e.b.e.c 2014 - team greece - day 2 case study

9
Greece - Case Study Thrasyvoulos Karydis Alexandros Kogkas Konstantinos Fragkakis Marios Bikos Day 2: Dust Control

Upload: marios-bikos

Post on 15-Feb-2017

377 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Greece - Case Study

Thrasyvoulos KarydisAlexandros Kogkas

Konstantinos FragkakisMarios Bikos

Day 2: Dust Control

Page 2: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Outline- Problem- Solution Schema

- Design- Materials- Benefits

- SWOT Analysis- Economic Viability

2 Greece – Case Study

Page 3: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Problem

• Dust Storms(Haboob)• Airborne Soil

3 Greece – Case Study

• Dust generated from Construction Activities

Page 4: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Solution Schema

4 Greece – Case Study

Anti-dust Photovoltaic Coating and Ventilation

Page 5: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Solution Schema

5 Greece – Case Study

“Using Nanotechnology for more efficient Dust Collection”, Thomas Green, United Air Specialists Inc.

Tree leaves can capture 50%+ of particulate matter pollution (down to 1 micron)

Nano-tech artificial leaves with superior dust collection capability

1 micronWater sprinkling system for dust control

Dust Collecting Sprinklers

Page 6: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Solution Schema

6 Greece – Case Study

Anti-Dust Carpets

Specially manufactured “carpets” which prevent sand from rising

Page 7: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Swot Analysis

7 Greece – Case Study

S• Innovative Technologies and

Materials• Better Working Conditions• Flexibility on installation (Modular

Design)

W• Initial CAPEX• Adaptation to Precipitation• Relatively large impact factor

on construction site

O• Reusable Materials• Integrable Technology• Power Generation

T• Risk of novel implementation • Less expensive proposals

SWOT

Page 8: E.B.E.C 2014 - Team Greece - Day 2 Case Study

Economic Viability

8 Greece – Case Study

• Costs :Cost Solar Coating Ventilation Dust Collecting

SprinklersAnti-dust Carpets

CAPEX ~ 20 mil. $ ~ 10 mil. $ ~ 8 mil. $ ~ 2 mil. $OPEX - < 50.000$/month

Total: 43.500.000 $

• Construction time : One month initial installation Continuous supply of modular units

• Long-term profits from generated solar energy

Page 9: E.B.E.C 2014 - Team Greece - Day 2 Case Study

The End

Greece – Case Study

THANK YOU!