eclrt environmental report cover kton · revised final report toronto transit commission (ttc)...

12
REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTIONS March 2010 Page 48 Exhibit 29: Recommended Layout for Black Creek Stop REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTIONS March 2010 APPENDIX A EVALUATION MATRIX

Upload: others

Post on 18-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

R

EVIS

ED F

INAL

REP

OR

T

Toro

nto

Tran

sit C

omm

issi

on (T

TC)

ECLR

T - J

ANE

STRE

ET T

O KE

ELE

STRE

ET -

VERT

ICAL

ALI

GNME

NT O

PTIO

NS

Mar

ch 2

010

Pag

e 48

Exhi

bit 2

9: R

ecom

men

ded

Layo

ut fo

r Bla

ck C

reek

Sto

p

R E V I S E D F I N A L R E P O R T

Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTIONS

March 2010

APPENDIX A

EVALUATION MATRIX

Page 2: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

Page 1 of 4

BLACK CREEK M&S FACILITY CONNECTION EVALUATION

OVERALL OBJECTIVES OF STUDY AREA

To develop and assess concept alternatives for the LRT connection to the proposed M&S Facility and to recommend a preferred alignment alternative for the intersection of Eglinton Avenue at Black Creek Drive that can: Provide high quality connection to proposed M&S Facility (loading/unloading capacity); Provide high quality transit service (speed, reliability and intermodal connectivity); Minimize impacts (traffic operations, property, environment and construction impacts); and Minimize costs. Six conceptual LRT interface alternatives were developed:

Interface Alternative Alignment Connection to Proposed M&S Facility

Alternative 1 At-grade alignment Three at-grade tracks with one secondary (emergency) at-grade track on Photography Drive

Alternative 2 Elevated north side alignment Three elevated tracks and one below-grade track

Alternative 3 Elevated south side alignment One elevated track and one below-grade track

Alternative 4 Below-grade alignment Two below-grade tracks

Alternative 5 Elevated north side alternate alignment Two elevated tracks and two below-grade tracks

Alternative 6 Hybrid alignment Three at-grade tracks with one secondary (emergency) elevated track

For each alternative, a score between 1 to 6 is given for each criteria where 1 is least preferred, and 6 is most preferred. The score is not a rank, i.e. more than one alternative may be given the same score under the same criteria. The exception to this is the scoring for Capital Cost, where alternatives are scored on a scale of 1 to 12 where: <$70M 12; $70M-$85M 11; $85M-$100M 10; $100M - $115M 9; $115M – $130M 8; $130M-$145M 7; $145M-$160M 6; $160M-$175M 5; $175M-$190M 4; $190-$205 3; $205-$220 2; >$220M 1. At the conclusion of the evaluation process, the alternative with the highest total score is the most preferred.

EVALUATION CRITERIA

OBJECTIVE CRITERIA INDICATOR Alternative 1 – At-

Grade Alternative 2 –

Elevated North Side Alternative 3 –

Elevated South Side Alternative 4 – Underground

Alternative 5 – Elevated North Side

Alternate Alternative 6 –

Hybrid

1. Ensure a high quality connection to the proposed M&S Facility

Quality of connection to M&S Facility

# Connection tracks (Note: all tracks have bi-directional capability) 4 tracks 4 tracks 2 tracks 2 tracks 4 tracks 4 tracks

# connection tracks available for normal operation

3 tracks (2 outbound, 1

inbound)

4 tracks (2 outbound, 1

inbound)

2 tracks (requires bi-directional

operation under normal conditions)

2 tracks (requires bi-directional

operation under normal conditions)

4 tracks (2 outbound, 2

inbound)

3 tracks (2 outbound, 1

inbound)

Interaction of LRT with roadway traffic under normal operation

Yes No No No No Yes

6

4

6

6

3

6

3

6

6

6

6

4

5 6 3 6 5 3

Page 3: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

Page 2 of 4

BLACK CREEK M&S FACILITY CONNECTION EVALUATION

OBJECTIVE CRITERIA INDICATOR Alternative 1 – At-

Grade Alternative 2 –

Elevated North Side Alternative 3 –

Elevated South Side Alternative 4 – Underground

Alternative 5 – Elevated North Side

Alternate Alternative 6 –

Hybrid

Impact of connection on M&S Facility layout

Ability to overcome grade differential

3 run-out tracks required

1 long run-out track required

1 long run-out track required

2 long run-out tracks required

2 long run-out tracks required

3 run-out tracks required

2. Ensure an attractive transit service relative to the private auto

LRT speed and reliability

Ability to maintain planned headways

Interaction with traffic, small profile changes

No interaction with traffic, long profile

changes

No interaction with traffic, long profile

changes

No impediments, small profile changes

No interaction with traffic, long profile

changes

Interaction with traffic, small profile changes

Connections to other transit

Proximity of LRT stops/stations to potential future GO Station location Close to potential

future station, 1 vertical level separation

2 vertical level separations

2 vertical level separations

Close to potential future station, 2

vertical level separations

Very close to future potential station, 2

vertical level separations

Close to potential future station, 1

vertical level separation

Proximity of LRT stops/stations to TTC bus stops on Weston Road and Black Creek Drive At-grade stops at both

Weston Road and Black Creek Drive

Elevated station at Black Creek Drive &

below-grade station at Weston Road

Elevated station at Black Creek Drive &

below-grade station at Weston Road

One below-grade station between

Weston Road & Black Creek Drive

Elevated station at Black Creek Drive &

below-grade station at Weston Road

At-grade stops at both Weston Road and Black Creek Drive

3. Ensure safe and reasonable traffic operations

Impact on traffic operations

Vehicle turning movement restrictions due to LRT

Traffic signal coordination at

intersections can minimize impact

No impact on traffic No impact on traffic No impact on traffic No impact on traffic Traffic signal coordination at

intersections can minimize impact

4. Respect the environment and adjacent properties

Property impact Impact on large development opportunities

Some impact on traffic due to at-grade LRT

Impact on development opportunity of

remaining Metrus property

Impacts high potential development of

property south of Eglinton (“No Frills”)

No impact Impact on development opportunity of

remaining Metrus property

Some impact on traffic due to at-grade LRT

Environmental impact

Impact on natural environment

No impact Pier construction in Black Creek Valley

lands north of Eglinton

Pier construction in Black Creek Valley

lands south of Eglinton

No impact Pier construction in Black Creek Valley

lands north of Eglinton

No impact

4 6 5 1 2 4

4 6 4 6 6 6

4 5 5 6 5 4

4 2 2 3 5 4

6 4 3 6 4 4

5 2 1 6 2 5

6 3 4 6 6 3

Page 4: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

Page 3 of 4

BLACK CREEK M&S FACILITY CONNECTION EVALUATION

OBJECTIVE CRITERIA INDICATOR Alternative 1 – At-

Grade Alternative 2 –

Elevated North Side Alternative 3 –

Elevated South Side Alternative 4 – Underground

Alternative 5 – Elevated North Side

Alternate Alternative 6 –

Hybrid

Level of visual intrusion by ECLRT structure

At-grade LRT in urban environment

Elevated structures and portals

Elevated structures over roadway and

portals

Below-grade Elevated structures and portals

At-grade LRT with elevated emergency

track in urban environment

Level of expected noise and vibration from ECLRT

At-grade LRT, urban environment, no

significant increase in noise and vibration

Elevated structures and portals, increased

noise and vibration

Elevated structures over roadway and portals, increased noise and vibration

Below-grade Elevated structures and portals, increased

noise and vibration

At-grade LRT, urban environment, no

significant increase in noise and vibration

Preservation of potential heritage Kodak building

Preserved Not preserved Not preserved Not preserved Not preserved Preserved

Construction impact Traffic impact during construction (Assumes TMB construction for tunnel sections) All at-grade, staged

construction Cut & cover station, no at-grade construction

Cut & cover station, no at-grade construction,

overhead structure required

Cut & cover station, no at-grade construction

Cut & cover station, no at-grade construction

All at-grade, staged construction

Natural environment impact during construction

No impact Impacts northeast quadrant of Eglinton Ave and Black Creek Drive (Black Creek

flood plain)

Impacts southeast quadrant of Eglinton Ave and Black Creek

Drive

No impact Impacts northeast quadrant of Eglinton Ave and Black Creek Drive (Black Creek

flood plain)

No impact

5. Support the city’s

urban structure Official Plan land use compatibility

Provision of bicycle lanes

Possible alternatives to provide bicycle

lanes

Bicycle lanes provided Bicycle lanes provided Bicycle lanes provided Bicycle lanes provided Possible alternatives to provide bicycle

lanes

# pedestrian crossings with LRT at-grade (Pedestrian transfers to stops/stations are considered under a previous criteria)

4 crossings across Eglinton Ave

0 crossings 0 crossings 0 crossings 0 crossings 4 crossings across Eglinton Ave

1

3

6

6

6

6

6

6

6

6

1

3

3 5 4 6 5 3

6 2 4 6 6 2

5 2 1 6 2 4

5 2 1 6 2 5

6 4 4 4 4 6

Page 5: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

Page 4 of 4

BLACK CREEK M&S FACILITY CONNECTION EVALUATION

OBJECTIVE CRITERIA INDICATOR Alternative 1 – At-

Grade Alternative 2 –

Elevated North Side Alternative 3 –

Elevated South Side Alternative 4 – Underground

Alternative 5 – Elevated North Side

Alternate Alternative 6 –

Hybrid

6. Ensure affordability Cost Capital cost (Using a scale of 1-12 where: <$70M 12; $70M-$85M 11; $85M-$100M 10; $100M - $115M 9; $115M – $130M 8; $130M-$145M 7; $145M-$160M 6; $160M-$175M 5; $175M-$190M 4; $190-$205 3; $205-$220 2; >$220M 1.)

$65M $195M $200M $245M $180M $70M

Maintenance cost (Maintenance of structures)

At-grade throughout Elevated structures and tunnel segments

Elevated structures and tunnel segments

Tunnel structure throughout

Elevated structures and tunnel segments

At-grade throughout with elevated

emergency track

TOTAL SCORE 95 78 69 88 79 93

RANK First Fifth Sixth Third Fourth Second

\\STO000892FS01\ibishare\24649_trnst_cityEA\5.0 Design (Work) Phase\Black Creek Yard Connection\M&S Facility Connection Options Study\Evaluation matrix 2009-10-02.docx\2009-10-05\A

122

6

3

2

3

1

1

4

4

3

12

5

Page 6: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

R E V I S E D F I N A L R E P O R T

Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTIONS

March 2010

APPENDIX B

ALIGNMENT OPTION DRAWINGS

Page 7: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

4

112

114

116

118

120

122

124

126

128

130

132

134

4+000 4+040 4+080 4+120 4+160

BVC

S: 4

+080

.45

BVC

E: 1

23.0

98

EVC

S: 4

+140

.45

EVC

E: 1

23.0

97

123.

032

123.

030

123.

095

123.

500

123.

400

123.

300

123.

200

123.

100

123.

195

123.

294

123.

388

3

2

112

114

116

118

120

122

124

126

128

130

132

134

2+840 2+880 2+920 2+960 3+000 3+040

PVI

STA

= 2

+940

PVI

ELE

V =

122.

844

123.

444

123.

344

123.

244

123.

144

123.

044

122.

944

122.

844

BVC

S: 2

+961

.75

BVC

E: 1

22.6

26

EVC

S: 3

+001

.75

EVC

E: 1

22.5

26

122.

506

122.

518

122.

844

122.

644

122.

617

122.

717

122.

817

122

872

2

3

1

112

114

116

118

120

122

124

126

128

130

132

134

1+640 1+680 1+720 1+760 1+800 1+840 1+880 1+920 1+960 2+000 2+040 2+080 2+120 2+160

BVC

S: 1

+696

.09

BVC

E: 1

23.1

22

EVC

S: 1

+756

.09

EVC

E: 1

22.0

72

123.

099

122.

883

122.

501

123.

402

123.

302

123.

202

BVC

S: 1

+914

.15

BVC

E: 1

17.3

30

EVC

S: 1

+974

.15

EVC

E: 1

16.2

80

117.

162

116.

694

116.

393

121.

955

121.

355

120.

755

120.

155

119.

555

118.

955

118.

355

117.

755

116.

251

116.

151

116.

051

115.

951

115.

851

115.

751

115.

651

115.

551

115.

451

115.

351

115.

251

115.

158

1

112

114

116

118

120

122

124

126

128

130

132

134

0+600 0+640 0+680 0+720 0+760 0+800 0+840 0+880 0+920 0+960 1+000 1+040 1+080 1+120 1+160

BVC

S: 0

+724

.16

BVC

E: 1

15.8

64

EVC

S: 0

+784

.16

EVC

E: 1

16.9

14

115.

996

116.

311

116.

793

115.

243

115.

343

115.

443

115.

543

115.

643

115.

743

115.

843

BVC

S: 0

+936

.59

BVC

E: 1

21.4

87

EVC

S: 0

+996

.59

EVC

E: 1

22.5

37

121.

587

122.

075

122.

397

117.

390

117.

990

118.

590

119.

190

119.

790

120.

390

120.

990

122.

554

122.

654

122.

754

122.

854

122.

954

123.

054

123.

154

123.

254

123.

354

123.

454

123.

500

2

3

1

2

4

0 10 20 30 40m

0

PLANSCALE 1:1000m

0

PROFILEm

V=1:200

0

0

PROFILEm

V=1:200

0

0

PROFILEm

V=1:200

0

0

PROFILEm

V=1:200

0

ALTERNATIVE 1

TCG

Transit City Group

Page 8: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

0

PROFILEm

V=1:200

0

118

120

122

124

126

128

130

132

134

136

25+800 25+840 25+880 25+920 25+960 26+000 26+040 26+080 26+120 26+160 26+200 26+240 26+280 26+320 26+360

120.

341

125.

001

BVC

S: 2

5+82

4.57

BVC

E: 1

19.2

87

EVC

S: 2

5+88

4.57

EVC

E: 1

19.3

80

118.

801

118.

697

119.

185

119.

483

BVC

S: 2

5+92

3.70

BVC

E: 1

21.1

80

EVC

S: 2

6+00

3.70

EVC

E: 1

23.2

20

121.

862

122.

512

122.

958

123.

198

120.

090

121.

010

123.

301

123.

401

123.

501

123.

601

123.

701

123.

801

123.

901

124.

001

124.

101

124.

201

124.

301

124.

401

124.

501

124.

601

124.

701

124.

801

124.

901

0

PROFILEm

V=1:200

0

108

110

112

114

116

118

120

122

124

126

128

130

10+560 10+600 10+640 10+680 10+720 10+760 10+800 10+840 10+880 10+920 10+960 11+000 11+040

BVC

S: 1

0+83

6.46

BVC

E: 1

22.6

99

EVC

S: 1

0+89

6.46

EVC

E: 1

24.1

69

122.

851

123.

555

123.

999

109.

655

110.

535

111.

415

112.

295

113.

175

114.

055

114.

935

115.

815

116.

695

117.

575

118.

455

119.

335

120.

215

121.

095

121.

975

124.

187

124.

287

124.

387

124.

487

124.

587

124.

687

124.

787

124.

887

124.

987

0

PROFILEm

V=1:200

0

106

108

110

112

114

116

118

120

122

124

126

128

130

132

134

105+320 105+360 105+400 105+440 105+480 105+520 105+560 105+600 105+640 105+680 105+720 105+760 105+800 105+840 105+880 105+920 105+960 106+000 106+040 106+080 106+120 106+160 106+200 106+240 106+280 106+320 106+360 106+400 106+440 106+480

BVC

S: 1

05+4

69.0

9B

VCE:

108

.005

EVC

S: 1

05+5

29.0

9

EVC

E: 1

09.1

75

107.

999

108.

241

108.

809

108.

851

108.

751

108.

651

108.

551

108.

451

108.

351

108.

251

108.

151

108.

051

BVC

S: 1

05+8

13.4

4

BVC

E: 1

21.6

86

EVC

S: 1

05+8

73.4

4

EVC

E: 1

22.9

16

121.

958

122.

579

122.

886

109.

655

110.

535

111.

415

112.

295

113.

175

114.

055

114.

935

115.

815

116.

695

117.

575

118.

455

119.

335

120.

215

121.

095

BVC

S: 1

06+2

55

BVC

E: 1

21.7

72

EVC

S: 1

06+3

15

EVC

E: 1

20.1

82

121.

747

121.

452

120.

843

122.

897

122.

837

122.

777

122.

717

122.

657

122.

597

122.

537

122.

477

122.

417

122.

357

122.

297

122.

237

122.

177

122.

117

122.

057

121.

997

121.

937

121.

877

121.

817

119.

932

118.

932

117.

932

116.

932

115.

932

114.

932

113.

932

112.

932

111.

932

110.

932

110.

920

0 10 20 30 40m0

PLANSCALE 1:1000m

29.70 mmTCG

Transit City GroupALTERNATIVE 2

Page 9: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

0

PROFILEm

V=1:200

0

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

60+96061+00061+04061+08061+12061+16061+20061+24061+28061+32061+36061+40061+44061+48061+52061+56061+60061+64061+68061+720

PV

I STA

= 6

1+26

7.13

PV

I ELE

V =

122.

658

121.

736

121.

796

121.

856

121.

916

121.

976

122.

036

122.

096

122.

156

122.

216

122.

276

122.

336

122.

396

122.

456

122.

516

122.

576

122.

636

122.

724

122.

828

122.

932

123.

035

123.

139

123.

242

123.

346

123.

450

123.

553

123.

657

123.

761

123.

864

123.

968

124.

071

124.

175

124.

279

124.

382

124.

486

124.

590

124.

693

124.

797

124.

900

125.

004

0

PROFILEm

V=1:200

0

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

50+440 50+480 50+520 50+560 50+600 50+640 50+680 50+720 50+760 50+800 50+840 50+880 50+920 50+960 51+000 51+040

BV

CS

: 50+

462.

12

BV

CE

: 109

.040

EV

CS

: 50+

522.

12

EV

CE

: 110

.390

109.

097

109.

508

110.

286

109.

151

109.

051

BV

CS

: 50+

757.

97

BV

CE

: 122

.182

EV

CS

: 50+

817.

97

EV

CE

: 123

.832

122.

283

123.

102

123.

622

111.

284

112.

284

113.

284

114.

284

115.

284

116.

284

117.

284

118.

284

119.

284

120.

284

121.

284

123.

843

123.

943

124.

043

124.

143

124.

243

124.

343

124.

443

124.

543

124.

643

124.

743

124.

843

124.

943

125.

043

0

PROFILEm

V=1:200

0

BLA

CK

CR

EEK

DR

WES

TON

RD

BLA

CK

CR

EEK

102

104

106

108

110

112

114

116

118

120

122

124

126

128

130

105+320 105+360 105+400 105+440 105+480 105+520 105+560 105+600 105+640 105+680 105+720 105+760 105+800 105+840 105+880 105+920 105+960 106+000 106+040 106+080 106+120 106+160 106+200 106+240 106+280 106+320 106+360 106+400 106+440 106+480

BV

CS

: 105

+457

.87

BV

CE

: 108

.061

EV

CS

: 105

+607

.87

EV

CE

: 110

.686

108.

051

108.

024

108.

117

108.

330

108.

662

109.

115

109.

688

110.

381

108.

851

108.

751

108.

651

108.

551

108.

451

108.

351

108.

251

108.

151

BV

CS

: 105

+846

.82

BV

CE

: 120

.244

EV

CS

: 105

+931

.82

EV

CE

: 121

.817

120.

727

121.

293

121.

656

121.

817

111.

171

111.

971

112.

771

113.

571

114.

371

115.

171

115.

971

116.

771

117.

571

118.

371

119.

171

119.

971

BV

CS

: 106

+203

.25

BV

CE

: 121

.002

EV

CS

: 106

+293

.25

EV

CE

: 118

.617

120.

879

120.

540

119.

991

119.

234

121.

792

121.

732

121.

672

121.

612

121.

552

121.

492

121.

432

121.

372

121.

312

121.

252

121.

192

121.

132

121.

072

121.

012

BV

CS

: 106

+404

.99

BV

CE

: 113

.031

112.

321

111.

505

110.

835

110.

312

109.

935

109.

895

118.

280

117.

280

116.

280

115.

280

114.

280

113.

280

0 10 20 30 40m0

PLANSCALE 1:1000m

ALTERNATIVE 3

TCG

Transit City Group

Page 10: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

0

PROFILEm

V=1:200

0

100

102

104

106

108

110

112

114

116

118

120

122

124

126

128

40+880 40+920 40+960 41+000 41+040 41+080 41+120 41+160 41+200 41+240 41+280 41+320 41+360 41+400

BVC

S: 4

0+87

8.22

BVC

E: 1

06.1

39

EVC

S: 4

0+93

8.22

EVC

E: 1

06.8

29

106.

093

105.

856

106.

131

106.

631

BVC

S: 4

1+26

0.12

BVC

E: 1

22.9

24

EVC

S: 4

1+32

0.12

EVC

E: 1

24.5

74

123.

770

124.

322

124.

574

106.

918

107.

918

108.

918

109.

918

110.

918

111.

918

112.

918

113.

918

114.

918

115.

918

116.

918

117.

918

118.

918

119.

918

120.

918

121.

918

122.

918

124.

674

124.

774

124.

874

124.

974

125.

074

125.

119

0

PROFILEm

V=1:200

0

98

100

102

104

106

108

110

112

114

116

118

120

122

124

126

128

40+880 40+920 40+960 41+000 41+040 41+080 41+120 41+160 41+200 41+240 41+280 41+320 41+360 41+400

0

PROFILEm

V=1:200

0

98

100

102

104

106

108

110

112

114

116

118

120

122

124

126

128

105+320 105+360 105+400 105+440 105+480 105+520 105+560 105+600 105+640 105+680 105+720 105+760 105+800 105+840 105+880 105+920 105+960 106+000 106+040 106+080 106+120 106+160 106+200 106+240 106+280 106+320 106+360 106+400 106+440 106+480

BVC

S: 1

05+4

67.7

3B

VCE:

108

.025

EVC

S: 1

05+5

27.7

3

EVC

E: 1

07.0

65

107.

937

107.

673

107.

263

108.

864

108.

764

108.

664

108.

564

108.

464

108.

364

108.

264

108.

164

108.

064

BVC

S: 1

05+7

67.2

6

BVC

E: 1

00.5

98

EVC

S: 1

05+8

27.2

6

EVC

E: 9

9.69

8

100.

287

99.9

29

99.7

31

106.

734

106.

194

105.

654

105.

114

104.

574

104.

034

103.

494

102.

954

102.

414

101.

874

101.

334

100.

794

BVC

S: 1

06+2

80

BVC

E: 9

8.34

0

EVC

S: 1

06+3

40

EVC

E: 9

9.75

0

98.3

40

98.4

57

98.9

27

99.7

50

99.6

60

99.6

00

99.5

40

99.4

80

99.4

20

99.3

60

99.3

00

99.2

40

99.1

80

99.1

20

99.0

60

99.0

00

98.9

40

98.8

80

98.8

20

98.7

60

98.7

00

98.6

40

98.5

80

98.5

20

98.4

60

98.4

00

99.7

50

100.

750

101.

750

102.

750

103.

750

104.

750

105.

750

106.

750

98

100

102

104

106

108

110

112

114

116

118

120

122

124

126

0 10 20 30 40m0

PLANSCALE 1:1000m

TCG

Transit City GroupALTERNATIVE 4

Page 11: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

0

PROFILEm

V=1:200

0

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

60+760 60+800 60+840 60+880 60+920 60+960 61+000 61+040 61+080 61+120 61+160 61+200 61+240

BVC

S: 6

0+85

0.95

BVC

E: 1

11.6

41

EVC

S: 6

0+91

0.95

EVC

E: 1

12.2

41

111.

424

111.

332

111.

773

114.

369

113.

769

113.

169

112.

569

111.

969

BVC

S: 6

1+11

9.11

BVC

E: 1

22.6

48

EVC

S: 6

1+17

9.11

EVC

E: 1

24.2

98

122.

693

123.

529

124.

066

112.

693

113.

693

114.

693

115.

693

116.

693

117.

693

118.

693

119.

693

120.

693

121.

693

124.

303

124.

403

124.

503

124.

603

124.

686

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

60+760 60+800 60+840 60+880 60+920 60+960 61+000 61+040 61+080 61+120 61+160 61+200 61+240

BVC

S: 6

0+85

0.95

BVC

E: 1

11.6

41

EVC

S: 6

0+91

0.95

EVC

E: 1

12.2

41

111.

424

111.

332

111.

773

114.

369

113.

769

113.

169

112.

569

111.

969

BVC

S: 6

1+11

9.11

BVC

E: 1

22.6

48

EVC

S: 6

1+17

9.11

EVC

E: 1

24.2

98

122.

693

123.

529

124.

066

112.

693

113.

693

114.

693

115.

693

116.

693

117.

693

118.

693

119.

693

120.

693

121.

693

124.

303

124.

403

124.

503

124.

603

124.

686

0

PROFILEm

V=1:200

0

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

50+560 50+600 50+640 50+680 50+720 50+760 50+800 50+840 50+880 50+920 50+960 51+000 51+040

BVC

S: 5

0+61

5.65

BVC

E: 1

11.8

73

EVC

S: 5

0+66

5.65

EVC

E: 1

12.9

98

111.

861

112.

077

112.

733

112.

251

112.

151

112.

051

111.

951

BVC

S: 5

0+85

9.40

BVC

E: 1

22.6

85

EVC

S: 5

0+91

9.40

EVC

E: 1

24.3

35

122.

715

123.

556

124.

097

113.

715

114.

715

115.

715

116.

715

117.

715

118.

715

119.

715

120.

715

121.

715

124.

338

124.

438

124.

538

124.

638

124.

738

124.

838

124.

938

125.

038

125.

082

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

50+560 50+600 50+640 50+680 50+720 50+760 50+800 50+840 50+880 50+920 50+960 51+000 51+040

BVC

S: 5

0+61

5.65

BVC

E: 1

11.8

73

EVC

S: 5

0+66

5.65

EVC

E: 1

12.9

98

111.

861

112.

077

112.

733

112.

251

112.

151

112.

051

111.

951

BVC

S: 5

0+85

9.40

BVC

E: 1

22.6

85

EVC

S: 5

0+91

9.40

EVC

E: 1

24.3

35

122.

715

123.

556

124.

097

113.

715

114.

715

115.

715

116.

715

117.

715

118.

715

119.

715

120.

715

121.

715

124.

338

124.

438

124.

538

124.

638

124.

738

124.

838

124.

938

125.

038

125.

082

0

PROFILEm

V=1:200

0

102

104

106

108

110

112

114

116

118

120

122

124

126

128

130

132

134

105+200 105+240 105+280 105+320 105+360 105+400 105+440 105+480 105+520 105+560 105+600 105+640 105+680 105+720 105+760 105+800 105+840 105+880 105+920 105+960 106+000 106+040 106+080 106+120 106+160 106+200 106+240 106+280 106+320 106+360 106+400 106+440 106+480

108.

327

108.

615

109.

229

110.

451

110.

351

110.

251

110.

151

110.

051

109.

951

109.

851

109.

751

109.

651

109.

551

109.

451

109.

351

109.

251

109.

151

109.

051

108.

951

108.

851

108.

751

108.

651

108.

551

108.

451

108.

351

121.

523

122.

171

122.

506

110.

092

110.

972

111.

852

112.

732

113.

612

114.

492

115.

372

116.

252

117.

132

118.

012

118.

892

119.

772

120.

652

121.

747

121.

452

120.

843

122.

537

122.

477

122.

417

122.

357

122.

297

122.

237

122.

177

122.

117

122.

057

121.

997

121.

937

121.

877

121.

817

119.

932

118.

932

117.

932

116.

932

115.

932

114.

932

113.

932

112.

932

111.

932

110.

938

BVC

S: 1

05+5

99.4

5

BVC

E: 1

11.3

53

EVC

S: 1

05+6

89.4

5

EVC

E: 1

12.4

78

111.

351

111.

333

111.

470

111.

763

112.

212

113.

451

113.

351

113.

251

113.

151

113.

051

112.

951

112.

851

112.

751

112.

651

112.

551

112.

451

112.

351

112.

251

112.

151

112.

051

111.

951

111.

851

111.

751

111.

651

111.

551

111.

451

BVC

S: 1

05+9

77.4

8

BVC

E: 1

21.1

19

EVC

S: 1

06+0

67.4

8E

VCE:

122

.334

121.

194

121.

702

122.

063

122.

278

122.

346

112.

795

113.

395

113.

995

114.

595

115.

195

115.

795

116.

395

116.

995

117.

595

118.

195

118.

795

119.

395

119.

995

120.

595

BVC

S: 1

06+2

55

BVC

E: 1

21.7

72

EVC

S: 1

06+3

15

EVC

E: 1

20.1

82

121.

747

121.

452

120.

843

122.

297

122.

237

122.

177

122.

117

122.

057

121.

997

121.

937

121.

877

121.

817

119.

932

118.

932

117.

932

116.

932

115.

932

114.

932

113.

932

112.

932

111.

932

110.

938

102

104

106

108

110

112

114

116

118

120

122

124

126

128

130

102

104

106

108

110

112

114

116

118

120

122

124

126

128

130

132

134

105+200 105+240 105+280 105+320 105+360 105+400 105+440 105+480 105+520 105+560 105+600 105+640 105+680 105+720 105+760 105+800 105+840 105+880 105+920 105+960 106+000 106+040 106+080 106+120 106+160 106+200 106+240 106+280 106+320 106+360 106+400 106+440 106+480

108.

327

108.

615

109.

229

110.

451

110.

351

110.

251

110.

151

110.

051

109.

951

109.

851

109.

751

109.

651

109.

551

109.

451

109.

351

109.

251

109.

151

109.

051

108.

951

108.

851

108.

751

108.

651

108.

551

108.

451

108.

351

121.

523

122.

171

122.

506

110.

092

110.

972

111.

852

112.

732

113.

612

114.

492

115.

372

116.

252

117.

132

118.

012

118.

892

119.

772

120.

652

121.

747

121.

452

120.

843

122.

537

122.

477

122.

417

122.

357

122.

297

122.

237

122.

177

122.

117

122.

057

121.

997

121.

937

121.

877

121.

817

119.

932

118.

932

117.

932

116.

932

115.

932

114.

932

113.

932

112.

932

111.

932

110.

938

BVC

S: 1

05+5

99.4

5

BVC

E: 1

11.3

53

EVC

S: 1

05+6

89.4

5

EVC

E: 1

12.4

78

111.

351

111.

333

111.

470

111.

763

112.

212

113.

451

113.

351

113.

251

113.

151

113.

051

112.

951

112.

851

112.

751

112.

651

112.

551

112.

451

112.

351

112.

251

112.

151

112.

051

111.

951

111.

851

111.

751

111.

651

111.

551

111.

451

BVC

S: 1

05+9

77.4

8

BVC

E: 1

21.1

19

EVC

S: 1

06+0

67.4

8E

VCE:

122

.334

121.

194

121.

702

122.

063

122.

278

122.

346

112.

795

113.

395

113.

995

114.

595

115.

195

115.

795

116.

395

116.

995

117.

595

118.

195

118.

795

119.

395

119.

995

120.

595

BVC

S: 1

06+2

55

BVC

E: 1

21.7

72

EVC

S: 1

06+3

15

EVC

E: 1

20.1

82

121.

747

121.

452

120.

843

122.

297

122.

237

122.

177

122.

117

122.

057

121.

997

121.

937

121.

877

121.

817

119.

932

118.

932

117.

932

116.

932

115.

932

114.

932

113.

932

112.

932

111.

932

110.

938

102

104

106

108

110

112

114

116

118

120

122

124

126

128

130

0 10 20 30 40m

0

PLANSCALE 1:1000m

ALTERNATIVE 5

TCG

Transit City Group

Page 12: ECLRT Environmental Report Cover KtoN · REVISED FINAL REPORT Toronto Transit Commission (TTC) ECLRT - JANE STREET TO KEELE STREET - VERTICAL ALIGNMENT OPTION S March 2010 Page 48

TCG

Transit City Group ALTERNATIVE 6