVAILABLEBANKFULL DATA NOT AVAILABLE
AutoCAD SHX Text
REVISION-DESCRIPTION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHK'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DWN. BY:
AutoCAD SHX Text
PROJ. ENGR.
AutoCAD SHX Text
CLIENT APP.
AutoCAD SHX Text
PROJ. MGR.
AutoCAD SHX Text
CHK.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
FOR ENVIRONMENTAL REVIEW PURPOSES ONLY
AutoCAD SHX Text
IMAGERY
AutoCAD SHX Text
CHANNEL CROSS SECTION NOTE: 1. CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON TOPOGRAPHIC/BATHYMETRIC SURVEY(S), AND AS SUCH DO NOT REFLECT CHANGES TO THE CHANNEL THAT MAY HAVE OCCURRED SINCE THAT TIME
AutoCAD SHX Text
B-93-5.84-MDNR-61-S22D-0
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
PRIMARY METHOD - WET OPEN CUT
AutoCAD SHX Text
CROSSING OF STONEY BROOK
AutoCAD SHX Text
ENBRIDGE MP 1106.5
AutoCAD SHX Text
CARLTON COUNTY, MINNESOTA
AutoCAD SHX Text
NOTED
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
0
AutoCAD SHX Text
ISSUED FOR PERMIT APPLICATION
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
BAB
AutoCAD SHX Text
BAB
AutoCAD SHX Text
2018
AutoCAD SHX Text
2018 SUMMER
AutoCAD SHX Text
95' TEMPORARY
AutoCAD SHX Text
95' TEMPORARY
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
1275
AutoCAD SHX Text
1280
AutoCAD SHX Text
1285
AutoCAD SHX Text
1290
AutoCAD SHX Text
1295
AutoCAD SHX Text
1275
AutoCAD SHX Text
1280
AutoCAD SHX Text
1285
AutoCAD SHX Text
1290
AutoCAD SHX Text
1295
AutoCAD SHX Text
-0+67
AutoCAD SHX Text
-0+50
AutoCAD SHX Text
0+00
AutoCAD SHX Text
0+35
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE (NTS)*
AutoCAD SHX Text
WET OPEN CUT (NTS)
AutoCAD SHX Text
*TRENCH IN PROFILE IS NOT TO SCALE (NTS)
Page 7: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

1115

1115.1

1115.2

1115.3

1115.4

1115.5

95’

120’

120’

MDNRID No. 179

UnnamedStream

Unna

med

Stre

am

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/30

/201

8)

S

ourc

e: Z

:\Clie

nts\

E_H

\Enb

ridge

\Lin

e_3_

Full_

Rep

lace

men

t\Per

mitt

ing\

Stat

e\Pu

blic

_Wat

ers\

Nov

_201

8\L3

R_W

ater

s_Ap

plic

atio

n_M

apse

t_O

pen_

Cut

_Nov

2018

.mxd

Milepost

Proposed L3R Centerline

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

MDNR-Administered Land

MDNR Rivers and Streams

Delineated Wetland

PEM

PFO

PSS

PUB

November 2018

For Environmental Review Purposes Only

Line 3 Replacement Project

Environmental Crossing Plan

ID# 62 Survey No. w-48n17w6-a

Unnamed Stream

Carlton County, Minnesota

Unnamed Stream at MP 1115.2ID#: 62T48N, R17W, S6, SESW, Forty - 34, Govt. Lot - 0Survey No. w-48n17w6-aMN DNR Kittle No. - S-002-009-001-002-001Crossing Method - Open Cut

Notes:1. Construction right-of-way width will be 95 feet.2. Construction mats will be installed in wetlands as described in the EPP.3. ECDs will be installed as described in the EPP.4. Construction procedures and methods are identified in the EPP.5. Restoration will be completed as described in the EPP.6. Permanent right-of-way width at crossing will be 50 feet.

Page 8: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

s-48n17w6-a

1115.3

1115.4

1115.5

1115.6

1115.7

1115.8

Little

Otte

r Cre

ek

95’

120’

120’

MDNRID No. 179

MDNRID No. 180

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/3

0/2

01

8)

S

ourc

e: Z

:\C

lient

s\E

_H

\En

brid

ge

\Lin

e_

3_

Fu

ll_R

ep

lace

me

nt\

Pe

rmitt

ing

\Sta

te\P

ubl

ic_

Wa

ters

\No

v_2

01

8\L

3R

_W

ate

rs_

Ap

plic

atio

n_

Ma

pse

t_D

ry_

Cro

ssin

g_

No

v20

18

.mxd

Milepost

Proposed L3R Centerline

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

Bridge

MDNR-Administered Land

PWI Watercourse

Field Delineated Waterbody

Delineated Wetland

PEM

PSS

PUB

November 2018

For Environmental Review Purposes Only

Unnamed Stream at MP 1115.6ID#: 63T48N, R17W, S6, SWSE, Forty - 43, Govt. Lot - 0Survey No. s-48n17w6-aMDNR Kittle No. - S-002-009-001-002Crossing Method - Dry Crossing

Notes:1. Bridge location approximate.2. Bridge will be constructed in accordance with the EPP.3. Construction mats will be installed in wetlands as described in the EPP.4. ECDs will be installed as described in the EPP.5. Construction timing will be based on permit conditions.6. Streambed and bank restoration will be completed as described in the EPP.7. Permanent right-of-way width at crossing will be 50 feet.

Line 3 Replacement Project

Environmental Crossing Plan

ID# 63 Survey No. s-48n17w6-a

Unnamed Stream

Carlton County, Minnesota

Page 9: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

s-48n17w8-a

1116.7

1116.8

1116.9

1117

1117.1

1117.2

95’

120’

Unn

amed

Stre

am

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/30

/201

8)

S

ourc

e: Z

:\Clie

nts\

E_H

\Enb

ridge

\Lin

e_3_

Full_

Rep

lace

men

t\Per

mitt

ing\

Stat

e\Pu

blic

_Wat

ers\

Nov

_201

8\L3

R_W

ater

s_Ap

plic

atio

n_M

apse

t_W

et_O

pen_

Cut

_Nov

2018

.mxdMilepost

Proposed L3R Centerline

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

Bridge

DNR Rivers and Streams

Field Delineated Waterbody

Delineated Wetland

PEM

PFO

PSS

November 2018

For Environmental Review Purposes Only

Line 3 Replacement Project

Environmental Crossing Plan

ID# 64 Survey No. s-48n17w8-a

Unnamed Stream

Carlton County, Minnesota

Unnamed Stream at MP 1116.9ID#: 64T48N, R17W, S8, NWSE, Forty - 42, Govt. Lot - 0Survey No. s-48n17w8-aMN DNR Kittle No. - S-002-009-001-001Crossing Method - Wet Open Cut

Notes:1. Bridge location approximate.2. Bridge will be constructed in accordance with the EPP.3. Construction mats will be installed in wetlands as

described in the EPP.4. ECDs will be installed as described in the EPP.5. Construction timing will be based on permit conditions.6. Streambed and bank restoration will be completed as

described in the EPP.7. Permanent right-of-way width at crossing will be 50 feet.

Page 10: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

LITTLE OTTER CREEK

MDNR ID 65 / SURVEY ID s-48n17w16-f

CARLTON COUNTY, MINNESOTA

S16-T48N-R17W TWIN LAKES TWP

T-0084-A

AutoCAD SHX Text
SECTION 16
AutoCAD SHX Text
SECTION 15
AutoCAD SHX Text
T-0084-A
AutoCAD SHX Text
T-0083-A
AutoCAD SHX Text
1120
AutoCAD SHX Text
1125
AutoCAD SHX Text
1130
AutoCAD SHX Text
1120
AutoCAD SHX Text
1125
AutoCAD SHX Text
1130
AutoCAD SHX Text
-2+49
AutoCAD SHX Text
-2+00
AutoCAD SHX Text
-1+00
AutoCAD SHX Text
0+00
AutoCAD SHX Text
1+00
AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
3+65
AutoCAD SHX Text
CHANNEL PROFILE (A -A )1-A )
AutoCAD SHX Text
A 1
AutoCAD SHX Text
WATER SURFACE
AutoCAD SHX Text
THALWEG
AutoCAD SHX Text
A
AutoCAD SHX Text
A 2
AutoCAD SHX Text
A 1
AutoCAD SHX Text
B 1
AutoCAD SHX Text
B 2
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
ADDITIONAL TEMPORARY WORKSPACE
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
WETLAND BOUNDARY
AutoCAD SHX Text
LITTLE OTTER CREEK
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE OTHER PIPELINE PERMANENT RIGHT OF WAY TEMPORARY WORKSPACE WATERBODY (ROSGEN SURVEY - THALWEG) TRACT BOUNDARY TEMPORARY MAT ROAD AND SPAN BRIDGE WETLAND ADDITIONAL TEMPORARY WORKSPACE TRACT ID ROSGEN SURVEY POINT - WATER SURFACE ROSGEN SURVEY POINT - RIVER BOTTOM (THALWEG)
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MN-XX-XX-XXX.XXX
AutoCAD SHX Text
REVISION-DESCRIPTION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHK'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DWN. BY:
AutoCAD SHX Text
PROJ. ENGR.
AutoCAD SHX Text
CLIENT APP.
AutoCAD SHX Text
PROJ. MGR.
AutoCAD SHX Text
CHK.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
FOR ENVIRONMENTAL REVIEW PURPOSES ONLY
AutoCAD SHX Text
IMAGERY
AutoCAD SHX Text
CHANNEL CROSS SECTION NOTE: 1. CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON TOPOGRAPHIC/BATHYMETRIC SURVEY(S), AND AS SUCH DO NOT REFLECT CHANGES TO THE CHANNEL THAT MAY HAVE OCCURRED SINCE THAT TIME
AutoCAD SHX Text
B-93-5.84-MDNR-65-S22D-0
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
PRIMARY METHOD - WET OPEN CUT
AutoCAD SHX Text
CROSSING OF LITTLE OTTER CREEK
AutoCAD SHX Text
ENBRIDGE MP 1118.4
AutoCAD SHX Text
CARLTON COUNTY, MINNESOTA
AutoCAD SHX Text
NOTED
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
0
AutoCAD SHX Text
ISSUED FOR PERMIT APPLICATION
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
BAB
AutoCAD SHX Text
BAB
AutoCAD SHX Text
2018
AutoCAD SHX Text
2018 SUMMER
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
100
AutoCAD SHX Text
50
AutoCAD SHX Text
0
AutoCAD SHX Text
25
AutoCAD SHX Text
CHANNEL CROSS SECTION (B -B )B -B )1-B ))
AutoCAD SHX Text
B 2
AutoCAD SHX Text
B 1
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
50' PERMANENT
AutoCAD SHX Text
TEMPORARY MAT ROAD AND SPAN BRIDGE WITH IN-STREAM SUPPORT
AutoCAD SHX Text
95' TEMPORARY
AutoCAD SHX Text
95' TEMPORARY
AutoCAD SHX Text
120' TEMPORARY
AutoCAD SHX Text
120' TEMPORARY
AutoCAD SHX Text
NOTES 1. NO FEMA DIGITAL FLOODPLAIN DATA AVAILABLE NO FEMA DIGITAL FLOODPLAIN DATA AVAILABLE 2. BANKFULL DATA NOT AVAILABLEBANKFULL DATA NOT AVAILABLE
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE (NTS)*
AutoCAD SHX Text
WET OPEN CUT (NTS)
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
1115
AutoCAD SHX Text
1120
AutoCAD SHX Text
1125
AutoCAD SHX Text
1130
AutoCAD SHX Text
1135
AutoCAD SHX Text
1115
AutoCAD SHX Text
1120
AutoCAD SHX Text
1125
AutoCAD SHX Text
1130
AutoCAD SHX Text
1135
AutoCAD SHX Text
-0+50
AutoCAD SHX Text
0+00
AutoCAD SHX Text
0+50
AutoCAD SHX Text
0+94
AutoCAD SHX Text
TOP OF PIPE
AutoCAD SHX Text
*TRENCH IN PROFILE IS NOT TO SCALE (NTS)
Page 11: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

11251125.1

1125.21125.3

1125.4

95’

120’

Unnamed Stream

0 100 200Feet

1 inch = 200 feet

Minnesota

Canada

Dat

e: (1

1/30

/201

8)

S

ourc

e: Z

:\Clie

nts\

E_H

\Enb

ridge

\Lin

e_3_

Full_

Rep

lace

men

t\Per

mitt

ing\

Stat

e\Pu

blic

_Wat

ers\

Nov

_201

8\L3

R_W

ater

s_Ap

plic

atio

n_M

apse

t_O

pen_

Cut

_Nov

2018

.mxd

Milepost

Proposed L3R Centerline

Existing Utility

Existing Utility

Permanent Right-of-Way

Construction Right-of-Way/ATWS

MDNR Rivers and Streams

Delineated Wetland

PEM

November 2018

For Environmental Review Purposes Only

Line 3 Replacement Project

Environmental Crossing Plan

ID# 66 Survey No. No Field Data

Unnamed Stream

Carlton County, Minnesota

Unnamed Stream at MP 1125.2ID#: 66T48N, R16W, S28, SWSE, Forty - 43, Govt. Lot - 0Survey No. No Field DataMN DNR Kittle No. - S-001.5-007Crossing Method - Open Cut

Notes:1. Construction right-of-way width will be 95 feet.2. Construction mats will be installed in wetlands as described in the EPP.3. ECDs will be installed as described in the EPP.4. Construction procedures and methods are identified in the EPP.5. Restoration will be completed as described in the EPP.6. Permanent right-of-way width at crossing will be 50 feet.

Page 12: EAST SAVANNA RIVER · 2. Construction mats will be installed in wetlands as described in the EPP. 3. ECDs will be installed as described in the EPP. 4. Construction procedures and

UNNAMED STREAM

MDNR ID 67 / SURVEY ID CR144aWB

CARLTON COUNTY, MINNESOTA

S34-T48N-R16W SILVER BROOK TWP

MN-CR-144.000

AutoCAD SHX Text
MN-CR-143.000
AutoCAD SHX Text
MN-CR-144.000
AutoCAD SHX Text
965
AutoCAD SHX Text
970
AutoCAD SHX Text
965
AutoCAD SHX Text
970
AutoCAD SHX Text
-2+92
AutoCAD SHX Text
-2+00
AutoCAD SHX Text
-1+00
AutoCAD SHX Text
0+00
AutoCAD SHX Text
1+00
AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
CHANNEL PROFILE (A -A )1-A )
AutoCAD SHX Text
A 1
AutoCAD SHX Text
A 2
AutoCAD SHX Text
NOTES 1. NO FEMA DIGITAL FLOODPLAIN DATA AVAILABLENO FEMA DIGITAL FLOODPLAIN DATA AVAILABLE
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE OTHER PIPELINE PERMANENT RIGHT OF WAY TEMPORARY WORKSPACE WATERBODY (ROSGEN SURVEY - THALWEG) FENCE TRACT BOUNDARY TEMPORARY MAT ROAD AND SPAN BRIDGE WETLAND ADDITIONAL TEMPORARY WORKSPACE TRACT ID ROSGEN SURVEY POINT - WATER SURFACE ROSGEN SURVEY POINT - RIVER BOTTOM (THALWEG)
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
*TRENCH IN PROFILE IS NOT TO SCALE (NTS)
AutoCAD SHX Text
MN-XX-XX-XXX.XXX
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE (NTS)*
AutoCAD SHX Text
WATER SURFACE
AutoCAD SHX Text
THALWEG
AutoCAD SHX Text
DRY CROSSING (NTS)
AutoCAD SHX Text
REVISION-DESCRIPTION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
BY
AutoCAD SHX Text
CHK'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DWN. BY:
AutoCAD SHX Text
PROJ. ENGR.
AutoCAD SHX Text
CLIENT APP.
AutoCAD SHX Text
PROJ. MGR.
AutoCAD SHX Text
CHK.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
FOR ENVIRONMENTAL REVIEW PURPOSES ONLY
AutoCAD SHX Text
IMAGERY
AutoCAD SHX Text
CHANNEL CROSS SECTION NOTE: 1. CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON CHANNEL LOCATIONS, DIMENSIONS, AND/OR ELEVATIONS ARE BASED ON TOPOGRAPHIC/BATHYMETRIC SURVEY(S), AND AS SUCH DO NOT REFLECT CHANGES TO THE CHANNEL THAT MAY HAVE OCCURRED SINCE THAT TIME
AutoCAD SHX Text
B-93-5.84-MDNR-67-S22D-0
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
PRIMARY METHOD - DRY CROSSING
AutoCAD SHX Text
CROSSING OF UNNAMED STREAM
AutoCAD SHX Text
ENBRIDGE MP 1126.2
AutoCAD SHX Text
CARLTON COUNTY, MINNESOTA
AutoCAD SHX Text
NOTED
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
0
AutoCAD SHX Text
ISSUED FOR PERMIT APPLICATION
AutoCAD SHX Text
AJJ
AutoCAD SHX Text
11/2018
AutoCAD SHX Text
BAB
AutoCAD SHX Text
BAB
AutoCAD SHX Text
2014
AutoCAD SHX Text
2018 SUMMER
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
100
AutoCAD SHX Text
50
AutoCAD SHX Text
0
AutoCAD SHX Text
25
AutoCAD SHX Text
A 2
AutoCAD SHX Text
A 1
AutoCAD SHX Text
B 1
AutoCAD SHX Text
B 2
AutoCAD SHX Text
955
AutoCAD SHX Text
965
AutoCAD SHX Text
975
AutoCAD SHX Text
955
AutoCAD SHX Text
965
AutoCAD SHX Text
975
AutoCAD SHX Text
-0+50
AutoCAD SHX Text
0+00
AutoCAD SHX Text
0+31
AutoCAD SHX Text
CHANNEL CROSS SECTION (B -B )B -B )1-B ))
AutoCAD SHX Text
B 2
AutoCAD SHX Text
B 1
AutoCAD SHX Text
965
AutoCAD SHX Text
970
AutoCAD SHX Text
965
AutoCAD SHX Text
970
AutoCAD SHX Text
-2+92
AutoCAD SHX Text
-2+00
AutoCAD SHX Text
-1+00
AutoCAD SHX Text
0+00
AutoCAD SHX Text
1+00
AutoCAD SHX Text
2+00
AutoCAD SHX Text
3+00
AutoCAD SHX Text
CHANNEL PROFILE (A -A )1-A )
AutoCAD SHX Text
A 1
AutoCAD SHX Text
A 2
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
MN-XX-XX-XXX.XXX
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
BANKFULL
AutoCAD SHX Text
969.45'
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
ADDITIONAL TEMPORARY WORKSPACE
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE
AutoCAD SHX Text
TEMPORARY MAT ROAD AND SPAN BRIDGE
AutoCAD SHX Text
WETLAND BOUNDARY
AutoCAD SHX Text
UNNAMED STREAM
AutoCAD SHX Text
PROPOSED ENBRIDGE L3R PIPELINE (NTS)*
AutoCAD SHX Text
WATER SURFACE
AutoCAD SHX Text
THALWEG
AutoCAD SHX Text
DRY CROSSING (NTS)