easygrow assembly
DESCRIPTION
EasyGrow Greehouse (6x8) assembly instructions.TRANSCRIPT
Easy2BuildTM
Smart Tech solutions
7Str
ucture
10
6’ x 8’ Easy-Grow Greenhouse
Assembly Instructions
Systems Trading Corporation450 7th Avenue Suite 2809, New York, NY 10123
Customer Service: (877) 407-9100 ext 1 Email: [email protected]
PC SHELL
Introduction
Before Starting Assembly:
5. Make sure you have the proper tools:
After choosing a location, proper preparation of the site is essential. The site must be level. If the site is not level, create a base slightly larger than the outside dimensions of the greenhouse using a perimeter of two by fours filled with either soil, sod or gravel. Make sure the base is square by measuring the diagonals from both sides and making sure they are equal. The greenhouse is secured from the inside with pegs into holes cast with concrete. See step16 for details. If you decide to have a concrete base it is best to contact a reliable contractor to ensure it is flat and level.Make sure you have checked with your local authorities regarding any required building permits.
When selecting a site for your greenhouse, a flat level area is essential and if possible, with proper water drainage and easy access to power and water necessary for greenhouse gardening. Choose a sunny, level position away from overhanging trees and power lines and protected from the wind as much as possible. The location should be away from structures that could cause snow to drift on or around the greenhouse. Locate underground pipes or cables before preparing the site or anchoring the greenhouse.Note: You may assemble the greenhouse on a hard level surface and move it to its final position when finished. Make sure there are no obstacles between the assembly area and the final position.
Thank you for purchasing your Easy2BuildTM 6x8 Easy-Grow Greenhouse. When properly assembled and maintained, this greenhouse will provide years of enjoyment.
The List of Parts has the corresponding step number referenced to each part. We recommend that while you go through the list, make staging areas for each step and place the parts necessary for each step in these areas. This will save you time and effort during assembly
2. Lay the parts out in separate staging areas:
3. Select a Location:
4. Prepare a Foundation:
1. Make sure you have all the necessary parts:Compare the contents of the two cartons to the List of Parts. If any parts are missing or damaged or you have any questions, please contact customer service by phone at (877) 407-9100 ext: 2 or by email at [email protected] before beginning assembly.
NOTE: A cordless drill with Phillips head bit is highly recommended but not essential.
Tape MeasureWork GlovesSafety GogglesPhillips Screwdriver Spirit Level
Small Step LadderWooden MalletLiquid Soap or WD40 LubricantScissorsHex Key (included)
•••••
•••••
1 of 51 www.stcny.com
This greenhouse has been designed with patented technology to be easily assembled. All but one step can be completed by one person. You will need assistance from another person to attach the roof. Although the greenhouse can be assmebled in six to eight hours, we recommend to take your time and make it a weekend project.
These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse. Please carefully read these instructions completely before you begin.
CAREFULLY READ ALL INSTRUCTIONS BEFORE YOU BEGIN AND FOLLOW THE STEPS IN THE ORDER THEY ARE PRESENTED.
General Order of AssemblyStep 1: Assemble BackStep 2: Assemble DoorStep 3: Assemble FrontStep 4: Assemble SidesStep 5: Prepare ShelvesStep 6: Connect Sides to BackStep 7: Connect Sides to FrontStep 8: Assemble and Connect GablesStep 9: Brace SidesStep 10: Assemble and Install Roof VentStep 11: Install Circular VentStep 12: Install Side and Roof PanelsStep 13: Weather StrippingStep 14: Install Trim PlatesStep 15: Weather Strip and Hang DoorStep 16: Secure to Ground Step 17: Install Trays and Bin Holder
Introduction ......................................... Safety Advice .......................................General Order of Assembly ............List of Parts ...........................................Assemble Back ....................................Assemble Door ...................................Assemble Front ..................................Assemble Sides ...................................Prepare Shelves ..................................Connect Sides to Back ......................Connect Sides to Front .....................Assemble and Connect Gables ......Brace Sides ............................................Assemble and Install Roof Vent .....Install Circular Vent ...........................Install Side and Roof Panels ............Install Weather Stripping ................Install Trim Plates ................................Weather Strip and Hang Door ........Secure to Ground ................................Install Trays and Bin Holder .............
1
3
4
9
5
8
13
12
11
14
15
16
17
10
6
7
2
Safety AdviceThe greenhouse must be positioned and fixed on a flat level surface.Dispose of all plastic bags safely. Keep them out of the reach of small children. Keep children and pets away from the assembly area until the work is completed.Always wear shoes, gloves and safety goggles when working.In manufacturing all sharp edges and burs have been removed but caution should still be taken when handling metal parts.Do not lean against or push the greenhouse during assembly.Take special care not to touch overhead power lines with the aluminium profiles.Do not attempt to assemble the greenhouse in windy or wet conditions.Do not position your greenhouse in an area exposed to excessive wind.If using power tools or a step ladder always follow the manufacturers safety instructions.Hot items such as recently used grills, blowtorches etc. must not be stored in the greenhouse.Store the polycarbonate panels in a cool dark place like a garage until you are ready to use them.Make sure the greenhouse complies with local building codes.
Table of Contents
2 of 51 www.stcny.com
1223614172530313336404244454648495051
L14A
L14C
L14D
2
2
2
Step 5
L14B 2 Step 5
Step 5
Step 5
L05A
L05C
L05D
L05DL05E
2
1
2
1
1
Step 1
Step 1
Step 3
Step 10
Step 2
L05B
L06A
L06C 1
1 Step 3
L08A 1 Step 8
L10A 1 Step 10
L11A 1 Step 10
L12A 2 Step 10
L06B 1 Step 3
L07A 2 Step 4
L07B 2 Step 4
Step 3
Profile QTY
L01A
L02A
L02CL02DL02EL02FL02G
1
1
2
2
111
1
4
Step 3
Step 3 Step 3
Steps 1,3 L02B 2 Steps 1,3
Step 1
Step 1 Step 1
Step 8
L03A
L03CL03D
L03FL03E
L03G
1
2
1
131
Step 8 Step 8
Step 4 L03B 4 Step 4
Step 1 Step 1
L04A
L04CL04DL04E
2
2
22 Step 17
L04F 2 Step 1
Step 3 L04B 2 Step 4
Step 4 Step 4
Step 8 L03H 1 Step 8
Step 4
L01B
L01C
Profile QTY
L13A 2
1
1
Step 2
Step 2
Step 2
L13B
L13C
3 of 51 www.stcny.com
List of Parts
!The greenhouse is shipped in two cartons. These cartons are heavy. Be careful when lifting them.Wear proper safety gear including work shoes, gloves and goggles.The parts are identified by removable stickers. Place all the parts for each step in staging areas, checking that you have all parts as you go.If any parts are missing or damaged, contact STC customer service before beginning assembly:Customer Service: (877) 407-9100 ext. 1 or email: [email protected]
Connector QTY
4
2
2
Steps 1,3
Steps 1,3
2 Steps 1,3
2 Steps 1,3
Step 4
S05
S09
S10
S04
S03
2 Step 4 S19
2 Step 4 S39
1 Step 8 S21
1
6 Steps 2,3
Step 3
1 Step 1
S28
S18
S12
Panel QTY
2 Step 1
1 Step 1
Y1
2 Step 3 Y7
2 Step 2 Y15
Y2
1 Step 1 Y3
1 Step 3 Y5
1 Step 3 Y6
1 Step 3 Y8
2 Step 1 Y4
4 Step 12 Y9
4 Step 12 Y10
4 Step 12 Y11
3 Step 12 Y12
1 Step 12 Y13
1 Step 10 Y14
4 of 51 www.stcny.com
L09A 2 Step 14
L09B 2 Step 14
J02L 2 Step 14
J02R 2 Step 14
J03 2 Step 14
J04 1 Step 14
J01rubberstripping
63M Steps 13,15
Trim Plate QTY
circular vent
vent frame
plastic nut 4
1 Step 11
1 Step 11
Step 11
Vent QTY
1S25 Step 10
Roof Vent Handle QTY
Steps 1,3,9 Hex Key
S06
S07
S16
L15A
S23
4
1
1
24 Steps 1,3,9
Steps 1,3
8
3 Step 8
Step 9
Step 2
Bracing Parts QTY
Connector QTY
16
6
2
Steps 1,4
Step 1
1
Step 3
Step 3
1
Steps 1,3,4
S11
S17L
S17R
S08
S01
12 Steps 5,16 S37
2 Step 8
4 Step 4
S22
S20
Connector QTY
124
9
9
Steps 1,2,10
Steps 1,2,10
Step 10
4 Step 17
Steps 1,2,3,4,8
S13
2
S14
S24
Step 10 1S24A
Step 10 4S26
S36
S02
6
6
S34
S35
Step 16
Step 16
Anchor Clip and Peg QTY
5 of 51 www.stcny.com
20J05 Step 17
Shelf Trays QTY
Door Handle QTY
S29S30S31S32S33
2
1 Step 2 Step 2 Step 2 Step 2 Step 2
1
11
Assemble Back
1.1A
1.2A
Secure with S02 screws.1.1B
Secure each S01 connector with two S02 screws.
1.2B
28”(711 mm)
L02BL02A
S01
QTY
46
#S01#S02
QTY
111
1 #L03C#L03D
Profile ConnectorQTYProfile
#L02A#L02B
Line up bottom hole on short side of connectors S01 with hole on side of profiles L03C and L03D.
Slide short side of connector S01 into channels of profiles L02A and L02B.Line up last hole on connector S01 with hole in each profile.
28”(711 mm)
L03C L03D
S01
S02
S02
!Lay out all the parts for the back face in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
! The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
IMPORTANT: The holes are not at the midpoint of the profile. Arrange profile so the 28” portion will be the bottom when standing.
6 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
1.3A
1.3B Secure with four S02 screws.
QTYQTY
2#L04F
Profile Screw
4#S02
L02B
L03DL02B L03C
L04F
L04F
L02A
L03C
L04F
L03D
L04F
L02A
Attach profiles L02B and L03C to profile L04F by sliding the long sides of connector S01 into channels lining up last hole in S01 with holes in profile L04F. Attach profiles L03D and L02A to profile L04F by sliding the long side of connector S01 into profile channels lining up last hole of S01 with holes in L04A.
7 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
Slide connectors S08 into channels of profiles L03C and L03D. 1.4A
1.5
1#S05#S04
QTYQTY
1
Connector ConnectorQTY
1#L01B
Profile
QTY
42
#S02#S08
Connector
S05
S04
L01B
S04
L01B
S05
L01B
Slide connectors S04 and S04 into profile L01B until they securely click into place.
Secure with four S02 screws.1.4B
8 of 51 www.stcny.com
L02B L03C
S08
S08
S08
S02
L03D
L02A
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
1.6A
1.7A
Carefully line up connector S04 with profile L02B and connector S05 with profile L02A. Slide profile L01B half way into place. Continue sliding until connectors S04 and S05 click securely into profiles.
QTY
4#S02
Screw
S13
S14
L01B
S02
Line up holes on connectors S08 with holes in profile L01B and secure with four S02 screws.
Slide hex bolt S13 into channels of profiles L05A and L05B as shown.
Screw hex nut S14 onto bolt. Do not completely tighten.
1.6B
1.7B
QTYQTY
21
#L05A#L05B
Profile Bolt/Nut
44
#S13#S14
L05B
L05B
L05A
L05A
9 of 51 www.stcny.com
S04
S05
L01B
L02B
L03CL03D
L02A
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
1.8A
1.8B
1.8C
L05A
L05A
L05B
Y1
Y1
Y1
Y1
Y2
Y2
L02B
L03C
L03DL02A
1
QTY
1
QTY PanelPanel
2
2
#Y1
#Y2
#Y3
#Y4
Remove protective plastic from both sides of panels Y1, Y2, Y3 and Y4. Place side to face toward the sun facing down. Fit panels Y1 and Y2 into bottom channel of profiles L05Aand L05B.
Slide panels into V-channels on profiles L0A, L02B, L03C and L03D.
Slide panels Y3 and Y4 into V-channels on profiles L0A, L02B, L03C and L03D. Fit inside channels on profiles L05A and L05B.
Y3
Y4
Y4
Y1
Y1
Y2
10 of 51 www.stcny.com
Remove protective plastic from EACH side of poly carbonate panels before installing. Dispose of plastic properly. Install with side labeled “Face this side towards the sun” FACING DOWN.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
L05A
L05B
L05A
1.9
1.10A
Slide hex nut S14 and hex bolts S13 into U-cutout in both sides ofprofiles L03C and L03D. Tighten securely to hold in place.
QTY
1#S12
ConnectorQTY
1#S09
QTY QTY
1#S10
ConnectorConnectorProfile
11#L02C
#L02D
L05A
L05AL05B
L03CL03D
11 of 51 www.stcny.com
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
Slide profiles L02C and L02D into connectors S09, S10 and S12 until they click into place.
L02C
S09
S10
L02D
L02C L02D
S12Connectors S09, S10 and S12 CLICK into place.
IMPORTANT: The holes are not at the midpoint of the profiles. Arrange profile so the 24.5” portion will be the bottom when standing.
24.5”(623 mm)
24.5”(623 mm)
S09
L02DL02C
S10
S12
1.11A Place connectors S11 onto profiles L02C and L03C and L02D and L03C matching up all holes.
Screw S02 screws partially into bottom two holes. Do not tighten.
Screw S02 screws into top two holes. Tighten all screws. Repeat for both sides.
1.11C
1.11B
QTY
82
#S02#S11
Connector
12 of 51 www.stcny.com
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
Slide connectors S09 and S10 half way into profiles L02A and L02B. Continue sliding together making sure panels Y3 and Y4 fit into V-channels of profiles L02C and L02D. Connectors click securely into profiles.
S11
S02
S02
S10
L02A
S09
L02B
Connectors S09 and S10 CLICK into place.
1.10B
L02C
L02B
L02A
L02D
S09
S10Y4
Y4
Y3
L03C
L03D L02D
L02C
S02
S02
1.13
Insert long side of cable connector S06 into profile channel L02B with hook facing up. Slide connector to other side of channel. Use hex key to securely tighten and hold in place.
Repeat step 1.12 inserting cable connectors S06 into profiles L02A and L01B. Cable rests next to panelY1 and behind profile L04F. Slide connector until profile corners are square and cable is tight. Securely tighten second connector to hold in place.
2#S16#S06
QTYQTY
4
Cable Connector CableQTY
1
Hex Key
L02B
L04F
L04F
L01B
L02A
1.12A
1.12B
Y1
Y1
13 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
Attach one side of short cable S16 to hook and lace under profile L04F. Attach other side of cable to another S06 cable connector. With hook facing the center, insert connector into profile channel L01B and push towards center until profile corners are square and cable is tight. Use hex key to securely tighten and hold in place.
Assemble Door
2.1A
2.2
Slide three hex bolts S13 into channel of profile L05E.
Screw two S14 hex nuts onto bolt on each end. Do not completely tighten.
2.1B
QTYPanel
2#Y15
QTYQTY
1#L05E
Profile Bolt/Nut
32
#S13#S14
L05E
L05E
L05E
L05E
S13
S14
!Lay out all the parts for the door in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
! The door is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
Y15
Y15
Remove protective plastic from both sides of panels Y15. Place side to face toward the sun facing down. Fit panels into channels of profile L05E.
14 of 51 www.stcny.com
Remove protective plastic from EACH side of poly carbonate panels before installing. Dispose of plastic properly. Install with side labeled “Face this side towards the sun” FACING DOWN.
!
NOTE: ALL VIEWS ARE FROM INSIDE.
2.3
2.4A
2.4B Secure connectors with six S02 screws.
Slide hex nuts and bolts into U-cutout in side of profiles L13B and L13C. Tighten securely to hold in place.
Place door profiles L13A, L13B and L13C next to connectors S28 around Y15 panels as shown. Slide connectors into profiles. Make sure panels and profile L05E fit into V-channels of each profile. S28 connectors will be secured to profiles in Step 2.4
L13BL13A L13B
L13C
L13A
L13A
S28
NOTE: The holes at the top of profile L13B and the bottom left corner of profile L13A will be secured in Step 2.5.
!
L13AL13C
#S28
QTY
4#S02
QTY
611
2Screw ConnectorQTYProfile
#L13A#L13B#L13C
15 of 51 www.stcny.com
L13BL13A
L13C
L13A
S28
S28
S28
S28
Y15
Y15
Y15
Y15
NOTE: ALL VIEWS ARE FROM INSIDE.
2.5
NOTE: Connectors packaged as Door Handle Kit.
Slide washer S32 into groove on pin S29 to hold securely in place.
Hook one side of spring S33 into hole on handle S30. Hook the other side into pin hole on profile L13C.
Place brace L15A onto door lining up the holes on each end with the holes in profiles L13A and L13B. Slide hex bolt so it fits through hole in brace. Secure brace with two S02 screws and S14 hex nut.
2.6B
2.6C
S14
IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn brace until all holes line up. Brace will dip slightly when hex bolt is secured.
2.6A Open door handle kit and remove parts. Slide pin S29 through handle S30, washer S31and hole in profile L13C into washer S31.
S32L13C
L13C
S33
QTYScrew/Nut
21
#S02#S14
QTYBrace
1#L15A
16 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
S29
S30
S31 S31
L13C
1
QTY
2QTY
Connector
Connector
1
1
#S29
#S30
#S31
#S32
#S33
1
L13A
L13A
L13B
L13C
L15A
Assemble Front
Lay out profiles L02A, L02B, L06A and L06B so all holes line up. Slide short side of connector S01 into channels of profiles L02A, L02B, L06A and L06B.
Line up lower hole on connector S01 with hole in each profile and secure with S02 screws.
28”(711 mm)
L06B L06A
L06BL06A
28”(711 mm)
L02BL02A
L02B
L02A
L06A
S01
L02A
S01
L02B
S01
L06B
S01
! The front is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
!Lay out all the parts for the front face in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
IMPORTANT: The holes are not at the midpoint of the profile. Arrange profile so the 28” portion will be the bottom when standing.
3.1A
3.1B
17 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
44
#S01#S02
QTY
111
1 #L06A#L06B
Profile ConnectorQTYProfile
#L02A#L02B
3.3A
3.3B
S28 S28
L06BL06A
L06C
Secure with four S02 screws.
Attach profiles L02B and L06B to profile L04A. Slide long sides of connectors S01 into channels of profile L04A, lining up last hole in S01 with holes in profile L04A. Attach profiles L06A and L02A to profile L04A. Slides long side of connectors S01 into channels of profiles L04A, lining up last hole of S01 with holes in L04A.
L02B
L02A
L06B
L06A
L04A
L04A
L02B
L02A
L06B
L06A
L04A
L04A
QTYQTY
2#L04A
Profile Screw
4#S02
S28
3.2A Slide profiles L06C into L06A and L06B using connectors S28. S28 connectors do not snap into place.
Secure each connector with two S02 screws.
3.2B Place connectors S17L and S17R on corners matching up bottom two holes with holes in profiles L06A, L06B and L06C as shown.
3.2C
S17R
L06A
#S17R#S17LQTY
2#S28
QTY
1#L06C
Profile Connector
22
S17L
L06B
S17L
S02
18 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
S17R
S17L
L06B
L06A
L06C
S17R
S02
3.4A
3.4B
Slide profiles L02E and L02F into connectors S09, S18 and S10 until they click into place.
L02F
S09
QTY
1#S18
ConnectorQTY
1#S09
QTY QTY
1#S10
ConnectorConnectorProfile
11#L02E
#L02F
Remove protective plastic from both sides of panel Y8. Place side to face toward the sun facing down. Fit panel into V-channel on profile L06.
L06C
Y8
QTY
1#Y8
Panel
19 of 51 www.stcny.com
S10
L02E
L02F
L02E
S18
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S09, S10 and S18 CLICK into place.
Remove protective plastic from EACH side of poly carbonate panels before installing. Dispose of plastic properly. Install with side labeled “Face this side towards the sun” FACING DOWN.
!
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
IMPORTANT: The holes are not at the midpoint of the profiles. Arrange profile so the 26.5” portion will be the bottom when standing.
L02E
S10
S09
S18
L02F
26.5”(676 mm)
26.5”(676 mm)
L06C
Y8
S09
S10
L02B
L02F
L02E
L02A
Y8
Place connectors S17L and S17R on frame, lining up holes as shown. 3.5B
3.5C Secure with two S02 screws.
20 of 51 www.stcny.com
3.5A Slide connectors S09 and S10 half way into profiles L02A and L02B. Continue sliding together making sure panel Y8 fits into V-channels of profiles L02F and L02E. Connectors click securely into profiles.
S10
L02A
S09
L02B
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S09 and S10 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
S02
S02
L06B
S17L
L06A
L02EL02F
S17R
QTY
2#S02
Screw
Remove protective plastic from both sides of panels Y5, Y6 and Y7. Place side to face toward the sun facing the down. Fit panels Y7 into top channels of L05C.
3.6A
3.6B
3.6C
Y7
L05C
Y7
L05C
Slide Y6 panels into V-channels on profiles L02A, L02B, L06A and L06B. Note Y7 panel sits next to panel Y8.
Slide Y5 and Y6 panels into V-channels on profiles L02A, L02B, L06A and L06B. Fit inside channels on L05C profiles.
Remove protective plastic from EACH side of poly carbonate panels before installing. Dispose of plastic properly. Install with side labeled “Face this side towards the sun” FACING DOWN.
!
IMPORTANT: Make sure to assemble a right and left side.Y6
L05C
Y7Y7
Y8
L02B
L06B L06A
L02A
L05CL05C
Y8
Y7
21 of 51 www.stcny.com
Y7
Y8
Y7
Y5Y6
L02B
L06B L06AL02A
L05CL05C
NOTE: ALL VIEWS ARE FROM INSIDE.
QTY
2
QTY PanelPanel
1#Y5 #Y7
QTY
1#L05C
PanelQTY
2 #Y6
Profile
Slide short side of connectors S01 into channel of profile L01A. Line up last hole on connector with holes on profile.
3.7A
3.7B Secure with S02 screws.
Slide connectors S04 and S05 into profile L01A until they click into place.
QTY
22
#S01#S02
QTY
1#L01A
Profile Connector
1#S05#S04
QTYQTY
1
Connector Connector
L01A
S01
S01
S02
S04
S05
S05
3.7C
S04
22 of 51www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
S02
3.8A
3.8B Secure S01 connector to profiles L06A and L06B with S02 screws.
As you slide bottom profile L01A half way into place, carefully line up S01 connectors with channels on profiles L06B and L06A and S04 and S05 connectors with profiles L02B and L02A. Continue sliding, making sure panels Y6 and Y5 fit into V-channels. Snap connectors S04 and S05 securely into profiles.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
L06A
L01A
L06A
L01A
23 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S04 and S05 CLICK into place.
S04S01
S01
S05
Y6
Y5
L02B
L02A
L06A
L01A
L06B L06A
L01A
S05
QTY
2#S02
Screw
3.10
Insert long side of cable connector S06 at an angle into profile channel L02B with hook facing up. Slide connector to other side of channel. Use hex key to securely tighten and hold in place.
Use hex key to securely tighten and hold in place.
Attach one side of short cable S16 to hook and lace under profile L04A. Attach other side of cable to another S06 cable connector. With hook facing the center, insert connector into profile channel L01A and push towards center until profile corners are square and cable is tight.
Repeat step 3.10 inserting cable connectors S06 into profiles L02A and L01A. Cable rests next to panelY5, under profile L04A and over vent. Slide connector until profile corners are square and cable is tight. Securely tighten second connector to hold in place.
3.9A
3.9B
Y6
Y5
L02B
L02A
L06A
L01A
L06B
3.9C
2#S16#S06
QTYQTY
4
Cable Connector CableQTY
1
Hex Key
24 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
Assemble Sides
! You are assembling both sides in the following steps. Both sides are identical until step 6.1
!Lay out all the parts for the sides in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
25 of 51 www.stcny.com
Line up the four profiles L03B so the holes are at the same position. Slide long side of connectors S20 and S08 into channel of profile, lining up holes as shown. Repeat for all four L03B profiles.
Place L03B onto profiles L07A and L01C. Line up holes as shown.
Secure with three S02 screws. Repeat to make two sets.
Secure with three S02 screws.4.1B
4.2B L07A
L07A
L01C
L01C
L03B
L03B
QTY
84
#S02#S08
ConnectorQTY
44
#S02#S20
QTY
4#L03B
Profile Connector
S20
S08
L03B
L03B
4.2A
4.1A
S20
S08
QTYScrew
#S02 6
QTYProfile
#L07A 22
QTYProfile
#L01C
S02S02
L01C S02
L07A
S02
26 of 51 www.stcny.com
Lay out profiles L03A so the holes are at the same position. Slide short side of connectors S01 into channel of profile until the last hole in S01 lines up with the bottom hole on profile L03A.
QTY
44
#S01#S02
QTY
2#L03A
Profile Connector
Place L03B onto profiles L07B and L01C. Line up holes as shown.
Secure with three S02 screws. Repeat to make two sets.
4.3B
4.4B Slide another connector S01 so it lines up with the middle hole on profile L03A.
4.4C Secure all pieces with S02 screws. Repeat to make two sets.
L07B
L01C
L03B
L03A
28”(715 mm)
6 1/2”(165 mm)
L03AL03A
S01
4.3A
4.4A
L03A
S01
L07B
L01C
L03B
IMPORTANT: The holes are not at the midpoint of the profile. Arrange profile so the 28” portion will be the bottom when standing.
L01C
QTYScrew
#S02
QTYProfile
#L07B 2 62
QTYProfile
#L01C
S02
S02
S02
S02
L07B
S02
S02
27 of 51 www.stcny.com
Slide connector S39 into profile L04D until it snaps into place. Repeat to make two sets.
4.5B
Lay out profiles L04D so the holes are at the same position. Slide short side of connector S01 into channel of profile, lining the last hole in S01 with the hole on profile L04D. Secure with S02 screw.
Slide connector S03 into profile L04B until it clicks into place.
Attach profiles L04B and L04C to profile L03A by sliding the long sides of connectors S01 into the channels. The last hole of connector S01 lines up with the holes in the profiles.
Secure with two S02 screws. Repeat to make two sets.
S03
L04B
4.7B
L03A
L04C
IMPORTANT: Connector S03 rests on top of connector S01. S02 screw secures S03 to profile L04B.
QTYQTY
2#L04C
Profile Screw
4#S02
QTY
22
#S01#S02
QTY
2#L04D
QTY
2#S39
ConnectorConnectorProfile
4.5A
4.7A
4.6
Connector S03 CLICKS into place.
Connector S39 CLICKS into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
S39
L04D
S01
L03A
L04C
L04B
S03
S02
S02
S01
S02
QTYQTY
2#L04B
Profile Connector
2#S03
S03
L04B
S01
L04D
S39
28 of 51 www.stcny.com
Secure with S02 screw. Repeat to make two sets.
4.8B
Connect profile L04D by sliding connector S39 into profile L04B until it clicks securely into place. Slide connector S01 into channel of L04C.
Slide connectors S19 and S03 into profile L03A until they click securely into place. Repeat to make two sets.
S03
S19
QTY
2#S03
QTY
2#S19
ConnectorConnector
4.8A
4.9
Connectors S03 and S19 CLICK into place.
Connectors S39 CLICKS into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
S39
S02
S01
S39
L04D
L03A
L04C
L04B
S19
S03
L03A
QTY
2#S02
Screw
NOTE: ALL VIEWS ARE FROM INSIDE.
29 of 51 www.stcny.com
Slide sections together as shown. Repeat to make two sets. 4.10
! NOTE: The two sides are identical. When you connect them tothe back, there will be a right and left side. Stand these up.
S19L07A
L07B
S03
L01C
L01CNOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S03 and S19 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
L03A
L01C
L01C
L07A
L07B
S19
S03
Line up the shelf profiles so the holes are at the same position. Slide long side of connector S37 into channel of each profile, lining up the last hole on the connector with the hole in the channel.
Secure with S02 screw.
S37
S02
Prepare Shelves
S37
S37
L14B
L14C
L14A
L14D
#S37#S02
88
#L14A#L14B
#L14C#L14D
QTYConnectorQTYProfile
22
22
QTYProfile
5.1A
5.1B
!Place all the parts for the shelves on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
IMPORTANT: The shelf profiles have rectangular holes in the channel or side of one end. Slide connector S37 into other side, lining up last hole in connector with hole in the channel.
30 of 51 www.stcny.com
Set up one side faAing inside with L07B next to the back. Slide shelf profile L14B into connector S03 until it clicks into place. Slide shelf profile L14D into connector S39 until it clicks into place.
Carefully slide left side into back, lining up connectors with profiles. Move side so connectors S09 and S04 are half way into profiles L07B and L01C. Connectors S37 rest on top of profile L04F. Push side in until connectors click into place.
Secure connectors S37 to profile L04F with two S02 screws.
With the outside facing a wall, carefully stand back up and lean against the wall. Stand each side up and place next to the back. Both sides are identical until the shelf profiles are connected. Make certain that positions of profiles L07A and L07B match the diagrams before connecting.
!
Connect Sides to Back
L07BS09
L01C
S04
6.1A
6.1B
S37L04F
S02
S02
L04F
31 of 51 www.stcny.com
Connectors S03 and S39 CLICK into place.
Connectors S04 and S09 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
VIEWS FROM INSIDE.
S37
S39
S03
L14B
L14DL07A
L07B
S03
S39
L14D
L14B
L07B
L01C
L04F
L14D
L14B
S09
S04
S37
S37
QTY
2#S02
Screw
Set up the other side facing inside with profile L07A next to back. Slide shelf profile L14A into connector S03 until it clicks into place. Slide shelf profile L14C into connector S39 until it clicks into place.
Carefully slide right side into back, lining connectors up with profiles. Move side so connectors S10 and S05 are half way into profiles L07A and L01C. Connectors S37 rest on top of profile L04F. Push side in until connectors click into place.
L14C
L14A
L07A
S03
S39
Secure connectors S37 to profile L04F with S02 screws.
QTY
2#S02
Screw
L04F
6.2A
6.2B
S10
L07A
S05
L01C
L04FS37
S37
32 of 51 www.stcny.com
Connector S10 CLICKS into place.
Connector S05 CLICKS into place.
Connectors S03 and S39 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
VIEWS FROM INSIDE.
S02
S02
L14E
L14C
S03
S39
S10
S05
L07A
L01C
L04F
L14A
L14C
Slide shelf profile L14A into connector S03 on the left side until it clicks into place. Slide shelf profile L14B into connector S03 on the right side until it clicks into place.
Connect Sides to Front
L14A
L14B
S03
S03
Keep the structure as is, with the back against the wall until you finish this step. This will make it easier to keep the angles square.!
7.1
33 of 51 www.stcny.com
Connectors S03 CLICK into place.
Connectors S38 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
L14A
L07A
L07B
L14B
S03
S03
Lift front from inside and rest it next to sides. Line up connector S10 with profile L07A, connector S09 with profile L07B and connectors S04 and S05 with profiles L01C.
7.2A
7.2B Carefully pull the front until all connectors are half way inside each profile. Make sure connector S37 attached to shelf profiles rest on top of profile L04A. Push front into sides until connectors click into place.
L07B
S09
L04A
S37
L01C
S04
34 of 51 www.stcny.com
Connectors S09 and S10 CLICK into place.
Connectors S04 and S05 CLICK into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
L07A
L07B
L01C
L14B
L14A
S10
S04
S09
S05S37
S37
L14A
L07A
L07B
L14B
L01C
S05
S04
S09
S10
L01C
7.3A Slide shelf profile L14C at a slight angle so one end slides half way into connector S39 and the other side with connector S37 rests on top of profile L04A. Continue to slide until profile clicks into connector S39.
7.3C
Repeat step 7.3A, sliding shelf profile L14H into S39 connector.Make sure connector S37 rests on top of profile L04A.
Secure S37 connectors to L04A profiles with four S02 screws.
7.3B
QTY
4#S02
Screw
L04A
L14A
L14C
L14B
L04A
L14D
35 of 51 www.stcny.com
Connector S39 CLICKS into place.
Connector S39 CLICKS into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
VIEWS FROM INSIDE.
L07A
S39
S37
L14C
L14A
L04A
S39
L14C
S39
L14D
Assemble and Connect Gables
8.1A Slide connector S22 into channels of profiles L03E. Slide another S22 connector into channels of profiles L03E and L03F.
S21
L03G
L03H
S23
L03G
L03H
!Lay out all the parts for the gables in a staging area. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including shoes, gloves and goggles.
L03E L03E
S22
L03EL03E
8.2B
Secure each set with four S02 screws.8.1B
8.2C
Line up holes on bracing bar S23 with holes in profiles L03G and L03H.
Secure brace to profiles with two S02 screws.
8.2A Slide connector S21 into profiles L03H and L03G until it clicks securely into place.
L03E L03F
S22
S02
S02
L03G L03H
1#S23
QTYBrace
2#S021#L03G
#L03H
QTYQTY
11
#S21
Connector ScrewQTYProfile
QTY
82
#S02#S22
QTY
31
#L03E#L03F
Profile Connector
IMPORTANT: U-shaped cutout is not at midpoint of profile L03F. Attach longer side (22.5”) to connector S22.
S21
L03HL03G
S22
L03EL03F
IMPORTANT: U-shaped cutout is not at midpoint of profile L03G. Attach longer side (22.5”) to connector S21. Make sure coonector S21 is positioned correctly before connecting.
L03G
L03F
36 of 51 www.stcny.com
Connectors S21 CLICKS into place.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
8.3 From the inside of the greenhouse, use two people to carefully lower center gable onto frame. Line up and slide profiles L03G and L03H into connectors S19 until they click securely into place.
L03H
S19
L03G
S19
From the inside of the greenhouse, use two people to carefully lower front and back gables onto frame. Line up and slide connectors S20 into channels of profiles L03E and L03F.
8.4
L03G
L03F
NOTE: U-shaped cutouts on profile L03F faces front.
NOTE: U-shaped cutoutson profile L03G faces back.
S20
L03E
S20
L03F
37 of 51 www.stcny.com
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
Connectors S19 CLICK into place.
L03GL03H
S19
S19
L03EL03E
S20
L03E
S20
L03F
S20
S20
Using a small step ladder inside the greenhouse, carefully slide profiles L08A and L02G into back connector S12 at a slight angle. Gently push center gable slightly towards the front to slide other end of profile into connector S21. Make sure both connectors snap securely into place. Note L02G profile rests on top of connector S22.
8.6A
8.6B Slide profile L02G at a slight angle into center gable connector S21. Gently push front side slightly forward to slide other end of profile into connecor S18. Make sure both connectors click securely into place. Note profile L02G rests on top of connector S22.
8.5 Line up profiles L08A and L02G as shown. Note that L08A has a cutout on one end. The plain side slides into V-channels of profile L02G. Note the rectangular holes in the channels of profile L02G are NOT on the side next to the V-channel.
L08A
L02G
QTY
11 #L08A
ProfileQTYProfile
#L02G
1
QTYProfile
#L02G
38 of 51 www.stcny.com
L08A
L02G
L08A
L02G
L08A
S21
S18
L02G
S22
S21
S12 L02G
S22
L08B
IMPORTANT: There is one correct way to connect these profiles. Arrange profiles before sliding together. Use WD40 or liquid soap if parts do not easily slde together
!
IMPORTANT: Make sure profiles L02G with L08B are in correct positions before installing. Arrange profile L02G so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside.
Connectors S12 andS21 CLICK into place.
IMPORTANT: Arrange profile L02G so rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside.
There is only one way to properly fasten connectors into profiles. Line up parts first to ensure correct placement. Slide connectors until they CLICK securely into profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
Connectors S21 and S18 CLICK into place.
From inside of greenhouse secure S20 connectors to profiles L03E and L03F with two S02 screws.
From inside of greenhouse, line up bracing bar S23 with holes in profiles L03A and L03H. Secure oneS02 screw partially into each end. Then go back and tighten both screws.
Line up bracing bar S23 withholes in profiles L03A and L03G. Secure one S02 screw partially into each end. Tighten both screws.
S22
L02G
S02
8.7A
8.8A
S20S02
L03E
S20
S02
L03F
QTY
10#S02
Screw
8.7B
8.8B
Secure S22 connectors to profiles L02G with one S02 screw.
S02
S23
L03H
L03A
S02
2#S23
QTYBrace
4#S02
QTYScrew
39 of 51 www.stcny.com
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
S23
L03H
L03A
S02
S02
S23
L03G
L03A
S23
L03G
L03A
Brace Sides
2#S07#S06
QTYQTY
4
Cable Connector CableQTY
1
Hex Key
From the inside of the greenhouse, insert long side of cable connector S06 into profile channel L07B with hook facing the front. Slide connector to other side of channel. Use hex key to securely tighten and hold in place.
Repeat step 9.1 inserting cable connectors S06 into profile L07B with hook facing the back and into profile L01C with hook facing the front. Cable rests behind profile L14A. Slide connector until profile corners are square and cable is tight. Securely tighten second connector to hold in place.
!Place all the parts for bracing the sides on a level surface. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including shoes, gloves and goggles.
Attach one side of long cable S07 to hook and lace behind profile L14A. Attach other side of cable to a second S06 cable connector. With hook facing the back, insert connector into profile channel L01C.
9.1A
9.1B
9.1C Push towards center until profile corners are square and cable is tight. Use hex key to securely tighten and hold in place.
9.2
L01C
L03A
40 of 51 www.stcny.com
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
L01C
L03A
L01C
L14A
L07B
L03A
L02B
L02B
L01C
L07B
L03A
L07B
L02B
IMPORTANT: Make sure all corners are squared at 90 degrees.
IMPORTANT: Make sure all corners are squared at 90 degrees.
L14A
L01C
L03A
L07B
L02B
Repeat step 9.1 through 9.4 on the other side of the greenhouse.
8#S07#S06
QTYQTY
12
Cable Connector CableQTY
1
Hex Key
From the inside of the greenhouse, insert long side of cable connector S06 into channel of profile L07A with hook facing the back. Slide connector to other side of channel. Use hex key to securely tighten and hold in place.
Attach one side of long cable S07 to hook and lace behind profile L14B. Attach other side of cable to a second S06 cable connector. With hook facing the front, insert connector into channel of profile L01C.
Repeat step 9.3 inserting cable connectors S06 into profile L01C with hook facing the front and into profile L07A with hook facing back. Cable rests behind profile L14A. Slide connector until profile corners are square and cable is tight. Use hex key to securely tighten second connector to hold in place.
9.3A
9.3B
9.4
9.5
9.3C Push towards center until profile corners are square and cable is tight. Use hex key to securely tighten and hold in place.
L01C
L03A
L01C
L03A
41 of 51 www.stcny.com
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
IMPORTANT: Make sure all corners are squared at 90 degrees.
L02AL14B
L07A
L01C
L02A
L01C
L07A
L03A
L07A
L02AL14B
L03A
L01C
L07A
L02A
L14BL14A
L07AL07B
L02A
L02B
L01CL01C
Assemble and Install Roof Vent
!Lay out all the parts for the roof vent in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
10.1
10.2A
10.3
Fit panel and profiles L10A and L11A into channels of profiles L12A. Make sure holes in endsof profiles line up.
! The roof vent is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
Remove protective plastic from both sides of panel Y14. Place side to face toward the sun facing up. Fit panel into channels of profiles L10A and L11A.
L11A
L10A
Y14
L10A
L11A
QTYPanel
1#Y14
QTYQTY
1#L10A 1#L11A
Profile Profile
L12A
L12A
Y14
Secure with four S26 screws.
Attach handle S25 to profile L10A with two S24 screws.
10.2B
L10A
L12A
L11A
L12A
L12A
L11A
L10AL12A
L12A
Y14S26
S26
S26
S26
S26
L10AS26
L12A
QTYScrew
24
#S24#S26
QTYQTY
2#L12A 1#S25
Profile Handle
L10A
S25
S24
S24Y14
IMPORTANT: hollow side of handle S25 faces down when attached.
L11A
L10A
S24
S24
S25
42 of 51 www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
Remove protective plastic from EACH side of poly carbonate panels before installing. Dispose of plastic properly. Install with side labeled “Face this side towards the sun” FACING UP.
!
10.4A With pins facing up on the inside of the greenhouse, slide one end of profile L05D into V-channel of profile L03F. Angle it slightly to fit the other end into V-channel of profile L03G.
10.4B Line up L05D channel with U-shaped cutouts in sides of profiles L03F and L03G. Slide hex nut and bolts into U-shaped notches and tighten securely.
1#L05D
QTYProfile
L05D
L03F
IMPORTANT: Profile L05D is shipped with four hex nuts and bolts attached. Loosen hex nuts on each end and slide towards center. Make sure the pins face up on inside of the greenhouse when profile L05D is installed.
L05DL03F L03G
L05DL03G
L05D L03G
10.5A
10.5B
Stand on a small step ladder inside the greenhouse. Install roof vent by sliding profile L11A into profile L08A from the back of the greenhouse towards the front.
Y14S24A
L08A
L05D
L11A
L08A
S24A
L08A
43 of 51 www.stcny.com
Continue to slide vent past the end of profile L08A until the hole in the other end is visible. Screw S24A into hole L08A and slide vent back until it rests next to the screw.
IMPORTANT: The handle of roof vent is on the inside of the greenhouse.
Y14L11A
L08A
L03FL03G
L05D
VIEW FROM INSIDE.
VIEWS FROM INSIDE.
QTY
#S24A 1
Screw
Install Circular Vent
!Lay out all the parts for circular vent in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
11.1A
44 of 51 www.stcny.com
Open the box containing the parts for the circular vent. From the outside of the greenhouse, line up vent frame pins with holes in panel Y6,and slide into place. From the inside of the greenhouse, slide circular vent under the cable. Line up pins in vent frame with holes in vent fan and slide into place.
11.1B From the inside, secure the vent with four plastic nuts.
11.1C Double check that the corners are squared at 90degrees and adjust if necessary. See step 3.10 fordetailed instructions.
QTYCircular Vent
1
QTYVent Frame
1
QTY
4
Plastic Nuts
Y6
IMPORTANT: Circular vent rests under the bracing cable. See step 3.10 for detailedinstructions on adjusting the cables.
Y6
Y6
IMPORTANT: Make sure all corners are squared at 90 degrees.
NOTE: VIEWS ARE FROM INSIDE.
Install Side and Roof Panels
!Lay out all side and roof panels in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
Remove protective plastic from both sides of panels Y9 and Y10. Place side to face toward the sun facing out when installing. Slide panels carefully into V-channels in corner profiles L02A and L02B and side profiles L03A and L03B. As you continue sliding the panels make sure they fit into the V-channels in base profiles L01C.
Remove protective plastic from both sides of panels Y11, Y12 and Y13. Place side to face toward the sun facing out when installing. Slide panels carefully into V-channels in gable profiles L03E, L03F, L03G and L03H and in front and back profiles L02C, L02D, L02Eand L02F. As you continue sliding the panels make sure they fit into the V-channels in center roof profiles L02G.
4
QTY
3
QTY PanelPanel
QTYPanel
4
1
#Y10
#Y114#Y9
#Y12
#Y13
Y9
Y9
Y10
Y10
Y9
Y10
Y9
Y10
12.2
12.1
45 of 51 www.stcny.com
Remove protective plastic from EACH side of poly carbonate panels before installing. Dispose of plastic properly. Install with side labeled “Face this side towards the sun” FACING OUT.
!
Y11
Y11
Y11
Y11Y13
Y12
Y12
Y12
Install Weather Stripping
From the outside of the greenhouse, line up the black rubber stripping with the V-channels of all profiles. Cut to length of each profile as you work, pushing the stripping between the panel and the empty space in the V-channel of the profile.
IMPORTANT: The black rubber stripping J01is cut to length with scissors. Make sure to insert stripping as shown, securely into the V-channels of all the profiles, cutting each piece to the proper length. This will help protect the inside of your greenhouse from the weather.
If you have been building your greenhouse in another place than it’s finalposition, we recommend you move the greenhouse before you begin these steps. Have at least one person help you carry it.!
QTY
#J01 63M
Rubber Stripping
13
NOTE: You will find a roll of 63 meters of black rubber weather proof stripping. You will need a pair of scissors for this step.
46 of 51 www.stcny.com
14.1
Install Trim Plates
!Lay out the trim plates in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
14.3
Remove the six hex nuts from the hex bolts attached to each L09A and L09B trim plate BEFORE installing.
Repeat Step 14.2A and 14.2B on other side of greenhouse. Note the positions of profiles L07A and L07B are reversed. Make sure to attach trim plate L09A to profile L07A in the frontand trim plate L09B to profile L07B in the back.
14.2A
14.2B
Place trim plates L09A and L09B onto profiles L07A and L07B on outside of greenhouse. Trim plates fit over edges of side and roof panels and bolts are inserted into holes on profiles L07A and L07B.
From inside of greenhouse, place hex nuts onto hex bolts in trim plates L09A and L09B and tighten securely.
NOTE: Trim plates cover edges of black rubber stripping, and roof and side panels.
IMPORTANT: The holes in profile L07A and L07B and the bolts in trim plates L09A and L09B are in different positions. Fit trim plate L09A into profile L07A. Fit trim plate L09B into profile L07B.
QTY
2#L09A2#L09B
Trim Plate
L09A
L09B
47 of 51 www.stcny.com
L09A
L07A
L09B
L07B
L09A
L09B
L07B
L07A
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
14.4A In the front of the greenhouse, slide plastic trim plates J02L, J02R, and J03 into connectors S09, S10 and S18 until they snap into place. On top of the greenhouse, snap trim plate J04 onto connector S21. The trim plates will cover the edges of the black rubber stripping installed in step 13.
In the back of the greenhouse, slide plastic trim plates J02L, J02R, and J03 into connectors S09, S10 and S12 until they snap into place.
IMPORTANT: The plastic trim plates J02L, J02R, J03 and J04 fit into connectors one way. Make sure the connectors are snapped securely into place as they will protect the connectors from the weather.
QTY
1#J04
Trim PlateQTY
2#J03
Trim PlateQTY
2#J02R
Trim PlateQTY
2#J02L
Trim Plate
14.4B
48 of 51 www.stcny.com
S21
S18
S12
S10
S10
S09
J02R
J02L
J03
J04
S12
J03
S10
J02L
S09
J02R
Weather Strip and Hang Door
Follow instructions for Step 13 to install rubber weather stripping to outside of the door.
From the outside of the greenhouse, carefully line up hinges on door into hinges on door frame and lower into place. There is no need to secure it.
15.1
15.2
IMPORTANT: The rubber stripping J01is cut to length with scissors. Make sure to insert stripping as shown, securely into the V-channels of all the profiles, cutting each piece to the proper length. This will help protect the inside of your greenhouse from the weather.
QTY
#J01 63M
Rubber Stripping
49 of 51www.stcny.com
The door has been assembled in Step 2. When hung, the bracing bar is on the inside of the greenhouse. We recommend using two people to hang the door. !
NOTE: You will use the remainder of the roll of 63 meters of black rubber weather stripping. You will need a pair of scissors for this step.
Secure to Ground
From the inside of the greenhouse, insert the S34 anchor clips into channels of side profile L01C at each corner and center of both sides. Place the S35 pegs through the holes and into the ground to establish proper placement. Remove the pegs, dig holes 12”/30cm deep and fill with concrete. When the concrete is partially dry, use a hammer to drive the pegs all the way into the concrete and let dry completely for twenty four hours.
QTY
#S35
Anchor PegQTY
#S34 6 6
Anchor Clip
IMPORTANT: The greenhouse must be firmly secured to the ground. Make sure the foundation is FLAT and LEVEL. Make sure the greenhouse is square. The two diagonal measurements inside the greenhouse should be identical.
!
NOTE: Insert S34 anchor clips into the channel of side profiles L01C at a slight angle and slide under the lip of the channel.
16
50 of 51 www.stcny.com
S35
S34
VIEW FROM INSIDE.
L01C
L01C
QTY
#S02#S36
44
ScrewQTY
#S37 4
ConnectorQTY
#L04E 2
Profile
Install Trays and Bin Holder
From the inside of the geenhouse, place the trays on the shelves. The trays interlock together and rest on the lip on the sides of the shelve profiles. Ten trays fit on each side of the greenhouse.
Slide long side of connector S37 into each end of profiles L04E, lining up the last hole on the connector with the hole in the channel.
Place profiles L04E on shelve profiles. Position to fit your bin.
QTY
#J05
Trays
20
!Lay out all the parts for the trays and bin holder in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation.Wear proper safety gear including work shoes, gloves and goggles.
17.1
17.2A
17.3A
S36
S37
S02
Secure each S37 connector with one S02 screw.
Secure each connector with one S36 screw.
17.3B
17.2B
IMPORTANT: S36 are self tapping screws used to screw into areas that do not have predrilled holes. When you have decided on the placement of your bin, use these screws to attach the L04E profiles into the shelf profiles.
NOTE: A cordless drill with a phillips head bit is recommended.
L04E
51 of 51 www.stcny.com
L04E
6’ x 8’ Easy-Grow Greenhouse
Assembly Instructions
Systems Trading Corporation
Systems Trading Corporation
If you need any help or have missing or damaged parts, please contact us.
Please keep this manual in a safe place for reference.
Copyright © 2008, Systems Trading Company, All rights reserved.
450 7th Avenue Suite 2809, New York, NY 10123Customer Service: (877) 407-9100 ext 1Email: [email protected]