east werribeethe future of east werribee - vpa...launch presentation 20 n b 2012 delivering a...
TRANSCRIPT
The future of East Werribee East Werribee
E W ib Launch Presentation
20 N b 2012
East WerribeeDelivering a development ready 21st Century City
L h P t ti East Werribee Launch Presentation
20 November 2012Launch Presentation7 October 2013
Launch PresentationNeed updated image / cover
20 November2012
East WerribeeEast WerribeeSetting the new international benchmark
Why East Werribee?y
• Melbourne’s largest piece of underused Government owned land
• All the attributes to be a ‘city shaping’ model 21st century city
• Addresses shortfall of diverse employment in West
• Catalyst as major new business centre for Melbourne’s west:
• 58,000 jobs ultimately
• Upmarket and high density housing – 15,000 residents
• Government delivering long term, large scale national employment cluster with a significant private sector development project pipeline
• Opportunity to set the new international benchmark in urban planning innovation sustainability and city productivityplanning innovation, sustainability and city productivity
East Werribee Employment
East Werribee’s Strategic Locational AttributesEast Werribee Employment Precinct‐ 774 ha site (excluding Point Cook West)
‐ 25 km from Melbourne CBD25 km from Melbourne CBD‐ 3km of M1 Freeway frontage ‐ Served by rail line and stations
One of Australia’s fastest growing areas : ultimately around 1 m people in Region
E W ib D li i D l R d 21 t C CiEast Werribee – Delivering a Development Ready 21st Century City
Key requirements to enable development to startWe need ...
• Extensive stakeholder input & consultation on initial planning• Extensive stakeholder input & consultation on initial planning
• PSP and DCP approval to embed Master Plan in Planning Scheme
R i i t C L d ti t b k d• Remaining permanent Crown Land reservations to be revoked
• Key enabling road infrastructure funded to unlock site
• Streamlined Development Facilitation structures in place
• Exemplar integrated water cycle management strategy
• Feasibility and concept design study for new station
• First tranche major land parcels to be released to market
For over 20 years, numerous ideas and ‘plans’ proposed …
… Today, the Government has prepared an innovative, aspirational and exemplar Masterplan capable of implementation
Approval of East Werribee Employment PSP & DCP
Precinct Structure Plan (PSP)• 21st century mixed use city
• 58,000 jobs – 356 ha employment land
Development Contributions Plan (DCP)• $160 m total levies – GAA Collection Agency
• $35 m – roadworks with bike paths (~10 km)$ i i ( 8)• 7,000 homes – 143 ha residential
• 167 hectares open space (22% of site)
• Innovative governance structures
• $51 m – intersections (18)• $39 m – bridges and culverts (14)• $15 m - recreation facilities• $9 m - community facilities• $5 m - shared trails (20 km)NVPP and GAIC
• Native Vegetation Precinct Plan
• $5.8m in biodiversity offsets
GAIC $9 6 • GAIC - $9.6 m
East Werribee Employment PSP – Future Urban Structure
East Werribee Master Plan – A fully integrated cityHealth & Learning Hub – 119 haHealth & Learning Hub – 119 hag
• 17,900 jobs / 800 dwellings
• Intensification of existing high quality health & educational uses, & new related uses
g• 17,900 jobs / 800 dwellings
• Intensification of existing high quality health & educational uses, & new related uses
East Werribee Town Centre – 25 ha• 13,900 jobs / 1,100 dwellings
• Retail, entertainment & high rise commercial / apartments
East Werribee Town Centre – 25 ha• 13,900 jobs / 1,100 dwellings
• Retail, entertainment & high rise commercial / apartments
C i l H b 93 hC i l H b 93 h
Interchange Business Hub – 53 ha• 5,500 jobs
• Commercial & clean industries leveraging off freeway exposure
Interchange Business Hub – 53 ha• 5,500 jobs
• Commercial & clean industries leveraging off freeway exposure
commercial / apartmentscommercial / apartments
Commercial Hub – 93 ha• 17,500 jobs / 1,100 dwellings
• Offices, civic, convention, clean research & technology based industries & apartments
Commercial Hub – 93 ha• 17,500 jobs / 1,100 dwellings
• Offices, civic, convention, clean research & technology based industries & apartments
g g y pg g y p
industries & apartmentsindustries & apartments
Enterprise Hub – 66 ha2 600 j b
Enterprise Hub – 66 ha2 600 j b
3 Residential Communities – 143 ha4 100 hi h li d lli
3 Residential Communities – 143 ha4 100 hi h li d lli • 2,600 jobs
• Commercial & clean industrial uses, & potentially high intensity horticultural uses
• 2,600 jobs
• Commercial & clean industrial uses, & potentially high intensity horticultural uses
• 4,100 high quality dwellings
• Range of dwelling / density
• 4,100 high quality dwellings
• Range of dwelling / density
Building blocks for delivering this new form of 21st Century City
Delivering an unencumbered site: Revoking Permanent Crown Land
• Most of site west of Freeway is • Most of site west of Freeway is • Most of site west of Freeway is currently Permanently Reserved
• Bill being prepared to revoke remaining permanent reservations
• Most of site west of Freeway is currently Permanently Reserved
• Bill being prepared to revoke remaining permanent reservationsremaining permanent reservations
• Balance of site is Temporary Reserved Crown Land that can be changed through other processes
remaining permanent reservations
• Balance of site is Temporary Reserved Crown Land that can be changed through other processesg g pg g p
Expanding on today’s 2,000 high tech jobs in renowned organisations
• CSIRO
• Werribee Mercy Hospital
• St Vincent’s Private Hospital
• CSIRO
• Werribee Mercy Hospital
• St Vincent’s Private Hospital • St Vincent s Private Hospital (proposed)
• South Stone Lodge
• Wyndham Private Medical
• St Vincent s Private Hospital (proposed)
• South Stone Lodge
• Wyndham Private Medical
• University of Melbourne – Vet School
• Victoria University
f h l
• University of Melbourne – Vet School
• Victoria University
f h l• University of Notre Dame School of Medicine
• Suzanne Cory Select Entry School
• Agrifood Technology
• University of Notre Dame School of Medicine
• Suzanne Cory Select Entry School
• Agrifood TechnologyAgrifood Technology
• Incitec Pivot
• National Centre for Dairy Education
Agrifood Technology
• Incitec Pivot
• National Centre for Dairy Education
• Victoria Police
• Recent and planned investments exceed $200 million
• Victoria Police
• Recent and planned investments exceed $200 millionexceed $200 millionexceed $200 million
Addressing today’s flooding impacts through …
dd• Significant reduction in area at risk from flooding
• Significant reduction in area at risk from flooding
The delivery of an exemplar innovative new water strategy
• Significant reduction in area at risk from flooding
• Significant reduction in area at risk from flooding
• 66 ha of lakes, basins and linear waterway parks
• 66 ha of lakes, basins and linear waterway parks
The delivery of an exemplar innovative new water strategy
I ti IWCM St tI ti IWCM St tInnovative IWCM Strategy:• Storm water harvesting
• Aquifer storage & retrieval
Innovative IWCM Strategy:• Storm water harvesting
• Aquifer storage & retrieval• Significant reduction in
area at risk from flooding• Significant reduction in
area at risk from flooding• Flood management and
‘smart’ lake system
• Rainwater harvesting
• Recycled wastewater
• Flood management and ‘smart’ lake system
• Rainwater harvesting
• Recycled wastewater
• 66 ha of lakes, basins and linear waterway parks
• 66 ha of lakes, basins and linear waterway parks
• Recycled wastewater
• Best practice water quality targets
• Water sensitive urban
• Recycled wastewater
• Best practice water quality targets
• Water sensitive urban Water sensitive urban design
• ‘Greening’ the west
Water sensitive urban design
• ‘Greening’ the west
• Extensive involvement of:• Office of Living Victoria
• Melbourne Water
Cit W t W t
• Extensive involvement of:• Office of Living Victoria
• Melbourne Water
Cit W t W t• City West Water
• Southern Rural Water
• Health and EPA
• Wyndham Council
• City West Water
• Southern Rural Water
• Health and EPA
• Wyndham Council
Innovatively managing site’s water assets in line with Government’s Melbourne’s Water Future Policyy
Delivers a ‘water positive’ result
And delivering the Town Centre lake as the Precinct’s ‘centre piece’
Designing high quality open space around site’s water system & features
To deliver expansive open space network – 167 ha (22%)
• Extensive recreational opportunities for workers, visitors & residents • Extensive recreational opportunities for workers, visitors & residents pp ,
• 4 major nodes, all fully interconnected by trails, ‘loops’, paths and roads• Regional sports field & indoor sports centre at Point Cook SW (1)
• New district sports fields at Wattle Village (2) and University Village (3)
pp ,
• 4 major nodes, all fully interconnected by trails, ‘loops’, paths and roads• Regional sports field & indoor sports centre at Point Cook SW (1)
• New district sports fields at Wattle Village (2) and University Village (3)p g ( ) y g ( )
• Heritage Park / Botanic Gardens (4)
p g ( ) y g ( )
• Heritage Park / Botanic Gardens (4)
3
41
4
2
State Research Farm – Reflecting the History at EWEP
Creating the State Research Farm Heritage Park & Botanic GardensHeritage Park & Botanic Gardens
• Located in heart of Town Centre • Like Treasury Gardens, Flagstaff Gardensy , g
• Permanent History Interpretative Centre and event spaces, blending into landscape towards Lake systemp y
• Around 11 ha in area, including: • 6 ha in Heritage Park, 5 ha in Botanic Gardens
• GAA preparing Adaptive Reuse Study and Master Plan with Wyndham Council
Elements of road based transport network as structural framework
• Princes Hwy & Freeway Access• Princes Hwy & Freeway AccessPrinces Hwy & Freeway Access
• 10 km of boulevards & avenues
• Interconnects all Precinct’s internal hubs and nodes
Princes Hwy & Freeway Access
• 10 km of boulevards & avenues
• Interconnects all Precinct’s internal hubs and nodes
Connectivity ensures full integration with wider area
• Fully connects to surrounding • Fully connects to surrounding Fully connects to surrounding areas:• Werribee City Centre
• Werribee
Fully connects to surrounding areas:• Werribee City Centre
• Werribee
• Hoppers Crossing
• Point Cook
• Werribee South
M iti i t f
• Hoppers Crossing
• Point Cook
• Werribee South
M iti i t f• Manages sensitive interfaces• Manages sensitive interfaces
Delivering high quality active, healthy walking & cycling network
10 k ‘d di t d ff d’ bik th 10 k ‘d di t d ff d’ bik th • 10 km ‘dedicated off road’ bike paths on all major arterials
• Over 20 km off road shared paths
• Bike paths / lanes on connector roads
• 10 km ‘dedicated off road’ bike paths on all major arterials
• Over 20 km off road shared paths
• Bike paths / lanes on connector roads• Bike paths / lanes on connector roads
• Links all parts of the Precinct & surrounding areas and to public transport system
• Bike paths / lanes on connector roads
• Links all parts of the Precinct & surrounding areas and to public transport system
Served by an extensive, accessible public transport network
• 85% of jobs within 1 km of an existing • 85% of jobs within 1 km of an existing • 85% of jobs within 1 km of an existing or potential station on Werribee line
• 100% of jobs & homes within 400m of a bus capable road
• 85% of jobs within 1 km of an existing or potential station on Werribee line
• 100% of jobs & homes within 400m of a bus capable road
• Adaptable to different transport modes• Adaptable to different transport modes
Existing Station
Proposed Station
Feasibility study for potential Derrimut Road Station
P d St tiProposed Station
• Feasibility Study and Concept Design for potential Derrimut Road t ti b i d
• Feasibility Study and Concept Design for potential Derrimut Road t ti b i dstation being prepared
• Directly serve East Werribee employment precinct and existing
station being prepared• Directly serve East Werribee
employment precinct and existing residential areasresidential areas
Delivering key transport infrastructure: $72m committed to date
Delivering new Sneydes Road Interchange – Full Diamond
• State Government has committed $40m to construct full diamond interchange in
• State Government has committed $40m to construct full diamond interchange in gone stage
• Connecting to both Melbourne and Geelong
gone stage
• Connecting to both Melbourne and Geelongand Geelongand Geelong
Delivering new Sneydes Road Interchange – Full Diamond
$40 i d $40 i d • $40m committed to construct full diamond interchange
• Design & construct tender to be released this month
• $40m committed to construct full diamond interchange
• Design & construct tender to be released this month
• Construction over ~2 years
• Open in 2015/16
• Construction over ~2 years
• Open in 2015/16
Delivering upgrade to Sneydes Rd-Princes Hwy Intersection
Delivering upgrade to Sneydes Rd-Princes Hwy Intersection
$4 6m committed to upgrade and signalise existing $4 6m committed to upgrade and signalise existing • $4.6m committed to upgrade and signalise existing Princes Highway - Sneydes Rd intersection
• VicRoads preparing detailed designs & costing
• Working with Wyndham Council
• $4.6m committed to upgrade and signalise existing Princes Highway - Sneydes Rd intersection
• VicRoads preparing detailed designs & costing
• Working with Wyndham Council• Working with Wyndham Council
• Construction during 2014 to 2016
• Working with Wyndham Council
• Construction during 2014 to 2016
Delivering upgrade to Sneydes Rd-Princes Hwy Intersection
$4 6m committed to upgrade and signalise existing $4 6m committed to upgrade and signalise existing • $4.6m committed to upgrade and signalise existing Princes Highway - Sneydes Rd intersection
• VicRoads preparing detailed designs & costing
• Working with Wyndham Council
• $4.6m committed to upgrade and signalise existing Princes Highway - Sneydes Rd intersection
• VicRoads preparing detailed designs & costing
• Working with Wyndham Council• Working with Wyndham Council
• Construction during 2014 to 2016
• Working with Wyndham Council
• Construction during 2014 to 2016
Delivering upgrades to Sneydes Road
$12 4m committed to upgrade Sneydes Road to $12 4m committed to upgrade Sneydes Road to • $12.4m committed to upgrade Sneydes Road to link interchange to Werribee City Centre
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council
• $12.4m committed to upgrade Sneydes Road to link interchange to Werribee City Centre
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council• Working with Wyndham Council
• Construction during 2014 to 2016
• Working with Wyndham Council
• Construction during 2014 to 2016
To be first stage of Melbourne’s newest grand Boulevard
$12 4m committed to upgrade Sneydes Road to $12 4m committed to upgrade Sneydes Road to • $12.4m committed to upgrade Sneydes Road to link interchange to Werribee City Centre
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council
• $12.4m committed to upgrade Sneydes Road to link interchange to Werribee City Centre
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council• Working with Wyndham Council
• Construction during 2014 to 2016
• Working with Wyndham Council
• Construction during 2014 to 2016
Sneydes Road Boulevard - The key ‘gateway’ to East Werribee and Werribee City Centre
Grand tree-lined boulevard over 3.5km long as central unifying g y gspine through the precinct, linking Point Cook & East Werribee through to Werribee City Centre
Opportunity to reflect & honour site’s proud research farm history
Delivering upgrade to Princes Hwy - Hoppers Lane Intersection
Delivering upgrade to Princes Hwy - Hoppers Lane Intersection
$9 6m committed to upgrade and improve existing $9 6m committed to upgrade and improve existing • $9.6m committed to upgrade and improve existing Princes Highway-Hoppers Lane intersection
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council
• $9.6m committed to upgrade and improve existing Princes Highway-Hoppers Lane intersection
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council• Working with Wyndham Council
• Construction during 2014 to 2016
• Working with Wyndham Council
• Construction during 2014 to 2016
Delivering upgrade to Princes Hwy - Hoppers Lane Intersection
$9 6m committed to upgrade and improve existing $9 6m committed to upgrade and improve existing • $9.6m committed to upgrade and improve existing Princes Highway-Hoppers Lane intersection
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council
• $9.6m committed to upgrade and improve existing Princes Highway-Hoppers Lane intersection
• VicRoads preparing detailed designs & costings
• Working with Wyndham Council• Working with Wyndham Council
• Construction during 2014 to 2016
• Working with Wyndham Council
• Construction during 2014 to 2016
To be the key ‘entry point’ from Princes Highway
New secondary access points will also open up the Precinct to Princes Highway, and provide vistas into the lakes and parks
Development Facilitation- Innovative governance structure t f ilit t k ti lto facilitate a key nationalemployment precinct
• Close governance relationship with GAA & Wyndham Councilf l d l• State Government commitment to facilitate major development
with Planning Minister as ‘Responsible Authority’ (admin. by GAA) for projects:• ≥ 3 storeys
• ≥ 30 dwellings
• > 2 000 sqm floor area • > 2,000 sqm floor area
• > $2.0m cost
• Development and infrastructure d lcoordination role: GAA
• DCP Collection Authority: GAA
Land Realisation: Delivering high quality land to the market
Land Realisation: Delivering high quality land to the market
Point Cook West PSP AreaPoint Cook West PSP AreaPoint Cook West PSP Area• >$100m sold to Satterley in May 2013
Point Cook West PSP Area• >$100m sold to Satterley in May 2013
• Town Centre & Lake Development Parcel• Town Centre & Lake Development Parcel
Land Package 1: Town Centre & Lake Development Parcel
• Town Centre & Lake Development Parcel• ~125 hectares gross
• ~82 hectares net developable
• Includes new major town centre, commercial
• Town Centre & Lake Development Parcel• ~125 hectares gross
• ~82 hectares net developable
• Includes new major town centre, commercial j ,development, civic & community uses, justice precinct, convention centre, entertainment & residential opportunities
• Focussed around Lake , Heritage Park and Boulevards
j ,development, civic & community uses, justice precinct, convention centre, entertainment & residential opportunities
• Focussed around Lake , Heritage Park and Boulevards
• Excellent accessibility
• Strong integration with Werribee City Centre
• Excellent accessibility
• Strong integration with Werribee City Centre
E i f I t t E i f I t t
Land Package 1: Town Centre & Lake Development Parcel
• Expression of Interest to be called soon
• Expression of Interest to be called soon
Land Package 1: Offers opportunity to create new heart
E i f I t t E i f I t t • Expression of Interest to be called soon
• Expression of Interest to be called soon
P d St tiProposed Station
Integration with Werribee City CentreIntegration with Werribee City CentreProposed Convention Centre
Eastern Gateway SiteEastern Gateway Site
Land Package 2: Eastern Gateway Site
• Eastern Gateway Site• 14 hectares gross
• 10 hectares net developable
• Eastern Gateway Site• 14 hectares gross
• 10 hectares net developable
• Includes new medical and educational, commercial & retail opportunities
• Integration with Hoppers Crossing
• Includes new medical and educational, commercial & retail opportunities
• Integration with Hoppers Crossing g pp gTown Centre and Station, and Health & Learning Precinct
g pp gTown Centre and Station, and Health & Learning Precinct
Sale of Eastern Gateway SiteSale of Eastern Gateway Site
Land Package 2: Eastern Gateway Site
• Sale of Eastern Gateway Site• 14 hectares gross
• 10 hectares net developable
• Sale of Eastern Gateway Site• 14 hectares gross
• 10 hectares net developable
• Includes new medical and educational, commercial & retail opportunities
• Integration with Hoppers Crossing Town Centre and Station, and Health & Learning Precinct
• Includes new medical and educational, commercial & retail opportunities
• Integration with Hoppers Crossing Town Centre and Station, and Health & Learning Precinct, g, g
• Preparation work fully underway to bring land to the market for sale
• Preparation work fully underway to bring land to the market for salebring land to the market for salebring land to the market for sale
And finally a name … current ‘patchwork’ of SuburbsTruganina - 3029Truganina 3029
Hoppers Crossing - 3029Point Cook - 3030
ib S h 3030
Werribee - 3030
Werribee South - 3030
Minister’s Announcement – New Suburb of “East Werribee”TruganinaTruganina
Hoppers CrossingPoint Cook
Werribee
ib S hWerribee South
Builds on Werribee’s history with strong local supportTruganinaTruganina
Hoppers CrossingPoint Cook
WerribeeWerribee
W ibWerribee Werribee South
Requirements now met to enable development to start
• Stakeholder input and consultation on planning completed
• Close ongoing working relationship with Wyndham Council
• PSP & DCP approval – in Wyndham Planning Scheme
• Proposed Bill to revoke remaining permanent Crown Land
• Key first road infrastructure and planning funded ($72 million)
• All delivered in 2015/2016
• Streamlined Development Facilitation structures in place
• Exemplar integrated water cycle management p g y g
• Feasibility study for potential new train station underway
• Site remediation studies being prepared Site remediation studies being prepared
• First tranche major land parcels soon to be released to market
• Business Attraction Strategy being prepared with Wyndham • Business Attraction Strategy being prepared with Wyndham
East Werribee - setting the new international benchmark
The Capital of Melbourne’s New West p f
Further Information and Registration of Interest
Peter SeamerPeter SeamerChief Executive [email protected] 9616
Paul ByrneDirector, Economic Planning & Development, g p
9651 9631 0400 045 702
M tt SMatt SnowDevelopment Manager
9651 9618
Stuart MilesStructure Planning Manager
[email protected] 9618
www.gaa.vic.gov.au
9651 9624
Nick PowerSenior Urban Planner – Approvals g g
9651 9600Senior Urban Planner Approvals
9651 9622
The future of East Werribee East Werribee
E W ib Launch Presentation
20 N b 2012
Delivering a development ready 21st Century City
7 October 2013 East Werribee Launch Presentation
20 November 20127 October 2013
Launch PresentationNeed updated image / cover
20 November2012