    Guide to

    Elemental Cost Estimating &

    Analysis for Build ing Works

    2003

    O riginal documentation utilised with the kind permission of the

    Association of South African Q uantity Surveyors

  • 5/28/2018 ECEA

    2/52

    Page

    FO REWO RD (ii)

    EXPLANATO RY NO TES 1

    DEFINIT IO NS 3

    SUM M ARY O F ELEM ENTS 5

    SC HEDULE O F ELEM ENTS 7

    EXAM PLES 41

    CONTENTS

    (i)

    The printing of this g uide is sp ons ored by Murray &Robe rts

  • 5/28/2018 ECEA

    3/52(ii)

    A working group, comprising Dave Lindenberg (chairman), M artin Smith, Professor Paul Bowen, M artin

    Treadaway and K eith Cattell, undertook the compilation of a G uide to Elemental C ost Analysis based on a

    previous version. A new version, with minor changes, has been prepared for use in Africa by a committee

    of the Africa Association of Q uantity Surveyors comprising Dr C orn de Leeuw (chairman) representing

    the Southern Region, Francis G ithaiga and Daniel K imoro representing the Eastern Region and Joseph

    Ajanlekok o representing the Western R egion

    The primary purpose of this G uide is to present a system for elemental estimating. However, the

    document has been compiled in such a a manner as to enable and stimulate dedicated cost analysis and

    cost comparison between construction projects

    M urray & Roberts is thanked for its sponsorship of this publication. T hey may be contacted on

    info@ murrob.com or www.murrob.com

    June 2003

    FOREWORD

  • 5/28/2018 ECEA

    4/521

    The primary objective of this Guide is to present a system which sets out principles and a model format

    for elemental estimating

    Cost analysis

    M eaningful elemental cost analysis will only be possible if cost data are based on a uniform standard analysis.

    The estimator is therefore urged not to deviate from the system proposed in this G uide since only then will

    it be possible to use the derived data for comparative elemental estimating and cost planning

    Guide

    The list of elements are as follows:

    P rimary elements

    Special installations

    Alterations

    External works and services

    Training

    P reliminaries

    C ontractors fee

    C ontingency allowances

    Fluctuation

    Tax

    Salient features of Guide

    The element P ILIN G falls under Special Installations as it represents an abnormal site condition and would

    adversely affect meaningful cost comparison of typical building projects with different ground conditions

    BASEM ENT EXCAVAT IO NS are deemed to be part of the site preparation and, therefore, have been included

    with External Works and Services. There is no separate element called BASEM EN T and the basementcomponents such as floors, walls, etc, have been included with the appropriate P rimary Elements. However,

    in a special case the estimator may decide to treat the basement as a separate P rimary Element.

    There is an element IND EP ENDEN T ST RUC TURAL C O M PO NENTS applicable to unframed structures.

    All slabs and staircases fall under the elements Structural Frame or Independent Structural Components,

    as the case may be, and the G uide clearly indicates how these are to be provided for

    C O NC RET E WALLS, whether reinforced or not, are included with External Facade or Internal D ivisions, as

    the case may be, and not with the Structural Frame. Concrete walls are included with the External Envelope

    or Internal Divisions based on a functional, rather than a construction, definition

    PAR TIT IO NS is an element which is separate from Internal Divisions

    The category SPEC IALIS T INSTALLAT IO NS includes all specialist subcontractor work, except for the

    conventional Electrical Installation within the building. T here is a comprehensive list of Specialist Installations

    which incorporates all the more frequently encountered specialist work

    An element, M ISC ELLANEO US ITEM S, appears at the end of sections 1, 2 and 4 for any items which are

    not catered for within the list of elements

    TRAIN IN G is a bill required in certain countries mainly by government clients to be included in bills of

    quantities and, therefore, is an element of cost

    PRELIM IN AR IES includes a break-down of components. It appears at the end of the estimate

    EXPLANATORY NOTES

  • 5/28/2018 ECEA

    5/522

    C O NTRAC TO R S FEE is a separate section. This is an optional approach and the estimator may wish to

    include the principal contractors fee on a pro ratabasis within the individual rates in the estimate. T he

    Contractors fee is often a separately identifiable and negotiated amount, as in the case of multiple procurement

    contracts, and it may be helpful to reflect this cost separately. However, it should be realised that this

    approach will distort the cost analysis data

    C O NTING ENC Y ALLO WANC E includes both P rice and Detail Development and Building Contract

    C ontingencies as components. The Price and Detail Development Contingency is there to take care of

    design development at the estimating stage, and the Building Contract Contingency is included to cover

    unforeseen circumstances during the contract stage

    FLU C TUAT IO N is included in order to provide estimated pre-tender and contract fluctuation in cost

    TA X is included as an element of cost. The estimator should not attempt to indicate sales tax separately if

    it is not readily identifiable.

  • 5/28/2018 ECEA

    6/523

    Sections

    The elements are sub-divided into the following sections: Primary Elements, Special Installations, A lterations,

    External Works and Services, Training, P reliminaries, C ontractors Fee, C ontingency Allowances, Fluctuation

    and Tax. Elements are defined and constant for all buildings, thus facilitating the use of information obtained

    from a building when estimating the cost of other similar buildings

    Element

    Buildings are divided into elements (e.g. Substructure, External Facade, Roofs, etc). A n element is that part

    of any building that always performs the same function irrespective of its construction or specification.

    Elements should not be combined or divided

    Component

    Each element is sub-divided into components (eg the element R oofs is sub-divided into the components

    of Construction, C overings, Insulation, etc). Where a specific component forms a high cost part of the

    estimate, such component should be further sub-divided into sub-components

    Measurements required for element or component

    The measurement required is the actual quantitative unit of the element or component. Each of the elements

    or components is considered and evaluated in the plane in which it occurs (eg the element R oofs would

    be evaluated per square metre in the various planes of the roof, the component Downpipes per metre length

    and the component Dormers per unit number). The quantity of an element or a component is measured

    and multiplied by a monetary rate thus obtaining an estimated construction cost for that element or component

    Unit

    Unit denotes the unit of measurement of the individual element or component.

    Composition of element or component

    Each element comprises various components. Each component comprises various parts or sub-components

    Taking off/Pricing notes

    Taking off/pricing notes are guidelines to assist the estimator in the taking off and pricing stages of an

    estimate

    Code

    The code is the numerical identification for each element or component

    Cost

    C ost is the cost of an element and is the aggregate of the component costs comprising the particular

    element

    Quantity

    Q uantity is the actual measured quantity of an element or component

    DEFINITIONS

  • 5/28/2018 ECEA

    7/524

    Cost per unit

    C ost per unit is the cost of an element divided by the measured quantity of the element (eg the cost of the

    element Roofs divided by the area of the element R oofs)

    Cost per square metre

    C ost per square metre is the cost of the element divided by the construction area

    Cost (percentage) %C ost % is the cost of the element expressed as a portion of the total cost

    Construction area

    The construction area of a building is the total of all the areas of a building measured on plan at each covered

    floor level over the external walls or external lines of the outermost vertical enclosing planes or, where

    applicable, the centre line of party walls between buildings

    The following items are includedin the calculation of construction area

    Internal stairwell and staircase areas

    Lift shaft areas

    Duct space areas

    M ezzanine floor areas

    Finished floor areas in attic spaces

    Floor areas to penthouses, staff quarters, lift motor rooms, etc.

    All open but covered porches, balconies and balcony corridors within the enclosing planes of the main

    building

    Floor areas to attached sheds, carports, etc., and all partially completed rooms, porches, balconies, etc.,

    provided the relevant areas are covered and have at least two of their walls not less than two thirds of

    the storey height on which they occur

    The following to be excludedfrom the calculation of construction area

    External steps and paved areas

    Areas of projecting roof overhangs, hoods, canopies and the like

    Enclosed open areas (light or ventilation wells and courtyards)

    Areas of open covered ways and carports, etc

    Areas of unenclosed fire escapes

    Areas on plan of small projections such a pilasters, attached piers, fins, chimney breasts, etc

    Training

    G overnment clients in some countries may require the inclusion of an amount for training of individuals.

    Training of candidates shall consist of institutional training on a competency based modular basis and

    practical on-site training under competent supervision provided by the contractor

  • 5/28/2018 ECEA

    8/52

    SUMMARY OF ELEMENTS

  • 5/28/2018 ECEA

    9/525

    Primary elements

    Foundations

    G round floor construction

    Structural frame

    Independent structural components External facade

    Roofs

    Internal divisions

    Partitions

    Floor finishes

    Internal wall finishes

    C eilings and soffits

    Fittings

    Electrical installation

    Internal plumbing

    Fire services

    Balustrading, etc.

    M iscellaneous items

    Specialist installations

    P iling

    Sun control screens, grilles, etc

    Raised access floors

    Special fire prevention

    Lifts

    Escalators Air conditioning

    Ventilation

    H eating

    Special electrical installations

    O ther services

    Compactors

    Access control

    G ondolas and cleaners rails

    Stoves

    K itchen equipment

    Specialised equipment

    Security systems

    C ommunication systems

    Prefabricated cold rooms

    S ignage

    Artwork

    M iscellaneous items

    SUMMARY OF ELEMENTS

  • 5/28/2018 ECEA

    10/52

    Alterations

    Alterations

    External works and services

    Soil drainage

    Sub-surface water drainage

    Stormwater drainage

    Water supplies Fire service

    External electrical installations and electrification

    C onnection fees, etc

    Demolitions

    Site clearance

    Earthworks

    Boundary, screen and retaining walls, etc

    Fencing and gates

    Roads, paving, etc

    C overed parking, walkways, etc

    Pergolas, canopies, etc

    M inor construction work

    Pools, etc

    Sports facilities

    G arden works

    M iscellaneous items

    Training

    Training

    Preliminaries Preliminaries

    Contractors fee

    C ontractors fee

    Contingency allowances

    Price and detail development

    Building contract contingencies

    Fluctuation

    Pre-tender fluctuation

    C ontract fluctuation

    Tax

    Value added tax

    Sales tax

    6

  • 5/28/2018 ECEA

    11/52

    SCHEDULE OF ELEMENTS

  • 5/28/2018 ECEA

    12/527

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    1 100

    PRIMARY

    ELEMENTS

    Foundations

    100.1

    0

    Unreinforceds

    trip

    footings

    m2

    Comprisesallworkbelowlowestflo

    orlevel

    tothebuildingsproperbutincluding

    basementfoundationsbutexcludin

    g

    structuralframe,pilingandsiteexc

    avation

    (referto102Structuralframe,20

    0

    Pilingand409Earthworks)

    Measuredifferentsizesseparately

    Measurefootingsforexternalandinternal

    wallsseparatelyforusewhenmeasu

    ring

    superstructure

    Statedepthofexcavationandsizeoffo

    oting

    Areasonplanofstructurehaving

    foundations,measuredoverwalls

    Lengthonplan

    m

    Comprisesallexcavation,riskof

    collapse,

    backfilling,workingspac

    e,

    concrete,

    blindingandformwork

    m

    Comprisesallexcavation,riskof

    collapse,

    backfilling,workingspac

    e,

    concrete,

    blinding,

    formworkands

    teel

    reinforcement

    100.2

    0

    Reinforcedstrip

    footings

    Lengthonplan

    m

    Comprisesallexcavation,riskof

    collapse,

    backfilling,workingspac

    e,

    concrete,

    blinding,

    formworkandsteel

    reinforcement

    100.3

    0

    Strapsandfou

    ndation

    beams

    Lengthonplan

    Comprisesallexcavation,riskof

    collapse,

    backfilling,workingspac

    e,

    concrete,

    blinding,

    formworkandsteel

    reinforcementbelowthelowestfloorlevel

    100.4

    0

    Columns,colu

    mn

    basesandpile

    caps

    Number

    Comprisesallexcavation,riskof

    collapse,

    backfilling,workingspac

    e,

    concrete,

    blinding,

    formworkandsteel

    reinforcement

    100.5

    0

    Liftshaftbases

    Number

    no

    no

    Measuredifferentsizesseparately

    Measurefootingsforexternalandinternal

    wallsseparatelyforusewhenmeasu

    ring

    superstructure

    Statedepthofexcavationandsizeoffo

    oting

    Measuredifferentsizesseparately

    Measurebeamsforexternalandinte

    rnal

    wallsseparatelyforusewhenmeasu

    ring

    superstructure

    Statedepthofexcavationandsizeoffo

    oting

    Measuredifferentsizesseparately

    Statedepthofexcavationandsizeofbases

    andpilecaps

    Statecolumnsizesandheightcolum

    ns

    Measuredifferentsizesseparately

    Statedepthofexcavationandsizeofbases

  • 5/28/2018 ECEA

    13/528

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Foundations

    (continued)

    100.6

    0

    Brickandbloc

    kwalls

    m

    Comprisesallbrickwork,

    blockwor

    k,

    brick

    reinforcementandplinthfinishesu

    pto

    lowestfloorlevel

    Measuredifferenttypesandthicknesses

    ofwallsseparately

    Includehorizontaldampproofcourseand

    triangularfilletinwalls

    Stateheightofwallandfinish

    Lengthonplan

    Lengthonplan

    Statethicknessofwallsandmeasure

    differentthicknessesseparately

    Stateheightofwallandfinish

    m

    Comprisesallconcrete,

    formwork,

    steel

    reinforcementandplinthfinishesu

    pto

    lowestfloorlevel

    m3

    Comprisesrockexcavation,remov

    alof

    concrete,

    brickwork,etc

    100.8

    0

    Rock,etcexca

    vation

    Volume

    Statepercentageofexcavationvolum

    e

    allowed

    100.7

    0

    Reinforcedconcrete

    walls

    m2

    Comprisescartingon/awayandde

    watering

    itemsthatapplyto100.1

    0to100.7

    0above

    (dewateringtobeincludedwith40

    9.7

    0

    Dewateringwhenbasementsoccur)

    100.9

    0

    Sundries

    Areaonplanofstructurehaving

    foundations

    Eachunittobemeasuredintheapplicable

    unitofmeasurement

    Groundfloor

    construction

    101.1

    0

    Solidfloors

    Comprisescompletegroundfloor

    construction,

    includingintegralst

    epsand

    ramps

    Finishes(screed,etc)tobemeasured

    under

    109FloorfinishesandSub-surface

    water

    drainagetobemeasuredunder401

    Sub-surfacewaterdrainage

    Areaonplanofgroundfloor

    construction,measuredoverwalls

    101

    Oftenthesameareaas

    foundations

    Comprisesexcavationorfillingund

    ersolid

    floors,antproofing,

    hardcore,underfloor

    waterproofing,surfacebeds,mesh

    reinforcement(ifany),expansionjo

    intsand

    thickeningoutofsurfacebedsunderwalls

    andatedges

    Measuredifferenttypesseparately.

    Measureexpansionjointsandthickening

    outseparately

    Statefloorthickness

    Areaonplanoftheportionhaving

    solidfloors,measuredoverwalls

    101.2

    0

    Suspendedflo

    ors

    Comprisesexcavation,antproofing,

    concrete,

    brickworkandtiestosleeperpiers,w

    allplates,

    sleepers,

    bearers,

    floorjoists,

    boar

    ding,

    battens,slabs,

    formworkandmesh

    reinforcement(ifany)

    Measuredifferenttypesseparately

    Appliedfinishestoboardingtobe

    measuredunder109Floorfinishe

    s

    Areaonplanoftheportionhaving

    suspendedfloors,measuredover

    walls

    m2

    m2

    m2

  • 5/28/2018 ECEA

    14/529

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Structural

    frame

    102.1

    0

    Slabs

    Comprisesthecomponentsabove

    lowest

    floorlevelthatform

    theskeletonframeof

    thebuilding

    Concretewallstobemeasuredwithexternal

    envelopeofinternaldivisions

    102

    Adjustareaforlarge

    openings

    m2

    Areaonplanofstructuralfloorand

    roofslabsmeasuredoversmall

    openingsandstaircases(deduct

    areaofliftshaftsandlarge

    openings)

    Comprisesconcrete,

    formwork(w

    hether

    smooth,patterned,orotherwise),

    steel

    reinforcement,structuralsteelworkand

    sundryitems

    Measuredifferentslabtypesseparately

    Measuresolidportionsofcoffersla

    bs

    separately

    Statethicknessofslabs

    m2

    Areaonplanofstructuralfloorand

    roofslabsmeasuredoversmall

    openings(deductareaofstaircases,

    liftshaftsandlargeopenings)

    102.2

    0

    Ramps

    Comprisesconcrete,

    formwork(w

    hether

    smooth,patterned,orotherwise),

    steel

    reinforcement,structuralsteelworkand

    sundryitems

    Statethicknessoframps

    Measureappliedfinishesunder109

    Floor

    finishesandbalustradesunder116

    Balustrading,etc

    m2

    Areaonslopemeasuredover

    supportingwalls

    102.3

    0

    Staircases

    Comprisesconcrete,

    formwork(w

    hether

    smooth,patterned,orotherwise),

    steel

    reinforcement,structuralsteelworkand

    sundryitems

    Measureappliedfinishesunder109

    Floor

    finishesandbalustradesunder116

    Balustrading,etc

    m2

    Areaonplanmeasuredover

    enclosingwallsateachfloorlevel

    102.4

    0

    Columnssupporting

    slabs

    Comprisesconcrete,

    formwork(w

    hether

    smooth,patterned,orotherwise),

    steel

    reinforcement,structuralsteelworkand

    sundryitems

    Measuredifferentsizesseparately

    Statesizeofcolumns

    m

    Length

    Groundfloor

    construction

    (continued)

    101.3

    0

    Steps

    m2

    Comprisesexcavations,

    filling,antp

    roofing,

    hardcore,waterproofing,concrete,

    formwork,meshreinforcement

    (ifany),etc

    Measurefinishesunder108Floor

    finishesandbalustradesunder115

    Balustrading,etc

    Areaonplanofthestepsmeasured

    overwalls

    101

    m2

    101.4

    0

    Ramps

    Comprisesexcavations,

    filling,antproofing,

    hardcore,waterproofing,concrete,

    mesh

    reinforcement(ifany),etc

    Statethicknessoframps,measurefin

    ishes

    under108Floorfinishesandbalustrades

    under115Balustrading,etc

    Areaonslopeoftheramps

    measuredoverwalls

    102.5

    0

    Beams

    Comprisesconcrete,

    formwork(whether

    smooth,patterned,orotherwise),steel

    reinforcement,structuralsteelworkand

    sundryitems

    m

    Measuredifferentsizesseperately

    Statenetsizeofbeams

    Length

  • 5/28/2018 ECEA

    15/5210

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Independent

    structural

    components

    m2

    Comprisesramps,staircases,slabsin

    unframedstructures,

    independentcolumns,

    beamsandportalframesnotform

    ingpart

    ofthestructuralframe(referto10

    3.2

    0for

    rampsand103.3

    0forstaircasesf

    orming

    partoftheintegralstructuralfram

    e)

    Concretewallstobemeasuredwithe

    xternal

    envelopeorinternaldivisions

    Constructionarea

    103.1

    0

    Ramps

    103

    m2

    Comprisesreinforcedconcrete,fo

    rmwork

    (whethersmooth,patternedoroth

    erwise),

    steelreinforcement,structuralsteelwork

    andsundryitems

    Statethicknessoframps

    Measureappliedfinishesunder109Floor

    finishesandbalustradesunder116

    Balustrading,etc

    Areaonslopemeasuredoverwalls

    103.2

    0

    Staircases

    m2

    Comprisesreinforcedconcrete,fo

    rmwork

    (whethersmooth,patternedoroth

    erwise),

    steelreinforcement,structuralsteelwork

    andsundryitems

    Measurereinforcedconcrete,structural

    steel,etc,staircasesseparately

    Measureappliedfinishesunder109Floor

    finishesandbalustradesunder116

    Balustrading,etc

    Areaonplanmeasuredover

    enclosingwallsateachfloorlevel

    103.3

    0

    Slabsinunframed

    structures

    m2

    Comprisesreinforcedconcrete,fo

    rmwork

    (whethersmooth,patternedoroth

    erwise),

    steelreinforcement,structuralsteelwork

    andsundryitems

    Measuredifferenttypesseparately

    Statethicknessandtypeofslabs

    Areaonplanoffloorandroofslabs

    measuredoversmallopenings

    (deductareaofstaircasesandlarge

    openings)

    103.4

    0

    Independentcolumns

    m

    Comprisesreinforcedconcrete,fo

    rmwork

    (whethersmooth,patternedoroth

    erwise),

    steelreinforcement,structuralsteelwork

    andsundryitems

    Measuredifferenttypesseparately

    Statesizeofcolumns

    Length

    103.5

    0

    Beams

    m

    Comprisesreinforcedconcrete,fo

    rmwork

    (whethersmooth,patternedoroth

    erwise,

    steelreinforcement,structuralsteelwork

    andsundryitems

    Measuredifferenttypesseparately

    Statenetsizeofbeams

    Length

    103.6

    0

    Portalframes

    m

    Comprisesreinforcedconcrete,fo

    rmwork

    (whethersmooth,patternedoroth

    erwise),

    steelreinforcement,structuralsteelwork

    andsundryitems

    Statesizeofbeamsandcolumns

    Combinedlengthofcolumnsand

    beams

  • 5/28/2018 ECEA

    16/5211

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    External

    facade

    m2

    Comprisesallverticalcomponents

    enclosingthebuildingincludingga

    ble

    walls

    Measuredfrom

    lowestfloorlevelto

    undersideofroof

    Measureparapetandbalustradewallsunder

    116Balustrading,etc

    Areaonelevationoftheexternal

    facadeofthebuildinginlinewith

    thegeneralfacesofthebuilding

    andmeasuredoveropenings,

    columns,slabedges,etcand

    includinggablewalls

    104.1

    0

    Brickandbloc

    kwalls

    104

    m2

    Comprisesbrickwork,

    blockwork,b

    eam

    filling,gablewalls,sundries(egdamp-

    proofing,

    tiestoconcrete,

    building

    cavities

    solid,

    tanking,etc)excludingbrickw

    ork,etc

    impartedbyopenings

    Measuredifferenttypesandwallthickn

    esses

    separately

    Areaonelevation

    104.2

    0

    Reinforcedconcrete

    walls

    m2

    Comprisesreinforcedconcrete,

    formwork

    (whethersmooth,patternedorothe

    rwise),

    steelreinforcement,waterproofingand

    tanking

    Measuredifferentwallthicknesses

    separately

    Areaonelevation

    104.3

    0

    Curtainwalls

    m2

    Comprisesthecurtainwallcompletewith

    framing,glass,

    infillpanels,service

    ducts,

    pelmets,etcandanyrelatedsundryb

    uilders

    work

    Ifdividedverticallyandhorizontallyby

    stucturalframe,

    thenmeasureaswin

    dows

    Areaonelevation

    104.4

    0

    Precastcladding

    m2

    Comprisesthecompleteprecastcladding

    withfinish,steelreinforcement,fixing

    method,shims,etc

    Measuredifferenttypes,

    thicknesses

    and

    finishesseparately

    Developedareaonelevation

    104.5

    0

    Externalfinishes

    m2

    Comprisesallfinishestotheextern

    al

    envelope,excludingfinishesimpar

    tedby

    stoneworkandopeningsbutinclud

    ingall

    finishestoprojectingslabs,etc

    Measuredifferentfinishesseparately

    Measureexpensivefinishesindetail

    Smooth,patternedorotherformworkto

    concretewallstobemeasuredsepar

    ately

    Areaonelevation

    104.6

    0

    Windows

    m2

    Compriseswindows,

    lintols,

    intern

    aland

    externalcills,pelmets,curtaintracks,

    remote

    control,reveals,glassandpaint

    Measurewindowwithdifferenttypesofglass

    separately

    Measurelouvredrapesseparately

    Areaonelevation

  • 5/28/2018 ECEA

    17/5212

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Externalfacade

    (continued)

    m2

    Comprisestheshopfronts,shopen

    trances,

    doors,stallboardrisersandbulkheads

    aboveincludingfinishesandappu

    rtenant

    sundrybuilderswork

    Measuresingle,

    doubleandrotating

    doors

    separately

    Stateprovisionalsum

    netrateifappl

    icable

    Doorstobemeasuredseparatelyas

    extra

    over

    Stateifremotecontrol

    Measurebulkheadconstruction,

    fixin

    gand

    finishesthereofseparately

    Areaonelevationmeasuredover

    doorsandstallboardrisers

    104.7

    0

    Shopfrontsan

    dsimilar

    entrancescree

    ns

    Comprisesdoors,

    frames,

    lintols,fanlights,

    sidelights,anchors,

    ironmongery,

    door

    closers,

    dowels,reveals,glassandpaint

    Measuredifferenttypesofsingleandd

    ouble

    doorsseparately

    Stateifdoorsarenonstandardsizes

    Measuredoorclosersseparately

    Measurematrecessesanddoorma

    ts

    separately

    Number

    104.8

    0

    Doors

    no

    Comprisesdoors,

    frames,

    lintols,fanlights,

    sidelights,anchors,

    ironmongery,

    door

    closers,

    dowels,reveals,glassandpaint

    Measurespecialdoors(egfireand

    electronicdoors)separately

    Number

    104.9

    0

    Specialdoors

    no

    Comprisesthecompleteroofinclu

    ding

    concreteflatroofs

    Excludesparapetandgablewalls

    Areaoftheroofcoveringand

    waterproofingmeasuredinthe

    variousplanesoftheroofover

    parapets,

    boxgutters,etc

    m2

    Roofs

    105

    105.1

    0

    Construction

    (otherthanco

    ncrete)

    Comprisesthecompleteroofconstruction

    includingwallplates,

    ties,

    trusses

    ,

    treatment,battens,purlins,

    boarding,

    hip

    andridgecoverings,windbracing,etc

    Measuretimberandstructuralsteel

    constructionseparately

    Areaonflatoronslope,excluding

    rooflights

    m2

    105.1

    5

    Coverings

    Comprisesroofanddomecoverin

    gs

    Measuredifferenttypesseparately

    Deductforareaofrooflightsanddo

    rmers

    Areaonflatoronslope,excluding

    rooflightsanddormers

    m2

    105.2

    0

    Roof,lanternand

    southlights

    Comprisesconstruction,glassor

    polycarbonate,paint,etc

    Measuredifferenttypesseparately

    Area

    m2

    Measurewaterproofed

    areaseparatefrom

    roofconstruction

    area

  • 5/28/2018 ECEA

    18/5213

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Roofs

    (continued)

    m2

    Comprisesscreedsforandwaterproofing

    toroofs,gutters,canopies,etc,

    tur

    nups,

    sundryitemsandpaint

    Measuredifferenttypesseparately

    Deductforareaofrooflightsanddormers

    Areameasuredoverparapets,etc

    butexcludingrooflightsand

    dormers

    Waterproofing

    105.2

    5

    m2

    Comprisesallinsulationmaterials

    and

    appurtenantsundryitems

    Deductforareaofrooflightsanddormers

    Areaonflatoronslopebut

    excludingrooflightsanddormers

    Insulation

    105.3

    0

    m2

    Comprisesthematerialsformingthe

    trafficablesurfaceincludingappurtenant

    sundryitems

    Measuredifferenttypesseparately

    Measureindetailifexpensive

    Areaofwaterproofingfinishedwith

    trafficablesurfaces

    Trafficablesur

    faces

    105.3

    5

    m

    Compriseseavessoffitandedgetr

    eatment

    andeavesgutters

    Measuredifferenttypesseparately

    Measureindetailifexpensive

    Stateprojection

    Length

    Eaves

    105.4

    0

    m

    Comprisessoffitandedgetreatme

    nt

    Measuredifferenttypesseparately

    Measureindetailifexpensive

    Length

    Verges

    105.4

    5

    m

    Comprisesflashings,

    lightningcon

    ductors

    andvalleydetails

    Statewidthofflashings

    Measureeachaccessory,etc.separately

    Length

    Accessoriesand

    flashings

    105.5

    0

    m

    Comprisesdownpipescast-inors

    urface

    mounted,sundriesandpaintinclu

    ding

    outlets,rainwaterheads,etc

    Measuredifferenttypesseparately

    Length

    Downpipes

    105.5

    5

    no

    Comprisesridgeventilators,revolving

    ventilators,poweredventilators,s

    lope

    ventilators,etc

    Measuredifferenttypesseparately

    Number

    Ventilators

    105.6

    0

    no

    Comprisesconstruction,cladding,c

    overing,

    flashing,window,etc

    Measuredifferenttypesseparately

    Number

    Dormers

    105.6

    5

    no

    Comprisesconstruction,

    finishes,

    cowls,

    etc

    Measuredifferenttypesandsizes

    separately

    Statelength

    Number

    Chimneys

    105.7

    0

  • 5/28/2018 ECEA

    19/5214

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Internal

    divisions

    m2

    Comprisesallverticalcomponentsdividing

    theinteriorofthebuildingexcluding

    partitions(referto108Partitions)

    Areaonelevationofinternal

    divisionsmeasuredoverall

    openings,columns,etc

    Brickandbloc

    kwalls

    106.1

    0

    m2

    Comprisesallbrickwork,

    blockworkand

    sundries

    Measuredifferenttypesandthicknesses

    separately

    Areaonelevationexcluding

    openings

    106

    Reinforcedconcrete

    walls

    106.2

    0

    m2

    Comprisesreinforcedconcrete,formwork

    (whethersmooth,patternedorotherwise),

    steelreinforcement,etc

    Measuredifferentthicknessessepar

    ately.

    Areaonelevationexcluding

    openings

    Borrowedligh

    ts

    106.3

    0

    m2

    Comprisesdoors,

    frames,

    lintols,fanlights,

    sidelights,anchors,

    ironmongery,

    door

    closers,

    dowels,reveals,glassand

    paint

    Measuredifferenttypesofglasssepa

    rately

    Areaonelevation

    Doors

    106.4

    0

    no

    Measuredifferenttypesandsizes

    separately

    Stateifdoorsarenonstandardsizes

    Number

    Comprisesdoors,

    frames,

    lintols,fanlights,

    sidelights,anchors,

    ironmongery,

    door

    closers,

    dowels,reveals,glassand

    paint

    Specialdoors

    106.5

    0

    no

    Measuredifferenttypesandsizes

    separately

    Stateifdoorsarenonstandardsizes

    Number

    Comprisesdemountable,

    fixed,firerated

    andglazedpartitions,

    frames,

    doors,

    fanlights,

    borrowedlights,

    ironmo

    ngery,

    finishes,attachedskirtingsandco

    rnices,

    glass,etc

    Partitions

    107.1

    0

    m2

    Measureeachtypeseparately

    Measureoverdoors

    Stateprovisionalsum

    netrateifapplicable

    Areasonelevationofpartitions

    measuredoverdoors,sidelights,

    fanlightsandborrowedlights

    Partitions

    107

    Comprisesdemountable,

    fixed,firerated

    andglazedpartitions,

    borrowedlig

    hts,

    finishes,attachedskirtingsandco

    rnices,

    glass,etc

    m2

    Areaonelevation

    Measuretoilet

    partitionsseparately

    from

    office

    partitioning

    Doors

    107.2

    0

    Comprisesdoors,

    frames,

    fanlights,

    sidelights,

    ironmongery,

    doorclosers,paint

    andglassandformingopeningsin

    partitioning

    no

    Number

    Measuredifferenttypesandsizesseparately

    Doorstobemeasuredseparatelyas

    extra

    over

    Comprisesborrowedlights,viewpanels,

    etc,cills,glassandpaint

  • 5/28/2018 ECEA

    20/5215

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Floorfinishes

    m2

    Comprisesallfinishestofloors,s

    tairs,

    ramps,etc

    Measureparking

    garage,etcfinishes

    separatelyfrom

    generaloffice,etc

    areas

    Areaonplanoffloorsmeasured

    overwalls,smallopeningsand

    staircases

    108.1

    0

    108

    m2

    Comprisesscreedsandfloorfinish

    esofall

    typesoffloorconstruction,raised

    access

    floors,etcincludingdividingstrip

    s,etc

    Appliedfloorfinishes

    Measuredifferenttypesseparately

    StatePCnetrateifapplicable

    Measureraisedaccessfloorconstruction

    under202Raisedaccessfloors

    Areaonplanofthoseportionsof

    thebuildinghavingappliedfloor

    finishesmeasuredoverwallsand

    smallopenings(deductareaof

    staircases,

    liftshaftsandlarge

    openings)

    108.2

    0

    m2

    Comprisesfinishestotreads,risers,

    landingsandedges

    Measuredifferenttypesseparately

    Soffitfinishestostairstobemeasured

    under111Ceilingsandsoffits

    Areaonplanofthestaircaseand

    rampsmeasuredoverwallsateach

    floorabovelowestfloorlevel

    Stairandramp

    finishes

    108.3

    0

    m

    Comprisesallskirtingsincluding

    finishes

    exceptwhereintegralwithpartitionsand

    panelling

    Measuredifferenttypesseparately

    Length

    Skirtings,etc

    109.1

    0

    m2

    Comprisesallfinishestointernalwalls,

    includinginternalcolumns,reveals,

    projectingbeams,etcincludingin

    ternal

    finishestoexternalwalls

    Areaofinternalwall

    finishesisareaof

    externalenvelopeplus

    twicetheareaof

    internaldivisions.

    Ratetobeadjustedfor

    largeglazed,etcareas

    Areaonelevationofinternal

    finishestoallwallsmeasured

    betweenunfinishedfloorand

    ceilingandoverdoors,windows,

    etc

    Finishes

    Internalwall

    finishes

    109

    m2

    Comprisesallfinishestointernalwalls,

    includingfinishestoliftshaftand

    other

    concretewalls(exceptwherefinishis

    impartedbyformwork),internalco

    lumns

    reveals,projectingbeams,etc

    Areaonelevationbutexcluding

    areaoffinishesimpartedby

    formwork,openings,etc

    Measuredifferentfinishesseparately

    StatePCnetrateifapplicable

    Measureexpensivefinishesaccurately

    109.2

    0

    Rails,etc

    Comprisesallpicturerails,

    hatandcoat

    rails,etc,

    includingfinishes,exceptwhere

    integralwithpartitionsandpanelling

    Length

    Measuredifferenttypesseparately

    m

  • 5/28/2018 ECEA

    21/5216

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Ceilingsand

    soffits

    Measureceilingsover

    parkinggarages,etc,

    separatelyfrom

    generaloffice,shop,

    mall,etc,areas

    Areaonplanofthoseportionsof

    thebuildinghavingsoffitfinishes

    andceilingsmeasuredoverwalls,

    smallopeningsandstaircases

    (deductareaofliftshaftsandlarge

    openings)

    110

    110.1

    0

    m2

    Comprisessoffitfinishesandceilings

    Slabsoffitfinishes

    Deductareaofstaircases,

    liftshafts

    and

    largeopenings

    Areaonplanmeasuredoverwalls,

    smallopeningsandstaircases

    Comprisesplasterandpaintfinishesto

    soffitsofslabs,stairs,ramps,

    landin

    gsand

    sidesandsoffitsofbeams

    110.2

    0

    m2

    Nailed-upceil

    ings

    Measuredifferenttypesseparately

    Deductareaofstaircases,

    liftshafts

    and

    largeopenings

    Areameasuredoverwallsandsmall

    openings

    Comprisesjoists,

    bearers,

    hangers

    ,

    brandering,

    boarding,

    finishes,

    trap

    doors,

    etc

    m2

    Suspendedce

    ilings

    Measuredifferenttypesseparately

    Deductareaofstaircases,

    liftshafts

    and

    largeopenings

    Stateprovisionalsum

    netrateifapplicable

    Areaonplanmeasuredoverwalls

    andsmallopenings

    Comprisesconstruction,

    hangers,

    tees,

    panels,

    finishes,etc

    110.3

    0

    m

    Bulkheads

    Measuredifferenttypesseparately

    Stategirth

    Lengthonplan

    Comprisesthecompleteconstruction

    ,fixing

    andfinishesthereof

    110.4

    0

    m

    Cornices,etc

    Measuredifferenttypesseparately

    Lengthonplan

    Comprisesallcornices,etcincluding

    finishes

    110.5

    0

    m2

    Chalkboards,

    etc

    Statetypeofmaterialandfinish

    Sanitaryfittings,etcintegraltojoinery

    fittingstobemeasuredunder113Internal

    plumbing

    Constructionarea

    Comprisesfittingscompletewith

    ironmongery,steelwork,

    finishes,e

    tc

    111.0

    5

    Fittings

    111

    Allowwhere

    possible

    individual

    m2

    Measuredifferenttypesseparately

    Stateifpatenttype.

    Areaonelevation

    Compriseschalkboards,whiteboards,etc

    Pinningboard

    s,etc

    111.1

    0

    m2

    Measuredifferenttypesseparately

    Stateifpatenttype

    Areaonelevation

    Comprisespinningboards,noticeboards,

    etc

    m2

  • 5/28/2018 ECEA

    22/5217

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Fittings

    (continued)

    m2

    Areaonplan

    Comprisesraisedplatformsnotforming

    partofthefloor

    111.1

    5

    Raisedplatforms

    Stateheightandcovering

    m

    Length

    Comprisescupboardsbuiltintorecesses

    inwalls,

    betweenwalls,etc

    111.2

    0

    Built-incupbo

    ards

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Comprisescupboardsattachedtofaceof

    walls

    111.2

    5

    Cupboardspluggedto

    walls

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Comprisespigeonholefittings,magazine

    displayracks,etc

    111.3

    0

    Pigeonholefittings,etc

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Comprisesworkbenchesandworktops

    includingintegralcupboardsorfra

    ming

    below

    111.3

    5

    Workbenches

    andwork

    tops

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Comprisesroom

    dividersofalltypesother

    thanbuilt-incupboardsorcupboards

    pluggedtowalls

    111.4

    0

    Room

    dividers

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Comprisescounters

    Counters

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    111.4

    5

    m

    Length

    Compriseskitchenunitsatfloorle

    vel

    Kitchenfloorunits

    111.5

    0

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Compriseskitchenunitsfixedtow

    allsbut

    nottouchingthefloor

    Kitchenwallu

    nits

    111.5

    5

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    m

    Length

    Comprisesshelving,

    brackets,clea

    ts,

    bearers,grounds,etc

    Shelving

    111.6

    0

    Measuredifferenttypesseparately

    Stateheightandifpatenttype

    Measurefreestandingshelvingseparately

    Statenumberofshelves

    m

    Length

    Comprisespews

    Pews

    111.6

    5

    Measuredifferenttypesseparately

    m

    Length

    Comprisesbenchesforseatingpurposes

    Singleseating

    benches

    111.7

    0

    Measuredifferenttypesseparately

  • 5/28/2018 ECEA

    23/5218

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Fittings

    (continued)

    m

    Length

    Comprisesbacktobackbenchesfor

    seating

    purposes

    111.7

    5

    Doubleseating

    benches

    Measuredifferenttypesseparately

    no

    Number

    Comprisestablesformingpartoffittings

    111.8

    0

    Tables

    Measuredifferentplanshapessepa

    rately

    no

    Number

    Comprisespulpits,

    lecterns,etc

    111.8

    5

    Pulpits,

    lecterns,etc

    Measuredifferenttypesseparately

    Measuredifferentuseareaswithina

    buildingandanticipatedluxlevels

    separately

    113.0

    5

    no

    Number

    Comprisesstaff,sport,

    firearm,etc

    lockers

    111.9

    0

    Lockers

    Measureareaof

    parkinggarages,etc

    separatelyfrom

    generaloffices,

    shops,mall,etc.areas

    Electrical

    installation

    (referalsoto209

    and405)

    m2

    Constructionarea

    Comprisesthecompleteelectrical

    installationincludinglightfittingsand

    builderswork

    112

    112.1

    0

    Installation

    m2

    Area

    Comprisesthecompleteelectrical

    installationincludingpowerskirting

    orrails

    andgenerallightfittingsbutexcluding

    tranformersandbuilderswork

    Measurechandeliers,etcseparately

    112.2

    0

    Speciallightfittings

    Number

    Comprisesspeciallightfittingsnotincluded

    elsewhere

    no

    112.3

    0

    Builderswork

    Constructionarea

    Comprisesbuildersworkinconne

    ction

    with113.1

    0and113.2

    0above,pro

    fitand

    attendance,sleeves,

    ductcovers,e

    tc

    m2

    Internal

    plumbing

    113

    Geysers,

    boilers,pumps,etcnottob

    e

    countedasfittings

    Each600mm

    ofstallurinalandeach

    showertobecountedasafitting

    Numberofsanitaryfittings

    Comprisesthecompleteinternalplumbing

    installation

    no

    Number

    Comprisesfittingsandunitscompletewih

    taps,servicepipes,stopcocksand

    traps

    andthosecombinedwithcupboard

    sor

    worktops

    no

    Sanitaryfitting

    s

    StatePCnetrateifapplicable

    Statequalityandcolour

    no

    Number

    Comprisesfittingsthatcannotbein

    cluded

    above

    111.9

    5

    Miscellaneous

    Measuredifferenttypesseparately

    Statesizeandheight

  • 5/28/2018 ECEA

    24/5219

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Internal

    plumbing

    (continued)

    no

    Number

    Comprisessoapdishes,

    toiletpaperh

    olders,

    mirrors,

    towelrails,medicinecabin

    ets,etc

    113.1

    0

    Sanitaryfittings

    sundries

    Number

    no

    Comprisesanti-siphonage,waste,s

    oiland

    ventstacks,paintonpipes,aproportionof

    holesandcuttingtotiling,etc

    113.1

    5

    Sanitaryplumbing

    Hotwatercylinderstobecountedasa

    supplypoint

    Number

    no

    Comprisescovers,

    framing,

    finishe

    s,etc

    113.2

    0

    Plumbingductcovers

    Number

    no

    Comprisesallcoldwaterservicesincluding

    paintonpipes,aproportionofholesand

    cuttingtotiling,wheelvalves,etc

    113.2

    5

    Coldwatersupplies

    Statecapacityofstoragetanks

    Number

    no

    Comprisestanks,

    ballvalves,

    tankstands,

    traysandoverflowpipes

    113.3

    0

    Waterstorage

    tanks

    Statecapacityofgeysers

    Number

    no

    Comprisespiping,

    lagging,painton

    pipes,

    aproportionofholesandcuttingto

    tiling,

    wheelvalves,etc

    113.3

    5

    Hotwatersupplies

    Number

    no

    Comprisesgeysers,stands,

    traysa

    nd

    overflowpipes(ifany)andthosecombined

    withcupboards

    113.4

    0

    Geysers

    Statecapacityofboilers,etc

    Number

    no

    Comprisesboilersandhotwatercylinders,

    laggings,etc

    113.4

    5

    Boilers

    Statearea,

    typeofpanelsandcapac

    ityof

    tanks

    Number

    no

    Comprisespumps,motors,etc

    113.5

    0

    Boosterpumps

    Number

    no

    Comprisessolarheatinginstallation,

    panels,

    support-andpipeworkandassocia

    ted

    storagetanks

    113.5

    5

    Solarheating

    Number

    no

    Comprisesheatpumpinstallation,support-

    andpipework

    113.6

    0

    Supplyheatpumps

  • 5/28/2018 ECEA

    25/5220

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Fireservices

    (referalsoto203)

    no

    Numberoffireservicefittings

    Comprisescompletefireserviceins

    tallation

    excludingsprinklerinstallationandother

    specialfirefightinginstallations(r

    eferto

    203Specialfireprevention.)

    114

    Firestopstovertical

    serviceshafts

    ,etc

    Measureinnumberorlengthifareasare

    inappropriate

    114.1

    0

    Area

    m2

    Comprisesfirestopping

    Fireresistant

    paint,etc

    Measuredifferenttypesseparately

    114.2

    0

    Area

    m2

    Comprisesfireresistant(intumescent)paint

    tostructuralsteelwork,etc

    Extinguishers

    114.3

    0

    Number

    no

    Comprisesextinguishersincluding

    backing

    boards,etc

    Measuredifferenttypesseparately

    Firehosereel

    s

    114.4

    0

    Number

    no

    Comprisesfirehosereels

    Statecapacity

    Valveandhos

    e

    couplings

    114.5

    0

    Number

    no

    Comprisesvalveswithinstantaneo

    us

    connectors,

    boosterpumpconnec

    tions,

    etc

    Watersupply

    114.6

    0

    Number

    no

    Comprisespiping,paintonpipes,

    a

    proportionofholesandcuttingtiling,wheel

    valves,etc

    Waterstorage

    tanks

    114.7

    0

    Number

    no

    Comprisestanks,

    ball-valves,

    tank

    stands,

    traysandoverflowpipes

    Boosterpump

    s

    114.8

    0

    Number

    no

    Comprisespumps,motors,etc

    Balustradewa

    lls

    115.1

    0

    Areaonelevation

    m

    Comprisesbalustrading,

    balustrad

    eand

    parapetwalls

    Balustrading,

    etc.

    115

    m2

    Comprisesbalustradewallscompletewith

    copings,

    finishes,etc

    Lengthofallbalustrading,parapet

    walls,etc

    Parapetwalls

    115.2

    0

    Areaonelevation

    m2

    Comprisesparapetwallscomplete

    with

    copings,

    finishes,etc

  • 5/28/2018 ECEA

    26/5221

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Balustrading,

    etc.

    (continued)

    m

    Comprisessteelbalustrading,

    hand

    rails,

    sundryfixingitems,

    infillpanels,finishes,

    cappings,etc

    Steelbalustrad

    ing

    Measuredifferenttypesseparately

    Stateheight

    115.3

    0

    Length

    Comprisesitemsthatcannotbeinc

    luded

    withotherelementsorcomponents

    above

    m2

    116.1

    0

    Miscellaneous

    items

    116

    m

    Comprisestimberbalustrading,

    han

    drails,

    sundryfixingitems,

    infillpanels,finishes,

    cappings,etc

    Timberbalustr

    ading

    Measuredifferenttypesseparately

    Stateheight

    115.4

    0

    Length

    m

    Comprisesotherbalustrading,

    handrails,

    sundryfixingitems,

    infillpanels,finishes,

    cappings,etc

    Otherbalustrading

    Measureexpensivebalustradingsepa

    rately

    Stateheight

    115.5

    0

    Length

    Constructionarea

    Length

    Comprisesconstruction,

    finishes,covers,

    etc

    m

    Floorducts

    Measuredifferenttypesseparately

    Statedepthandwidth

    116.2

    0

    Number

    Comprisesotheritemsthatcannot

    be

    includedwithotherelementsand

    componentsabove

    no

    Other

    Measuredifferenttypesseparately

    200.1

    0

    Areaonplanoflowestfloorhaving

    piledfoundations

    Comprisesspecialistpilingandsundry

    builderswork

    m2

    Sheetpiling

    SPECIALIST

    INSTALLATIONS

    2 200

    Piling

    Areaonelevation

    Comprisessheetpilingexcludingbuilders

    work

    m2

    Statetype,

    diameterandlength

    200.2

    0

    Drivenpiles

    Number

    Comprisesdrivenpilesexcludingbuilders

    work

    no

    Statetype,

    diameterandlength

    200.3

    0

    Castin-situpiles

    Number

    Comprisescastin-situpilesexclud

    ing

    builderswork

    no

    Measureestablishmentandde-

    establishmentseparately

    200.4

    0

    Establishment,

    etc

    Number

    Comprisesestablishmentandde-

    establishment

    no

  • 5/28/2018 ECEA

    27/5222

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Piling

    (continued)

    m2

    Comprisespiletesting,etc

    Piletesting,et

    c

    200.5

    0

    Areaonplanoflowestfloorhaving

    piledfoundations

    Stateifpatenttype

    Measureappliedfinishesunder109

    .10

    Appliedfloorfinishes

    m2

    Comprisesbuilderswork,cuttingdown

    pilingitems,etcinconnectionwith

    200.1

    0

    to200.5

    0above

    Builderswork

    200.6

    0

    Areaonplanoflowestfloorhaving

    piledfoundations

    Suncontrol

    screens,grilles,

    etc.

    m2

    Comprisesspecialsuncontrolfeatu

    resnot

    integralwiththestructuralframeco

    mplete

    withfinishesandsundrybuilderswork

    Suncontrolsc

    reens,

    grilles,etc

    201.1

    0

    Areaonelevationofsuncontrol

    screens,grilles,etc

    201

    m2

    Comprisesspecialsuncontrolfeatu

    resnot

    integralwiththestructuralframeco

    mplete

    withfinishesexcludingbuilderswork

    Areaonelevation

    Measuredifferenttypesseparately

    Builderswork

    201.2

    0

    m2

    Comprisesbuildersworkinconne

    ction

    with201.1

    0above

    Areaonelevation

    Raisedaccess

    floors

    202.1

    0

    m2

    Comprisesallraisedaccessfloors

    Areaonplanofthoseportionsof

    thebuildinghavingraisedaccess

    floorsmeasuredoverwallsand

    smallopenings

    Raisedaccess

    floors

    202

    m2

    Comprisesallraisedaccessfloors

    Areaonplanofthoseportionsof

    thebuildinghavingraisedaccess

    floorsmeasuredoverwallsand

    smallopenings

    Stateifdoubleorsinglesystem

    Sprinklerinsta

    llation

    203.1

    0

    m2

    Comprisesthecompletespecialfir

    e

    prevention/protectioninstallationa

    nd

    sundrybuilderswork

    Areaonplanoftheportionsofthe

    buildingprotected

    Specialfire

    prevention

    (referalsoto114)

    203

    m2

    Comprisesthecompletesprinkler

    installationexcludingbuilderswork

    Areaonplanoftheportionsofthe

    buildingprotected

  • 5/28/2018 ECEA

    28/5223

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Specialfire

    prevention

    (Referalsoto114)

    (continued)

    m2

    Comprisesthecompletesmokedetection

    system

    excludingbuilderswork

    Smokedetectio

    nsystem

    203.2

    0

    Areaonplanofportionsofthe

    buildingprotected

    m2

    Comprisesthecompleteearlyfirew

    arning

    system

    excludingbuilderswork

    Earlyfirewarning

    system

    203.3

    0

    Areaonplanoftheportionsofthe

    buildingprotected

    Lifts

    204

    Measuredifferenttypesseparately

    Measuredifferenttypesseparately

    m2

    Comprisesthecompletebuildingevacuation

    system

    excludingbuilderswork

    Buildingevacu

    ation

    203.4

    0

    Areaonplanoftheportionsofthe

    buildingprotected

    Measuredifferenttypesseparately

    m2

    Comprisesotherspecialfireprotec

    tion

    systemsexcludingbuilderswork

    Otherspecialfire

    protection

    203.5

    0

    Areaonplanoftheportionsofthe

    buildingprotected

    Measuredifferenttypesseparately

    m2

    Comprisesbuildersworkinconnection

    with203.1

    0to203.5

    0above

    Builderswork

    203.6

    0

    Areaonplanoftheportionsofthe

    buildingprotected

    Measuredifferenttypesseparately

    Statenumberofstops,speedandcapacity

    Stateifhydraulic,etc

    no

    Comprisesthecompleteliftinstallationand

    sundrybuilderswork

    Lifts

    204.1

    0

    Numberoflifts

    no

    Comprisesthecompleteliftinstalla

    tion

    excludingbuilderswork

    Number

    Builderswork

    204.2

    0

    no

    Comprisesbuildersworkinconnection

    wirh204.1

    0above

    Number

    Escalators

    205

    Measuredifferenttypesseparately

    Statecapacity,stepwidth,speedan

    drise

    Measuresoffitandsidecladding

    separately

    no

    Comprisesthecompleteescalator

    installationandsundrybuilderswo

    rk

    Escalators

    205.1

    0

    Numberofescalators

    no

    Comprisesthecompleteescalator

    installationexcludingbuilderswor

    k

    Number

    Builderswork

    205.2

    0

    no

    Comprisesbuildersworkinconnection

    205.1

    0above

    Number

  • 5/28/2018 ECEA

    29/5224

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Airconditioning

    m2

    Comprisesthecompleteairconditioning

    installationandsundrybuildersw

    ork

    Areaonplanoftheair

    conditionedportionsofthebuilding

    m2

    Comprisesairconditioninginstallation

    excludingbuilderswork

    Airconditioning

    206.1

    0

    Areaonplanoftheairconditioned

    portionsofthebuilding

    Ventilation

    206

    Applytorentable

    areasonly

    Measuredifferenttypesseparately

    m2

    Comprisesbuildersworkinconne

    ction

    with206.1

    0above

    Builderswork

    206.2

    0

    Areaonplanoftheairconditioned

    portionsofthebuilding

    Measureextractcanopiesseparately

    Comprisesthecompleteventilation

    installationandsundrybuildersw

    ork

    Ventilation

    207.1

    0

    Areaonplanoftheventilated

    portionsofthebuilding

    Areaonplanoftheventilated

    portionsofthebuilding

    Heating

    208

    Measuredifferenttypesseparately

    Comprisesthecompleteheatinginstallation

    andsundrybuilderswork

    Heating

    208.1

    0

    Areaonplanoftheheatedportions

    ofthebuilding

    Comprisesunderfloor,wallmounted,etc

    heatingexcludingbuilderswork

    Areaonplanoftheheatedportions

    ofthebuilding

    207

    m2

    Comprisesventilationinstallationex

    cluding

    builderswork

    m2

    Builderswork

    207.2

    0

    Areaonplanoftheventilated

    portionsofthebuilding

    Comprisesbuildersworkinconne

    ction

    with207.1

    0above

    m2

    m2

    m2

    Builderswork

    208.2

    0

    Comprisesbuildersworkinconne

    ction

    with208.1

    0above

    Areaonplanoftheheatedportions

    ofthebuilding

    m2

    Special

    electrical

    installations

    (referalsoto

    112and405)

    209

    Comprisesthecompletespecialelectrical

    installationandsundrybuildersw

    ork

    Tranformers

    209.1

    0

    Constructionarea

    Comprisestransformersexcludingb

    uilders

    work

    Number

    m2

    no

    Emergencyge

    nerators

    209.2

    0

    Comprisesemergencygenerators

    excludingbuilderswork

    Number

    no

  • 5/28/2018 ECEA

    30/5225

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Special

    electrical

    installation

    (referalsoto

    112and405)

    (continued)

    no

    Comprisesuninterruptedpowersu

    pply

    excludingbuilderswork

    Number

    no

    Comprisescleanpowersupplyexc

    luding

    builderswork

    Uninterrupted

    power

    supply

    209.3

    0

    Number

    Cleanpowers

    upply

    209.4

    0

    Otherservices

    210

    Comprisessuchservicesasgasinstallation,

    TVinstallation,refrigeration,etcand

    sundry

    builderswork

    Otherservices

    210.1

    0

    Constructionarea

    Comprisesotherservicesexcludin

    g

    builderswork

    Number

    m2

    no

    no

    Comprisesotherspecialelectrical

    installationexcludingbuilderswork

    Number

    Otherspecialelectrical

    installation

    209.5

    0

    no

    Comprisesbuildersworkinconne

    ction

    with209.1

    0to209.5

    0above

    Number

    Builderswork

    209.6

    0

    Builderswork

    210.2

    0

    Comprisesbuildersworkinconne

    ction

    with210.1

    0above

    Number

    no

    Compactors

    211

    Comprisesthecompletecompacto

    r

    installationandsundrybuilderswork

    Compactors

    211.1

    0

    Numberofcompactors

    Comprisescompactorsexcluding

    builderswork

    Number

    no

    no

    Statecapacity

    Builderswork

    211.2

    0

    Comprisesbuildersworkinconnection

    with211.1

    0above

    Number

    no

    Accesscontrol

    212

    Comprisesthecompleteaccessco

    ntrol

    installationandsundrybuilderswork

    Numberofaccesscontrol

    no

  • 5/28/2018 ECEA

    31/5226

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Accesscontrol

    (continued)

    no

    Comprisesthecompleteaccessco

    ntrol

    includinginstallationofparkingbo

    oms

    and/ortrafficlights,etcexcludingbuilders

    work

    Number

    Parkingboomsand/or

    trafficlights

    212.1

    0

    Gondolasand

    cleanersrails

    213

    Comprisesthecompletewindowcleaning

    gondolainstallationandsundrybu

    ilders

    workand/orcleanersrails

    Gondolas

    213.1

    0

    Numberofgondolas

    Number

    no

    Stoves

    214

    Comprisessupplyandinstallation

    ofgas

    orelectricalstovesandsundrybuilders

    work

    Stoves

    214.1

    0

    Numberofstoves

    Comprisesstoveexcludingbuilder

    swork

    Number

    no

    no

    Measureextractorhoodsseparatelyunder

    207.1

    0Ventilation

    no

    Comprisesbuildersworkinconne

    ction

    with212.1

    0above

    Number

    Builderswork

    212.2

    0

    Comprisesgondolasexcludingbuilders

    work

    no

    Stateifmanualorautomatic

    Builderswork

    213.2

    0

    Number

    Comprisesbuildersworkinconne

    ction

    with213.1

    0and213.2

    0above

    no

    Builderswork

    214.2

    0

    Comprisesbuildersworkinconne

    ction

    with214.1

    0above

    Number

    no

    Measureelectricalconnectionsund

    er

    113Electricalinstallationandwater

    connectionunder114Internalplum

    bing

    Kitchen

    equipment

    215

    Comprisesthecompletekitchenequ

    ipment

    installationandsundrybuilderswork

    Kitchenequipment

    215.1

    0

    Areaonplanoftheportionofthe

    buildinghavingkitchenequipment

    Comprisessupplyandinstallation

    ofall

    equipmentexcludingbuilderswork

    Number

    m2

    no

    Builderswork

    215.2

    0

    Comprisesthebuildersworkincon

    nection

    with215.1

    0above

    Number

    no

    213.3

    0

    Length

    Comprisescleanersrails

    Cleanersrails

    m

  • 5/28/2018 ECEA

    32/5227

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Specialised

    equipment

    m2

    Comprisesthecompletespecialise

    d

    equipmentinstallationandsundrybuilders

    work

    Areaonplanoftheportionofthe

    buildingbeingservedby

    specialisedequipment

    Security

    systems

    217

    Areasonplanoftheportionofthe

    buildinghavingsecuritysystems

    no

    Comprisesspecialisedequipmentexcluding

    builderswork

    Number

    Specialisedeq

    uipment

    216.1

    0

    Comprisesthecompletesecuritysystem

    installationandsundrybuilderswork

    m2

    Securitysystems

    217.1

    0

    Number

    Comprisescardreaders,

    CCTVinsta

    llation,

    turnstiles,etcexcludingbuildersw

    ork

    no

    216

    Measuredifferenttypesseparately

    no

    Comprisesbuildersworkinconne

    ction

    with216.1

    0above

    Number

    Builderswork

    216.2

    0

    Builderswork

    217.2

    0

    Number

    Comprisesbuildersworkinconne

    ction

    with217.1

    0above

    no

    Communication

    systems

    218

    Areaonplanoftheportionofthe

    buildinghavingcommunication

    systems

    Comprisesthecompletecommunication

    system

    installationandsundrybuilders

    work

    m2

    Communicationsystems

    218.1

    0

    Number

    no

    Builderswork

    218.2

    0

    Number

    Comprisesbuildersworkinconne

    ction

    with218.1

    0above

    no

    Prefabricated

    coldrooms

    219

    Numberofprefabricatedcold

    rooms

    Comprisesthecompleteprefabricatedcold

    roominstallationandsundrybuilder

    swork

    no

    219.1

    0

    Number

    Comprisesthecompleteprefabricatedcold

    room

    installationincludingnecessary

    mechanicalequipmentexcludingbuilders

    work

    Prefabricatedcoldrooms

    no

    Comprisescommunicationsystems

    excludingbuilderswork

    Measuredifferenttypesseparately

  • 5/28/2018 ECEA

    33/5228

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Prefabricated

    coldrooms

    (continued)

    no

    Comprisesbuildersworkinconne

    ction

    with219.1

    0onabove

    Number

    Builderswork

    219.2

    0

    Measuredifferenttypesseparately

    Miscellaneous

    items

    222

    Constructionarea

    Comprisesspecialitemsthatcannotbe

    includedwithotherelementsorcomp

    onents

    above

    m2

    222.1

    0

    Number

    Comprisesfireplacesorunits,man

    tles,

    shelves,

    hearths,

    fluelinings,cappings,oil

    burners,paraffinheaters,etc

    Fireplaces,etc

    no

    Signage

    220

    Constructionarea

    Comprisesthecompletesignageinstallation

    andsundrybuilderswork

    m2

    Signage

    220.1

    0

    Number

    Comprisesdirectional,identificatio

    nand

    safetysignageexcludingbuilderswork

    no

    Signagepylon

    s,

    towers,

    etc

    220.2

    0

    Number

    Comprisesthecompletesignagep

    ylon

    constructionandinstallationexcluding

    builderswork

    no

    Builderswork

    220.3

    0

    Number

    Comprisesbuildersworkinconne

    ction

    with220.1

    0and220.2

    0above

    no

    Measureeachartworkseparately

    Artworks

    Numberofartworks

    Comprisesstatues,ornamentation,

    artworks,murals,

    fountains,

    banners,etc

    no

    Artworks

    221.1

    0

    Number

    221

    Comprisesstatues,ornamentation,

    artworks,murals,

    fountains,

    banners,etc

    no

    222.2

    0

    Number

    Comprisesdocklevellersinstallati

    onand

    sundrybuilderswork

    Docklevellers

    no

    222.3

    0

    Number

    Comprisesmiscellaneousitemsthat

    cannot

    beincludedwithotherelementsor

    componentsabove

    Other

    no

  • 5/28/2018 ECEA

    34/5229

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPONENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    ALTERATIONS

    m2

    Comprisesallalterationstoexisting

    buildings

    Areaonplanoftheportionofthe

    buildinghavingalterationworks

    3 300

    Alterations

    m2

    Comprisesallalterationstoexisting

    buildings

    Areaonplanoftheportionofthe

    buildinghavingalterationworks

    Alterations.

    300.1

    0

    Measureindetail

    EXTERNAL

    WORKSAND

    SERVICES

    m

    Comprisesallworksinconnectionwith

    soildrainage

    Lengthofsoildrainsmeasured

    overmanholesfrom

    thefeetof

    stackstotheconnections,etc

    4 400

    Soildrainage

    m

    Length

    Soildrains

    400.1

    0

    no

    Measuredifferenttypesanddiame

    ters

    separately

    Number

    Inspectionch

    ambers

    400.2

    0

    Comprisesexcavations,soildrain

    s,

    cleaningeyes,gulleysandconcrete

    encasing

    Comprisesinspectionchamberscomplete

    withchannelling,covers,etc

    Measuredifferenttypesandsizes

    separately

    no

    Number

    Septictanks,

    etc

    400.3

    0

    Comprisesseptictanks,soakaway,

    conservancytanks,etc

    Measuredifferenttypesandsizes

    separately

    Number

    Catchpits,

    ins

    pection

    chambers,sumps,etc

    m

    Comprisesallworksinconnectionwith

    sub-surfacewaterdrainage,sumps,sump

    pumps,catchpits,etc

    Lengthofsub-surfacedrains

    measuredovercatchpitstosumps

    401

    Sub-surface

    waterdrainage

    m

    Length

    Sub-surfaced

    rains

    401.1

    0

    Measuredifferenttypesanddiame

    ters

    separately

    Comprisesexcavations,sub-surfacedrains,

    stonechips,geofabricfilterblanke

    t,etc

    no

    401.2

    0

    Measuredifferenttypesseparately

    Comprisescatchpits,

    inspectionch

    ambers,

    sumps,etccompletewithcoversor

    gratings

    andallsundryitems

    no

    Number

    Pumps

    401.3

    0

    Comprisespumps,motors,etc

  • 5/28/2018 ECEA

    35/5230

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    m

    Comprisesallworksinconnection

    with

    stormwaterdrainage,gratingsorcovers,

    etc

    Lengthofstormwaterchannelling

    andpipingmeasuredovercatchpits

    toconnections

    402

    Stormwater

    drainage

    Length

    Surfacewaterc

    hanelling

    402.1

    0

    m

    Compriseschannellingandallsundryitems

    Measuredifferenttypesandsizessep

    arately

    Length

    Stormwaterdrains

    402.2

    0

    m

    Comprisesstormwaterdrainsandall

    sundry

    items

    Measuredifferenttypesandsizessep

    arately

    Number

    Catchpits,

    insp

    ection

    chambers,sum

    ps,etc

    402.3

    0

    no

    Comprisescatchpits,

    inspectioncha

    mbers,

    sumps,etccompletewithcoversorg

    ratings

    andallsundryitems

    Measuredifferenttypesandsizessep

    arately

    Number

    Pumps

    402.4

    0

    no

    Comprisespumps,motors,etc

    Measuredifferenttypesandsizessep

    arately

    m

    Compriseswatersupplieswithinth

    esite,

    piping,wheelvalves,non-returnva

    lves,

    valvechambers,

    trustblocks,

    tapsto

    standpipe,sundrybuilderswork,e

    tc

    Lengthofwaterpipingfrom

    mains

    tobuildingandoversite

    403

    Watersupplies

    Length

    Incomingmain

    403.1

    0

    m

    Comprisestheincomingmainwith

    inthe

    site,piping,wheelvalves,non-return

    valves,

    valvechambers,

    trustblocks,etc

    Measuredifferentdiameterssepara

    tely

    Length

    Sitereticulatio

    n

    403.2

    0

    m

    Comprisessitereticulationpiping,

    wheel

    valves,

    tapstostandpipes,sundrybuilders

    word,etc

    Measuredifferentdiameterssepara

    tely

    m

    Comprisesfireservicewithinthesite,

    piping,wheelvalves,non-returnva

    lves,

    valvechambers,

    trustblocks,sundry

    builderswork,etc

    Lengthofwaterpipingfrom

    mains

    tobuildingandoversite

    404

    Fireservice

    Length

    Incomingmain

    404.1

    0

    m

    Comprisestheincomingmainwith

    inthe

    site,piping,wheelvalves,non-return

    valves,

    valvechambers,

    trustblocks,etc

    Measuredifferentdiameterssepara

    tely

    Length

    Sitereticulatio

    n

    404.2

    0

    m

    Comprisessitereticulation,piping,wheel

    valves,etc

    Measuredifferentdiameterssepara

    tely

  • 5/28/2018 ECEA

    36/5231

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Measuredifferentdiametersseparat

    ely

    m

    Compriseselectricalinstallationwithinthe

    site,

    includingcables,streetlightin

    g,

    floodlighting,sundry,

    builderswor

    k,etc

    Lengthofcablesfrom

    mainsto

    buildingandoversite

    405

    External

    electrical

    installations

    and

    electrification

    (referalsoto

    112and209)

    Length

    Incomingmain

    m

    405.2

    0

    Comprisescables,etc

    Length

    Sitereticulatio

    n

    no

    405.3

    0

    Comprisescables,etc

    Number

    Street,bollard

    ,etc

    lighting

    no

    405.4

    0

    Comprisesstreet,bollard,etclight

    ing

    includingsundrybuilderswork,e

    tc

    Number

    Floodlighting

    no

    405.5

    0

    Comprisesfloodlightingandsundry

    builderswork,etc

    404

    Fireservice

    (continued)

    Number

    Boosterconne

    ction,

    wheelvalves,etc

    no

    404.3

    0

    Comprisesboosterconnection,wh

    eel

    valves,sundrybuilderswork,etc

    Number

    Hydrants,pedestals,etc

    no

    404.4

    0

    Compriseshydrants,pedestals,su

    ndry

    builderswork,etc

    406

    Connection

    fees,etc.

    Number

    Soildrainage

    406.2

    0

    Number

    Stormwaterdrainage

    406.1

    0

    no

    Comprisesthelocalauthoritycon

    nection

    fees,etc

    Numberofconnections,etc

    no

    Comprisesthelocalauthoritycon

    nection

    fees,etc

    Comprisesthelocalauthoritycon

    nection

    fees,etc

    no

    Number

    Watersupplie

    s

    no

    406.3

    0

    Comprisesthelocalauthoritycon

    nection

    fees,etc

    Number

    Electrification

    405.1

    0

    Compriseselectricpowergeneratin

    gplant

    no

  • 5/28/2018 ECEA

    37/5232

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Area

    m2

    Comprisesclearingofsite,removaloftrees,

    etc(referto407.2

    forremovalofpavings,

    etc)

    408

    Siteclearance

    Siteclearance

    408.1

    0

    Areaofsiteclearance

    m2

    Comprisesclearingofsite,removaloftrees,

    etc(referto407.2

    forremovalofpavings,

    etc)

    Number

    Trees

    408.2

    0

    no

    Comprisestheremovaloflargetre

    es

    Stategirthandheight

    Measureeachcategoryseparately

    Length

    Hedges,

    fences,etc

    408.3

    0

    m

    Comprisestheremovalofhedges,

    fences,

    etc

    Measureeachcategoryseparately

    406

    Connection

    fees,etc.

    (continued)

    Number

    Fileservice

    no

    Comprisesthelocalauthorityconn

    ection

    fees,etc

    Number

    Externalelectr

    ical

    installation

    no

    406.5

    0

    Comprisesthelocalauthorityconn

    ection

    fees,etc

    406.4

    0

    Stateifremovaloffoundationsareinc

    luded

    Number

    Comprisesdemolitionofbuildings

    and

    removalofpavings,rubble,etc

    407

    Demolitions

    Demolitionofbuildings

    407.1

    0

    Numberofitems

    demolished

    Comprisesdemolitionofbuildings

    and

    removalofpavings,rubble,etc

    Area

    Pavings,etc

    407.2

    0

    Comprisestheremovalofpavings,

    etc

  • 5/28/2018 ECEA

    38/5233

    Volume

    m3

    Comprisestotalcutting,

    filling,

    levelling,

    formingbanks,

    basementexcavatio

    ns,

    cartingawayexcavatedmaterial,etc

    409

    Earthworks

    Siteexcavation

    409.1

    0

    Volumeofexcavationand/orfilling

    m3

    Comprisesallbulkexcavationandle

    velling

    oversiteandcartingawayexcavate

    d

    material

    Measurecartingawayofexcavated

    materialseparately

    Volume

    Rock,etcexcavationover

    site

    m3

    409.2

    0

    Comprisesrockexcavation,removalof

    concrete,

    brickwork,etcandcarting

    away

    material

    Statepercentageofexcavationvolume

    allowed

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    410

    411

    Volume

    Sitefilling

    m3

    409.3

    0

    Comprisesallbulkfillingoversite,

    roof

    gardens,etcandcartingonearthfilling

    Measurecartingaway/onofearthfilling

    separately

    Boundary,

    screenand

    retainingwalls,

    etc.

    Areaonelevationofwalls,etc

    Boundary,screenand

    retainingwalls

    ,etc

    m2

    Comprisesfoundations,walls,

    finishes,

    copings,

    doors,screens,etctobou

    ndary,

    screen,retainingandwingwalls,e

    tc

    Measuredifferenttypesseparately

    Measurefootings(includingexcavation)

    inmetrestatingsizeanddepthof

    excavationandwalls,

    includingcopings,

    inm2

    Areaonelevation

    m2

    410.1

    0

    Comprisesfoundations,walls,

    finishes,

    copings,

    doors,screens,etc

    Fencingand

    gates

    Lengthoffencingmeasuredover

    gates

    m

    Comprisesfencing,gates,standards,

    droppers,posts,

    footings,etc

    Length

    Fencing

    m

    411.1

    0

    Comprisesfencing,standards,pos

    ts

    droppers,

    footings,etc

    Measuredifferenttypesseparately

    Stateheightandoverhang(ifapplicable)

    Number

    Gates

    411.2

    0

    Comprisesgates,posts,stays,

    footings,

    ironmongery,etc

    Measuredifferenttypesseparately

    Stateifelectronic,

    doubleorsingle

    ,etc

    no

  • 5/28/2018 ECEA

    39/5234

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Roads

    412.1

    0

    Roads,paving,

    etc

    Areaonplanofroads,paving,etc

    m2

    Comprisesroads,parkingareas,pa

    ving,

    paths,etcincludingkerbs(chanelli

    ng

    measuredwithstormwaterdrainage

    )

    412

    Area

    m2

    Comprisesroads

    Measuredifferenttypesseparately

    Statethickness

    Pavings

    412.2

    0

    Area

    m2

    Comprisespavings,steps,etc

    Measuredifferenttypesseparately

    Measureexpansionjointsseparately

    Statethickness

    Kerbs

    412.3

    0

    Length

    m

    Compriseskerbsfor412.1

    0and41

    2.2

    0

    above

    Coveringtopa

    rking

    413.1

    0

    Covered

    parking,

    walkways,etc.

    Areaonplanofcoveredparking,

    walkways,etc

    m2

    Comprisesfoundations,columns,walls,

    doors,windows,screens,roofs,

    fin

    ishes,

    floorfinishes,etc

    413

    Areaonplan

    Measureindetailifinformationisav

    ailable

    Coveredwalkw

    ays

    413.2

    0

    Areaonplan

    Measureindetailifinformationisav

    ailable

    m2

    Comprisesfoundations,columns,walls,

    doors,windows,screens,roofs,

    fin

    ishes,

    floorfinishes,etc

    m2

    Comprisesfoundations,columns,walls,

    doors,windows,screens,roofs,

    fin

    ishes,

    floorfinishes,etc

    Pergolas,

    canopies,etc.

    Areaonplanofpergolas,canopies,

    etc

    m2

    Comprisesfoundations,construction,

    covering,supports,etc

    Areaonplan

    Pergolas

    m2

    414.1

    0

    Comprisesfoundations,construction,

    covering,support,etc

    Areaonplan

    Canopies

    414.2

    0

    m2

    414

    Comprisesfoundations,construction,

    covering,support,etc

  • 5/28/2018 ECEA

    40/5235

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Minorconstru

    ctionwork

    415.1

    0

    Minor

    construction

    work

    Areaonplanofallminor

    constructionwork

    m2

    Comprisesconstructionworksuch

    asgate

    houses,switchgearrooms,shelters,etc

    415

    Areaonplan

    Comprisesallelements

    Measuredifferentstructuressepara

    tely

    Measureindetailifinformationis

    available

    Swimmingpo

    ols,etc

    416.1

    0

    Pools,etc.

    Numberofpools

    no

    Comprisespool,surrounds,shelters,change

    rooms,

    filtrationplant,powerconn

    ections,

    etc

    416

    Number

    Comprisespool,surrounds,

    filtratio

    nplant,

    powerconnections,etc

    Measureswimming,reflection,etc

    pools

    separately

    Statesizeanddepthrange

    Changerooms,etc

    416.2

    0

    Areaonplan

    m2

    Compriseschangerooms,shelters

    ,etc

    complete

    Sportsfacilitie

    s

    417.1

    0

    Sportsfacilities

    Numberofsportsfacilities

    no

    Comprisestenniscourts,

    bowling

    greens,

    puttinggreens,etcandchangeroo

    ms,

    shelters,etc

    417

    Number

    no

    Comprisestenniscourts,

    bowling

    greens,

    puttinggreens,etc

    Measureeachfacilityseparately

    Changerooms,etc

    417.2

    0

    Areaonplan

    m2

    Compriseschangerooms,shelters

    ,etc

    Measureindetailifinformationisavailable

    m2

    no

    Gardenworks

    Areaonplanofgardenwork

    m2

    Comprisestopdressing,rockeries,g

    rassing

    andplanting,stonepitchingandgeneral

    landscaping

    Areaonplanofgardenworks

    Gardenworks

    m2

    418.1

    0

    Comprisestop,

    dressing,rockeries,

    grassingandplanting,stonepitchingand

    generallandscaping

    Measuresoftandhardlandscaping

    separately

    418

    Areaonplanunderirrigation

    Irrigation

    m2

    418.2

    0

    Comprisespiping,sprinkleheads

    and

    programmingfacilities

  • 5/28/2018 ECEA

    41/5236

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY

    UNIT

    COMPOSITION

    OFELEMENT

    ORCOMPONENT

    TAKINGOFF/

    PRICINGNOTES

    ANALYSIS

    Expressaspercentageofnetestimatetotal

    excludingPreliminariesand

    Contingencies

    TRAINING

    Constructionarea

    m2

    Comprisesthewholeofthetrainingbill

    Additionalpreliminaries

    Item

    500.1

    0

    5

    Comprisesadditionalcompetent

    instructional,supervisingadministrative

    personneltocarryoutthetraining

    programmeinameaningfulway,additional

    toilets,safetyandfirstaidequipme

    nt,

    computers,offices,clockcardandIDcard

    systems,etc

    Training

    500

    Institutionaltraining

    Item

    500.2

    0

    Comprisestherevelanttrainingski

    lls

    obtainedfrom

    approvedtrainingce

    ntres

    accreditedbytheapplicableIndustries

    TrainingBoards

    Trainingskills

    andtrade

    tests

    500.3

    0

    Comprisestherevelanttrainingski

    lls

    obtainedfrom

    approvedtrainingce

    ntres

    accreditedbytheapplicableIndustries

    TrainingBoards

    PracticalTraining

    Item

    500.4

    0

    Comprisespracticaltrainingonsite

    forthe

    timeperiod(s)whentraineesareno

    t

    engagedininstitutionaltrainingor

    doing

    testsbutareactivelybeingtrainedonsite

    Miscellaneous

    items

    Number

    Miscellaneous

    external

    workandservices

    no

    419.1

    0

    419

    Comprisesitems,services,etcthat

    cannot

    beincludedwithotherelementsor

    componentsabove

    Comprisesitems,services,etcthat

    cannot

    beincludedwithotherelementsor

    componentsabove

    Numberofmiscellaneoussite

    works

    Item

  • 5/28/2018 ECEA

    42/5237

    CODE

    SECTION

    AND

    ELEMENT

    CODE

    COMPON

    ENT

    MEASUREMENTREQUIRED

    FORELEMENT

    ORCOMPONENT

    QTY