EBB Overview
• Jointly managed by CEA and Cal OES
• Created to offer retrofit incentives
• EBB first to promote code-compliant retrofit
• More than 1 Million homes
+ =
![Page 3: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/3.jpg)
EBB Overview
• 2017 Marks Year Four
• Up to $3,000
• In Accordance with:
Appendix Chapter A3 or
Plan Set A or LA City Standard #1
• Grown Every Year to More Cities and Zips
• Funding is through CEA; however the last two years we’ve also received $3 Million from the State of California
![Page 4: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/4.jpg)
The Process
Timeline: 8 months
2 Months: find contractor and get permit
6 Months: complete work
Step 1: Pre-Retrofit Documentation
• Permit language reference in scope of work
“Retrofit in accordance with Chapter A3 of the CEBC”
“Retrofit in accordance with Plan Set A”
“Retrofit in accordance with LA City Standard Plan #1”
• Before photos
![Page 5: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/5.jpg)
Step 2: Complete Retrofit
Step 3: Post-Retrofit Documentation
• Signed building permit
• Contractor invoice broken down by materials, labor and overhead/profit
• After photos
• Payment Authorization From (provided by homeowner only)
• IRS W-9 Form (provided by homeowner only)
![Page 6: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/6.jpg)
![Page 7: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/7.jpg)
The Retrofit Process
EBB was created to provide incentives to California Homeowners to seismically retrofit wood-frame residential structures.
The Program is limited to funding retrofit expenses that:
• strengthen cripple walls to enable them to function as shear members, significantly protecting the dwelling from collapsing;
• bolt foundation, enabling the dwelling to remain in place, rather than sliding off the foundation during an earthquake; and
• properly strap the water heater to reduce the likelihood of water and fire damage, and to protect the water supply.
![Page 8: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/8.jpg)
The seismic retrofit includes adding anchor bolts and bracing in the crawl space
around the perimeter of the foundation to improve the connection between the
wooden framing and concrete foundation. Contractors experienced in seismic
retrofitting, specifically with California Existing Building Code (CEBC) Chapter A3,
2010 Edition, are sought after for this work.
![Page 9: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/9.jpg)
EBB Retrofit:Sill Plate Anchorage and Cripple Wall Vulnerabilities
![Page 10: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/10.jpg)
![Page 11: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/11.jpg)
![Page 12: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/12.jpg)
Cripple Wall Failure
![Page 13: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/13.jpg)
Dangerous Cripple Wall Damage
![Page 14: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/14.jpg)
Cripple Wall Damage
![Page 15: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/15.jpg)
Cripple Wall Damage
![Page 16: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/16.jpg)
Cripple Wall Damage
![Page 17: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/17.jpg)
Cripple Wall Retrofits Work
![Page 18: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/18.jpg)
The legacy of the “Voluntary Retrofit”
• Just about anything allowed if it didn’t make the house unsafe
• Retrofits were often incomplete
• Retrofits were often not effective
![Page 19: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/19.jpg)
The Code: Chapter A3
The State of California has adopted, effective January 1, 2011,
California Existing Building Code (CEBC) Appendix Chapter A3:
Prescriptive Provisions for Seismic Strengthening of Cripple Walls and Sill
Plate Anchorage of Light, Wood-Frame Residential Buildings
![Page 20: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/20.jpg)
Code Requirements = EBB Requirements
• Code = CBC Appendix Chapter A3
• Engineered retrofit allowedby A3 for:-Cripple walls > 4’-0” tall-Walls with many/large openings
• Construction Documents =
Plan Set A, LA Standard Plan
Set or Custom Plans
![Page 21: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/21.jpg)
Why the 4’-0” or less Cripple Wall Requirement?
4'-0" high wall does not require a hold-down
![Page 22: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/22.jpg)
Can I use a Plan Set on a house with an attached garage?
If the crawlspace area to be retrofitted meets the requirements of the plan set,
AND
The building official allows it.
![Page 23: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/23.jpg)
Garage RetrofitOften requires engineered solution:
• > 4’-0” tall wall
• Requires prefabricated seismic resisting element
![Page 24: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/24.jpg)
Chapter A3 Prescriptive House
![Page 25: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/25.jpg)
Chapter A3 Prescriptive House
![Page 26: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/26.jpg)
A3 Retrofit Requirements
![Page 27: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/27.jpg)
A3 – Plan Set Comparison
![Page 28: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/28.jpg)
Retrofit Plan Required
![Page 29: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/29.jpg)
Retrofit Plan Required
![Page 30: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/30.jpg)
LABD Sample Plan
![Page 31: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/31.jpg)
LA Standard Plan
![Page 32: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/32.jpg)
Plan Set A
![Page 33: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/33.jpg)
Chapter A3
![Page 34: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/34.jpg)
Prescriptive Details
![Page 35: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/35.jpg)
Condition of Existing Wood
• Wood that is part of the retrofit shall be “in sound condition and free from defects” such as:
• Fungus• Insect infestation
• If damaged, replace with new materials with the same net dimension as the original
![Page 36: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/36.jpg)
Condition of Concrete Foundation
• Partial perimeter foundations or unreinforced masonry (brick, stone, etc.) must be evaluated by engineer or architect
• New reinforced concrete perimeter footings may be installed using the prescriptive details
![Page 37: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/37.jpg)
Chapter A3 allows New Footing
• New foundation may be designed per Figure A3-1 or A3-2, or be designed by an architect or engineer
• A local building official may require a soils report
![Page 38: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/38.jpg)
LABD Standard Plan Set allows New Footing
![Page 39: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/39.jpg)
Dwelling Anchorage to Foundation
Concept:
• Install anchor bolts if space permits
• If not, install proprietary or engineered anchors
![Page 40: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/40.jpg)
Dwelling Anchorage to Foundation
Concept:
• Is also applicable to basement and retaining walls
• Contact building department for additional retaining wall concerns
![Page 41: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/41.jpg)
New Anchor Bolts
Install with approved washers
![Page 42: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/42.jpg)
New Anchor Bolts with Proper End Distance
9 to 12 Inches from end
![Page 43: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/43.jpg)
Add Replacements Bolts
It is not recommended to rely on old anchor bolts
![Page 44: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/44.jpg)
New Foundation Plate (FP)
Chapter A3 specifies requirements for fabricated FP
![Page 45: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/45.jpg)
New Foundation Plates
![Page 46: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/46.jpg)
New Foundation Plates
![Page 47: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/47.jpg)
Cripple Wall Bracing
Concept:
• Install sheathing on inside face of cripple wall to resist load direction F1
• Anchor top plate to floor framing above (load in)
![Page 48: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/48.jpg)
New Plywood Sheathing
![Page 49: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/49.jpg)
New Blocking
• Mudsill is often wider than cripple wall studs
• Blocking required to create a flush face for sheathing
![Page 50: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/50.jpg)
Properly Placed Nails
• Size (8d common) and
spacing (4” o.c.) as
required by code/plan set
• No overdriven nails
• No shiners
![Page 51: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/51.jpg)
Connect Wall to Floor
Plan Set A allows a Simpson H10 in lieu of Framing Clip
Framing Clips
![Page 52: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/52.jpg)
Framing Clip Detail
![Page 53: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/53.jpg)
Vent Holes in Each Stud Bay
![Page 54: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/54.jpg)
Not Seismic Retrofit
Chapter A3 (Plan Set) retrofit is at perimeter bearing walls
![Page 55: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/55.jpg)
Not Seismic Retrofit
Angles are not approved Chapter A3/Plan Set retrofit
![Page 56: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/56.jpg)
Seismic Retrofit
![Page 57: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/57.jpg)
Seismic Retrofit
![Page 58: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/58.jpg)
Seismic Retrofit
![Page 59: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/59.jpg)
Seismic Retrofit
![Page 60: EBB Overview - Microsoft](https://reader033.vdocuments.net/reader033/viewer/2022042013/6255a3b5f424711225046758/html5/thumbnails/60.jpg)
• Mark Grissom
–Customer Service Manager
–916.661.5520