ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-A85A30) Life is back in our Tx board - Solved problems and changed all components as stated last week (replaced Rmod, lowered VCSEL…) - Soldered new Tx board - Result: good open eyes (conn VCSEL) Thanks to group 1 for spec sheet on unconnectorized VCSEL, tips on alignment tolerance testing on Tx board, and loaning us a Rx board Need to trade unconn VCSEL for conn PD (if interested see us) Progress: Continue Working on alignment tolerance testing on Tx board Focus on the final paper Next Week:

Upload: kimama

Post on 13-Jan-2016

52 views

Category:

Documents


3 download

DESCRIPTION

ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002). Progress:. Finished alignment tolerance testing with Rx board (S7911 and PDT-A85A30) Life is back in our Tx board - Solved problems and changed all components as stated last week (replaced - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002)

• Finished alignment tolerance testing with Rx board (S7911 and PDT-A85A30)

• Life is back in our Tx board- Solved problems and changed all

components as stated last week (replaced Rmod, lowered VCSEL…)

- Soldered new Tx board- Result: good open eyes (conn VCSEL)

• Thanks to group 1 for spec sheet on unconnectorized VCSEL, tips on alignment tolerance testing on Tx board, and loaning us a Rx board

• Need to trade unconn VCSEL for conn PD (if interested see us)

Progress:

• Continue Working on alignment tolerance testing on Tx board

• Focus on the final paper

Next Week:

Page 2: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

XYZ-Test of Rx Board with PD PDT-A85A30Three Positions of Open eyes

Best eye 10-dots eye

Z up by 0.72mm

Page 3: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

XYZ-Test of RX Board (PD-Hamamatsu S7911)

-25

-20

-15

-10

-5

0

5

10

15

20

25

-30 -20 -10 0 10 20 30

z=0 z=0.87mm

Units: x10 microns

XYZ test

-15

-10

-5

0

5

10

15

20

-15 -10 -5 0 5 10 15

Z-0.2mm down Z-0.72mm UpReference XYZ TEST

Units: x10 microns

Alignment Tolerance Testing for Rx with Unconnectorized PD, S7911 and PDT-A85A30

(Mapping Figures)

Unconnectorized PD S7911 Unconnectorized PD PDT-A85A30

Page 4: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November15-21, 2002)

K28.5 PRBS7

Open eyes for Tx board

Page 5: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

Alignment tolerance testing with Tx board

Page 6: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

REV 03 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec

Research PMeasurements/Lab Work A

Optical Link Budget POrder VCSEL and PDs O O E

Design optical Rx w/ on-board PD R R RDesign optical Tx w/on-board VCSEL D D &

Design Rx PCB E E VDesign TX PCB R R C

Lay out & submit Rx & Tx PCB SAseemble Rx & Tx PCB E

Measurements/Lab Work LAnalyze results

Papers Due 3pm 3pmExam

Expected Actual

Page 7: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

XYZ-Test of Rx Board with PD S7911

XYZ-Test of RX Board (PD-Hamamatsu S7911)

-25

-20

-15

-10

-5

0

5

10

15

20

25

-30 -20 -10 0 10 20 30

z=0 z=0.87mm

Capacitance= 0.45F

Units: x10 microns

Page 8: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)

XYZ-Test of Rx Board with PD PDT-A85A30

XYZ test (Lasermate PDT-A85A30)

-15

-10

-5

0

5

10

15

20

-15 -10 -5 0 5 10 15

Z-0.2mm down Z-0.72mm UpReference XYZ TEST

Capacitance=1.2F

Units: x10 microns

Page 9: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)
Page 10: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)
Page 11: ECE 4006B Fall, 2002, Group 3, Man Le      Progress Report Period (November 15-21, 2002)