OUTLINE� Introduction
�CEFR Project
�Economic characteristic of CEFR
�Preliminary considerations of the economics issues
of CFR-600
�Conclusion and Suggestion
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
CONTENT� Introduction
�Economic analysis guard line and rules of nuclear
power plant in China
�Economic characteristic of China Experimental
Fast Reactor
�Preliminary considerations of the economics issues
of CFR-600
�Conclusion and suggestion
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Thermal reactor+once through
FBR+closed fuel cycle
Nuclear Fission Energy Technical Roadmap
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
6 Advanced Next Systems Suggested by GIF
SFR LFR GFR
SCWR MSR VHTR
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Fuel, material, safety, economic
Time Arrangement and Main Tasks
Fuel, material, safety, economic
Fuel, assistant system, safety, economic
Fuel, material, safety, economic
Economic and fuel cycle
Fuel, material, safety, economic
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
1940
1950
1960
1970
1980
1990
2000
201020202030
�
BN-600
1470/600SUPER
-PHENIX
2000/800
PHENIX
563/255
MONJU
714/280
PFR
650/250
BN-350
750/130
Clementine
0.025/0
Clementine
0.025/0
EBR-I
1.2/0.2
EBR-I
1.2/0.2
EBR-II
62.5/20
EBR-II
62.5/20
FERMI
200/66
FERMI
200/66
LAMPRI
1.0/0
LAMPRI
1.0/0
SEFOR
20/0
SEFOR
20/0
FFTF
400/0
FFTF
400/0
BOR-60
55/12
BOR-60
55/12
BOR-5/10
5-10/0
BOR-5/10
5-10/0
RAPSODIE
20-40/0
RAPSODIE
20-40/0
JOYO
140/0
JOYO
140/0
FBTR
40/13.5
FBTR
40/13.5
DFR
60/15
DFR
60/15
KNK-II
58/20
KNK-II
58/20
CEFR
65/20
CEFR
65/20
CRBRP
975/380
ALMR
840/303
DFBR
1600/660
SNR-300
762/327
EFR
3600/1580
BN-800
2000/800
ASTRIDJSFR
3531/1500
PFBR
1250/500
KALIMER
392/162CFR-600
BN-1200
2800/1200ABR
First First First First DDDDevelopment Tideevelopment Tideevelopment Tideevelopment Tide
Second Second Second Second DDDDevelopment Tideevelopment Tideevelopment Tideevelopment Tide
FR Development Map in the World
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
FR Development in China
Foundational
technical stage
(1965-1986)
Applied
technical stage
(1986-1992)
Engineering
technical stage
(1992-2011)
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
National FBR Stratagem
CEFR
20MWe
CDFR
600-1000MWe
CCFR
>1000MWe
The technical selection be
determined in 2013. The CFR-
600 is confirmed to
development now
Design Option to fit GIF
requirement
Get 40% rated power
connected to the
national grid
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Reactor CEFR CDFR CCFR
Power MWe 20 600-900 >1000
Coolant Na Na Na
Type Pool Pool Pool
Fuel UO2 (MOX) MOX MOX (Metal)
Cladding Cr-Ni Cr-Ni (ODS) Cr-Ni (ODS)
Core Outlet Temp. ℃ 530 500-550 500-550
Linear Power W/cm 430 450-480 450-480
Burn-up MWd/kg 60-100 100 (120) 120 (150)
Fuel Handling DRPs, SMHM DRPs, SMHM DRPs, SMHM
Spent Fuel Storage IVPS,WPSS IVPS,WPSS IVPS,WPSS
Safety ASDS
PDHRS
ASDS+PSDS
PDHRS
ASDS+PSDS
PDHRS
Technical selection
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
CONTENT� Introduction
�CEFR Project
�Economic characteristic of China Experimental
Fast Reactor
�Preliminary considerations of the economics issues
of CFR-600
�Conclusion and suggestion
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
China Experimental Fast Reactor
China Experimental Fast Reactor(CEFR), 65MWth,,,,20MWe,,,,a pool
type sodium cooled fast reactor.
CEFR Project
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Parameter Unit Value Parameter Unit Value
Thermal Power MW 65 Primary Circuit
Electric Power, net MW 20 Number of Loops 2
Reactor Core Quantity of Sodium t 260
Height cm 45.0 Flow Rate, total t/h 1328.4
Diameter Equivalent cm 60.0 Number of IHX per Loop2
Fuel (Pu, U)O2 (first
loading is UO2)
Secondary Circuit
Linear Power max. W/cm 430 Number of Loop 2
Neutron Flux n/cm2·s 3.7×1015 Quantity of Sodium t 48.2
Bum-up, first load max. MWd/t 60000 Flow Rate t/h 986.4
Inlet/outlet Temp. of the
Core
℃ 360/530 Tertiary Circuit
Diameter of Main
Vessel(outside)
m 8.010 Steam Temperature℃ 480
Design Life A 30 Steam Pressure MPa 14
Flow Rate t/h 96.2
Main Parameters of CEFR
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Main heat transfer system of CEFR
Primary loop
Intermediary
Loop
Water-steam
loop
DHRsCEFR-generally view
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
NONONONO WorkWorkWorkWork timetimetimetime
1 Project proved 1995199519951995年年年年12121212月月月月29292929日日日日
2 prelimanry design approved 1997年11月4日
3 FCD 2000200020002000年年年年5555月月月月30303030日日日日
4 Close of the reactor building 2002年8月15日
5 Finish of the reactor block installation 2008200820082008年年年年12121212月月月月22225555日日日日
6 Ready to first loading 2009年9月27日
7 First Physics Criticality 2010201020102010年年年年7777月月月月21212121日日日日
8 Finish of the phase B of commissioning 2010年11月30日
9 Connected to the national grid first time 2011201120112011年年年年7777月月月月21212121日日日日
10 24h operation on the 40% rated power with electricity production 2011201120112011年年年年7777月月月月22222222日日日日
Milestones of CEFR
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Plan o f CEFR
First criticality
2010.7.21
First connected to national grid
at 40% rated power and
operation 24h
2011.7.21-7.22
Start to power startup till to 100%
rated power
2013.10
Project Target
Summarize the
whole Project
Elimination of the diffraction problem
combined with original design
Feedback of the
former
commissioning
Research and confirmation of the
R&D program after 100% rated
power
All the sodium system operation safety and very
good
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
CONTENT� Introduction
�Economic analysis guard line and rules of nuclear
power plant in China
�Economic characteristic of China Experimental
Fast Reactor
�Preliminary considerations of the economics issues
of CFR-600
�Conclusion and suggestion
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
� Financial is a key factor for the development of the nuclear
power plant all the time.
� It is mature to evaluate the capital cost of the PWR in China
now. the guard lines and rules are constructed and so the
method and the account category is united.
� Even that the economic issues perplex the owner because
that the modifition of the design and the new techno lodge is
deplored always.
The Importance of the Economic Issues
� <<NB/T20023-2010 guidelines for cost category and cost account
of nuclear power plant construction project>>
� <<regulation for indirect cost of nuclear power plant
construction project>>
� <<The fee standard of engineering survey and design>>
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
� The readiness of the technical
� Few plant design and construction practices
� Uncertain of the equipment manufacture which is quite
complex because of the sodium and the experiences
� Difficulty of the installation of the integrated reactor block,
especially the internals and the reactor vessel
� The cost increment of the I&C for the special physics and
chemistry characters of the sodium coolant
� Nee the united and detail account category for sodium
cooled fast reactor
� Difficulty to evaluation of the importance of FR in the
closed fuel cycle
� … …
Trouble faced to the Economic Analysis of FR
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
The Overnight capital cost of CEFR
NO. ItemCost Ratio
RMB USD
1 Civil and erection cost 1,639,528,800 252,235,200 65.15%
1.1 Civil engineering cost 335,053,400 51,546,677 13.31%
1.2 Equipment procurement cost 1,002,590,100 154,244,631 39.84%
1.3 Erection engineering cost 301,885,300 46,443,892 12.00%
2 Indirect cost 695,842,200 107,052,646 27.65%
In Design 109,851,100 16,900,169 4.37%
3 First loading fuel 115,989,500 17,844,538 4.61%
4 preparation R&D 65,017,400 10,002,677 2.58%
5 total 2,516,377,900 387,135,062 100.00%
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
①①①① Lower mature of the technical. As the first fast reactor of china, the
technical configuration and key system have been changed. The function
of main components has been adjusted during the construction.
②②②② Short of the Engineering management experience. Engineering
management play a importance role for the nuclear power plant
construction. It is clear, the integrated design of pool type fast reactor
need more experience in the organization and coordination.
③③③③ International collaboration. The international collaboration in CEFR
project includes technical configuration consultation from international
and key components purchase from other country.
The unit cost of CEFR is about 125819y/kwe, it is higher than the PWR of China
The unit cost of CEFR is Relatively higher
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
The unit cost of CEFR is Relatively higher
①①①① Long construction time. Plan control is a very factor for the control of
the total capital cost of nuclear plant engineering. For many reasons, the
construction of CEFR is more ten years, and it is almost double
compared with PWR. Of course
②②②② The total capital cost varies in the different stage. During the
construction, the total capital cost of CEFR was adjusted two times. The
total capital cost is about 680 million yuan at the preparation stage and
then adjusted to 1358.8 million yuan after preliminary design reviewed.
After the detail design finished, it is finally changed to the 2516 million
yuan
The unit cost of CEFR is about 125819y/kwe, it is higher than the PWR of China
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Main Economic Characteristic Parameters
The percentage of the equipment
procurement cost is relatively
lowerThe equipment purchase price is quite lower. The
reason is that the government invest is limited, the
strictly equipment purchase program is adopted.
Some equipment from PEC reactor of Italy are used
in CEFR.
Other cost is relatively bigger because of the
longer construction time.
65.15%
13.31%
39.84%
12.00%
27.65%
4.37%4.61% 2.58%
Civil and erection cost
Civil engineering cost
Equipment procurement cost
Erection engineering cost
Indirect cost
Design
First loading fuel
preparation R&D
The percentage of the design cost is
relatively lower
• The engineering design of CEFR have been finished by
China Institute of Atomic energy and other civil
designer, that is a “self-design” model in China, so the
percentage of the design cost looks like lower than
the currently PWR situation.
The percentage of the indirect
cost is relatively higher
• The stop of the construction work for
the abnormal reasons leads to more
consume of indirect cost.
• As a R&D project, CEFR took a longer
time including the preparation stage.
• International consultation cost also
included in the indirect cost.
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Fast reactors invest in the world
FBR name
Thermal
power
((((MW))))
Electricity power
((((MW))))
Year start
construct
Year first
criticality
Total capital cost
((((Million USD))))
FBTR 40 13 1972 1985 62.50
DFR 60 15 1954 1962 36.53
EBR-II 62.5 20 1958 1964 35.22
KNK-II 58 20 1972 63.41
FFTF 400 - 1970 1980 615.00
EBR-I 1400 0.2 1951 1951 2.80
Fermi 200 61 1956 1966 29.59
Rapsodie 40 - 1962 1967 1.20
JOYO 100 - 1970 1977 970
BR-2 - - - - 50-60
Kalimer 330 110- 1997 - 176.2
PFBR 500 - - 84.5
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Relatively cost of world’s fast reactors and CEFR
费用(亿元)
28.75
20.5818.69
23.14
94.6
6.7
10.42
0.8
81.4
21.97
0
20
40
60
80
100
F
B
T
R
D
F
R
E
B
R
-
I
I
K
N
K
-
I
I
F
F
T
F
E
B
R
-
I
F
e
r
m
i
R
a
p
s
o
d
i
e
K
a
l
i
m
e
r
P
F
B
R
Based on the scaling method, A=A0(P/P0)X, calculated the proximately
invest of CEFR from the other fast reactor’s cost
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
①①①① FFTF is a neurotic’s irradiation facility with multiplied
function. The design of FFTF is quite different compared
with CEFR. So this two reactor should not be compared in
the view of the capital cost.
②②②② The EBR-I, Rapsodie, Fermi and FBTR all are test reactor.
It is difficulty to calculate their cost clearly. At some time,
the safety requirement is quite simple in those ages.
③③③③ The FBTR, DFR, EBR-II and the KNK-II have similar
technical selection, so their calculation result could be
referred.
Relatively cost of world’s fast reactors and CEFR
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
CONTENT� Introduction
�Economic analysis guard line and rules of nuclear
power plant in China
�Economic characteristic of China Experimental
Fast Reactor
�Preliminary considerations of the economics issues
of CFR-600
�Conclusion and suggestion
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Parameters value
Thermal power, MW ~1500
Electricity power, MW 600
Thermal efficient ~41%
Capacity 80%
Design life, year 60
Fuel MOX
Maximum burn-up, MWd/kg 100
Breeder ratio 1.2
Circuits of each loop 2/2
Pumps of each loop 1/1
IHXs of each loop 2
CDF <10-6
LRF <10-8
CFR-600
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
CFR-600
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
①①①① High burn-up of the fuel to try to lengthens the during time
between two fuel exchange
②②②② Optimize the spent fuel cleaning and new fuel handling
program to try to shorten the fuel exchange during
③③③③ longer lifetime
④④④④ Compact reactor building and optimize the number and the
area structure of the buildings in the plant
⑤⑤⑤⑤ Modulated SG configuration
Economic consideration of CFR-600
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
⑥⑥⑥⑥ Higher heat efficiency
⑦⑦⑦⑦ Earthquake isolation design of the reactor building
⑧⑧⑧⑧ Optimized technical specification based on the PSA to
improve the economic during operation
⑨⑨⑨⑨ Optimized reactor block integrity design with 3-D
technology to reduce the steel consumption
⑩⑩⑩⑩ Advanced coordination design system to regulation all the
design work. So can easily handle the modification,
manufacture, installation, commissioning and operation.
Economic consideration of CFR-600
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
CONTENT� Introduction
�Economic analysis guard line and rules of nuclear
power plant in China
�Economic characteristic of China Experimental
Fast Reactor
�Preliminary considerations of the economics issues
of CFR-600
�Conclusion and Suggestion
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
①①①① More and more fast reactor could be appearing in
the world currently and near future.
②②②② China get the little experience and practice about
the economics issues of sodium cooled fast reactor.
③③③③ The economic issues become more and more
important for the deplot of fast reactor.
CONCLUSION
INPRO
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
①①①① A authoritative economic evaluation solution for
fast reactor and related fuel cycles facilities is
necessary. The solution may be developed by the
interested country together to share the only few of
data, experience and methodology for that.
②②②② A new initiative to help to share the economic
information for fast reactor and related fuel cycle
facilities is necessary. The meeting like TM-44899
organized by the IAEA is very beneficial for this
topic and hopes to continue.
SUGGESTION
快快快快 堆堆堆堆 研研研研 究究究究 设设设设 计计计计 所所所所
Department of Fast Reactor Research and Design
Thanks for your attention!